CN109079972A - A kind of method of entire winter prefabricated thermal insulation maintenance - Google Patents
A kind of method of entire winter prefabricated thermal insulation maintenance Download PDFInfo
- Publication number
- CN109079972A CN109079972A CN201810914568.2A CN201810914568A CN109079972A CN 109079972 A CN109079972 A CN 109079972A CN 201810914568 A CN201810914568 A CN 201810914568A CN 109079972 A CN109079972 A CN 109079972A
- Authority
- CN
- China
- Prior art keywords
- sleeper
- workshop
- maintenance
- double
- feed bin
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012423 maintenance Methods 0.000 title claims abstract description 39
- 238000000034 method Methods 0.000 title claims abstract description 18
- 238000009413 insulation Methods 0.000 title claims abstract description 13
- 241001669679 Eleotris Species 0.000 claims abstract description 70
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 17
- 238000004519 manufacturing process Methods 0.000 claims abstract description 4
- 238000004321 preservation Methods 0.000 claims description 16
- 238000010438 heat treatment Methods 0.000 claims description 6
- 238000009434 installation Methods 0.000 claims description 6
- 239000011490 mineral wool Substances 0.000 claims description 6
- 238000000889 atomisation Methods 0.000 claims description 5
- 239000000463 material Substances 0.000 claims description 4
- 230000000979 retarding effect Effects 0.000 claims description 3
- 239000004576 sand Substances 0.000 claims description 3
- 238000010025 steaming Methods 0.000 claims 2
- 238000002955 isolation Methods 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 6
- 230000003020 moisturizing effect Effects 0.000 abstract description 4
- 230000002411 adverse Effects 0.000 abstract description 2
- 230000007547 defect Effects 0.000 abstract description 2
- 230000006698 induction Effects 0.000 abstract description 2
- 238000013461 design Methods 0.000 description 3
- 238000003860 storage Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000005096 rolling process Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 241001074085 Scophthalmus aquosus Species 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 238000007710 freezing Methods 0.000 description 1
- 230000008014 freezing Effects 0.000 description 1
- 230000001939 inductive effect Effects 0.000 description 1
- 239000003595 mist Substances 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 238000002604 ultrasonography Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B11/00—Apparatus or processes for treating or working the shaped or preshaped articles
- B28B11/24—Apparatus or processes for treating or working the shaped or preshaped articles for curing, setting or hardening
- B28B11/245—Curing concrete articles
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Drying Of Solid Materials (AREA)
Abstract
A kind of method of entire winter prefabricated thermal insulation maintenance, belong to prefabricated sleeper technical field, it is short in the reset time of the semiarid property climatic province teletostage double-block type sleeper of cool temperature zone, it is not timely completed constructing aims and the ineffective problem of conventional maintenance, the workshop includes boiler room, sandstone feed bin, mixing station, sleeper workshop and maintenance workshop, by using method of the invention, it solves under cold dry adverse weather condition, it ensure that the normal production of double-block type sleeper, it ensure that going on smoothly for construction period, while guaranteeing the construction quality of sleeper product.The automatic humidity induction having by the industrial ultrasonic wave humidifier configured and timing means, by the uniform expanding of ultrasonic wave fog of generation to sleeper surface, carry out all standing moisturizing, reduce water consumption and the artificial investment of maintenance, eliminate human factor generation leakage support and conserve it is not in place caused by mass defect, rejection rate is reduced, to improve sleeper natural curing process sleeper quality.
Description
Technical field
The invention belongs to prefabricated sleeper technical fields, and in particular to a kind of method of entire winter prefabricated thermal insulation maintenance.
Background technique
In the semiarid property climatic province of cool temperature zone, winter is controlled by powerful Mongolian hyperbar, and very long cold dry, summer is more
Thunderstorm, spring and autumn are windy and dusty.- 20 DEG C of winter minimum temperature, the 3 of 10 the end of month to the next year for being divided into current year of winter construction period
The end of month, about 5 months or so.In the prefabricated double-block type sleeper in this area, for the realization for guaranteeing constructing aims, it is necessary to the teletostage be taken to apply
Work measure carries out the prefabricated of double-block type sleeper.
