CN110318552A - A kind of indoor wall percolating water repairerment technique - Google Patents
A kind of indoor wall percolating water repairerment technique Download PDFInfo
- Publication number
- CN110318552A CN110318552A CN201910323191.8A CN201910323191A CN110318552A CN 110318552 A CN110318552 A CN 110318552A CN 201910323191 A CN201910323191 A CN 201910323191A CN 110318552 A CN110318552 A CN 110318552A
- Authority
- CN
- China
- Prior art keywords
- layer
- brushing
- waterproof material
- injected hole
- indoor wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B28/00—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0203—Arrangements for filling cracks or cavities in building constructions
- E04G23/0211—Arrangements for filling cracks or cavities in building constructions using injection
Abstract
The present invention relates to construction engineering technical fields, specifically a kind of indoor wall percolating water repairs technique, the following steps are included: cleaning metope, dust on the metope for leaking region and the coating of brushing are removed, expose construction part, brill sets injected hole, clear up injected hole, grouting, it is in the milk by grouter from injected hole, hair pulling treatment, brushing first layer waterproof material, mending mortar is levelling and brushing second layer waterproof material, smear material, cement mortar is smeared in the outside of second layer waterproof material, again in the outside brushing insulating layer material of cement mortar, concrete is smeared in the outside of insulating layer material.The present invention by cleaning metope, expose construction part, bore and set levelling injected hole, cleaning injected hole, grouting, hair pulling treatment, brushing first layer waterproof material, mending mortar and brushing second layer waterproof material, smear the step of material and handle, solve the problems, such as wall percolating water, it is durable, good water-proof effect.
Description
Technical field
The present invention relates to a kind of construction engineering technical field, specifically a kind of indoor wall percolating water repairs technique.
Background technique
In construction projects in the prevalence of wall leakage water the problem of.The infiltration of less serious case's indoor wall, severe one cause interior
Floated coat falls off, influence using.The reason of wall leakage formation, is more complicated, it is related to design, material, constructs, makes
With etc. multiple links.The reason of the reason of including in terms of material and construction aspect.As building block, the quality of mechanism clay brick, cement
It does not reach requirement, intensity is inadequate;The ratio of mud is excessive, influences the intensity of concrete wall.Vibrate when pouring leakiness, maintenance it is too late
When, demoulding it is too early.
Traditional indoor wall percolating water repairs the mode for generalling use closure, and the leakage on wall is blocked with waterproof and sealing material
Point, this mode can only solve the problems, such as that there are also to be hoisted for antiseep effect the short time.In view of this, the invention proposes one kind
Indoor wall percolating water repairs technique.
Summary of the invention
The purpose of the present invention is to provide a kind of indoor wall percolating waters to repair technique, to solve to propose in above-mentioned background technique
The problem of.
To achieve the above object, the invention provides the following technical scheme:
A kind of indoor wall percolating water repairerment technique, comprising the following steps:
Step 1: cleaning metope: the dust on the indoor wall for leaking region and the coating of brushing being removed, leakage region is exposed
Metope;
Step 2: expose construction part: cutting knock out leakage region metope concrete layer, then knock out below concrete layer every
Cement mortar protective course, waterproof layer, screed-coat below thermosphere material and thermal insulation layer expose concrete base layer, the concrete
Base is construction part;
Injected hole is set Step 3: boring: finding the leakage water (flow) direction of construction part, and injected hole is set according to leakage water (flow) direction brill;
Step 4: cleaning injected hole: by electric blower come pressure-vaccum injected hole, the dust residue in injected hole being cleaned out;
Step 5: grouting: it is in the milk by grouter from injected hole, grouting sequence is the bottom of from toward high, from the bottom to top, filling process
Until perfusion is full, after the completion of grouting, waits slurry to be fully cured, do the removing surface at position of being in the milk after solidification
Only;
Step 6: hair pulling treatment: carrying out hair pulling treatment to the surface of construction part, facilitate brushing waterproof material below, Neng Gouzeng
Strong cohesive force is bonded in waterproof material more firmly on the surface of construction part;
Step 7: brushing first layer waterproof material: in the external coating first layer waterproof material of construction part;
Step 8: mending mortar is levelling with brushing second layer waterproof material: anti-in first layer after the solidification of first layer waterproof material
Mending mortar is smeared in the outside of water material, and progress is levelling, then in the outside brushing second layer waterproof material of mending mortar;
Step 9: smearing material: after the solidification of second layer waterproof material, smearing cement bonded sand in the outside of second layer waterproof material
Slurry, plays the role of protection, then in the outside brushing insulating layer material of cement mortar, finally smears in the outside of insulating layer material
Concrete.
As a further solution of the present invention: in step 4, the voltage of the electric blower is 220V, frequency 50Hz,
Air quantity is 2m3/min。
As the present invention further scheme: Step 7: Step 8: in step 9, the waterproof material by liquid and
Powder mixes.
As further scheme of the invention: the liquid includes styrene-acrylic emulsion, preservative, defoaming agent, wetting and dispersing
Agent, acrylic emulsion and water.
As further scheme of the invention: the powder includes cement, titanium dioxide, acrylic acid rubber powder and sand.
As further scheme of the invention: the defoaming agent is the modest W086 or HY-1040F mineral oil antifoam agent of moral.
As further scheme of the invention: the preservative is ROHM AND HAAS LXE or G-181 preservative.
Compared with prior art, the beneficial effects of the present invention are:
The present invention sets injected hole, cleaning injected hole, grouting, hair pulling treatment, brushing by cleaning metope, exposing construction part, brill
First layer waterproof material, mending mortar be levelling and brushing second layer waterproof material, smears the step of material and is handled, and effectively solves
Determined wall percolating water the problem of, durable, good water-proof effect.
Specific embodiment
The technical solution of the patent is explained in further detail With reference to embodiment.
Embodiment 1
A kind of indoor wall percolating water repairerment technique, comprising the following steps:
Step 1: cleaning metope: the dust on the indoor wall for leaking region and the coating of brushing being removed, leakage region is exposed
Metope;
Step 2: expose construction part: cutting knock out leakage region metope concrete layer, then knock out below concrete layer every
Cement mortar protective course, waterproof layer, screed-coat below thermosphere material and thermal insulation layer expose concrete base layer, the concrete
Base is construction part;
Injected hole is set Step 3: boring: finding the leakage water (flow) direction of construction part, and injected hole is set according to leakage water (flow) direction brill;
Step 4: cleaning injected hole: by electric blower come pressure-vaccum injected hole, the dust residue in injected hole being cleaned out;
Specifically, selecting voltage is 220V, frequency 50Hz, air quantity 2m3The electric blower of/min;
Step 5: grouting: it is in the milk by grouter from injected hole, grouting sequence is the bottom of from toward high, from the bottom to top, filling process
Until perfusion is full, after the completion of grouting, waits slurry to be fully cured, do the removing surface at position of being in the milk after solidification
Only;
Step 6: hair pulling treatment: carrying out hair pulling treatment to the surface of construction part, facilitate brushing waterproof material below, Neng Gouzeng
Strong cohesive force is bonded in waterproof material more firmly on the surface of construction part;
Step 7: brushing first layer waterproof material: in the external coating first layer waterproof material of construction part, waterproof material is by liquid
Body and powder mix, and liquid includes styrene-acrylic emulsion, preservative, defoaming agent, wetting dispersing agent, acrylic emulsion and water, powder
Body includes cement, titanium dioxide, acrylic acid rubber powder and sand;
Step 8: mending mortar is levelling with brushing second layer waterproof material: anti-in first layer after the solidification of first layer waterproof material
Mending mortar is smeared in the outside of water material, and progress is levelling, then in the outside brushing second layer waterproof material of mending mortar;
Step 9: smearing material: after the solidification of second layer waterproof material, smearing cement bonded sand in the outside of second layer waterproof material
Slurry, plays the role of protection, then in the outside brushing insulating layer material of cement mortar, finally smears in the outside of insulating layer material
Concrete.
Wherein, defoaming agent uses the modest W086 of moral, and preservative uses ROHM AND HAAS LXE.
Embodiment 2
A kind of indoor wall percolating water repairerment technique, comprising the following steps:
Step 1: cleaning metope: the dust on the indoor wall for leaking region and the coating of brushing being removed, leakage region is exposed
Metope;
Step 2: expose construction part: cutting knock out leakage region metope concrete layer, then knock out below concrete layer every
Cement mortar protective course, waterproof layer, screed-coat below thermosphere material and thermal insulation layer expose concrete base layer, the concrete
Base is construction part;
Injected hole is set Step 3: boring: finding the leakage water (flow) direction of construction part, and injected hole is set according to leakage water (flow) direction brill;
Step 4: cleaning injected hole: by electric blower come pressure-vaccum injected hole, the dust residue in injected hole being cleaned out;
Specifically, selecting voltage is 220V, frequency 50Hz, air quantity 2m3The electric blower of/min;
Step 5: grouting: it is in the milk by grouter from injected hole, grouting sequence is the bottom of from toward high, from the bottom to top, filling process
Until perfusion is full, after the completion of grouting, waits slurry to be fully cured, do the removing surface at position of being in the milk after solidification
Only;
Step 6: hair pulling treatment: carrying out hair pulling treatment to the surface of construction part, facilitate brushing waterproof material below, Neng Gouzeng
Strong cohesive force is bonded in waterproof material more firmly on the surface of construction part;
Step 7: brushing first layer waterproof material: in the external coating first layer waterproof material of construction part, waterproof material is by liquid
Body and powder mix, and liquid includes styrene-acrylic emulsion, preservative, defoaming agent, wetting dispersing agent, acrylic emulsion and water, powder
Body includes cement, titanium dioxide, acrylic acid rubber powder and sand;
Step 8: mending mortar is levelling with brushing second layer waterproof material: anti-in first layer after the solidification of first layer waterproof material
Mending mortar is smeared in the outside of water material, and progress is levelling, then in the outside brushing second layer waterproof material of mending mortar;
Step 9: smearing material: after the solidification of second layer waterproof material, smearing cement bonded sand in the outside of second layer waterproof material
Slurry, plays the role of protection, then in the outside brushing insulating layer material of cement mortar, finally smears in the outside of insulating layer material
Concrete.
Wherein, defoaming agent uses HY-1040F mineral oil antifoam agent, and preservative uses G-181 preservative.
Embodiment 3
A kind of indoor wall percolating water repairerment technique, comprising the following steps:
Step 1: cleaning metope: the dust on the indoor wall for leaking region and the coating of brushing being removed, leakage region is exposed
Metope;
Step 2: expose construction part: cutting knock out leakage region metope concrete layer, then knock out below concrete layer every
Cement mortar protective course, waterproof layer, screed-coat below thermosphere material and thermal insulation layer expose concrete base layer, the concrete
Base is construction part;
Injected hole is set Step 3: boring: finding the leakage water (flow) direction of construction part, and injected hole is set according to leakage water (flow) direction brill;
Step 4: cleaning injected hole: by electric blower come pressure-vaccum injected hole, the dust residue in injected hole being cleaned out;
Specifically, selecting voltage is 220V, frequency 50Hz, air quantity 2m3The electric blower of/min;
Step 5: grouting: it is in the milk by grouter from injected hole, grouting sequence is the bottom of from toward high, from the bottom to top, filling process
Until perfusion is full, after the completion of grouting, waits slurry to be fully cured, do the removing surface at position of being in the milk after solidification
Only;
Step 6: hair pulling treatment: carrying out hair pulling treatment to the surface of construction part, facilitate brushing waterproof material below, Neng Gouzeng
Strong cohesive force is bonded in waterproof material more firmly on the surface of construction part;
Step 7: brushing first layer waterproof material: in the external coating first layer waterproof material of construction part, waterproof material is by liquid
Body and powder mix, and liquid includes styrene-acrylic emulsion, preservative, defoaming agent, wetting dispersing agent, acrylic emulsion and water, powder
Body includes cement, titanium dioxide, acrylic acid rubber powder and sand;
Step 8: mending mortar is levelling with brushing second layer waterproof material: anti-in first layer after the solidification of first layer waterproof material
Mending mortar is smeared in the outside of water material, and progress is levelling, then in the outside brushing second layer waterproof material of mending mortar;
Step 9: smearing material: after the solidification of second layer waterproof material, smearing cement bonded sand in the outside of second layer waterproof material
Slurry, plays the role of protection, then in the outside brushing insulating layer material of cement mortar, finally smears in the outside of insulating layer material
Concrete.
Wherein, defoaming agent uses HY-1040F mineral oil antifoam agent, and preservative uses ROHM AND HAAS LXE.
In conclusion the present invention by cleaning metope, expose construction part, bore set injected hole, cleaning injected hole, grouting,
Hair pulling treatment, brushing first layer waterproof material, mending mortar be levelling and brushing second layer waterproof material, smear the step of material into
Row processing, solves the problems, such as wall percolating water, durable, good water-proof effect.
