CN109081241A - The method for dismounting of continuous galvanizing line furnace nose - Google Patents

The method for dismounting of continuous galvanizing line furnace nose Download PDF

Info

Publication number
CN109081241A
CN109081241A CN201810894933.8A CN201810894933A CN109081241A CN 109081241 A CN109081241 A CN 109081241A CN 201810894933 A CN201810894933 A CN 201810894933A CN 109081241 A CN109081241 A CN 109081241A
Authority
CN
China
Prior art keywords
furnace nose
falsework
furnace
nose
dismounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810894933.8A
Other languages
Chinese (zh)
Other versions
CN109081241B (en
Inventor
张健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201810894933.8A priority Critical patent/CN109081241B/en
Publication of CN109081241A publication Critical patent/CN109081241A/en
Application granted granted Critical
Publication of CN109081241B publication Critical patent/CN109081241B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Coating With Molten Metal (AREA)

Abstract

The invention discloses a kind of method for dismounting of continuous galvanizing line furnace nose, this method continuous galvanizing line is shut down, and zinc pot is removed, and stops sending and closing all kinds of media into furnace nose, all kinds of medium pipelines are removed and marked, and furnace nose is located at stop position;Production falsework simultaneously assembles under furnace nose, and the steel construction and column of falsework connection suspension furnace nose are withstood below swing mechanism respectively on gooseneck and on furnace nose pull rod crossbeam;Driving and steel beam hanging furnace nose cross bearer are cut and disassembled cross bearer and are hung to storage area;It removes type metal expansion joint and fixes its stroke;Using lifting wirerope binding furnace nose and steel construction, the connection of steel construction and basis is cut off, driving connection lifting wirerope integrally hangs out furnace nose, steel construction and falsework to storage area, completes the dismounting of furnace nose.This method improves construction efficiency, reduces workload, avoids security risk, it is ensured that intact, the precision of raising furnace nose secondary installing of furnace nose component.

