CN109057850A - A kind of novel load-carrying air crossing and return air detour piercing technique - Google Patents
A kind of novel load-carrying air crossing and return air detour piercing technique Download PDFInfo
- Publication number
- CN109057850A CN109057850A CN201810979708.4A CN201810979708A CN109057850A CN 109057850 A CN109057850 A CN 109057850A CN 201810979708 A CN201810979708 A CN 201810979708A CN 109057850 A CN109057850 A CN 109057850A
- Authority
- CN
- China
- Prior art keywords
- coal
- main entry
- return air
- mining
- air
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 24
- 239000003245 coal Substances 0.000 claims abstract description 68
- 239000002390 adhesive tape Substances 0.000 claims abstract description 21
- 238000010276 construction Methods 0.000 claims abstract description 17
- 239000011449 brick Substances 0.000 claims abstract description 7
- 238000005065 mining Methods 0.000 claims description 42
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims description 19
- 229910000831 Steel Inorganic materials 0.000 claims description 17
- 239000010959 steel Substances 0.000 claims description 17
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 8
- 238000013461 design Methods 0.000 claims description 7
- 238000005266 casting Methods 0.000 claims description 5
- 238000003801 milling Methods 0.000 claims description 5
- 238000009423 ventilation Methods 0.000 claims description 5
- 241001669679 Eleotris Species 0.000 claims description 4
- 239000003795 chemical substances by application Substances 0.000 claims description 4
- 229910052742 iron Inorganic materials 0.000 claims description 4
- 239000003292 glue Substances 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims description 2
- 238000007796 conventional method Methods 0.000 abstract description 4
- 238000004519 manufacturing process Methods 0.000 abstract description 4
- 230000008901 benefit Effects 0.000 abstract description 3
- 230000000694 effects Effects 0.000 abstract description 2
- 238000005457 optimization Methods 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000032258 transport Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F1/00—Ventilation of mines or tunnels; Distribution of ventilating currents
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/14—Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Environmental & Geological Engineering (AREA)
- Piles And Underground Anchors (AREA)
Abstract
It detours piercing technique the invention discloses a kind of novel load-carrying air crossing and return air, including coal return air main entry, one end vertical connection of coal return air main entry and the lane Jiao Huilian, the other end and the side vertical connection in the middle part of coal adhesive tape main entry in the lane Jiao Huilian, one end vertical connection of the other side and the lane Fu Jiaolian in the middle part of coal adhesive tape main entry, a kind of novel load-carrying air crossing of the present invention and return air detour piercing technique, it avoids and secondary caunches and build air crossing brick wall, lane is once tunneled into tunnel, good forming effect, accelerate construction speed, cost is saved, upgrading cost efficiency is realized for company;The conventional method construction period about 20 days, construction period about 7 days after optimization saved 13 days;209 return air are detoured after common air crossing is optimized for driving air crossing, in coal east area driving, detoured through coal east area by 209 return air during back production, do not need to detour from the lane Fu Jiaolian, saving transportation range about 3000m, economic benefit is obvious.
Description
Technical field
The present invention relates to a kind of return air to detour, in particular to a kind of novel load-carrying air crossing and return air detour piercing technique, belongs to
In mine technology field.
Background technique
Field with "nine squares" developing uses " major and minor gentle slope inclined shaft+return air shafts " combined development, central block form ventilation, loopful section glue
Band conveyer transports, and the upper and lower assistant conveyance of well uses railless free-wheeled vehicle, and it is coal that Longde coal mine, which shows back production coal seam, and three main entrys occupy
In be arranged in the middle part of field with "nine squares", both wings exploitation, 209 return air detour to be tunneled using continuous milling machine, the wide 5.2m in tunnel, high 3.6m.When driving
It needs to penetrate through with the auxiliary fortune main entry of coal and adhesive tape main entry respectively, conventional method is first normal perforation, and the later period, big gun pick was caunched again, is then constructed
Air crossing.
But existing 209 return air detours and caunches that project amount is big, risk is high, difficulty of construction is big, long in time limit there are the later period
And the problems such as coal east area assistant conveyance distance.
Summary of the invention
It detours piercing technique the purpose of the present invention is to provide a kind of novel load-carrying air crossing and return air, to solve above-mentioned background
The project amount of caunching proposed in technology is big, risk is high, difficulty of construction is big, long in time limit and coal east area assistant conveyance distance
The problem of.
