CN200998886Y - Humiture even concrete maintenance chamber - Google Patents

Humiture even concrete maintenance chamber Download PDF

Info

Publication number
CN200998886Y
CN200998886Y CNU2007200337699U CN200720033769U CN200998886Y CN 200998886 Y CN200998886 Y CN 200998886Y CN U2007200337699 U CNU2007200337699 U CN U2007200337699U CN 200720033769 U CN200720033769 U CN 200720033769U CN 200998886 Y CN200998886 Y CN 200998886Y
Authority
CN
China
Prior art keywords
annular
input tube
carrier pipe
fog
humiture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200337699U
Other languages
Chinese (zh)
Inventor
俞加友
李山林
杨莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2007200337699U priority Critical patent/CN200998886Y/en
Application granted granted Critical
Publication of CN200998886Y publication Critical patent/CN200998886Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

A concrete curing room with even temperature and humidity is provided, which mainly comprises a cool and hot wind device, a wind input tube, an atomization device and an atomization input tube. The wind input tube is a ring-shape wind input tube, the lower part of the ring-shape wind input tube is distributed with wind output openings, the atomization input tube is a ring-shape input tube, spraying openings are distributed evenly at the lower part of the ring-shape atomization input tube, the supersonic atomization machine is a plurality of atomization machine single-head pottery wafers which are led outside the room and is connected with the power source. The utility model has the advantages that the wind input and adding humidity is evener, the structure is more reasonable and the use and maintaining is more convenient. Besides, because the two ends of a capillary in a cold and hot wind device are provided with an assistance passage which is connected by another capillary and electromagnetism valve, the protecting room can be changed into a contracted laboratory and can be used in two ways.

Description

The uniform concrete curing of humiture chamber
Technical field
The utility model relates to a kind of curing means before concrete or cement briquette are detected, and the concrete curing chamber that particularly a kind of humiture is evenly distributed belongs to the field of the sample of preparation test usefulness.
Background technology
Because the quality of concrete or cement components quality directly influences the quality and the life-span of building, construction quality in order to ensure various buildings such as house, bridge, roads, just must test specimen or the test block that raw material such as used cement, stone and sand and different proportioning thereof are formed be detected, to select material and the proportioning that conforms to quality requirements, for samples such as these test specimens or test block can be solidified, just need the concrete curing chamber of the interior temperature and humidity of conditioning chamber uniformly under official hour and humiture environment.Existing concrete curing chamber, general single tube air-supply (hot blast or cold wind) and the short tube of adopting sprayed, atomizer adopts the combined type atomising head, obviously there is following defective: 1, single tube air-supply, make the non-uniform temperature in the fog room, the temperature difference is bigger, place, air port temperature is too high, temperature is on the low side all around, can not satisfy the temperature requirement of concrete curing well, 2, the same uneven phenomenon of atomizing that exists of short tube spraying, excessive near the test block moisture content of spout, away from the test block water deficient of spout, directly scape rings the maintenance quality of concrete test block.3, the combined type atomising head is except that being difficult for scale removal, and more easy-maintaining does not change, and a bad atomising head must whole subscription rate, must shut down when changing atomising head, makes the moisture fluctuation in the fog room big, and maintenance quality is difficult to guarantee.
Summary of the invention
The purpose of this utility model is in order to overcome the weak point of above-mentioned existing concrete curing chamber, and it is more reasonable to design a kind of structure, and the more all even working service of indoor temperature and humidity is the uniform concrete curing of humiture chamber more easily.
The uniform concrete curing of humiture of the present utility model chamber, its structure comprises cold and hot wind apparatus, ajutage, atomising device and atomizing carrier pipe, it is characterized in that ajutage is the annular air supply pipe, the atomizing carrier pipe is an annular atomizing carrier pipe, the top of described annular air supply pipe ring in the fog room, the bottom of annular air supply pipe is evenly distributed with air outlet, and the air inlet of annular air supply pipe stretches out fog room and is communicated with the air outlet of cold and hot wind apparatus; Described annular atomizing carrier pipe is looped around in the fog room a little less than the annular air supply pipe, and the bottom of annular atomizing carrier pipe is evenly distributed with nozzle, and the fog inlet of annular atomizing carrier pipe is communicated with the fog outlet of indoor atomising device.
For the spray effect that makes atomising device good, can automatic water supplement, long service life is keeped in repair with being convenient to, described atomising device comprises water tank, ultrasonic ultrasonic delay line memory and the air blast of automatic water supplement, described ultrasonic ultrasonic delay line memory selects for use a plurality of single head ceramic wafers formula ultrasonic ultrasonic delay line memories to be distributed in the water tank, the power line of each ultrasonic ultrasonic delay line memory is drawn respectively and outdoorly is connected with power supply, and air blast is contained in the upper side edge of water tank, and water tank is suitable for reading to be the fog outlet of atomising device.
In order to strengthen the temperature adjustment ability, can be that the capillary two ends in the cold and hot wind apparatus have additional the accessory channel of being connected with magnetic valve by another capillary.
The uniform concrete curing of humiture of the present utility model chamber, owing to change single tube air-supply and short tube spray structure into annular air supply pipe and annular atomizing carrier pipe, a plurality of atomising heads are combined into one atomising device to be changed a plurality of single head ceramic wafers formula ultrasonic ultrasonic delay line memories into and draws with long power line respectively and outdoorly be connected with power supply, having air-supply and humidification distributes more even, structure is more reasonable, advantages such as working service is more convenient, again because the capillary two ends in cold and hot wind apparatus have additional the accessory channel of being connected with magnetic valve by another capillary, when with the use in parallel of two capillaries, refrigeration or heating capacity are doubled, both can make rapid raising of temperature of fog room and be used to prepare the quality of solidifying of testing concrete sample, the temperature and humidity (closing ultrasonic ultrasonic delay line memory) that can make fog room again descends rapidly and is used to prepare early-age shrinkage stress of concrete sample etc., the concrete curing chamber can be converted to concrete at short notice and shrink the laboratory, make it to accomplish that energy one Room is dual-purpose.
Description of drawings
Accompanying drawing 1 is a structural representation of the present utility model;
Accompanying drawing 2 is structural representations of the annular air supply pipe in the accompanying drawing 1;
Accompanying drawing 3 is structural representations of the annular atomizing carrier pipe in the accompanying drawing 1.
The specific embodiment
Referring to accompanying drawing 1, cold and hot wind apparatus among the figure mainly is made up of condenser 1, compressor 2, four-way change-over valve 3, capillary 6, evaporimeter 7 and centrifugal fan 8, in order to strengthen the temperature adjustment ability, can have additional the accessory channel of connecting with magnetic valve 4 at capillary 6 two ends in this cold and hot wind apparatus by another capillary 5.When needs heat up rapidly or lower the temperature rapidly, magnetic valve 4 is opened and capillary 5 can be connected and capillary 6 uses in parallel, refrigeration or heating capacity are doubled, get final product operate as normal with a capillary 6 at ordinary times.Among the figure 9 is annular air supply pipes, the 10th, be opened in the air outlet of annular air supply pipe bottom, and its structure is referring to accompanying drawing 2, and the air outlet that the air inlet of annular air supply pipe 9 stretches out the centrifugal blower 8 in fog room and the cold and hot wind apparatus is communicated with; Air inlet 11 communicates with the middle and lower part of fog room in the cold and hot wind apparatus, during work, air in the fog room enters the cold and hot wind apparatus from air inlet 11, sent into from top by centrifugal fan 8 usefulness annular air supply pipes 9 through heating or cooled air indoor, reciprocation cycle and room temperature is raise or reduce.Among the figure 12 is annular atomizing carrier pipes, the 13rd, and the equally distributed nozzle in bottom of annular atomizing carrier pipe 12, its structure is referring to accompanying drawing 3, the 14th, Temperature Humidity Sensor, the 15th, air blast, the 16th, the water tank of automatic water supplement, the 17th, ultrasonic ultrasonic delay line memory, the 18th, the ball valve of automatic control water level in the water tank.The fog inlet of annular atomizing carrier pipe 12 is communicated with the fog outlet of indoor atomising device.Wherein, the ultrasonic ultrasonic delay line memory 17 that is placed in the water tank 16 is selected a plurality of single head ceramic wafers formula ultrasonic ultrasonic delay line memories for use; the power line of each ultrasonic ultrasonic delay line memory 17 is drawn respectively and outdoorly is connected with power supply; can change one by one when finding fault and do not influence operate as normal; overcome being difficult for outside the scale removal of combined type atomizer; open defects such as more easy-maintaining does not change, and a bad atomising head must whole subscription rate and must shut down when changing atomising head.Water tank 16 suitable for reading is that the fog outlet of atomising device is communicated with annular atomizing carrier pipe 12.During work, ultrasonic ultrasonic delay line memory 17 is near water smoke formation gas, and the air blast 15 of upper side edge that is installed in water tank is through annular atomizing carrier pipe 12 and nozzle 13 is blown into indoor from fog room top and increase humidity.Make the input signal of microcomputer with the output signal of Temperature Humidity Sensor 12, can require the temperature and humidity of control fog room automatically according to setting.Be a kind of effective concrete curing chamber of humiture of controlling, also can be used as concrete and shrink the laboratory.

Claims (3)

1, the uniform concrete curing of a kind of humiture chamber, comprise cold and hot wind apparatus, ajutage, atomising device and atomizing carrier pipe, it is characterized in that ajutage is the annular air supply pipe, the atomizing carrier pipe is an annular atomizing carrier pipe, the top of described annular air supply pipe ring in the fog room, the bottom of annular air supply pipe is evenly distributed with air outlet, and the air inlet of annular air supply pipe stretches out fog room and is communicated with the air outlet of cold and hot wind apparatus; Described annular atomizing carrier pipe is looped around in the fog room a little less than the annular air supply pipe, and the bottom of annular atomizing carrier pipe is evenly distributed with nozzle, and the fog inlet of annular atomizing carrier pipe is communicated with the fog outlet of indoor atomising device.
2, the uniform concrete curing of humiture as claimed in claim 1 chamber, it is characterized in that atomising device comprises water tank, ultrasonic ultrasonic delay line memory and the air blast of automatic water supplement, described ultrasonic ultrasonic delay line memory selects for use a plurality of single head ceramic wafers formula ultrasonic ultrasonic delay line memories to be distributed in the water tank, the power line of each ultrasonic ultrasonic delay line memory is drawn respectively and outdoorly is connected with power supply, air blast is contained in the upper side edge of water tank, and water tank is suitable for reading to be the fog outlet of atomising device.
3, the uniform concrete curing of humiture as claimed in claim 1 or 2 chamber is characterized in that the capillary two ends in the cold and hot wind apparatus have additional the accessory channel of being connected with magnetic valve by another capillary.
CNU2007200337699U 2007-01-23 2007-01-23 Humiture even concrete maintenance chamber Expired - Fee Related CN200998886Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200337699U CN200998886Y (en) 2007-01-23 2007-01-23 Humiture even concrete maintenance chamber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200337699U CN200998886Y (en) 2007-01-23 2007-01-23 Humiture even concrete maintenance chamber

Publications (1)

Publication Number Publication Date
CN200998886Y true CN200998886Y (en) 2008-01-02

Family

ID=39013293

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200337699U Expired - Fee Related CN200998886Y (en) 2007-01-23 2007-01-23 Humiture even concrete maintenance chamber

Country Status (1)

Country Link
CN (1) CN200998886Y (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104072197A (en) * 2014-06-30 2014-10-01 江苏南瓷绝缘子股份有限公司 Method for curing insulator cement adhesive
CN104308965A (en) * 2014-10-11 2015-01-28 江苏交科工程检测技术有限公司 Concrete test block curing room
CN104369265A (en) * 2014-11-05 2015-02-25 中国建筑第八工程局有限公司 Environmental conditioning system and method for concrete standard curing room
CN104924438A (en) * 2015-06-02 2015-09-23 深圳大学 Concrete test block maintenance box
CN105619582A (en) * 2014-11-05 2016-06-01 天津银龙预应力材料股份有限公司 Track board steam-curing system
CN107498701A (en) * 2017-08-30 2017-12-22 宜昌市微特电子设备有限责任公司 Winter mass concrete construction conserves automatic warming and humidifying system
CN109079972A (en) * 2018-08-13 2018-12-25 中铁三局集团有限公司 A kind of method of entire winter prefabricated thermal insulation maintenance

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104072197A (en) * 2014-06-30 2014-10-01 江苏南瓷绝缘子股份有限公司 Method for curing insulator cement adhesive
CN104308965A (en) * 2014-10-11 2015-01-28 江苏交科工程检测技术有限公司 Concrete test block curing room
CN104369265A (en) * 2014-11-05 2015-02-25 中国建筑第八工程局有限公司 Environmental conditioning system and method for concrete standard curing room
CN105619582A (en) * 2014-11-05 2016-06-01 天津银龙预应力材料股份有限公司 Track board steam-curing system
CN104369265B (en) * 2014-11-05 2016-09-07 中国建筑第八工程局有限公司 Concrete standard fog room environment adjustment system and control method
CN104924438A (en) * 2015-06-02 2015-09-23 深圳大学 Concrete test block maintenance box
CN107498701A (en) * 2017-08-30 2017-12-22 宜昌市微特电子设备有限责任公司 Winter mass concrete construction conserves automatic warming and humidifying system
CN107498701B (en) * 2017-08-30 2020-04-03 宜昌市微特电子设备有限责任公司 Automatic heating and humidifying system for construction and maintenance of mass concrete in winter
CN109079972A (en) * 2018-08-13 2018-12-25 中铁三局集团有限公司 A kind of method of entire winter prefabricated thermal insulation maintenance

Similar Documents

Publication Publication Date Title
CN200998886Y (en) Humiture even concrete maintenance chamber
CN104267769B (en) Growing environment following system and method for dendrobium candidum
CN110702357B (en) Hot and humid climate wind tunnel and multi-field coupling control system thereof
CN203595716U (en) Multi-functional asphalt pavement aging simulation device
CN202973701U (en) Snowfall device for artificial climate environmental test chamber
CN104614146A (en) Low-energy-consumption efficient wind tunnel capable of simulating snowfall process
CN106525703A (en) Concrete durability test device
CN104544501A (en) Macadimia nut drying device with weighing devices and macadimia nut drying method
CN106840999A (en) A kind of air cleaner or filtering material combined test stand and method of testing
CN105751363B (en) One kind self-control concrete mark supports case
CN215892716U (en) Accurate even control by temperature change whirlwind air current's artificial crop climate chamber
CN102032624A (en) Performance test device for evaporative air conditioner
CN204426637U (en) A kind of Queensland nut drying device with weighing device
CN200995443Y (en) Movable standard maintenance equipment of concrete workpiece
CN204405289U (en) A kind of environment protecting and power-saving wind-tunnel of energy snowfall simulation process
CN208323748U (en) The curing system of concrete curing chamber
CN101575669B (en) Experimental device of iron ore pellets during drying and preheating processes and method thereof
CN205783514U (en) A kind of new concrete fog room
CN201897270U (en) Performance test unit of evaporative type air conditioner
CN109946098A (en) A kind of frozen condition lower surface cooler performance testing stand of enclosed band centre refrigerant
CN102010120B (en) Constant-temperature and constant-humidity pouring device
CN201896125U (en) Constant temperature and humidity pouring device
CN105202701A (en) Curing room temperature and humidity controller
CN206787822U (en) A kind of fan coil units device for detecting performance
CN209478507U (en) A kind of curing kilns

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080102

Termination date: 20110123