Description

The method for dismounting of continuous galvanizing line furnace nose
Technical field
The present invention relates to a kind of method for dismounting of continuous galvanizing line furnace nose.
Background technique
Hot galvanizing is the steel surface processing method most widely used at present, the ratio of performance to price is optimal, hot dip zinc product pair The corrosion inhibitor of steel plate is lengthened the life, energy-saving material-saving plays inestimable and irreplaceable role, while electroplated steel products are also that country fosters With the high added value undersupplied product first developed.Steel plant's Automobile Plate strip hot-dip galvanizing unit is the capital equipment of steel plant, is Guarantee the quality of hot dip zinc product, the key equipment zinc pot furnace nose in continuous galvanizing line is frequently necessary to be transformed and replace, such as exists Cleaning inside device is configured in furnace nose, for zinc gray occurrence quantity in galvanizing process to be greatly reduced, is improved product quality, is promoted Zinc-plated speed.
But the replacement job very difficult of furnace nose, first this intermediate item are online transformation, and most of workload must be It is carried out under shutdown status.It is removed including used equipment dismounting, the mounting and adjusting of new equipment, old pipeline, the installation of new pipeline, electric instrument profession Cable laying and equipment installation, also need to carry out single examination and joint-trial, task amount weight, therefore the construction period seems extremely nervous.
Secondly furnace nose Demolition Construction risk is larger, since furnace nose is suspended on steel construction, Demolition Construction operation Major part is in high-altitude Lin Bianchu, therefore there are a large amount of high-altitudes to face side operation, in addition, being zinc pot region below construction location, also very It is dangerous.
Furthermore precision of equipment installation requires height, and adjustment difficulty is big, master of the furnace nose as continuous galvanizing line core process section Equipment is wanted, it is higher to installation site required precision;Furnace nose is by type metal expansion joint, the furnace nose including swing mechanism and telescoping mechanism By flanged joint, furnace nose ontology passes through swing mechanism for the composition such as sub- ontology and lip, type metal expansion joint and zinc pot furnace body It is located on steel construction with the bearing block of telescoping mechanism.It is whole for furnace nose such as to be splitted into loose mail when removing, it will break Bad its whole connection precision and performance, may damage its component, and remove heavy workload, Demolition Construction low efficiency, and influence Later installation accuracy.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of method for dismounting of continuous galvanizing line furnace nose, this method has Effect improves the construction efficiency that furnace nose is removed, and reduces and removes workload, avoids the security risk for removing operation, it is ensured that furnace nose portion Intact, the precision of raising furnace nose secondary installing of part.
In order to solve the above technical problems, the method for dismounting of continuous galvanizing line furnace nose of the present invention includes the following steps:
Step 1: continuous galvanizing line is shut down, zinc pot is removed, and stops sending and closing all kinds of media into furnace nose, all kinds of medium pipelines It removes and marks, furnace nose is located at stop position;
Step 2: production falsework, falsework include rectangular base, be vertical at the four columns of rectangular base quadrangle with And the crossbeam between adjacent columns, falsework are installed on furnace underthe nose and assemble under furnace nose, furnace nose passes through Steel construction suspension, the two root posts of rectangular base side are withstood on the steel structure beam below swing mechanism, and rectangular base is another The two root posts of side are withstood on the steel structure beam of furnace nose pull rod, and furnace nose ontology is located in falsework;
Step 3: cross bearer is cut and disassembled and is hung to storage area and uprightly stores using driving and steel beam hanging furnace nose cross bearer;
Step 4: the flange bolt of type metal expansion joint and zinc pot furnace body is removed, using the fixed expansion of metal of pull rod before removing The stroke of section;
Step 5: cutting off the connection of steel construction and basis using lifting wirerope binding furnace nose and steel construction, while removing steel Cucurbit, pedestrian passage platform and zincification electric block are overhauled in structure, driving connection lifts wirerope for furnace nose, steel knot Structure and falsework, which are integrally hung out to storage area, uprightly to be stored, and the dismounting of furnace nose is completed.
Further, the falsework further includes cross strut, and the cross strut is set to the rectangular base length side To adjacent columns between.
Further, each component of the falsework uses electric welding connection.
Since the method for dismounting of continuous galvanizing line furnace nose of the present invention uses above-mentioned technical proposal, i.e. this method hot galvanizing first Compressor emergency shutdown, zinc pot remove, stop sending and closing all kinds of media into furnace nose, all kinds of medium pipelines are removed and marked, furnace nose Son is located at stop position;Production falsework simultaneously assembles under furnace nose, and the steel construction of falsework connection suspension furnace nose is simultaneously And column withstood on the gooseneck below swing mechanism respectively and furnace nose pull rod crossbeam on;Using driving and steel beam hanging furnace Nose cross bearer is cut and disassembled cross bearer and is hung to storage area and uprightly stores;It removes type metal expansion joint and fixes its stroke;It adopts With lifting wirerope binding furnace nose and steel construction, the connection of steel construction and basis is cut off, while removing auxiliary on steel construction, row Vehicle connection lifting wirerope, which integrally hangs out furnace nose, steel construction and falsework to storage area, uprightly to be stored, and furnace nose is completed The dismounting of son.This method effectively improves the construction efficiency of furnace nose dismounting, reduces and removes workload, avoids the safety for removing operation Hidden danger, it is ensured that intact, the precision of raising furnace nose secondary installing of furnace nose component.
Detailed description of the invention
The present invention will be further described in detail below with reference to the accompanying drawings and embodiments:
Fig. 1 is the method for dismounting schematic diagram of continuous galvanizing line furnace nose of the present invention;
Fig. 2 is falsework schematic diagram in this method.
Specific embodiment
Embodiment is as depicted in figs. 1 and 2, and the method for dismounting of continuous galvanizing line furnace nose of the present invention includes the following steps:
Step 1: continuous galvanizing line is shut down, zinc pot 2 is removed, and stops sending and closing all kinds of media into furnace nose 3, all kinds of medium tubes Road removes and marks, and furnace nose 3 is located at stop position;
Step 2: production falsework 1, falsework 1 includes rectangular base 11, is vertical at four of 11 4 jiaos of rectangular base Column 12 and the crossbeam 13 between adjacent columns 12, falsework 1 are installed on 3 lower section of furnace nose and under furnace noses 3 Assembling, furnace nose 3 are hung by steel construction 4, and it is horizontal that the two root posts of rectangular base side withstand on the steel construction 4 below swing mechanism Liang Shang, the two root posts of the rectangular base other side are withstood on 4 crossbeam of steel construction of 3 pull rod of furnace nose, and 3 ontology of furnace nose is located at and faces When bracket 1 in;
Step 3: cross bearer 5 is cut and disassembled and is hung to storage area and uprightly deposits using driving and steel beam hanging furnace nose cross bearer 5 It puts;
Step 4: the flange bolt of type metal expansion joint 6 and 2 furnace body of zinc pot is removed, it is swollen using the fixed metal of pull rod before removing The stroke of swollen section 6;
Step 5: cutting off the connection of steel construction 4 and basis using lifting wirerope binding furnace nose 3 and steel construction 4, tearing open simultaneously Except cucurbit, pedestrian passage platform and zincification electric block is overhauled on steel construction 4, driving connection lifts wirerope for furnace nose 3, steel construction 4 and whole hang out to storage area of falsework 1 are uprightly stored, and complete the dismounting of furnace nose 3.
Preferably, the falsework 1 further includes cross strut 14, and the cross strut 14 is set to the rectangular base 11 Between the adjacent columns 12 of length direction.Cross strut is used to further increase the rigidity of falsework, it is ensured that its bearing capacity.
Preferably, each component of the falsework 1 uses electric welding connection.
In order to guarantee the secondary installing precision of furnace nose, the damage of furnace nose component in disassembly process is avoided, this method is adopted With furnace nose overall pulling down mode, so that the injury to furnace nose is minimum, construction period is most short, and falsework is mounted on shutdown It is carried out when furnace nose reaches stop position afterwards, does not influence other equipment and remove work, can carry out simultaneously;By falsework by furnace Nose is integrally fixed, and is easy to lift, to realize the overall pulling down of furnace nose.