For double-block type sleeper after the maintenance demoulding of channel, whether secondary natural curing link can reach concrete sleeper intensity
To highest, to meet, quality requirement is particularly critical, and the later strength of sleeper depends on natural curing, and traditional approach takes watering
The method of moisturizing, sleeper surface area is small, complex contour, is unfavorable for maintenance effect, and be also easy to produce water resource waste.
Summary of the invention
The present invention is short for the reset time in the semiarid property climatic province teletostage double-block type sleeper of cool temperature zone, cannot be on time complete
At the ineffective problem of constructing aims and conventional maintenance, a kind of method of entire winter prefabricated thermal insulation maintenance is provided.
The present invention adopts the following technical scheme:
A kind of method of entire winter prefabricated thermal insulation maintenance, the heat preservation of heat preservation, mixing station including sandstone feed bin, sleeper produce vehicle
Between heat preservation and demoulding after double-block type sleeper finished product maintenance, include the following steps:
The first step, install oil burning boiler, configuration two be respectively used to sandstone feed bin and the mixing station teletostage heat preservation steam boiler with
And the steam boiler for the heat preservation of sleeper workshop teletostage;
Second step, the heat preservation of sandstone feed bin and mixing station are buried at sandstone bin bottom 5cm for the heating of sand material teletostage
Jet chimney is laid for keeping jet chimney of the sandstone feed bin inner ring border temperature at 5 DEG C or more on the divider wall of sandstone feed bin;
The surrounding installation rock wool board of mixing station is closed, and steam heating pipe is installed in the position of host machine of mixing station and the position of air valve cylinder
Road and radiator, the interior setting of the water tank of mixing station are used for the jet chimney of mixing water heating, and being arranged on jet chimney can control water
Temperature is not less than 60 DEG C of temp.-control valve;
Third step, the heat preservation of sleeper workshop, the surrounding of sleeper workshop lay the winter for controlling sleeper workshop
Jet chimney of the phase temperature at 10 DEG C or more, sleeper workshop wall and roof setting for prevent sleeper workshop and
The external world generates the rock wool board with flame retarding function of thermal convection, and the window of sleeper workshop is arranged for preventing thermal loss
The air-heater for extraneous cold wind to be isolated is arranged in double glazing, the feed inlet of sleeper workshop;
Double-block type sleeper after demoulding is sent into and closed is equipped with several ultrasonic waves by the 4th step, the maintenance of sleeper finished products after demoulding
The double-block type sleeper for completing 10 day curing period is sent out maintenance workshop by the maintenance workshop of humidifier, and circulation completes the double of every batch of
The maintenance of block type sleeper.
Steam boiler described in the first step is the steam boiler of 4t.
A steam boiler in two steam boilers passes through the jet chimney and water tank of pipeline and sandstone feed bin
Interior jet chimney connection, another steam boiler are connect by pipeline with the jet chimney of sleeper workshop.
The grey trolley of overhead fortune is equipped between the discharge port of the mixing station and the entrance of sleeper workshop.
It sets on the ultrasonic humidifier in the maintenance workshop there are three mutually independent atomization conduit, atomization conduit is equipped with
Several fog outlets, fog outlet setting is between every two rows of double-block type sleepers.
The maintenance workshop is closed structure, conserves and is equipped with automatically between the outlet of the entrance and sleeper workshop in workshop
Go up and down rolling screen door.
Beneficial effects of the present invention are as follows:
By using method of the invention, solves under cold dry adverse weather condition, ensure that double-block type sleeper just
Often production, ensure that going on smoothly for construction period, while guaranteeing the construction quality of sleeper product.
