CN109083110A - The mud-rock flow that streaming separation of solid and liquid is chosen in a kind of energy dissipating is blocked structure and its construction method - Google Patents

The mud-rock flow that streaming separation of solid and liquid is chosen in a kind of energy dissipating is blocked structure and its construction method Download PDF

Info

Publication number
CN109083110A
CN109083110A CN201811152420.6A CN201811152420A CN109083110A CN 109083110 A CN109083110 A CN 109083110A CN 201811152420 A CN201811152420 A CN 201811152420A CN 109083110 A CN109083110 A CN 109083110A
Authority
CN
China
Prior art keywords
energy dissipating
mud
rock flow
stream
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811152420.6A
Other languages
Chinese (zh)
Other versions
CN109083110B (en
Inventor
吴帆
谭焮月
张连卫
曾鑫
唐伟程
吴聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811152420.6A priority Critical patent/CN109083110B/en
Publication of CN109083110A publication Critical patent/CN109083110A/en
Application granted granted Critical
Publication of CN109083110B publication Critical patent/CN109083110B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B8/00Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
    • E02B8/06Spillways; Devices for dissipation of energy, e.g. for reducing eddies also for lock or dry-dock gates

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Treatment Of Sludge (AREA)
  • Revetment (AREA)

Abstract

The mud-rock flow for choosing streaming separation of solid and liquid the invention discloses a kind of energy dissipating is blocked structure and its construction method, it blocks wall and energy dissipating separated structure including choosing stream, stream coping of blocking is chosen to be provided with and choose stream arcuate structure, wall rear portion is provided with several protrusions, waste tire is provided in protrusion, rubble is filled with inside waste tire, waste tire surface is provided with steel wire, and steel wire is fixed on the wall with rivet;The inside of energy dissipating separated structure is cavity structure, and top is provided with several energy dissipating teeth and several sorting holes, and bottom is slope structure.The present invention can reduce the impact energy of mud-rock flow, separate the silt for the big stone and fluid for including in mud-rock flow, effectively prevent mud-stone flow disaster.

Description

The mud-rock flow that streaming separation of solid and liquid is chosen in a kind of energy dissipating is blocked structure and its construction method
Technical field
The mud-rock flow for choosing streaming separation of solid and liquid the invention belongs to debris flow field more particularly to a kind of energy dissipating is blocked knot Structure further relates to its construction method.
Background technique
Mud-rock flow refers in mountain area or other cheuch deep gullies, the dangerously steep area of landform because heavy rain, severe snow or other from The landslide of right disaster initiation and the special mighty torrent for carrying a large amount of silts and stone.Mud-rock flow has sudden and stream The features such as fast fast, flow is big, and matter content is big and destructive power is strong.Mud-rock flow, which occurs, can usually destroy by rush of water the means of transportation such as road and rail Even villages and small towns etc., bring about great losses.
China's mud-rock flow breaks out the excitation that rainfall is mainly concentrated by continuous rainfall, heavy rain, especially extra torrential rain.Cause This, the temporal regularity that mud-rock flow occurs be it is consistent with rain time rule is concentrated, have apparent seasonal.It typically occurs in Rainy summer and autumn.The rainfall of the southwests such as Sichuan, Yunnan focused mostly in the 6-9 month, therefore, the mud-rock flow of southwest it is more Occur in the 6-9 month;And the Northwest's rainfall focused mostly at 6,7,8 three months, especially 7, the concentration of rainfall in 8 two months, heavy rain is strong Degree is big, therefore the Debris Flow of the Northwest is raw at 7,8 two months.According to incompletely statistics, the mudstone in the two months occurs Stream disaster accounts for about 90% or more of this area's whole mud-stone flow disaster.
According to statistics, China has 29 provinces (area), 771 counties (city) just by the harm of mud-rock flow, every year on average mud-rock flow The frequency that disaster occurs is 18 times/county.At present China oneself find out that the cities and towns above county level by state of debris flow disasters or threat have 138 It is a, the western provinces and regions such as Gansu (45), Sichuan (34), Yunnan (23) and Tibet (13) are mainly distributed on, by mud-rock flow Harm or the township level cities and towns quantity threatened are bigger.
Structure of blocking is the solid matter and heavy rain, flood runoff to control mud-rock flow, weaken mud-rock flow flow, under let out Amount and energy, to reduce mud-rock flow washing away, hit and becoming silted up and the engineering measure of harm such as bury to downstream architectural engineering.It is main at present Structure of blocking have column slag dam, storage silt field, retaining engineering, cut big vast engineering etc..However, their function is all relatively simple, often The effects of only individually considering the flow velocity for reducing mud-rock flow, retaining mud-rock flow.Due to mud-rock flow mainly include solid stone and The silt of fluid, thus they hazard ratio it is common flood it is bigger, can reduce mud-rock flow if separating stone with silt Harm.Therefore, the flow velocity of mud-rock flow can be reduced by being badly in need of one kind now, and can separate the mudstone of the stone and silt in mud-rock flow Stream is blocked structure.
Summary of the invention
For the problems in background technique, the purpose of the present invention is to provide the mudstones that streaming separation of solid and liquid is chosen in a kind of energy dissipating Stream is blocked structure and its construction method, it can not only reduce the impact energy of mud-rock flow, but also can separate the stone in mud-rock flow Block and silt are of great significance to prevention and treatment mud-stone flow disaster.
In order to solve the above-mentioned technical problem, the mud-rock flow that streaming separation of solid and liquid is chosen in a kind of energy dissipating of the present invention is blocked structure use Technical solution: block wall and energy dissipating separated structure including choosing stream, the stream coping of blocking of choosing is provided with and chooses stream arc knot Structure, wall rear portion are provided with several protrusions, and waste tire is provided in the protrusion, is filled with inside the waste tire broken Stone, the waste tire surface are provided with steel wire, and the steel wire is fixed on the wall with rivet;The energy dissipating separated structure Inside be cavity structure, top is provided with several energy dissipating teeth and several sorting holes, and bottom is slope structure.
Preferably, the protrusion is cylinder, and size is consistent with the inner cylindrical cavity of the waste tire.
Preferably, the energy dissipating separated structure choose stream block wall downstream at two rows are at least set.
It blocks the construction of structure another object of the present invention is to provide the mud-rock flow that streaming separation of solid and liquid is chosen in a kind of energy dissipating Method, method includes the following steps:
S1 it) in the mountain valley for needing to prevent and treat mud-rock flow, according to design requirement, builds and chooses stream and block wall;