Claims (3)

1. a kind of method for dismounting of continuous galvanizing line furnace nose, it is characterised in that this method includes the following steps:
Step 1: continuous galvanizing line is shut down, zinc pot is removed, and stops sending and closing all kinds of media into furnace nose, all kinds of medium pipelines It removes and marks, furnace nose is located at stop position;
Step 2: production falsework, falsework include rectangular base, be vertical at the four columns of rectangular base quadrangle with And the crossbeam between adjacent columns, falsework are installed on furnace underthe nose and assemble under furnace nose, furnace nose passes through Steel construction suspension, the two root posts of rectangular base side are withstood on the steel structure beam below swing mechanism, and rectangular base is another The two root posts of side are withstood on the steel structure beam of furnace nose pull rod, and furnace nose ontology is located in falsework;
Step 3: cross bearer is cut and disassembled and is hung to storage area and uprightly stores using driving and steel beam hanging furnace nose cross bearer;
Step 4: the flange bolt of type metal expansion joint and zinc pot furnace body is removed, using the fixed expansion of metal of pull rod before removing The stroke of section;
Step 5: cutting off the connection of steel construction and basis using lifting wirerope binding furnace nose and steel construction, while removing steel Cucurbit, pedestrian passage platform and zincification electric block are overhauled in structure, driving connection lifts wirerope for furnace nose, steel knot Structure and falsework, which are integrally hung out to storage area, uprightly to be stored, and the dismounting of furnace nose is completed.
2. the method for dismounting of continuous galvanizing line furnace nose according to claim 1, it is characterised in that: the falsework is also Including cross strut, the cross strut is set between the adjacent columns of the rectangular base length direction.
3. the method for dismounting of continuous galvanizing line furnace nose according to claim 1 or 2, it is characterised in that: the interim branch Each component of frame uses electric welding connection.
CN201810894933.8A 2018-08-08 2018-08-08 Method for removing furnace nose of hot galvanizing unit Active CN109081241B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810894933.8A CN109081241B (en) 2018-08-08 2018-08-08 Method for removing furnace nose of hot galvanizing unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810894933.8A CN109081241B (en) 2018-08-08 2018-08-08 Method for removing furnace nose of hot galvanizing unit

Publications (2)

Publication Number Publication Date
CN109081241A true CN109081241A (en) 2018-12-25
CN109081241B CN109081241B (en) 2020-04-28

Family

ID=64833829

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810894933.8A Active CN109081241B (en) 2018-08-08 2018-08-08 Method for removing furnace nose of hot galvanizing unit

Country Status (1)

Country Link
CN (1) CN109081241B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112680773A (en) * 2020-12-17 2021-04-20 中国二十冶集团有限公司 Dismounting, updating and reforming method for electroplating bath of electrotinning unit