The automatic humidity induction having by the industrial ultrasonic wave humidifier configured and timing means, by the ultrasound of generation
The uniform expanding of wave fog carries out all standing moisturizing, reduces water consumption and the artificial investment of maintenance, eliminate people to sleeper surface
For the leakage that factor generates support and conserve it is not in place caused by mass defect, rejection rate is reduced, so that it is naturally feeding to improve sleeper
Nurse's sequence sleeper quality.
Detailed description of the invention
Fig. 1 is floor map of the present invention;
Fig. 2 is maintenance workshop structural schematic diagram of the invention;
Wherein: the boiler room 1-;2- steam boiler;3- sandstone feed bin;4- jet chimney;5- host;6- water tank;7- caliduct;
8- sleeper workshop;The grey trolley of the overhead fortune of 9-;10- air-heater;11- steam curing channel;12- conserves workshop;13- ultrasonic wave
Humidifier;14- automatic lifting rolling screen door;15- double-block type sleeper;16- atomization conduit.
Specific embodiment
In conjunction with attached drawing, the present invention will be further described.
In the environment of teletostage temperature is at -20 DEG C, sandstone feed bin 3, mixing station and sleeper workshop 8 need to keep the temperature extremely
5 DEG C or more, the steam boiler 2 of two 4t is configured, one keeps the temperature for the teletostage of sandstone feed bin 3 and mixing station, and another is used for
The heat preservation of sleeper workshop 8.
Sandstone feed bin 3 faces when building construction, buries jet chimney 4 in subsurface, the heating of sand material when for winter construction,
It prevents from freezing;Jet chimney 4 is laid on the divider wall of sandstone feed bin 3, is maintained at 5 DEG C for the environment temperature in sandstone feed bin 3
More than.The Insulation of mixing station is mainly closed mixing station surrounding using rock wool board, operates 5 position of host and air valve
The position emphasis installation caliduct 7 of cylinder and radiator heat preservation, mixing water are taken jet chimney to place and are risen in water tank 6
Temperature, and install temp.-control valve, steam valve is automatically closed when water temperature is controlled to 60 DEG C, and valve is opened when being lower than this temperature.Guarantee
Concrete out-of-machine temperature is not less than 10 DEG C.
Sleeper workshop 8 teletostage temperature is controlled at 10 DEG C or more, and 8 surrounding of sleeper workshop is mainly taken to lay steam
Pipeline 4 is kept the temperature, and workshop wall and roof, which are all made of rock wool board with flame retarding function and the external world, can not generate thermal convection current phenomenon,
Windowpane in workshop takes double glazing to prevent thermal loss.Entire workshop is at closed state.Mixing station concrete discharging mouth
Take the grey trolley of overhead fortune with the transfer passage in workshop, above entrance wall the extraneous cold wind of 10 pairs of installation air-heater carry out every
From.
The design in workshop 12 is conserved, designs 10 days sleeper maximum outputs first, by practical daily two classes of production 1600
The quantitative design of sleepers, 10 days 16000 sleepers stores floor space.Sleeper is stored according to 8 layers, and every layer of 4 every pile can be deposited
32 are put, occupied area 3.75m2.Area needed for 16000 sleepers are stored is 1875m2, the maintenance workshop 12 of configuration and sleeper
Workshop 8 shares, span 21m, and the length for sleeper caching maintenance is 110m, can meet 10 days sleeper outputs and support
Protect the requirement of time.Ground region scribing line, divides 6 region block pattern row pattern sleepers by 21m span, stays between per pass sleeper storage area
The interval 50cm.