S2) choose stream block wall top portion setting choose stream arcuate structure, several protrusions are set after wall;
S3) waste tire is installed in protrusion, filling rubble in inside is covered on the surface of waste tire with steel wire, uses riveting Steel wire is fixed on the wall by nail;
S4) choose stream block wall downstream at the row's of building energy dissipating separated structure, the bottom of energy dissipating separated structure is set as slope surface knot Structure, top are provided with energy dissipating tooth and sorting hole, and two rows are at least arranged in energy dissipating separated structure.
Compared with prior art, it beneficial effects of the present invention: is blocked wall design using stream is chosen, is set in the protrusion on its surface It is equipped with waste tire, using the elastic characteristic of tire, when on mud-rock-flow-impact to waste tire, it can generate flexible deformation, So that mudstone stream energy is decayed, reduces debris flow velocity;Using energy dissipating separated structure, its top energy dissipating tooth secondary can be cut Weak mudstone stream energy, sorting hole can separate the silt of stone and fluid, reduce the disaster of mud-rock flow;In addition, the structure building Quickly, easy for construction, the advantages such as maintenance cost is low.
Detailed description of the invention
Fig. 1 is that mud-rock flow of the present invention is blocked the diagrammatic cross-section of structure;
Fig. 2 is that mud-rock flow of the present invention is blocked the floor plan of structure;
Fig. 3 is that of the invention stream of individually choosing is blocked the diagrammatic cross-section of wall;
Fig. 4 is the stereoscopic schematic diagram of single energy dissipating separated structure of the invention;
Fig. 5 is that the present invention intercepts and separates mud-rock flow process schematic;
Marginal data: 1- chooses stream and blocks wall;2- energy dissipating separated structure;3- chooses stream arcuate structure;4- protrusion;5- waste tire;6- Rubble;7- steel wire;8- rivet;9- energy dissipating tooth;10- sorting hole;11- cavity structure;12- slope structure;13- mud-rock flow.
Specific embodiment
Embodiments of the present invention are described in further detail with reference to the accompanying drawing.
Referring to figures 1-4, the mud-rock flow that streaming separation of solid and liquid is chosen in a kind of energy dissipating of the present invention is blocked structure, including is chosen stream and blocked Wall 1 and energy dissipating separated structure 2, choose stream block wall 1 top be provided with choose stream arcuate structure 3, wall rear portion is provided with several convex 4 are played, waste tire 5 is provided in protrusion 4, is filled with rubble 6 inside waste tire 5,5 surface of waste tire is provided with steel wire 7, steel wire 7 is fixed on the wall with rivet 8;The inside of energy dissipating separated structure 2 is cavity structure 11, and top is provided with several disappear Energy tooth 9 and several sorting holes 10, bottom are slope structure 12.
Wherein, protrusion 4 is cylinder, and size is consistent with 5 inner cylindrical cavity of waste tire.
Wherein, energy dissipating separated structure 2 choose stream block wall 1 downstream at two rows are at least set.
The mud-rock flow that streaming separation of solid and liquid is chosen in a kind of energy dissipating of the present invention is blocked the construction method of structure, and this method includes following Step:
S1 it) in the mountain valley for needing to prevent and treat mud-rock flow 13, according to design requirement, builds and chooses stream and block wall 1;
S2 stream arcuate structure 3) is chosen choosing stream setting at the top of wall 1 of blocking, and is arranged several raised 4 after wall;
S3) waste tire 5 is installed in protrusion 4, filling rubble 6 in inside is covered on the surface of waste tire 5 with steel wire 7, Steel wire 7 is fixed on the wall with rivet 8;
S4) choose stream block wall 1 downstream at the row's of building energy dissipating separated structure 2, the bottom of energy dissipating separated structure 2 is set as slope surface Structure 12, top are provided with energy dissipating tooth 9 and sorting hole 10, and two rows are at least arranged in energy dissipating separated structure 2.
Referring to Fig. 5, the principle of the present invention are as follows: impacted in mud-rock flow 13 and choose stream and block after wall 1, chosen stream and block the resistance of wall 1 13 flow velocity of mud-rock flow can be reduced by hindering, first energy dissipating, when mud-rock flow 13 by choose stream arcuate structure 3 cross block wall after, fall on and disappear When on energy separated structure 2, the energy dissipating again of energy dissipating tooth 9, the stone of bulky grain is trapped on energy dissipating separated structure 2, silt and water Across sorting hole 10, it is discharged by the slope structure 12 of bottom.
The above examples are only used to illustrate the technical scheme of the present invention and are not limiting, those skilled in the art should Understand, it can be with modification or equivalent replacement of the technical solution of the present invention are made, without departing from the objective of technical solution of the present invention And range, it is intended to be within the scope of the claims of the invention.

Claims (4)

1. the mud-rock flow that streaming separation of solid and liquid is chosen in a kind of energy dissipating is blocked structure, including chooses stream and blocks wall and energy dissipating separated structure, Be characterized in that: the stream coping of blocking of choosing is provided with and chooses stream arcuate structure, and wall rear portion is provided with several protrusions, described convex It is provided with waste tire on rising, is filled with rubble inside the waste tire, the waste tire surface is provided with steel wire, institute Steel wire is stated to be fixed on the wall with rivet;The inside of the energy dissipating separated structure is cavity structure, and top is provided with several disappear Energy tooth and several sorting holes, bottom are slope structure.
The structure 2. mud-rock flow that streaming separation of solid and liquid is chosen in a kind of energy dissipating according to claim 1 is blocked, it is characterised in that: institute Protrusion is stated as cylinder, size is consistent with the cylindrical cavity inside the waste tire.
The structure 3. mud-rock flow that streaming separation of solid and liquid is chosen in a kind of energy dissipating according to claim 1 is blocked, it is characterised in that: institute State energy dissipating separated structure choose stream block wall downstream at two rows are at least set.
The construction method of structure 4. the mud-rock flow that streaming separation of solid and liquid is chosen in a kind of energy dissipating is blocked, it is characterised in that: this method includes Following steps:
S1 it) in the mountain valley for needing to prevent and treat mud-rock flow, according to design requirement, builds and chooses stream and block wall;
S2) choose stream block wall top portion setting choose stream arcuate structure, several protrusions are set after wall;
S3) waste tire is installed in protrusion, filling rubble in inside is covered on the surface of waste tire with steel wire, uses riveting Steel wire is fixed on the wall by nail;
S4) choose stream block wall downstream at the row's of building energy dissipating separated structure, the bottom of energy dissipating separated structure is set as slope surface knot Structure, top are provided with energy dissipating tooth and sorting hole, and two rows are at least arranged in energy dissipating separated structure.
CN201811152420.6A 2018-09-29 2018-09-29 Energy-dissipation flow-raising type solid-liquid separation debris flow blocking structure and construction method thereof Active CN109083110B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811152420.6A CN109083110B (en) 2018-09-29 2018-09-29 Energy-dissipation flow-raising type solid-liquid separation debris flow blocking structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811152420.6A CN109083110B (en) 2018-09-29 2018-09-29 Energy-dissipation flow-raising type solid-liquid separation debris flow blocking structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN109083110A true CN109083110A (en) 2018-12-25
CN109083110B CN109083110B (en) 2021-01-26

Family

ID=64842996

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811152420.6A Active CN109083110B (en) 2018-09-29 2018-09-29 Energy-dissipation flow-raising type solid-liquid separation debris flow blocking structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN109083110B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112281908A (en) * 2020-09-30 2021-01-29 江西工业职业技术学院 Prevent tailing mud-rock flow landslide protective structure with buffer structure
CN112921903A (en) * 2021-01-25 2021-06-08 枣庄学院 Pile forest solid bed-solid phase unloading-erosion-preventing composite slag blocking dam
CN115030095A (en) * 2022-06-30 2022-09-09 清华大学 A energy dissipation retaining structure that shocks resistance for geological disasters prevention and cure

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202298575U (en) * 2011-09-18 2012-07-04 中国科学院水利部成都山地灾害与环境研究所 Water and stone separation system for debris flow
CN103088791A (en) * 2013-02-27 2013-05-08 中国科学院水利部成都山地灾害与环境研究所 Energy dissipation type debris flow check dam combined draining and guiding and blocking
KR20140108476A (en) * 2013-02-28 2014-09-11 한양대학교 에리카산학협력단 Debris barrier
CN104164851A (en) * 2014-08-22 2014-11-26 水利部交通运输部国家能源局南京水利科学研究院 Gabion arch ecological flexible debris flow blocking dam and building method thereof
CN204385572U (en) * 2014-11-17 2015-06-10 吴帆 A kind of junked tire mud-rock flow erosion subgrade protection device
CN205205781U (en) * 2015-07-21 2016-05-04 中国科学院水利部成都山地灾害与环境研究所 Junked tire mud -rock flow engineering body protector
CN105862679A (en) * 2016-05-19 2016-08-17 中国电建集团成都勘测设计研究院有限公司 Grilled pile dam for debris flow protection
CN207047874U (en) * 2017-07-25 2018-02-27 重庆工程职业技术学院 A kind of retaining wall structure administered for mine slope

