CN109057254A - Fixation device and its construction method for indoor distribution box construction - Google Patents

Fixation device and its construction method for indoor distribution box construction Download PDF

Info

Publication number
CN109057254A
CN109057254A CN201811104642.0A CN201811104642A CN109057254A CN 109057254 A CN109057254 A CN 109057254A CN 201811104642 A CN201811104642 A CN 201811104642A CN 109057254 A CN109057254 A CN 109057254A
Authority
CN
China
Prior art keywords
distribution box
steel pipe
indoor
hole
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811104642.0A
Other languages
Chinese (zh)
Inventor
王涛
廖晓涛
谭彪
陈浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201811104642.0A priority Critical patent/CN109057254A/en
Publication of CN109057254A publication Critical patent/CN109057254A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Sewage (AREA)

Abstract

The present invention relates to indoor construction technical field, the open fixation device and method for indoor distribution box construction, comprising: steel pipe, adjusting sleeve pipe and installation frame, jacking mechanism include threaded rod and tapped adjustment seat;Threaded rod injects steel pipe bottom, and adjustment seat contacts support with steel pipe bottom end, and ground base supports threaded rod, and for steel pipe for holding out against indoor top, steel pipe is vertically adjustable;Adjusting sleeve pipe is sleeved on steel pipe and has threaded hole, and adjusting sleeve pipe can adjust its height along length of steel pipe, and be fixed on steel pipe by lock-screw;Adjusting sleeve pipe top and the bottom weld horizontal crossbeam, horizontal gird have strip-shaped hole, and angle steel is welded in installation frame top and the bottom, and angle steel has through-hole, and bolt passes through through-hole and strip-shaped hole realizes that installation frame is affixed with horizontal gird, and installation frame is fixedly mounted with distribution box.Distribution box easily can be supported in design height, installation process is not influenced by other professions, and the operating space that spool is connect with fitting case is big, without largely filling up work.