In workshop two sides, every 10m spacing lays ultrasonic humidifier 13,3.2m high above the wall of corresponding humidifier position
Position weld 50cm long T-steel, the corresponding hole for boring 3 φ 10 on T-steel penetrates the wirerope of φ 8, wirerope in each hole
Above the position wall of span 21m to opposite humidifier, 3 wirerope are tensed with cord holder respectively.3 on every humidifier
It says mist pipeline and is individually laid along wirerope, fog outlet stays in 50cm interval location between storage sleeper, per pass fog outlet ladder
Shape is laid.According to said method humidifier is corresponding two-by-two lays fog output tube.Fog output tube and wirerope are fixed by band.
After the completion of fog output tube road 16 is laid, water lines and electric line, the independent water of every equipment are laid along length of walls position
Valve and circuit switch control, unwanted maintenance region can close maintenance of equipment.It is installed in 6 regions away from fog outlet highest distance position
Humidity inductive is popped one's head at 6.Starting ultrasonic humidifier carries out the automatic moisture-keeping maintenance to sleeper after being all installed.
The maintenance workshop is the function and principle by concrete sample standard curing room;It is supported by the moisturizing of code requirement
10 days time of shield and this period sleeper quantity produced plan storage space area, configure certain amount and humidification
Amount meets the supersonic humidifier of maintenance effect, and fog output tube road is laid in installation.By supersonic humidifier it is included be arranged automatically it is wet
The function of degree and time set humidity and enter working condition.Early period is examined by 3 days, 7 days, 28 days with condition test piece intensity
It surveys and determines setting humidity value.Data are obtained through test: demoulding strength 40.8Mpa;3 days intensity be averaged 48.5Mpa(47.8Mpa,
49.3Mpa, 48.5Mpa);7 days intensity is averaged 54.0Mpa(53.3Mpa, 55.8Mpa, 52.9Mpa);Intensity is average within 10 days
58.5Mpa(57.6Mpa, 59.5Mpa, 58.5Mpa).
Claims (6)
1. a kind of method of entire winter prefabricated thermal insulation maintenance, it is characterised in that: heat preservation, mixing station including sandstone feed bin (3)
Heat preservation, the heat preservation of sleeper workshop (8) and the maintenance of double-block type sleeper (15) finished product after demoulding, including walk as follows
It is rapid:
The first step, installs oil burning boiler, and configuration two is respectively used to the steam boiler of sandstone feed bin (3) and the heat preservation of mixing station teletostage
(2) and for sleeper workshop (8) teletostage heat preservation steam boiler (2);
Second step, the heat preservation of sandstone feed bin (3) and mixing station are buried at sandstone feed bin (3) bottom 5cm for the sand material teletostage
The jet chimney (4) of heating, lay on the divider wall of sandstone feed bin (3) for keep sandstone feed bin inner ring border temperature 5 DEG C with
On jet chimney;
The surrounding installation rock wool board of mixing station is closed, and host (5) position of mixing station and the position installation of air valve cylinder are warm
Feed channel (7) and radiator, the interior setting of the water tank (6) of mixing station are used for the jet chimney of mixing water heating, set on jet chimney
Set the temp.-control valve that controlling water temperature is not less than 60 DEG C;
Third step, the heat preservation of sleeper workshop (8), the surrounding of sleeper workshop (8) are laid for controlling sleeper production vehicle
Between (8) jet chimney (4) of the teletostage temperature at 10 DEG C or more, the wall and roof of sleeper workshop (8) be arranged for hindering
Only sleeper workshop (8) and the extraneous rock wool board with flame retarding function for generating thermal convection, the window of sleeper workshop (8)
Double glazing for preventing thermal loss is set, and the feed inlet setting of sleeper workshop (8) is for carrying out extraneous cold wind
The air-heater (10) of isolation;
4th step, the maintenance of sleeper finished products after demoulding, by the double-block type sleeper (15) after demoulding be sent into it is closed be equipped with it is several super
The double-block type sleeper (15) for completing 10 day curing period is sent out maintenance workshop, followed by the maintenance workshop (12) of sound wave humidifier (13)
Ring completes the maintenance of the double-block type sleeper of every batch of.
2. a kind of method of entire winter prefabricated thermal insulation maintenance according to claim 1, it is characterised in that: institute in the first step
State the steam boiler that steam boiler (2) are 4t.
3. a kind of method of entire winter prefabricated thermal insulation maintenance according to claim 1, it is characterised in that: two steamings
The jet chimney (4) and the steaming in water tank (6) that a steam boiler (2) in boiler furnace passes through pipeline and sandstone feed bin (3)
The connection of steam pipe road, another steam boiler (2) are connect by pipeline with the jet chimney (4) of sleeper workshop (8).
4. a kind of method of entire winter prefabricated thermal insulation maintenance according to claim 1, it is characterised in that: mixing station goes out
The grey trolley (9) of overhead fortune is equipped between material mouth and the entrance of sleeper workshop (8).
5. a kind of method of entire winter prefabricated thermal insulation maintenance according to claim 1, it is characterised in that: described to care the car
Between (12) ultrasonic humidifier (13) on set there are three mutually independent atomization conduit (16), atomization conduit (16) is if be equipped with
Dry fog outlet, fog outlet setting is between every two rows of double-block type sleepers (15).
6. a kind of method of entire winter prefabricated thermal insulation maintenance according to claim 1, it is characterised in that: described to care the car
Between (12) be closed structure, conserve workshop (12) entrance and sleeper workshop (8) outlet between be equipped with automatic lifting volume
Curtain door (14).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810914568.2A CN109079972A (en) | 2018-08-13 | 2018-08-13 | A kind of method of entire winter prefabricated thermal insulation maintenance |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810914568.2A CN109079972A (en) | 2018-08-13 | 2018-08-13 | A kind of method of entire winter prefabricated thermal insulation maintenance |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109079972A true CN109079972A (en) | 2018-12-25 |
Family
ID=64834414
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810914568.2A Pending CN109079972A (en) | 2018-08-13 | 2018-08-13 | A kind of method of entire winter prefabricated thermal insulation maintenance |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109079972A (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000335987A (en) * | 1999-05-31 | 2000-12-05 | Tohoku Jikou Kk | Steam-curing of concrete product and apparatus therefor |
KR20050119483A (en) * | 2004-06-16 | 2005-12-21 | 현대건설주식회사 | Concrete surface heating method and device of low temperature and winter time |
CN1837474A (en) * | 2006-04-25 | 2006-09-27 | 中铁八局集团有限公司 | Maintenance method for double-block type sleeper |
CN200998886Y (en) * | 2007-01-23 | 2008-01-02 | 俞加友 | Humiture even concrete maintenance chamber |
CN102162301A (en) * | 2011-03-04 | 2011-08-24 | 葛洲坝集团第五工程有限公司 | Method and device for preserving temperature and humidity and protecting during concrete construction in winter |
CN202862404U (en) * | 2012-10-26 | 2013-04-10 | 中铁二十二局集团第六工程有限公司 | Concrete mixing plant heating system |
CN107160551A (en) * | 2017-06-28 | 2017-09-15 | 中国电建集团贵阳勘测设计研究院有限公司 | Construction method for prefabricating box girder concrete in cold area in winter |
CN206520080U (en) * | 2017-02-28 | 2017-09-26 | 中国葛洲坝集团第一工程有限公司 | A kind of intelligent precast construction curing means |
-
2018
- 2018-08-13 CN CN201810914568.2A patent/CN109079972A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000335987A (en) * | 1999-05-31 | 2000-12-05 | Tohoku Jikou Kk | Steam-curing of concrete product and apparatus therefor |
KR20050119483A (en) * | 2004-06-16 | 2005-12-21 | 현대건설주식회사 | Concrete surface heating method and device of low temperature and winter time |
CN1837474A (en) * | 2006-04-25 | 2006-09-27 | 中铁八局集团有限公司 | Maintenance method for double-block type sleeper |
CN200998886Y (en) * | 2007-01-23 | 2008-01-02 | 俞加友 | Humiture even concrete maintenance chamber |
CN102162301A (en) * | 2011-03-04 | 2011-08-24 | 葛洲坝集团第五工程有限公司 | Method and device for preserving temperature and humidity and protecting during concrete construction in winter |
CN202862404U (en) * | 2012-10-26 | 2013-04-10 | 中铁二十二局集团第六工程有限公司 | Concrete mixing plant heating system |
CN206520080U (en) * | 2017-02-28 | 2017-09-26 | 中国葛洲坝集团第一工程有限公司 | A kind of intelligent precast construction curing means |
CN107160551A (en) * | 2017-06-28 | 2017-09-15 | 中国电建集团贵阳勘测设计研究院有限公司 | Construction method for prefabricating box girder concrete in cold area in winter |
Non-Patent Citations (5)
Title |
---|
刘勇: "轨枕环行法生产制枕场总体设计与轨枕预制配套设备研究", 《铁道建筑技术》 * |
戴会生: "《混凝土搅拌站实用技术》", 31 August 2014, 中国建材工业出版社 * |
李昌宁 等: "《CRTSⅡ型双块式无砟轨道轨枕预制与铺设技术》", 31 March 2013, 中国铁道出版社 * |
郑西铁路客运专线有限责任公司: "《郑西高速铁路工程总结》", 30 June 2011, 中国铁道出版社 * |
钱肖萍 等: "《水利水电工程施工工厂设计实例》", 30 November 2012, 黄河水利出版社 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104712345B (en) | Tunnel lining concrete heat preserving and maintaining construction device and construction method thereof | |
CN105134278B (en) | High aititude extremely frigid zones tunnel ventilation temperature elevation system and ventilation heating construction method | |
CN105737397B (en) | Solar ground heat can comprehensively utilize walling system | |
CN209633328U (en) | High speed railway prefabricating box girder intelligence steam curing system | |
CN107062474A (en) | A kind of nearly zero energy consumption building system based on accumulation of energy | |
CN102972233B (en) | Industrialized production straw mushroom house | |
CN113586120A (en) | Combined hot air jet heat preservation device for cold region tunnel and control method | |
CN112854748A (en) | Maintenance method for construction of suspension casting box girder in winter | |
CN108590730B (en) | A kind of roadway cooling simulation test device and test method | |
CN109676774A (en) | A kind of steam-cured cellar of efficient precast concrete shield duct piece and its application method | |
CN106642766B (en) | Closed interior well circulating picture-changing heat pipe | |
CN108360523B (en) | A kind of building structure with temperature control device | |
CN109079972A (en) | A kind of method of entire winter prefabricated thermal insulation maintenance | |
CN104737923B (en) | Severe cold and cold district scale pig house VMC (Ventilation Mechanical Control System) in winter | |
CN202324250U (en) | Novel thermal-insulation and energy-saving wall body | |
CN108437181A (en) | A kind of steam curing device for highway assembly concrete component | |
CN204894186U (en) | Solar energy curing kiln | |
CN218669434U (en) | A combined hot air jet insulation device for tunnels in cold regions | |
CN202350367U (en) | Heating system for absorbing terrestrial heat by utilizing heat pipes | |
CN206669938U (en) | A kind of nearly zero energy consumption building system based on accumulation of energy | |
CN213260125U (en) | Prestressed concrete sleeper dual-mode steam curing device | |
CN205536362U (en) | Reduce air inlet system of hot pressing effect | |
CN205332317U (en) | Utilize energy -concerving and environment -protective heating system of millet electricity and secret cistern | |
CN107143056A (en) | A kind of ecological energy conservation building walling system | |
CN207945986U (en) | A kind of ceramic kiln dehumidifier exhaust gas utilization system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181225 |
|
RJ01 | Rejection of invention patent application after publication |