To achieve the above object, the driving the invention provides the following technical scheme: a kind of novel load-carrying air crossing and return air detour
Technique, including coal return air main entry, one end vertical connection of the coal return air main entry and the lane Jiao Huilian, the lane Jiao Huilian it is another
End and the side vertical connection in the middle part of coal adhesive tape main entry, one end of the other side and the lane Fu Jiaolian in the middle part of the coal adhesive tape main entry are hung down
Direct-connected logical, the other end and the middle part vertical connection of the auxiliary fortune main entry side of coal, the auxiliary fortune main entry of coal in the lane Fu Jiaolian are another
One end vertical connection that the middle part of side and return air detour.
As a preferred technical solution of the present invention, the top in the lane Jiao Huilian and the junction of coal adhesive tape main entry is opened
Equipped with caunching.
As a preferred technical solution of the present invention, the inside caunched is fixed with air crossing, and the air crossing includes
Two mining i beams, two mining i beams are fixedly connected by installing bolt, and the top of the mining i beam is solid
Surely it is equipped with reinforcing steel bar cage, the outside of the reinforcing steel bar cage is cast with concrete layer.
As a preferred technical solution of the present invention, the return air detour piercing technique the following steps are included:
S1: it constructs when driving in strict accordance with design grade, it is ensured that and stay and set when the auxiliary fortune main entry of coal and the perforation of coal adhesive tape main entry
Good step, when construction in later period air crossing, directly can be laid with mining i beam on the step of tunnel two sides, not need in addition to build brick wall,
With the auxiliary fortune main entry perforation of coal at set up firm platform using sleeper in advance, and stayed under platform and set pedestrian space, side
Just pedestrian, ventilation.
S2: with after coal auxiliary fortune main entry perforation, continuous milling machine directly passes through the platform set up and offers caunches, across the auxiliary fortune of coal
Continue to tunnel according to design grade after main entry, be penetrated through until with coal adhesive tape main entry, this technique is not needed from the auxiliary fortune main entry opening of coal
The lane main entry Fu Jiaolian is tunneled, the influence to mining assistant conveyance is reduced.
S3: by 209 return air detour common air crossing be optimized for driving air crossing, air crossing bottom be laid with mining i beam, construction
When in mining i beam bottom install template, reinforcing steel bar cage is then installed above mining i beam, reinforcing steel bar cage uses iron wire
It is fixed on mining i beam, it is highly 180mm that reinforcing steel bar cage is formed using 20# steel bar meter, mesh width 200mm.
S4: being punched in the middle part of I-steel both ends, be bolted together using M30, and every mining i beam two sides use
On bottom plate, earth anchor is welded on I-steel earth anchorage, and earth anchor specification Φ 18 × 1200mm screw-thread steel uses CK2360 type anchor
Gu agent full length fastening is fixed on top plate in the middle part of the mining i beam that air crossing two sides are laid with using anchor cable and M30 flower basket bolt,
Finally use 400mm thickness C30 concrete layer one-piece casting.
Compared with prior art, the beneficial effects of the present invention are:
1) a kind of novel load-carrying air crossing of the present invention and return air detour piercing technique, avoid and secondary caunch and build air crossing brick
Wall reduces difficulty of construction, reduces project amount.Lane is once tunneled into tunnel, and good forming effect accelerates construction speed, section
About cost realizes upgrading cost efficiency for company.
2) a kind of novel load-carrying air crossing of the present invention and return air detour piercing technique, the conventional method construction period about 20 days, excellent
Construction period about 7 days after change save 13 days;Conventional method is caunched expense, and: 424m3 × 900 yuan/m3=38.16 ten thousand builds 50 bricks
Wall expense: 18m3 × 600 yuan/m3 × 2=2.16 ten thousand, once supporting Master Cost: 25m × 316 yuan/m=0.79 ten thousand;Spoil returns
Fill out expense: 320m3 × 50 yuan/m3=1.6 ten thousand;It is total to have saved 38.16+2.16+0.79+1.6=42.71 ten thousand, increase enterprise
The benefit of industry.
3) a kind of novel load-carrying air crossing of the present invention and return air detour piercing technique, and the 209 return air common air crossing that detours is optimized
After driving air crossing, in coal east area driving, detoured through coal east area by 209 return air during back production, do not need from auxiliary glue
Join lane to detour, save transportation range about 3000m, economic benefit is obvious.
Detailed description of the invention
Fig. 1 is positive structure schematic of the present invention;
Fig. 2 is that section view of caunching of the invention moves structural schematic diagram;
Fig. 3 is reinforcing steel bar cage partial structural diagram of the invention;
Fig. 4 is the lane Jiao Huilian side structure schematic view of the invention.
In figure: 1, coal return air main entry;2, the lane Jiao Huilian;3, coal adhesive tape main entry;4, the auxiliary fortune main entry of coal;5, return air detours;6,
It caunches;7, mining i beam;8, concrete layer;9, reinforcing steel bar cage;10, the lane Fu Jiaolian.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Fig. 1-4 is please referred to, is detoured piercing technique, including coal return air the present invention provides a kind of novel load-carrying air crossing and return air
Main entry 1, one end vertical connection of coal return air main entry 1 and the lane Jiao Huilian 2,3 middle part of the other end and coal adhesive tape main entry in the lane Jiao Huilian 2
Side vertical connection, the other side at the middle part of coal adhesive tape main entry 3 and one end vertical connection in the lane Fu Jiaolian 10, the lane Fu Jiaolian 10
The other end and coal it is auxiliary fortune 4 side of main entry middle part vertical connection, coal it is auxiliary fortune 4 other side of main entry middle part and return air detour 5 one
Hold vertical connection.
Preferably, the top of the junction of the lane Jiao Huilian 2 and coal adhesive tape main entry 3, which offers, caunches 6, passes through the 6 pairs of wind that caunch
Bridge is stepped down, and the height on tunnel top is improved.
Preferably, caunch 6 inside is fixed with air crossing, and air crossing includes two mining i beams 7, two mining i beams
7 are fixedly connected by installing bolt, and the top of mining i beam 7 is fixed with reinforcing steel bar cage 9, the external casting of reinforcing steel bar cage 9
Have concrete layer 8,209 return air detoured after 5 common air crossings are optimized for driving air crossing, in coal east area driving, lead to during back production
It crosses 209 return air to detour 5 through coal east areas, does not need to detour from the lane Fu Jiaolian 10.
Preferably, return air detour piercing technique the following steps are included:
S1: it constructs when driving in strict accordance with design grade, it is ensured that and stayed when the auxiliary fortune main entry 4 of coal and the perforation of coal adhesive tape main entry 3
If good step, when construction in later period air crossing, can be laid with mining i beam 7 directly on the step of tunnel two sides, not need in addition to build brick
Wall, with auxiliary 4 perforation of fortune main entry of coal at set up firm platform using sleeper in advance, and stay under platform and to have set pedestrian's sky
Between, facilitate pedestrian, ventilation.
S2: after penetrating through with the auxiliary fortune main entry 4 of coal, continuous milling machine, which directly passes through the platform set up and offers, caunches 6, auxiliary across coal
Continue to tunnel according to design grade after fortune main entry 4, be penetrated through until with coal adhesive tape main entry 3, this technique is not needed from the auxiliary fortune main entry 4 of coal
The opening driving lane main entry Fu Jiaolian 10, reduces the influence to mining assistant conveyance.
S3: by 209 return air detour 5 common air crossings be optimized for driving air crossing, air crossing bottom be laid with mining i beam 7, apply
Working hour installs template in 7 bottom of mining i beam, and reinforcing steel bar cage 9 is then installed above mining i beam 7, and reinforcing steel bar cage 9 makes
It is fixed on mining i beam 7 with iron wire, it is highly 180mm, mesh width is that reinforcing steel bar cage 9 is formed using 20# steel bar meter
200mm。
S4: being punched in the middle part of I-steel both ends, be bolted together using M30, and every 7 two sides of mining i beam use
On bottom plate, earth anchor is welded on I-steel earth anchorage, and earth anchor specification Φ 18 × 1200mm screw-thread steel uses CK2360 type anchor
Gu agent full length fastening is fixed on top plate using anchor cable and M30 flower basket bolt in the middle part of the mining i beam 7 that air crossing two sides are laid with
On, finally use 8 one-piece casting of 400mm thickness C30 concrete layer.
When specifically used, a kind of novel load-carrying air crossing of the present invention and return air detour piercing technique, in strict accordance with setting when driving
Count gradient construction, it is ensured that and stay when the auxiliary fortune main entry 4 of coal and the perforation of coal adhesive tape main entry 3 and set step, when construction in later period air crossing can be straight
Connect on the step of tunnel two sides laying mining i beam 7, do not need in addition to build brick wall, with auxiliary 4 perforation of fortune main entry of coal at mention
It is preceding to have set up firm platform using sleeper, and stayed under platform and set pedestrian space, facilitate pedestrian, ventilation, with the auxiliary fortune of coal
After main entry 4 penetrates through, continuous milling machine, which directly passes through the platform set up and offers, caunches 6, across the auxiliary fortune main entry 4 of coal after according to design grade
Continue to tunnel, be penetrated through until with coal adhesive tape main entry 3, this technique is not needed from the auxiliary opening of the fortune main entry 4 driving lane main entry Fu Jiaolian of coal
10, reduce the influence to mining assistant conveyance, by 209 return air detour 5 common air crossings be optimized for driving air crossing, in air crossing bottom
It is laid with mining i beam 7, template is installed in 7 bottom of mining i beam when construction, then installs reinforcing bar above mining i beam 7
Cage 9, reinforcing steel bar cage 9 are fixed on mining i beam 7 using iron wire, and reinforcing steel bar cage 9 is formed using 20# steel bar meter, height
It punches in the middle part of I-steel both ends, is bolted together using M30 for 180mm, mesh width 200mm, every mining work
7 two sides of word steel are using earth anchorage on bottom plate, and earth anchor is welded on I-steel, earth anchor specification Φ 18 × 1200mm screw-thread steel,
Use CK2360 type Anchor Agent full length fastening.Anchor cable and M30 gaily decorated basket spiral shell are used in the middle part of the mining i beam 7 that air crossing two sides are laid with
Bolt is fixed on top plate, finally uses 8 one-piece casting of 400mm thickness C30 concrete layer.
In the description of the present invention, it is to be understood that, term " coaxial ", " bottom ", " one end ", " top ", " middle part ",
The orientation or positional relationship of the instructions such as " other end ", "upper", " side ", " top ", "inner", " front ", " center ", " both ends " is
It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description of the present invention and simplification of the description, rather than instruction or dark
Show that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as pair
Limitation of the invention.
In addition, term " first ", " second ", " third ", " the 4th " are used for description purposes only, and should not be understood as instruction or
It implies relative importance or implicitly indicates the quantity of indicated technical characteristic, define " first ", " second ", " the as a result,
Three ", the feature of " the 4th " can explicitly or implicitly include at least one of the features.
In the present invention unless specifically defined or limited otherwise, term " installation ", " setting ", " connection ", " fixation ",
Terms such as " being screwed on " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;It can be with
It is mechanical connection, is also possible to be electrically connected;It can be directly connected, two can also be can be indirectly connected through an intermediary
The interaction relationship of connection or two elements inside a element, unless otherwise restricted clearly, for the common of this field
For technical staff, the specific meanings of the above terms in the present invention can be understood according to specific conditions.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (4)
- The piercing technique 1. a kind of novel load-carrying air crossing and return air detour, including coal return air main entry (1), which is characterized in that the coal One end vertical connection of return air main entry (1) and the lane Jiao Huilian (2), the other end and coal adhesive tape main entry (3) of the lane Jiao Huilian (2) The side vertical connection at middle part, one end vertical connection of the other side and the lane Fu Jiaolian (10) in the middle part of the coal adhesive tape main entry (3), The middle part vertical connection of auxiliary fortune main entry (4) side of the other end and coal of the lane Fu Jiaolian (10), the auxiliary fortune main entry (4) of coal are another The middle part of side and return air detour one end vertical connection of (5).
- The piercing technique 2. a kind of novel load-carrying air crossing according to claim 1 and return air detour, it is characterised in that: the glue The top of the lane Hui Lian (2) and the junction of coal adhesive tape main entry (3) offers caunch (6).
- The piercing technique 3. a kind of novel load-carrying air crossing according to claim 2 and return air detour, it is characterised in that: described to choose The inside on top (6) is fixed with air crossing, and the air crossing includes two mining i beams (7), and two mining i beams (7) are logical It crosses installation bolt to be fixedly connected, the top of the mining i beam (7) is fixed with reinforcing steel bar cage (9), the reinforcing steel bar cage (9) Outside be cast with concrete layer (8).
- The piercing technique 4. a kind of novel load-carrying air crossing according to claim 1 and return air detour, it is characterised in that: described time Wind detour piercing technique the following steps are included:S1: it constructs when driving in strict accordance with design grade, it is ensured that and stayed when the auxiliary fortune main entry (4) of coal and coal adhesive tape main entry (3) perforation If good step, when construction in later period air crossing, can be laid with mining i beam (7) directly on the step of tunnel two sides, not need in addition to build Brick wall, with auxiliary fortune main entry (4) perforation of coal at set up firm platform using sleeper in advance, and stayed under platform and set pedestrian Space facilitates pedestrian, ventilation.S2: with after auxiliary fortune main entry (4) perforation of coal, continuous milling machine directly passes through the platform set up and offers caunch (6), auxiliary across coal Continue to tunnel according to design grade after fortune main entry (4), be penetrated through until with coal adhesive tape main entry (3), this technique is not needed from the auxiliary fortune of coal Main entry (4) the opening driving lane main entry Fu Jiaolian (10), reduces the influence to mining assistant conveyance.S3: the 209 return air common air crossing that detours is optimized for driving air crossing, mining i beam (7) are laid in air crossing bottom, when construction Template is installed in mining i beam (7) bottom, then installs reinforcing steel bar cage (9), reinforcing steel bar cage above mining i beam (7) (9) it being fixed on mining i beam (7) using iron wire, it is highly 180mm that reinforcing steel bar cage (9) is formed using 20# steel bar meter, Mesh width is 200mm.S4: being punched in the middle part of I-steel both ends, be bolted together using M30, and every mining i beam (7) two sides use ground It is anchored on bottom plate, earth anchor is welded on I-steel, and earth anchor specification Φ 18 × 1200mm screw-thread steel is anchored using CK2360 type Agent full length fastening is fixed on top plate using anchor cable and M30 flower basket bolt in the middle part of the mining i beam (7) that air crossing two sides are laid with On, finally use 400mm thickness C30 concrete layer (8) one-piece casting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810979708.4A CN109057850A (en) | 2018-08-27 | 2018-08-27 | A kind of novel load-carrying air crossing and return air detour piercing technique |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810979708.4A CN109057850A (en) | 2018-08-27 | 2018-08-27 | A kind of novel load-carrying air crossing and return air detour piercing technique |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109057850A true CN109057850A (en) | 2018-12-21 |
Family
ID=64756085
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810979708.4A Pending CN109057850A (en) | 2018-08-27 | 2018-08-27 | A kind of novel load-carrying air crossing and return air detour piercing technique |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109057850A (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU899954A1 (en) * | 1979-10-05 | 1982-01-23 | Государственный Научно-Исследовательский,Проектно-Конструкторский И Проектный Угольный Институт "Печорниипроект" | Method of mining thick gently sloping coal beds |
US20060105695A1 (en) * | 2004-11-12 | 2006-05-18 | Kennedy William R | Anchored mine ventilation structure |
WO2007035973A1 (en) * | 2005-09-29 | 2007-04-05 | Sandvik Mining And Construction G.M.B.H. | Length-variable connection of an intake pipe with a dust channel |
JP2007308902A (en) * | 2006-05-16 | 2007-11-29 | Kajima Corp | Ventilating device in tunnel |
CN102966365A (en) * | 2012-05-16 | 2013-03-13 | 山西晋城无烟煤矿业集团有限责任公司 | Novel air bridge construction method |
CN106223961A (en) * | 2016-07-28 | 2016-12-14 | 北京昊华能源股份有限公司 | A kind of coal mine return air big lane passing fault tunneling construction method |
US20180187548A1 (en) * | 2015-06-24 | 2018-07-05 | Manchao He | Equipment system for no-roadway no-coal-pillar retained roadway mining method |
WO2018133492A1 (en) * | 2017-01-23 | 2018-07-26 | 山东科技大学 | Non-uniform support structure for gob-side entry driving under deep unstable overburden rock and construction method |
CN208870627U (en) * | 2018-08-27 | 2019-05-17 | 神木县隆德矿业有限责任公司 | A kind of novel load-carrying air crossing |
-
2018
- 2018-08-27 CN CN201810979708.4A patent/CN109057850A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU899954A1 (en) * | 1979-10-05 | 1982-01-23 | Государственный Научно-Исследовательский,Проектно-Конструкторский И Проектный Угольный Институт "Печорниипроект" | Method of mining thick gently sloping coal beds |
US20060105695A1 (en) * | 2004-11-12 | 2006-05-18 | Kennedy William R | Anchored mine ventilation structure |
WO2007035973A1 (en) * | 2005-09-29 | 2007-04-05 | Sandvik Mining And Construction G.M.B.H. | Length-variable connection of an intake pipe with a dust channel |
JP2007308902A (en) * | 2006-05-16 | 2007-11-29 | Kajima Corp | Ventilating device in tunnel |
CN102966365A (en) * | 2012-05-16 | 2013-03-13 | 山西晋城无烟煤矿业集团有限责任公司 | Novel air bridge construction method |
US20180187548A1 (en) * | 2015-06-24 | 2018-07-05 | Manchao He | Equipment system for no-roadway no-coal-pillar retained roadway mining method |
CN106223961A (en) * | 2016-07-28 | 2016-12-14 | 北京昊华能源股份有限公司 | A kind of coal mine return air big lane passing fault tunneling construction method |
WO2018133492A1 (en) * | 2017-01-23 | 2018-07-26 | 山东科技大学 | Non-uniform support structure for gob-side entry driving under deep unstable overburden rock and construction method |
CN208870627U (en) * | 2018-08-27 | 2019-05-17 | 神木县隆德矿业有限责任公司 | A kind of novel load-carrying air crossing |
Non-Patent Citations (4)
Title |
---|
宁国中: "煤矿机组挑风桥的设计及施工工艺", 《山东煤炭科技》, no. 09, pages 99 - 100 * |
李小龙;: "西二下盘区101运输顺槽系统巷优化设计研究与应用", 煤矿现代化, no. 02 * |
梁建义;: "山西塔山煤矿近距离软岩煤层巷道掘进技术方案", 现代矿业, no. 04 * |
陈苏社: "大柳塔煤矿跨大巷无腿立交新技术试验研究", 《煤炭工程》, no. 06, pages 29 - 30 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106013218B (en) | A kind of method of construction of underground garage open caisson | |
CN206942764U (en) | The supplementary structure of assembly and disassembly shield machine or TBM development machines in a kind of hole | |
CN204457792U (en) | A kind ofly dig large diameter shield tunnel with many pilot tunnel methods and the subway station of building | |
CN110439574B (en) | Tunnel structure for shield lateral translation starting and slag discharging material conveying and construction method | |
CN106930777A (en) | The construction method of the lining of Bored Section of Metro main track assembled two | |
CN211257077U (en) | Prefabricated assembly and cast-in-place utility tunnel who mixes construction | |
CN109898550A (en) | A kind of prefabricated assembled cantilever retaining wall being connected by screw bolts mode | |
CN110242305A (en) | A kind of inclined shaft applies the construction technique in main hole into single side heading method | |
CN106948834A (en) | Construction method and building structure that subway is built together with Urban Underground pipe gallery | |
CN206942799U (en) | A kind of shield tunnel anti-floating system based on prestress anchorage cable | |
CN108915714A (en) | The double TBM installation methods in one hole | |
CN209907183U (en) | Highway assembled abutment | |
CN208870627U (en) | A kind of novel load-carrying air crossing | |
CN109184752B (en) | Supporting structure for coal mine to penetrate through old kiln goaf and supporting method thereof | |
CN208294532U (en) | A kind of bellows cut-and-cover tunnel supporting construction | |
CN204457789U (en) | A kind of stake arch wall supports the subway station digging large diameter shield tunnel and build | |
CN103670449B (en) | Coal bunker partial sealing support technology | |
CN109057850A (en) | A kind of novel load-carrying air crossing and return air detour piercing technique | |
CN103754589B (en) | The continuous shaft transport method of bulk material height drop and transportation system | |
CN207362885U (en) | A kind of prefabricated piping lane system being freely combined | |
CN207062955U (en) | The foundation pit supporting construction that a kind of thick long stake is combined with thin stub | |
CN109356603A (en) | Mating trailer suspension arrangement and its construction method after a kind of rock tunnel(ling) machine | |
CN212404803U (en) | Tunnel inverted arch combined type cableway bridge abutment | |
CN104695315A (en) | Frame structure of deep foundation pit under existing railway and layered jacking method for construction of frame structure | |
CN209398430U (en) | A kind of quick liner structure of speciality light section hydraulic tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20181221 |