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3823981A1 (en) * 1987-09-10 1989-03-23 Rolf Mintert Galvanising unit for small components
KR20040031308A (en) * 2002-10-04 2004-04-13 주식회사 포스코 Dross removal apparatus of snout inside for zinc galva-nizing pot
CN102127727A (en) * 2011-04-22 2011-07-20 上海东新冶金技术工程有限公司 Grate for hot galvanizing
CN203307408U (en) * 2013-06-08 2013-11-27 首钢总公司 Lifting appliance for cleaning zinc ash inside zinc boiler nose
CN204401088U (en) * 2015-01-16 2015-06-17 中国十九冶集团有限公司 Quick mounting and dismounting platform for underground zinc boiler nose
CN205258554U (en) * 2015-12-28 2016-05-25 中国钢研科技集团有限公司 Stove nose chute with wear belting
CN108342673A (en) * 2017-01-22 2018-07-31 宝钢新日铁汽车板有限公司 A kind of online position regulator of zinc pot stove nose

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3823981A1 (en) * 1987-09-10 1989-03-23 Rolf Mintert Galvanising unit for small components
KR20040031308A (en) * 2002-10-04 2004-04-13 주식회사 포스코 Dross removal apparatus of snout inside for zinc galva-nizing pot
CN102127727A (en) * 2011-04-22 2011-07-20 上海东新冶金技术工程有限公司 Grate for hot galvanizing
CN203307408U (en) * 2013-06-08 2013-11-27 首钢总公司 Lifting appliance for cleaning zinc ash inside zinc boiler nose
CN204401088U (en) * 2015-01-16 2015-06-17 中国十九冶集团有限公司 Quick mounting and dismounting platform for underground zinc boiler nose
CN205258554U (en) * 2015-12-28 2016-05-25 中国钢研科技集团有限公司 Stove nose chute with wear belting
CN108342673A (en) * 2017-01-22 2018-07-31 宝钢新日铁汽车板有限公司 A kind of online position regulator of zinc pot stove nose

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112680773A (en) * 2020-12-17 2021-04-20 中国二十冶集团有限公司 Dismounting, updating and reforming method for electroplating bath of electrotinning unit

Also Published As

Publication number Publication date
CN109081241B (en) 2020-04-28

Similar Documents

Publication Publication Date Title
CN102192368B (en) Large-span overhead pipeline sliding installation method
CN104863362B (en) The arch barrel lattice shell construction technology that the sliding of arch steel lattice moulding bed is installed is set
CN103255726A (en) Construction method for continuous beam and arch combination bridge
CN109081241A (en) The method for dismounting of continuous galvanizing line furnace nose
CN111608086A (en) Lateral flat top construction structure and method for steel-concrete composite beam
CN106567548B (en) Rectangular raw coal bucket is segmented installation method
CN103342321B (en) The integral replacing hanging method of in-service nuclear power station steam generator
CN205799359U (en) Hoist cylinder seal nipple quick replacement device
CN209702791U (en) Suspender is used in a kind of dismounting of blast furnace bustle pipe
CN109958819A (en) A kind of gas pipeline laying method and its supporting structure
CN107119561A (en) A kind of basket-hanging bridge maintaining job platform
CN107416685A (en) Installation of gas pipeline construction method and its supporting structure on the downside of a kind of bridge
CN104192579B (en) Method for replacing material taking machine jackstay and material taking machine jackstay used for method
CN203065965U (en) Bridge inspection vehicle capable of detaching and replacing frame automatically
JP2020060052A (en) Installation method for moving scaffold
CN201313928Y (en) Galvanized pot safety overhaul platform for hot galvanizing unit
CN208088150U (en) Cantilever type movable type bridge repairing stage apparatus
CN202925471U (en) Hydraulic formwork system for high pier construction
CN209024078U (en) Online replacement operation box for plate hook of crane
CN206169974U (en) Instrument of quick assembly disassembly railroad locomotive axle box pull rod
CN106624125A (en) Energy saving blast furnace billet steel shearing machine
CN109868334A (en) A kind of dismounting of blast furnace bustle pipe suspender and method for dismounting
CN218712218U (en) Construction protection platform for I-steel-concrete composite beam striding over existing road
CN219933170U (en) Detachable fixed hanger
CN220789452U (en) Bottom covering protection shed device for crossing existing roads and bridges

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant