CN109057850A - A kind of novel load-carrying air crossing and return air detour piercing technique - Google Patents

A kind of novel load-carrying air crossing and return air detour piercing technique Download PDF

Info

Publication number
CN109057850A
CN109057850A CN201810979708.4A CN201810979708A CN109057850A CN 109057850 A CN109057850 A CN 109057850A CN 201810979708 A CN201810979708 A CN 201810979708A CN 109057850 A CN109057850 A CN 109057850A
Authority
CN
China
Prior art keywords
coal
main entry
return air
mining
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810979708.4A
Other languages
Chinese (zh)
Inventor
冉星仕
马清水
任崇鹏
李玺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenmu Longde Mining Industry Co Ltd
Original Assignee
Shenmu Longde Mining Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenmu Longde Mining Industry Co Ltd filed Critical Shenmu Longde Mining Industry Co Ltd
Priority to CN201810979708.4A priority Critical patent/CN109057850A/en
Publication of CN109057850A publication Critical patent/CN109057850A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

It detours piercing technique the invention discloses a kind of novel load-carrying air crossing and return air, including coal return air main entry, one end vertical connection of coal return air main entry and the lane Jiao Huilian, the other end and the side vertical connection in the middle part of coal adhesive tape main entry in the lane Jiao Huilian, one end vertical connection of the other side and the lane Fu Jiaolian in the middle part of coal adhesive tape main entry, a kind of novel load-carrying air crossing of the present invention and return air detour piercing technique, it avoids and secondary caunches and build air crossing brick wall, lane is once tunneled into tunnel, good forming effect, accelerate construction speed, cost is saved, upgrading cost efficiency is realized for company;The conventional method construction period about 20 days, construction period about 7 days after optimization saved 13 days;209 return air are detoured after common air crossing is optimized for driving air crossing, in coal east area driving, detoured through coal east area by 209 return air during back production, do not need to detour from the lane Fu Jiaolian, saving transportation range about 3000m, economic benefit is obvious.

Description

A kind of novel load-carrying air crossing and return air detour piercing technique
Technical field
The present invention relates to a kind of return air to detour, in particular to a kind of novel load-carrying air crossing and return air detour piercing technique, belongs to In mine technology field.
Background technique
Field with "nine squares" developing uses " major and minor gentle slope inclined shaft+return air shafts " combined development, central block form ventilation, loopful section glue Band conveyer transports, and the upper and lower assistant conveyance of well uses railless free-wheeled vehicle, and it is coal that Longde coal mine, which shows back production coal seam, and three main entrys occupy In be arranged in the middle part of field with "nine squares", both wings exploitation, 209 return air detour to be tunneled using continuous milling machine, the wide 5.2m in tunnel, high 3.6m.When driving It needs to penetrate through with the auxiliary fortune main entry of coal and adhesive tape main entry respectively, conventional method is first normal perforation, and the later period, big gun pick was caunched again, is then constructed Air crossing.
But existing 209 return air detours and caunches that project amount is big, risk is high, difficulty of construction is big, long in time limit there are the later period And the problems such as coal east area assistant conveyance distance.
Summary of the invention
It detours piercing technique the purpose of the present invention is to provide a kind of novel load-carrying air crossing and return air, to solve above-mentioned background The project amount of caunching proposed in technology is big, risk is high, difficulty of construction is big, long in time limit and coal east area assistant conveyance distance The problem of.
To achieve the above object, the driving the invention provides the following technical scheme: a kind of novel load-carrying air crossing and return air detour Technique, including coal return air main entry, one end vertical connection of the coal return air main entry and the lane Jiao Huilian, the lane Jiao Huilian it is another End and the side vertical connection in the middle part of coal adhesive tape main entry, one end of the other side and the lane Fu Jiaolian in the middle part of the coal adhesive tape main entry are hung down Direct-connected logical, the other end and the middle part vertical connection of the auxiliary fortune main entry side of coal, the auxiliary fortune main entry of coal in the lane Fu Jiaolian are another One end vertical connection that the middle part of side and return air detour.
As a preferred technical solution of the present invention, the top in the lane Jiao Huilian and the junction of coal adhesive tape main entry is opened Equipped with caunching.
As a preferred technical solution of the present invention, the inside caunched is fixed with air crossing, and the air crossing includes Two mining i beams, two mining i beams are fixedly connected by installing bolt, and the top of the mining i beam is solid Surely it is equipped with reinforcing steel bar cage, the outside of the reinforcing steel bar cage is cast with concrete layer.
As a preferred technical solution of the present invention, the return air detour piercing technique the following steps are included:
S1: it constructs when driving in strict accordance with design grade, it is ensured that and stay and set when the auxiliary fortune main entry of coal and the perforation of coal adhesive tape main entry Good step, when construction in later period air crossing, directly can be laid with mining i beam on the step of tunnel two sides, not need in addition to build brick wall, With the auxiliary fortune main entry perforation of coal at set up firm platform using sleeper in advance, and stayed under platform and set pedestrian space, side Just pedestrian, ventilation.
S2: with after coal auxiliary fortune main entry perforation, continuous milling machine directly passes through the platform set up and offers caunches, across the auxiliary fortune of coal Continue to tunnel according to design grade after main entry, be penetrated through until with coal adhesive tape main entry, this technique is not needed from the auxiliary fortune main entry opening of coal The lane main entry Fu Jiaolian is tunneled, the influence to mining assistant conveyance is reduced.
S3: by 209 return air detour common air crossing be optimized for driving air crossing, air crossing bottom be laid with mining i beam, construction When in mining i beam bottom install template, reinforcing steel bar cage is then installed above mining i beam, reinforcing steel bar cage uses iron wire It is fixed on mining i beam, it is highly 180mm that reinforcing steel bar cage is formed using 20# steel bar meter, mesh width 200mm.
S4: being punched in the middle part of I-steel both ends, be bolted together using M30, and every mining i beam two sides use On bottom plate, earth anchor is welded on I-steel earth anchorage, and earth anchor specification Φ 18 × 1200mm screw-thread steel uses CK2360 type anchor Gu agent full length fastening is fixed on top plate in the middle part of the mining i beam that air crossing two sides are laid with using anchor cable and M30 flower basket bolt, Finally use 400mm thickness C30 concrete layer one-piece casting.
Compared with prior art, the beneficial effects of the present invention are:
1) a kind of novel load-carrying air crossing of the present invention and return air detour piercing technique, avoid and secondary caunch and build air crossing brick Wall reduces difficulty of construction, reduces project amount.Lane is once tunneled into tunnel, and good forming effect accelerates construction speed, section About cost realizes upgrading cost efficiency for company.
2) a kind of novel load-carrying air crossing of the present invention and return air detour piercing technique, the conventional method construction period about 20 days, excellent Construction period about 7 days after change save 13 days;Conventional method is caunched expense, and: 424m3 × 900 yuan/m3=38.16 ten thousand builds 50 bricks Wall expense: 18m3 × 600 yuan/m3 × 2=2.16 ten thousand, once supporting Master Cost: 25m × 316 yuan/m=0.79 ten thousand;Spoil returns Fill out expense: 320m3 × 50 yuan/m3=1.6 ten thousand;It is total to have saved 38.16+2.16+0.79+1.6=42.71 ten thousand, increase enterprise The benefit of industry.
3) a kind of novel load-carrying air crossing of the present invention and return air detour piercing technique, and the 209 return air common air crossing that detours is optimized After driving air crossing, in coal east area driving, detoured through coal east area by 209 return air during back production, do not need from auxiliary glue Join lane to detour, save transportation range about 3000m, economic benefit is obvious.
Detailed description of the invention
Fig. 1 is positive structure schematic of the present invention;
Fig. 2 is that section view of caunching of the invention moves structural schematic diagram;
Fig. 3 is reinforcing steel bar cage partial structural diagram of the invention;
Fig. 4 is the lane Jiao Huilian side structure schematic view of the invention.
In figure: 1, coal return air main entry;2, the lane Jiao Huilian;3, coal adhesive tape main entry;4, the auxiliary fortune main entry of coal;5, return air detours;6, It caunches;7, mining i beam;8, concrete layer;9, reinforcing steel bar cage;10, the lane Fu Jiaolian.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1-4 is please referred to, is detoured piercing technique, including coal return air the present invention provides a kind of novel load-carrying air crossing and return air Main entry 1, one end vertical connection of coal return air main entry 1 and the lane Jiao Huilian 2,3 middle part of the other end and coal adhesive tape main entry in the lane Jiao Huilian 2 Side vertical connection, the other side at the middle part of coal adhesive tape main entry 3 and one end vertical connection in the lane Fu Jiaolian 10, the lane Fu Jiaolian 10 The other end and coal it is auxiliary fortune 4 side of main entry middle part vertical connection, coal it is auxiliary fortune 4 other side of main entry middle part and return air detour 5 one Hold vertical connection.
Preferably, the top of the junction of the lane Jiao Huilian 2 and coal adhesive tape main entry 3, which offers, caunches 6, passes through the 6 pairs of wind that caunch Bridge is stepped down, and the height on tunnel top is improved.
Preferably, caunch 6 inside is fixed with air crossing, and air crossing includes two mining i beams 7, two mining i beams 7 are fixedly connected by installing bolt, and the top of mining i beam 7 is fixed with reinforcing steel bar cage 9, the external casting of reinforcing steel bar cage 9 Have concrete layer 8,209 return air detoured after 5 common air crossings are optimized for driving air crossing, in coal east area driving, lead to during back production It crosses 209 return air to detour 5 through coal east areas, does not need to detour from the lane Fu Jiaolian 10.
Preferably, return air detour piercing technique the following steps are included:
S1: it constructs when driving in strict accordance with design grade, it is ensured that and stayed when the auxiliary fortune main entry 4 of coal and the perforation of coal adhesive tape main entry 3 If good step, when construction in later period air crossing, can be laid with mining i beam 7 directly on the step of tunnel two sides, not need in addition to build brick Wall, with auxiliary 4 perforation of fortune main entry of coal at set up firm platform using sleeper in advance, and stay under platform and to have set pedestrian's sky Between, facilitate pedestrian, ventilation.
S2: after penetrating through with the auxiliary fortune main entry 4 of coal, continuous milling machine, which directly passes through the platform set up and offers, caunches 6, auxiliary across coal Continue to tunnel according to design grade after fortune main entry 4, be penetrated through until with coal adhesive tape main entry 3, this technique is not needed from the auxiliary fortune main entry 4 of coal The opening driving lane main entry Fu Jiaolian 10, reduces the influence to mining assistant conveyance.
S3: by 209 return air detour 5 common air crossings be optimized for driving air crossing, air crossing bottom be laid with mining i beam 7, apply Working hour installs template in 7 bottom of mining i beam, and reinforcing steel bar cage 9 is then installed above mining i beam 7, and reinforcing steel bar cage 9 makes It is fixed on mining i beam 7 with iron wire, it is highly 180mm, mesh width is that reinforcing steel bar cage 9 is formed using 20# steel bar meter 200mm。
S4: being punched in the middle part of I-steel both ends, be bolted together using M30, and every 7 two sides of mining i beam use On bottom plate, earth anchor is welded on I-steel earth anchorage, and earth anchor specification Φ 18 × 1200mm screw-thread steel uses CK2360 type anchor Gu agent full length fastening is fixed on top plate using anchor cable and M30 flower basket bolt in the middle part of the mining i beam 7 that air crossing two sides are laid with On, finally use 8 one-piece casting of 400mm thickness C30 concrete layer.
When specifically used, a kind of novel load-carrying air crossing of the present invention and return air detour piercing technique, in strict accordance with setting when driving Count gradient construction, it is ensured that and stay when the auxiliary fortune main entry 4 of coal and the perforation of coal adhesive tape main entry 3 and set step, when construction in later period air crossing can be straight Connect on the step of tunnel two sides laying mining i beam 7, do not need in addition to build brick wall, with auxiliary 4 perforation of fortune main entry of coal at mention It is preceding to have set up firm platform using sleeper, and stayed under platform and set pedestrian space, facilitate pedestrian, ventilation, with the auxiliary fortune of coal After main entry 4 penetrates through, continuous milling machine, which directly passes through the platform set up and offers, caunches 6, across the auxiliary fortune main entry 4 of coal after according to design grade Continue to tunnel, be penetrated through until with coal adhesive tape main entry 3, this technique is not needed from the auxiliary opening of the fortune main entry 4 driving lane main entry Fu Jiaolian of coal 10, reduce the influence to mining assistant conveyance, by 209 return air detour 5 common air crossings be optimized for driving air crossing, in air crossing bottom It is laid with mining i beam 7, template is installed in 7 bottom of mining i beam when construction, then installs reinforcing bar above mining i beam 7 Cage 9, reinforcing steel bar cage 9 are fixed on mining i beam 7 using iron wire, and reinforcing steel bar cage 9 is formed using 20# steel bar meter, height It punches in the middle part of I-steel both ends, is bolted together using M30 for 180mm, mesh width 200mm, every mining work 7 two sides of word steel are using earth anchorage on bottom plate, and earth anchor is welded on I-steel, earth anchor specification Φ 18 × 1200mm screw-thread steel, Use CK2360 type Anchor Agent full length fastening.Anchor cable and M30 gaily decorated basket spiral shell are used in the middle part of the mining i beam 7 that air crossing two sides are laid with Bolt is fixed on top plate, finally uses 8 one-piece casting of 400mm thickness C30 concrete layer.
In the description of the present invention, it is to be understood that, term " coaxial ", " bottom ", " one end ", " top ", " middle part ", The orientation or positional relationship of the instructions such as " other end ", "upper", " side ", " top ", "inner", " front ", " center ", " both ends " is It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description of the present invention and simplification of the description, rather than instruction or dark Show that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as pair Limitation of the invention.
In addition, term " first ", " second ", " third ", " the 4th " are used for description purposes only, and should not be understood as instruction or It implies relative importance or implicitly indicates the quantity of indicated technical characteristic, define " first ", " second ", " the as a result, Three ", the feature of " the 4th " can explicitly or implicitly include at least one of the features.
In the present invention unless specifically defined or limited otherwise, term " installation ", " setting ", " connection ", " fixation ", Terms such as " being screwed on " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;It can be with It is mechanical connection, is also possible to be electrically connected;It can be directly connected, two can also be can be indirectly connected through an intermediary The interaction relationship of connection or two elements inside a element, unless otherwise restricted clearly, for the common of this field For technical staff, the specific meanings of the above terms in the present invention can be understood according to specific conditions.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (4)

  1. The piercing technique 1. a kind of novel load-carrying air crossing and return air detour, including coal return air main entry (1), which is characterized in that the coal One end vertical connection of return air main entry (1) and the lane Jiao Huilian (2), the other end and coal adhesive tape main entry (3) of the lane Jiao Huilian (2) The side vertical connection at middle part, one end vertical connection of the other side and the lane Fu Jiaolian (10) in the middle part of the coal adhesive tape main entry (3), The middle part vertical connection of auxiliary fortune main entry (4) side of the other end and coal of the lane Fu Jiaolian (10), the auxiliary fortune main entry (4) of coal are another The middle part of side and return air detour one end vertical connection of (5).
  2. The piercing technique 2. a kind of novel load-carrying air crossing according to claim 1 and return air detour, it is characterised in that: the glue The top of the lane Hui Lian (2) and the junction of coal adhesive tape main entry (3) offers caunch (6).
  3. The piercing technique 3. a kind of novel load-carrying air crossing according to claim 2 and return air detour, it is characterised in that: described to choose The inside on top (6) is fixed with air crossing, and the air crossing includes two mining i beams (7), and two mining i beams (7) are logical It crosses installation bolt to be fixedly connected, the top of the mining i beam (7) is fixed with reinforcing steel bar cage (9), the reinforcing steel bar cage (9) Outside be cast with concrete layer (8).
  4. The piercing technique 4. a kind of novel load-carrying air crossing according to claim 1 and return air detour, it is characterised in that: described time Wind detour piercing technique the following steps are included:
    S1: it constructs when driving in strict accordance with design grade, it is ensured that and stayed when the auxiliary fortune main entry (4) of coal and coal adhesive tape main entry (3) perforation If good step, when construction in later period air crossing, can be laid with mining i beam (7) directly on the step of tunnel two sides, not need in addition to build Brick wall, with auxiliary fortune main entry (4) perforation of coal at set up firm platform using sleeper in advance, and stayed under platform and set pedestrian Space facilitates pedestrian, ventilation.
    S2: with after auxiliary fortune main entry (4) perforation of coal, continuous milling machine directly passes through the platform set up and offers caunch (6), auxiliary across coal Continue to tunnel according to design grade after fortune main entry (4), be penetrated through until with coal adhesive tape main entry (3), this technique is not needed from the auxiliary fortune of coal Main entry (4) the opening driving lane main entry Fu Jiaolian (10), reduces the influence to mining assistant conveyance.
    S3: the 209 return air common air crossing that detours is optimized for driving air crossing, mining i beam (7) are laid in air crossing bottom, when construction Template is installed in mining i beam (7) bottom, then installs reinforcing steel bar cage (9), reinforcing steel bar cage above mining i beam (7) (9) it being fixed on mining i beam (7) using iron wire, it is highly 180mm that reinforcing steel bar cage (9) is formed using 20# steel bar meter, Mesh width is 200mm.
    S4: being punched in the middle part of I-steel both ends, be bolted together using M30, and every mining i beam (7) two sides use ground It is anchored on bottom plate, earth anchor is welded on I-steel, and earth anchor specification Φ 18 × 1200mm screw-thread steel is anchored using CK2360 type Agent full length fastening is fixed on top plate using anchor cable and M30 flower basket bolt in the middle part of the mining i beam (7) that air crossing two sides are laid with On, finally use 400mm thickness C30 concrete layer (8) one-piece casting.
CN201810979708.4A 2018-08-27 2018-08-27 A kind of novel load-carrying air crossing and return air detour piercing technique Pending CN109057850A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810979708.4A CN109057850A (en) 2018-08-27 2018-08-27 A kind of novel load-carrying air crossing and return air detour piercing technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810979708.4A CN109057850A (en) 2018-08-27 2018-08-27 A kind of novel load-carrying air crossing and return air detour piercing technique

Publications (1)

Publication Number Publication Date
CN109057850A true CN109057850A (en) 2018-12-21

Family

ID=64756085

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810979708.4A Pending CN109057850A (en) 2018-08-27 2018-08-27 A kind of novel load-carrying air crossing and return air detour piercing technique

Country Status (1)

Country Link
CN (1) CN109057850A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU899954A1 (en) * 1979-10-05 1982-01-23 Государственный Научно-Исследовательский,Проектно-Конструкторский И Проектный Угольный Институт "Печорниипроект" Method of mining thick gently sloping coal beds
US20060105695A1 (en) * 2004-11-12 2006-05-18 Kennedy William R Anchored mine ventilation structure
WO2007035973A1 (en) * 2005-09-29 2007-04-05 Sandvik Mining And Construction G.M.B.H. Length-variable connection of an intake pipe with a dust channel
JP2007308902A (en) * 2006-05-16 2007-11-29 Kajima Corp Ventilating device in tunnel
CN102966365A (en) * 2012-05-16 2013-03-13 山西晋城无烟煤矿业集团有限责任公司 Novel air bridge construction method
CN106223961A (en) * 2016-07-28 2016-12-14 北京昊华能源股份有限公司 A kind of coal mine return air big lane passing fault tunneling construction method
US20180187548A1 (en) * 2015-06-24 2018-07-05 Manchao He Equipment system for no-roadway no-coal-pillar retained roadway mining method
WO2018133492A1 (en) * 2017-01-23 2018-07-26 山东科技大学 Non-uniform support structure for gob-side entry driving under deep unstable overburden rock and construction method
CN208870627U (en) * 2018-08-27 2019-05-17 神木县隆德矿业有限责任公司 A kind of novel load-carrying air crossing

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU899954A1 (en) * 1979-10-05 1982-01-23 Государственный Научно-Исследовательский,Проектно-Конструкторский И Проектный Угольный Институт "Печорниипроект" Method of mining thick gently sloping coal beds
US20060105695A1 (en) * 2004-11-12 2006-05-18 Kennedy William R Anchored mine ventilation structure
WO2007035973A1 (en) * 2005-09-29 2007-04-05 Sandvik Mining And Construction G.M.B.H. Length-variable connection of an intake pipe with a dust channel
JP2007308902A (en) * 2006-05-16 2007-11-29 Kajima Corp Ventilating device in tunnel
CN102966365A (en) * 2012-05-16 2013-03-13 山西晋城无烟煤矿业集团有限责任公司 Novel air bridge construction method
US20180187548A1 (en) * 2015-06-24 2018-07-05 Manchao He Equipment system for no-roadway no-coal-pillar retained roadway mining method
CN106223961A (en) * 2016-07-28 2016-12-14 北京昊华能源股份有限公司 A kind of coal mine return air big lane passing fault tunneling construction method
WO2018133492A1 (en) * 2017-01-23 2018-07-26 山东科技大学 Non-uniform support structure for gob-side entry driving under deep unstable overburden rock and construction method
CN208870627U (en) * 2018-08-27 2019-05-17 神木县隆德矿业有限责任公司 A kind of novel load-carrying air crossing

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
宁国中: "煤矿机组挑风桥的设计及施工工艺", 《山东煤炭科技》, no. 09, pages 99 - 100 *
李小龙;: "西二下盘区101运输顺槽系统巷优化设计研究与应用", 煤矿现代化, no. 02 *
梁建义;: "山西塔山煤矿近距离软岩煤层巷道掘进技术方案", 现代矿业, no. 04 *
陈苏社: "大柳塔煤矿跨大巷无腿立交新技术试验研究", 《煤炭工程》, no. 06, pages 29 - 30 *

Similar Documents

Publication Publication Date Title
CN106013218B (en) A kind of method of construction of underground garage open caisson
CN206942764U (en) The supplementary structure of assembly and disassembly shield machine or TBM development machines in a kind of hole
CN204457792U (en) A kind ofly dig large diameter shield tunnel with many pilot tunnel methods and the subway station of building
CN110439574B (en) Tunnel structure for shield lateral translation starting and slag discharging material conveying and construction method
CN106930777A (en) The construction method of the lining of Bored Section of Metro main track assembled two
CN211257077U (en) Prefabricated assembly and cast-in-place utility tunnel who mixes construction
CN109898550A (en) A kind of prefabricated assembled cantilever retaining wall being connected by screw bolts mode
CN110242305A (en) A kind of inclined shaft applies the construction technique in main hole into single side heading method
CN106948834A (en) Construction method and building structure that subway is built together with Urban Underground pipe gallery
CN206942799U (en) A kind of shield tunnel anti-floating system based on prestress anchorage cable
CN108915714A (en) The double TBM installation methods in one hole
CN209907183U (en) Highway assembled abutment
CN208870627U (en) A kind of novel load-carrying air crossing
CN109184752B (en) Supporting structure for coal mine to penetrate through old kiln goaf and supporting method thereof
CN208294532U (en) A kind of bellows cut-and-cover tunnel supporting construction
CN204457789U (en) A kind of stake arch wall supports the subway station digging large diameter shield tunnel and build
CN103670449B (en) Coal bunker partial sealing support technology
CN109057850A (en) A kind of novel load-carrying air crossing and return air detour piercing technique
CN103754589B (en) The continuous shaft transport method of bulk material height drop and transportation system
CN207362885U (en) A kind of prefabricated piping lane system being freely combined
CN207062955U (en) The foundation pit supporting construction that a kind of thick long stake is combined with thin stub
CN109356603A (en) Mating trailer suspension arrangement and its construction method after a kind of rock tunnel(ling) machine
CN212404803U (en) Tunnel inverted arch combined type cableway bridge abutment
CN104695315A (en) Frame structure of deep foundation pit under existing railway and layered jacking method for construction of frame structure
CN209398430U (en) A kind of quick liner structure of speciality light section hydraulic tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181221