Description

Fixation device and its construction method for indoor distribution box construction
Technical field
The present invention relates to indoor construction technical fields, in particular to are used for the fixation device of indoor distribution box construction and its apply Work method.
Background technique
Indoors when construction, the installation of cubicle switch and its spool is often related to, there are two types of conventional modes:
The first is first to complete wall construction, and the hole of installation distribution box has been reserved on wall, has then been opened up on wall The tube seat of spool and plastering are installed, then electrician installs spool, and by spool and distribution box abutting joint, due to hole and distribution Adjustment gap very little between case, causes spool and docking for distribution box very inconvenient, meanwhile, spool and distribution box are installed Afterwards, it also needs brickwork further to plaster, and the gap between distribution box and hole is poured and is filled up, be related to two work posts Cross-operation, it is very complicated;
It is for second while embedded spool during wall construction, needs brickwork and electrician to cooperate at the scene simultaneously at this time and apply Work is buried always to the position for needing reserved opening, and work progress is very complicated, after the completion of wall construction, then installs distribution Case is also required at this time by distribution box and spool abutting joint, to reserved opening also due to the adjustment between hole and distribution box Gap very little causes spool and docking for distribution box very inconvenient, meanwhile, after distribution box is installed, also need brickwork further Gap between distribution box and hole is poured and is filled up, the cross-operation of two work posts is also related to, it is very complicated.
In conclusion above two mode has the following problems: 1, installing distribution box in reserved opening and be easy to appear peace Phenomena such as dress skew, cabinet recess, levelness is poor, and later period adjustment difficulty is larger;2, distribution box and spool attended operation space It is limited, it installs inconvenient;3, the later period between reserved opening and distribution box, which pours, fills up heavy workload, increases distribution carton deformed With hollowing risk;4, electrician and brickwork cross-operation are frequent, and work progress is cumbersome.
Therefore, the application proposes a kind of fixation device and its construction method for indoor distribution box construction.
Summary of the invention
The technical problems to be solved by the present invention are: in view of the above problems, providing a kind of for indoor distribution The fixation device and its construction method of case construction, installation are adjusted and fixation procedure is convenient and efficient, can be convenient and will effectively be matched Electronic box is fixedly supported to design height position, the vertical adjustment range of adjusting sleeve pipe is big, installation frame can transverse shifting adjust, energy Enough in the vertical and lateral design installation site for effectively adapting to each distribution box, guarantees positioning and the installation quality of distribution box, increase Adaptability, installation process are not influenced by other professions, and installation effectiveness is higher, more flexible, the operation that spool is connect with fitting case Space is big, and spool can arrange neat smooth, and the gap between distribution box surrounding and subsequent masonry panel is small, does not need largely to fill up Work, distribution box are unlikely to deform, and levelness can guarantee well.
The technical solution adopted by the invention is as follows: for indoor distribution box construction fixation device, including vertical steel pipe, Adjusting sleeve pipe, jacking mechanism and installation frame, the jacking mechanism include threaded rod and tapped adjustment seat, the tune Section seat is threadedly coupled with the threaded rod;
The threaded rod is injected from the steel pipe bottom, and the top surface of the adjustment seat contacts and supports, ground with the steel pipe bottom end Face basis forms the threaded rod bottom and supports, and the steel pipe top is for holding out against indoor top;
The steel pipe is held out against between indoor ground base and indoor top by jacking mechanism, can be adjusted by the adjustment seat The vertical position of the steel pipe, the steel pipe can be relative to the threaded rod vertical motions;
The adjusting sleeve pipe is set in the outer surface of steel tube, and threaded hole, the adjusting sleeve pipe are offered on the adjusting sleeve pipe Its mounting height can be adjusted along the length of steel pipe direction, and adjusting sleeve pipe lock is realized by threaded hole described in lock-screw precession It is tightly fixed on the steel pipe;
The adjusting sleeve pipe top and the bottom are welded with horizontal gird, and strip-shaped hole, the peace are offered on the horizontal gird The frame up top and the bottom of frame are welded with horizontal angle steel, offer through-hole on the angle steel of the level, pass through institute by bolt It states through-hole and strip-shaped hole realizes that the installation frame is fixedly connected with the horizontal gird, the installation frame is for being fixedly mounted Distribution box.
So set, steel pipe easily and effectively can be fixedly supported to indoor ground base and indoor top by jacking mechanism Between portion, can conveniently and efficiently adjust vertical fixed position of the adjusting sleeve pipe on steel pipe, so by distribution box positioning support in The height and position of design can conveniently and efficiently adjust lateral peace of the installation frame on horizontal gird in strip-shaped hole length range Holding position, and then distribution box is finely tuned to the position that is transversely mounted of design, installation process is not influenced by other professions, installation effectiveness Higher, more flexible, the operating space that spool is connect with fitting case is big, spool can arrange it is neat smooth, distribution box surrounding with it is subsequent The gap formed between masonry panel is small, does not need largely to fill up work, and distribution box is unlikely to deform, and levelness can protect well Card, meanwhile, the vertical height of steel pipe can be changed by adjusting adjustment seat, and then adapt to the high scene of different layers, ground can be adapted to The variation of spacing between basic and indoor top.
Fixation device of the present invention for indoor distribution box construction, the top of the steel pipe is fixedly installed with channel steel Seat, the notch of the channel steel seat is upward, and chock block is fixedly installed in the notch, and the chock block contacts branch with indoor top Support;The bottom end of the threaded rod is also fixedly installed with channel steel seat, and the notch of the channel steel seat is downward, also fixed in the notch to pacify Equipped with chock block, the chock block contacts support with ground base.
So set, chock block further ensures present apparatus upper and lower side respectively between ground base and indoor top Stability of strutting system and reliability, channel steel seat provide reliable and stable installation site for chock block.
Fixation device of the present invention for indoor distribution box construction, there are two adjust ear for the adjustment seat tool.
So set, operator can easily rotate operation adjustment seat by adjusting ear, so that the vertical adjustment of steel pipe Process is more smooth.
Fixation device of the present invention for indoor distribution box construction, the adjustment seat top surface have annular groove, steel Pipe lower end is located in the annular groove.
So set, annular groove can play positioning action to steel pipe, prevent steel pipe from moving horizontally relative to adjustment seat, guarantees The horizontal position accurate positioning of distribution box.
Fixation device of the present invention for indoor distribution box construction, installation frame top and the bottom two are horizontal Angle steel is located at the left and right sides of the adjusting sleeve pipe.
So set, ensure that the reliability that installation frame is fixedly connected with adjusting sleeve pipe.
Fixation device of the present invention for indoor distribution box construction, the installation frame include four angle steel groups At forming a rectangular frame, two horizontal angle steel are welded and fixed with the top angle steel of rectangular frame and lower part angle steel respectively.
So set, installation frame is made of angle steel, material has been saved, the discarded angle steel system of construction site can be selected Make, it is convenient and efficient, it reduces costs.
Fixation device of the present invention for indoor distribution box construction, the company of offering on the angle steel of the installation frame Connect hole, the position of mounting hole Corresponding matching on the connection hole site and the distribution box, by screw pass through the through-hole and Mounting hole realizes being fixedly connected for the distribution box and installation frame.
So set, make the installation of distribution box and installation frame fixed more rationally, reliable, the later period is between the two to be torn open It unloads also more convenient, and distribution box will not be damaged.
The construction method of fixation device of the present invention for indoor distribution box construction, first distribution box is fixedly mounted In on installation frame, the projected position of distribution box is determined in ground base further according to the specific installation site of distribution box, will be pacified Dress auxiliary device is moved to projected position and is adjusted, so that distribution box is located at right above projected position, then adjusts Seat, until steel pipe top holds out against indoor top, is then pacified according to the design of distribution box so that steel pipe is vertically raised and keeps vertical It fills vertical installation site of the height adjustment adjusting sleeve pipe on steel pipe and guarantees that distribution box end face is flushed with metope, until adjusting It to the design mounting height of distribution box, tightens lock-screw and fixes, then spool is correspondingly connected to the knock-off hole on distribution box, until The positioning of this distribution box is completed, and the building construction of wall can be carried out, and carries out building construction according to already installed distribution box It is tamped with the small gap of reserved lintel, distribution box surrounding with mortar.
Using this construction method, there is no the cross-operation of different majors, so that left and right process is more orderly, it is cumbersome, Flowing water section can be divided to construct, improve it is whole make operating efficiency, improve the installation quality of distribution box.
The construction method of indoor distribution box of the present invention, after steel pipe top holds out against indoor top, if the non-position of distribution box Right above the projected position, can in strip-shaped hole length range lateral adjustments installation frame lateral position, and then adjust distribution The lateral position of case makes distribution box be located at the surface of projected position;It, can be according to the perpendicular of distribution box bottom spool when spool is installed To corresponding specific location, the lateral position of lateral adjustments installation frame in strip-shaped hole length range, and then adjust distribution box Lateral position so that knock-off hole on distribution box is directed at spool.
Compared with prior art, having the beneficial effect that using auxiliary device and peace of the invention by adopting the above technical scheme Dress method, installation are adjusted and fixation procedure is convenient and efficient, can be convenient and distribution box be effectively fixedly supported to design height Position, the vertical adjustment range of adjusting sleeve pipe is big, installation frame can transverse shifting adjust, can be vertical and laterally effectively adapt to The design installation site of each distribution box guarantees positioning and the installation quality of distribution box, increases adaptability, installation process is not by it He influences profession, and installation effectiveness is higher, more flexible, and the operating space that spool is connect with fitting case is big, and spool can arrange neat suitable Freely, the gap between distribution box surrounding and subsequent masonry panel is small, does not need largely to fill up work, distribution box is unlikely to deform, water Pingdu can guarantee well.
Detailed description of the invention
Fig. 1 is scheme of installation of the invention;
Fig. 2 is enlarged drawing at A in Fig. 1;
Fig. 3 is enlarged drawing at B in Fig. 1;
Fig. 4 is enlarged drawing at C in Fig. 1;
Fig. 5 is the side view of installation frame and adjusting sleeve pipe cooperation in the present invention;
Fig. 6 is the top view of horizontal gird in the present invention;
Fig. 7 is the top view of adjustment seat in the present invention;
Fig. 8 is the top view of installation frame and the cooperation of horizontal angle steel in the present invention.
Appended drawing reference: 1 is steel pipe, and 2 be adjusting sleeve pipe, and 3 be installation frame, and 4 be threaded rod, and 5 be adjustment seat, and 6 be ground Basis, 7 be indoor top, and 8 be threaded hole, and 9 be horizontal gird, and 10 be strip-shaped hole, and 11 be horizontal angle steel, and 12 be through-hole, 13 It is chock block for channel steel seat, 14,15 is adjust ear, and 16 be annular groove, and 17 be connecting hole.
Specific embodiment
The present invention is described further with reference to the accompanying drawing.
Embodiment 1
As shown in Fig. 1 to 6,8, for the fixation device of indoor distribution box construction, including vertical steel pipe 1, adjusting sleeve pipe 2, top Support mechanism and installation frame 3, jacking mechanism include threaded rod 4 and tapped adjustment seat 5, adjustment seat 5 and 4 spiral shell of threaded rod Line connection;
Threaded rod 4 is injected from 1 bottom of steel pipe, and the top surface of adjustment seat 5 contacts and supports with 1 bottom end of steel pipe, and ground base 6 is to screw thread Support is formed on 4 bottom of bar, is used to hold out against indoor top 7 at the top of steel pipe 1, steel pipe 1 is held out against by jacking mechanism in indoor ground base Between plinth 6 and indoor top 7, the vertical position of steel pipe 1 can be adjusted by adjustment seat 5, during vertical adjustment, steel pipe 1 can Relative to 4 vertical motion of threaded rod;
Adjusting sleeve pipe 2 is set in 1 outer surface of steel pipe, and 2 internal diameter of adjusting sleeve pipe is adapted with 1 outer diameter of steel pipe, opens up on adjusting sleeve pipe 2 There is threaded hole 8, specifically open up three threaded holes 8 along 2 length direction of adjusting sleeve pipe, adjusting sleeve pipe 2 can be along 1 length direction tune of steel pipe Its mounting height is saved, and realizes that adjusting sleeve pipe 2 is locked in steel pipe by lock-screw (not shown) precession threaded hole 8 On 1, lock-screw holds out against 1 outer surface of steel pipe;
2 top and the bottom of adjusting sleeve pipe are welded with horizontal gird 9, and horizontal gird 9 is specially angle steel, two horizontal girds 9 difference Positioned at the left and right sides of adjusting sleeve pipe 2, lateral strip-shaped hole 10, the top and the bottom weldering of installation frame 3 are offered on two horizontal girds 9 It connects and is fixed with two horizontal angle steel 11, two horizontal angle steel 11 are located at the left and right sides of adjusting sleeve pipe 2, and two horizontal Angle steel 11 is correspondingly connected with 2 left and right sides of adjusting sleeve pipe, two horizontal gird 9 respectively, offers through-hole 12 on horizontal angle steel 11, is led to It crosses bolt (not shown) and realizes that installation frame 3 is fixedly connected with horizontal gird 9 across through-hole 12 and strip-shaped hole 10, it can be in item Installation frame 3 is adjusted in the length range in shape hole 10 and is transversely mounted position on horizontal gird 9, and installation frame 3 is for fixing Distribution box (not shown) is installed.
Further, the top of steel pipe 1 is equipped with channel steel seat 13 by being welded and fixed, and the notch of channel steel seat 13 is upward, slot Chock block 14 is fixedly installed in mouthful, the top surface of chock block 14 is higher by 13 top of channel steel seat, and chock block 14 is contacted with indoor top 7 Support;The bottom end of threaded rod 4 is equipped with channel steel seat 13 also by being welded and fixed, and the notch of channel steel seat 13 is downward, also solid in notch Dingan County is equipped with chock block 14, and the bottom surface of chock block 14 is lower than 13 bottom of channel steel seat, and chock block 14 contacts support with ground base 6.
Embodiment 2
As shown in fig. 7, on the basis of embodiment 1, the tool of adjustment seat 5 has annular groove there are two ear 15,5 top surface of adjustment seat is adjusted 16,1 lower end of steel pipe is located in annular groove 16 with being adapted.
Embodiment 3
As shown in Figures 3 and 5, on the basis of embodiment 2, installation frame 3 includes four angle steel compositions, and four angle steel weld to be formed One rectangular frame, two horizontal angle steel 11 are welded and fixed with the top angle steel of rectangular frame and lower part angle steel respectively, and two Horizontal angle steel 11 is welded and fixed with the top angle steel of rectangular frame and lower part angle steel respectively.
Embodiment 4
As shown in figure 3, offering connecting hole 17,17 position of connecting hole on the angle steel of installation frame 3 on the basis of embodiment 3 With the mounting hole (not shown) position Corresponding matching on distribution box, the quantity of connecting hole 17 and position are pacified according on distribution box The quantity and specific location for filling hole are specifically set, and pass through through-hole 12 by screw (not shown) and mounting hole realizes distribution box With being fixedly connected for installation frame 3.
The construction method of the above-mentioned fixation device for indoor distribution box construction, is first fixedly installed in installation for distribution box On frame 3, the projected position of distribution box is determined in ground base 6 further according to the specific installation site of distribution box, will be installed auxiliary It helps device to be moved to projected position and is adjusted, so that distribution box is located at right above projected position, then adjust adjustment seat 5, So that steel pipe 1 is vertically raised and keeps vertical, until holding out against indoor top 7 at the top of steel pipe 1, then pacified according to the design of distribution box It fills vertical installation site of the height adjustment adjusting sleeve pipe 2 on steel pipe 1 and guarantees that distribution box end face is flushed with metope, until tune It saves to the design mounting height of distribution box, tightens lock-screw and fix, then spool is correspondingly connected to the knock-off hole on distribution box, So far the positioning of distribution box is completed, and can carry out the building construction of wall, build according to already installed distribution box and be applied Work and reserved lintel, the small gap of distribution box surrounding are tamped with mortar.
In above-mentioned construction method, further, after indoor top 7 is held out against at the top of steel pipe 1, if distribution box is not located at throwing Right above shadow position, can in 10 length range of strip-shaped hole lateral adjustments installation frame 3 lateral position, and then adjust distribution box Lateral position, so that distribution box is located at the surface of projected position;It, can be according to the vertical of distribution box bottom spool when spool is installed Corresponding specific location, the lateral position of lateral adjustments installation frame 3 in 10 length range of strip-shaped hole, and then adjust distribution box Lateral position so that knock-off hole on distribution box is directed at spool.
The invention is not limited to specific embodiments above-mentioned.The present invention, which expands to, any in the present specification to be disclosed New feature or any new combination, and disclose any new method or process the step of or any new combination.If this Field technical staff is altered or modified not departing from the unsubstantiality that spirit of the invention is done, should belong to power of the present invention The claimed range of benefit.

Claims (9)

1. for indoor distribution box construction fixation device, it is characterised in that: including vertical steel pipe (1), adjusting sleeve pipe (2), Jacking mechanism and installation frame (3), the jacking mechanism include threaded rod (4) and tapped adjustment seat (5), the tune Section seat (5) is threadedly coupled with the threaded rod (4);
The threaded rod (4) is injected from the steel pipe (1) bottom, and top surface and the steel pipe (1) bottom end of the adjustment seat (5) connect It touches and supports, ground base (6) forms the threaded rod (4) bottom and supports, for holding out against indoor top at the top of the steel pipe (1) Portion (7);
The steel pipe (1) is held out against between indoor ground base (6) and indoor top (7) by jacking mechanism, can be by described Adjustment seat (5) adjusts the vertical position of the steel pipe (1), and the steel pipe (1) can be relative to the threaded rod (4) vertical motion;
The adjusting sleeve pipe (2) is set in the steel pipe (1) outer surface, offers threaded hole (8) on the adjusting sleeve pipe (2), The adjusting sleeve pipe (2) can adjust its mounting height along the steel pipe (1) length direction, and pass through spiral shell described in lock-screw precession Pit (8) realizes that adjusting sleeve pipe (2) are locked on the steel pipe (1);
Adjusting sleeve pipe (2) top and the bottom are welded with horizontal gird (9), offer bar shaped on the horizontal gird (9) The top and the bottom in hole (10), the installation frame (3) are welded with horizontal angle steel (11), are opened on the angle steel (11) of the level Equipped with through-hole (12), the through-hole (12) are passed through by bolt and strip-shaped hole (10) realizes the installation frame (3) and the water Flat crossbeam (9) is fixedly connected, and the installation frame (3) is for being fixedly mounted distribution box.
2. the fixation device according to claim 1 for indoor distribution box construction, it is characterised in that: the steel pipe (1) Top be fixedly installed with channel steel seat (13), the notch of the channel steel seat (13) is upward, is fixedly installed with chock in the notch Block (14), the chock block (14) contact support with indoor top (7);The bottom end of the threaded rod (4) is also fixedly installed with slot The notch of steel seat (13), the channel steel seat (13) is downward, is also fixedly installed in the notch chock block (14), the chock block (14) support is contacted with ground base (6).
3. the fixation device according to claim 1 for indoor distribution box construction, it is characterised in that: the adjustment seat (5) there are two adjust ear (15) for tool.
4. the fixation device according to claim 1 for indoor distribution box construction, it is characterised in that: the adjustment seat (5) top surface has annular groove (16), and steel pipe (1) lower end is located in the annular groove (16).
5. the fixation device according to claim 1 for indoor distribution box construction, it is characterised in that: the installation frame (3) the horizontal angle steel (11) in top and the bottom two is located at the left and right sides of the adjusting sleeve pipe (2).
6. the fixation device according to claim 1 for indoor distribution box construction, it is characterised in that: the installation frame (3) include four angle steel composition, form a rectangular frame, two horizontal angle steel (11) respectively with the upper corners of rectangular frame Steel and lower part angle steel are welded and fixed.
7. the fixation device according to claim 6 for indoor distribution box construction, it is characterised in that: the installation frame (3) it is offered on angle steel connecting hole (17), connecting hole (17) position is corresponding with the position of mounting hole on the distribution box Matching passes through being fixedly connected for the through-hole (12) and the mounting hole realization distribution box and installation frame (3) by screw.
8. utilizing the construction method described in claim 1 to 7 for the fixation device of indoor distribution box construction, feature exists In: first distribution box is fixedly installed on installation frame (3), further according to the specific installation site of distribution box on ground base (6) Installation auxiliary device is moved to projected position and is adjusted by the projected position for determining distribution box, so that distribution box is located at Right above projected position, adjustment seat (5) then are adjusted, so that steel pipe (1) is vertically raised and keeps vertical, until steel pipe (1) is pushed up Portion holds out against indoor top (7), and it is perpendicular on steel pipe (1) then to adjust adjusting sleeve pipe (2) according to the design mounting height of distribution box To installation site and guarantee that distribution box end face is flushed with metope, until being adjusted to the design mounting height of distribution box, tightens locking Screw is fixed, then spool is correspondingly connected to the knock-off hole on distribution box, and so far the positioning of distribution box is completed, and can carry out wall Building construction, building construction and reserved lintel are carried out according to already installed distribution box, the small gap of distribution box surrounding is used Mortar tamps.
9. the construction method of indoor distribution box according to claim 8, it is characterised in that: held out against at the top of steel pipe (1) indoor Behind top (7), if distribution box is not located at right above projected position, can in strip-shaped hole (10) length range lateral adjustments installing frame The lateral position of frame (3), and then the lateral position of distribution box is adjusted, so that distribution box is located at the surface of projected position;Hookup wire Guan Shi, can be according to the vertical corresponding specific location of distribution box bottom spool, the lateral adjustments in strip-shaped hole (10) length range The lateral position of installation frame (3), and then the lateral position of distribution box is adjusted, so that the knock-off hole on distribution box is directed at spool.
CN201811104642.0A 2018-09-21 2018-09-21 Fixation device and its construction method for indoor distribution box construction Pending CN109057254A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811104642.0A CN109057254A (en) 2018-09-21 2018-09-21 Fixation device and its construction method for indoor distribution box construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811104642.0A CN109057254A (en) 2018-09-21 2018-09-21 Fixation device and its construction method for indoor distribution box construction

Publications (1)

Publication Number Publication Date
CN109057254A true CN109057254A (en) 2018-12-21

Family

ID=64763357

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811104642.0A Pending CN109057254A (en) 2018-09-21 2018-09-21 Fixation device and its construction method for indoor distribution box construction

Country Status (1)

Country Link
CN (1) CN109057254A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565952A (en) * 2019-09-12 2019-12-13 上海建工一建集团有限公司 electric box installation device and installation method
CN112993833A (en) * 2019-12-17 2021-06-18 柏诚工程股份有限公司 Method for centralized installation of multiple power distribution cabinets of static pressure box

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104196239A (en) * 2014-08-11 2014-12-10 中建二局第三建筑工程有限公司 Method for installing concealed installation distribution box in block wall and applied fixing device
CN204597304U (en) * 2015-05-07 2015-08-26 中国新兴建设开发总公司 A kind of distributing box fixing device for installing
CN205846637U (en) * 2016-07-15 2016-12-28 中建五局第三建设有限公司 Distribution box, line box direct-burried device in inside and outside building block
CN205921249U (en) * 2016-08-08 2017-02-01 广东施富电气实业有限公司 XM type lighting power distribution panel's casing
CN107171233A (en) * 2017-06-23 2017-09-15 陕西建工第三建设集团有限公司 Built a wall after building concealed distribution box one-time-reach-place installation method
CN107394648A (en) * 2017-09-11 2017-11-24 中国五冶集团有限公司 Servicing unit for strong and weak electronic box location and installation

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104196239A (en) * 2014-08-11 2014-12-10 中建二局第三建筑工程有限公司 Method for installing concealed installation distribution box in block wall and applied fixing device
CN204597304U (en) * 2015-05-07 2015-08-26 中国新兴建设开发总公司 A kind of distributing box fixing device for installing
CN205846637U (en) * 2016-07-15 2016-12-28 中建五局第三建设有限公司 Distribution box, line box direct-burried device in inside and outside building block
CN205921249U (en) * 2016-08-08 2017-02-01 广东施富电气实业有限公司 XM type lighting power distribution panel's casing
CN107171233A (en) * 2017-06-23 2017-09-15 陕西建工第三建设集团有限公司 Built a wall after building concealed distribution box one-time-reach-place installation method
CN107394648A (en) * 2017-09-11 2017-11-24 中国五冶集团有限公司 Servicing unit for strong and weak electronic box location and installation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565952A (en) * 2019-09-12 2019-12-13 上海建工一建集团有限公司 electric box installation device and installation method
CN112993833A (en) * 2019-12-17 2021-06-18 柏诚工程股份有限公司 Method for centralized installation of multiple power distribution cabinets of static pressure box

Similar Documents

Publication Publication Date Title
CN109057254A (en) Fixation device and its construction method for indoor distribution box construction
KR101304985B1 (en) Foundation bolt mount with height adjustment
CN103088994B (en) Plastering fillet and constructional plastering method
CN207283099U (en) A kind of wall pre-embedded hydroelectric line case positioning device
CN111593819A (en) Pre-embedded masonry wall connecting assembly capable of being adjusted flexibly and positioned accurately and using method
CN105421629A (en) Fixing device and installation method for curtain wall unit
CN109066409A (en) The auxiliary device and its installation method of indoor distribution box installation
CN109057255A (en) The auxiliary mould and its construction method of indoor distribution box construction
KR100824799B1 (en) An assembly device for local pannel the utilization of unit pannel
CN208608690U (en) Embedded junction box accurate-location device in a kind of masonry structure
CN110416888A (en) The connection structure and its construction method of installation breakers on a kind of masonry panel
CN208056661U (en) A kind of pinpoint device of pre embedded bolt
CN210049616U (en) Vertical pre-buried device of reservation entrance to a cave
CN210628812U (en) Connecting structure for installing distribution equipment on masonry wall
CN207878943U (en) A kind of foundation ground flatness and elevation control device
CN209046128U (en) A kind of built-in sliding chute verticality adjusting device
KR100407860B1 (en) A leveling device for carrying out the ground
JP2020066903A (en) Lining structure for water channel
KR101962173B1 (en) Construction method of underground structure wall
KR20160035253A (en) Fixing bracket for faucet joint and faucet joint construction method using it
KR200475858Y1 (en) Connection devices for Steel skeleton
JP3650020B2 (en) Joist support and floor structure
CN208701746U (en) A kind of underground pipe gallery abnormity section bracket
JPH0128124Y2 (en)
CN210148396U (en) Fixing structure of pre-buried sleeve

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181221

RJ01 Rejection of invention patent application after publication