The preferred embodiment of the patent is described in detail above, but this patent is not limited to above-mentioned embodiment party
Formula within the knowledge of one of ordinary skill in the art can also be under the premise of not departing from this patent objective
It makes a variety of changes.
Claims (7)
1. a kind of indoor wall percolating water repairs technique, which comprises the following steps:
Step 1: cleaning metope: the dust on the indoor wall for leaking region and the coating of brushing being removed, leakage region is exposed
Metope;
Step 2: expose construction part: cutting knock out leakage region metope concrete layer, then knock out below concrete layer every
Cement mortar protective course, waterproof layer, screed-coat below thermosphere material and thermal insulation layer expose concrete base layer, the concrete
Base is construction part;
Injected hole is set Step 3: boring: finding the leakage water (flow) direction of construction part, and injected hole is set according to leakage water (flow) direction brill;
Step 4: cleaning injected hole: by electric blower come pressure-vaccum injected hole, the dust residue in injected hole being cleaned out;
Step 5: grouting: it is in the milk by grouter from injected hole, grouting sequence is the bottom of from toward high, from the bottom to top, filling process
Until perfusion is full, after the completion of grouting, waits slurry to be fully cured, do the removing surface at position of being in the milk after solidification
Only;
Step 6: hair pulling treatment: carrying out hair pulling treatment to the surface of construction part;
Step 7: brushing first layer waterproof material: in the external coating first layer waterproof material of construction part;
Step 8: mending mortar is levelling with brushing second layer waterproof material: anti-in first layer after the solidification of first layer waterproof material
Mending mortar is smeared in the outside of water material, and progress is levelling, then in the outside brushing second layer waterproof material of mending mortar;
Step 9: smearing material: after the solidification of second layer waterproof material, smearing cement bonded sand in the outside of second layer waterproof material
Slurry, then in the outside brushing insulating layer material of cement mortar, concrete finally is smeared in the outside of insulating layer material.
2. indoor wall percolating water according to claim 1 repairs technique, which is characterized in that in step 4, the air sucking/blowing
The voltage of machine is 220V, frequency 50Hz, air quantity 2m3/min。
3. indoor wall percolating water according to claim 1 repairs technique, which is characterized in that Step 7: Step 8: step 9
In, waterproof material is mixed by liquid and powder.
4. indoor wall percolating water according to claim 3 repairs technique, which is characterized in that the liquid includes phenylpropyl alcohol cream
Liquid, preservative, defoaming agent, wetting dispersing agent, acrylic emulsion and water.
5. indoor wall percolating water according to claim 3 or 4 repairs technique, which is characterized in that the powder include cement,
Titanium dioxide, acrylic acid rubber powder and sand.
6. indoor wall percolating water according to claim 4 repairs technique, which is characterized in that the defoaming agent is the modest W086 of moral
Or HY-1040F mineral oil antifoam agent.
7. the indoor wall percolating water according to claim 4 or 6 repairs technique, which is characterized in that the preservative is sieve door
Haas LXE or G-181 preservative.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910323191.8A CN110318552A (en) | 2019-04-22 | 2019-04-22 | A kind of indoor wall percolating water repairerment technique |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910323191.8A CN110318552A (en) | 2019-04-22 | 2019-04-22 | A kind of indoor wall percolating water repairerment technique |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110318552A true CN110318552A (en) | 2019-10-11 |
Family
ID=68112995
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910323191.8A Pending CN110318552A (en) | 2019-04-22 | 2019-04-22 | A kind of indoor wall percolating water repairerment technique |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110318552A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112049233A (en) * | 2020-08-20 | 2020-12-08 | 韶关市新城兴建筑工程有限公司 | Basement terrace seepage water repairing method |
CN113775199A (en) * | 2021-09-28 | 2021-12-10 | 黑龙江科顺防水堵漏技术有限公司 | Wall heat preservation and water leakage repairing integrated device and process method thereof |
CN113833500A (en) * | 2021-09-01 | 2021-12-24 | 中国华冶科工集团有限公司 | Method for repairing waterproof impermeable layer of mountain cave depot |
CN114352057A (en) * | 2021-12-23 | 2022-04-15 | 广东省源天工程有限公司 | Method for repairing surface of wall of hydraulic structure |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1193641A (en) * | 1997-03-17 | 1998-09-23 | 武汉大东化工有限公司 | Waterproof coating material |
CN108252530A (en) * | 2018-01-23 | 2018-07-06 | 厦门防水博士建筑工程有限公司 | A kind of parapet percolating water repairs technique |
CN108374566A (en) * | 2018-02-06 | 2018-08-07 | 厦门防水博士建筑工程有限公司 | A kind of back side percolating water repairerment technique |
CN108999421A (en) * | 2018-07-03 | 2018-12-14 | 广东碧通防水补强技术应用工程有限公司 | A kind of wall body structure seepage treatment method |
-
2019
- 2019-04-22 CN CN201910323191.8A patent/CN110318552A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1193641A (en) * | 1997-03-17 | 1998-09-23 | 武汉大东化工有限公司 | Waterproof coating material |
CN108252530A (en) * | 2018-01-23 | 2018-07-06 | 厦门防水博士建筑工程有限公司 | A kind of parapet percolating water repairs technique |
CN108374566A (en) * | 2018-02-06 | 2018-08-07 | 厦门防水博士建筑工程有限公司 | A kind of back side percolating water repairerment technique |
CN108999421A (en) * | 2018-07-03 | 2018-12-14 | 广东碧通防水补强技术应用工程有限公司 | A kind of wall body structure seepage treatment method |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112049233A (en) * | 2020-08-20 | 2020-12-08 | 韶关市新城兴建筑工程有限公司 | Basement terrace seepage water repairing method |
CN113833500A (en) * | 2021-09-01 | 2021-12-24 | 中国华冶科工集团有限公司 | Method for repairing waterproof impermeable layer of mountain cave depot |
CN113775199A (en) * | 2021-09-28 | 2021-12-10 | 黑龙江科顺防水堵漏技术有限公司 | Wall heat preservation and water leakage repairing integrated device and process method thereof |
CN114352057A (en) * | 2021-12-23 | 2022-04-15 | 广东省源天工程有限公司 | Method for repairing surface of wall of hydraulic structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110318552A (en) | A kind of indoor wall percolating water repairerment technique | |
CN104230376B (en) | Organic silicon emulsion-Ludox permeable crystalline waterproofing material and preparation method thereof | |
CN103938656A (en) | Building wall surface underground waterproof construction method | |
CN107035085A (en) | A kind of indoor wall machine spray gypsum mortar is plastered one-time formed construction method | |
CN104530871A (en) | Ceramic tile interfacial agent and using method thereof | |
CN107859282A (en) | Hotel toilet specific complex marine glue, infiltration rapid-maintenance technique | |
CN108468413A (en) | A kind of air-entrained concrete building block exempts from anti-hollowing construction method of plastering | |
CN104120847B (en) | A kind of concrete porous brick wall exempts to paint the construction method that batch putty processes | |
CN103806662B (en) | A kind of toilet bath room Waterproof Construction Technique | |
CN111608280A (en) | External wall heat insulation construction method | |
CN108947430A (en) | A kind of slow setting hard features waterproof mortar and preparation method thereof fastly | |
CN106121069A (en) | A kind of construction method of construction wall insulation | |
CN207700742U (en) | Repairing concrete crack spray equipment | |
CN109095901A (en) | A kind of high stable type coke oven thermal spray coating and preparation method | |
CN109853888A (en) | A kind of historical building plucking wall surface construction technology | |
CN108947464A (en) | A kind of ground surface layer and its construction technology based on phosphorus magnesium material | |
CN109853889A (en) | A kind of construction method of kervit microbead insulated sand slurry | |
CN105833760A (en) | Waterproof coating mixing equipment | |
CN110055369A (en) | Molten iron KR desulfurization blender dry slag quickly cleans method | |
CN110005174A (en) | Improve the construction method of Machine-blasting mortar plastering quality | |
CN104452813B (en) | A kind of underground power house gate shaft protected against the effects of immersion method | |
CN108265978A (en) | A kind of construction method of vitrified microbead inorganic heat preservation mortar | |
CN104234249A (en) | Construction method of outer heat insulation wall using polyurethane hard foam composite boards | |
CN104891849B (en) | A kind of take sewer oil as osmosis type water-resisting agent of preparing of raw material and preparation method thereof and using method | |
CN105256922A (en) | Mounting method of light-weight wall boards |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191011 |