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202298575U (en) * 2011-09-18 2012-07-04 中国科学院水利部成都山地灾害与环境研究所 Water and stone separation system for debris flow
CN103088791A (en) * 2013-02-27 2013-05-08 中国科学院水利部成都山地灾害与环境研究所 Energy dissipation type debris flow check dam combined draining and guiding and blocking
KR20140108476A (en) * 2013-02-28 2014-09-11 한양대학교 에리카산학협력단 Debris barrier
CN104164851A (en) * 2014-08-22 2014-11-26 水利部交通运输部国家能源局南京水利科学研究院 Gabion arch ecological flexible debris flow blocking dam and building method thereof
CN204385572U (en) * 2014-11-17 2015-06-10 吴帆 A kind of junked tire mud-rock flow erosion subgrade protection device
CN205205781U (en) * 2015-07-21 2016-05-04 中国科学院水利部成都山地灾害与环境研究所 Junked tire mud -rock flow engineering body protector
CN105862679A (en) * 2016-05-19 2016-08-17 中国电建集团成都勘测设计研究院有限公司 Grilled pile dam for debris flow protection
CN207047874U (en) * 2017-07-25 2018-02-27 重庆工程职业技术学院 A kind of retaining wall structure administered for mine slope

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112281908A (en) * 2020-09-30 2021-01-29 江西工业职业技术学院 Prevent tailing mud-rock flow landslide protective structure with buffer structure
CN112281908B (en) * 2020-09-30 2022-03-29 华东交通大学 Prevent tailing mud-rock flow landslide protective structure with buffer structure
CN112921903A (en) * 2021-01-25 2021-06-08 枣庄学院 Pile forest solid bed-solid phase unloading-erosion-preventing composite slag blocking dam
CN115030095A (en) * 2022-06-30 2022-09-09 清华大学 A energy dissipation retaining structure that shocks resistance for geological disasters prevention and cure
CN115030095B (en) * 2022-06-30 2023-03-17 清华大学 A energy dissipation retaining structure that shocks resistance for geological disasters prevention and cure

Also Published As

Publication number Publication date
CN109083110B (en) 2021-01-26

Similar Documents

Publication Publication Date Title
CN109083110A (en) The mud-rock flow that streaming separation of solid and liquid is chosen in a kind of energy dissipating is blocked structure and its construction method
CN207392069U (en) A kind of Falling Rocks guard system
CN106801403B (en) A method of preventing mud-stone flow disaster and mudstone apoblema recycles
CN104594230B (en) Rockfall quick draining structure for mountain highway protection
CN108221547A (en) A kind of urban road system for reclaiming rainwater and method
CN204370384U (en) A kind of mud-rock flow classified energy-dissipation exhaust system
CN207003450U (en) A kind of hydrophobic bank protection of express highway roadbed greening
CN109083109A (en) It is a kind of multistage energy dissipating and infiltration mud-rock flow blocking dam and its method of construction
CN109183640A (en) The shed hole structure and its construction method of a kind of antidetonation and anti-mud-rock flow and falling rocks
CN104863098A (en) Danger-elimination refitting method for stilling pool downstream energy dissipater
CN204370372U (en) The ecological bank protection device of junked tire resistance to erosion
CN214089444U (en) Pier protection device for preventing impact of rolling stones and debris flow
CN205999849U (en) A kind of highlight lines frigid mountainous areas highway cutting gradient slope ecological protection system
CN204385572U (en) A kind of junked tire mud-rock flow erosion subgrade protection device
CN109162297A (en) A kind of the solid-liquid separating shed hole structure and its construction method of anti-mud-rock flow
CN105603940B (en) Step fish ridge water stone piece-rate system and design method
CN207891684U (en) A kind of urban road system for reclaiming rainwater
CN104963379B (en) For the water intaking structure on mountain channel
Rudolf-Miklau et al. Technical standards for debris flow barriers and breakers
CN105421305A (en) Pile plate plane and vertical face intersecting combination auxiliary energy dissipater
CN110241678A (en) A kind of nearly water pavement structure and its construction method
CN206070493U (en) A kind of guard system blocked for mud-rock flow
CN106013007B (en) Suitable for the husky separation building of water of linear pattern chute spillway
CN209178853U (en) A kind of rock side slope safeguard structure and rock side slope protective survey system
CN204551386U (en) For the gear row structure of ditch water treatment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant