CN109056542A - 一种桥梁施工支撑托架及其使用方法 - Google Patents
一种桥梁施工支撑托架及其使用方法 Download PDFInfo
- Publication number
- CN109056542A CN109056542A CN201810993600.0A CN201810993600A CN109056542A CN 109056542 A CN109056542 A CN 109056542A CN 201810993600 A CN201810993600 A CN 201810993600A CN 109056542 A CN109056542 A CN 109056542A
- Authority
- CN
- China
- Prior art keywords
- support
- bracket
- support rod
- bridge construction
- fixedly connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 23
- 238000000034 method Methods 0.000 title claims abstract description 13
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract description 28
- 230000009471 action Effects 0.000 claims description 5
- CWYNVVGOOAEACU-UHFFFAOYSA-N Fe2+ Chemical compound [Fe+2] CWYNVVGOOAEACU-UHFFFAOYSA-N 0.000 claims description 3
- 239000003822 epoxy resin Substances 0.000 claims description 3
- 238000012423 maintenance Methods 0.000 claims description 3
- 239000011159 matrix material Substances 0.000 claims description 3
- 239000007769 metal material Substances 0.000 claims description 3
- 229920000647 polyepoxide Polymers 0.000 claims description 3
- 239000007787 solid Substances 0.000 claims 2
- 238000009434 installation Methods 0.000 abstract description 4
- 230000000694 effects Effects 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 230000006872 improvement Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810993600.0A CN109056542B (zh) | 2018-08-29 | 2018-08-29 | 一种桥梁施工支撑托架及其使用方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810993600.0A CN109056542B (zh) | 2018-08-29 | 2018-08-29 | 一种桥梁施工支撑托架及其使用方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109056542A true CN109056542A (zh) | 2018-12-21 |
CN109056542B CN109056542B (zh) | 2020-11-06 |
Family
ID=64757562
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810993600.0A Active CN109056542B (zh) | 2018-08-29 | 2018-08-29 | 一种桥梁施工支撑托架及其使用方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109056542B (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102733299A (zh) * | 2012-07-13 | 2012-10-17 | 福州大学 | 一种新型装配式钢筋混凝土简支板桥铰缝及其施工方法 |
KR20130001458A (ko) * | 2011-06-27 | 2013-01-04 | 동도산업 주식회사 | 프리캐스트 박스 거더용 철근망 조립대 |
CN205529865U (zh) * | 2016-01-29 | 2016-08-31 | 赵艳 | 一种桥梁支撑座 |
CN205557338U (zh) * | 2016-02-03 | 2016-09-07 | 江苏瑞沃建设集团有限公司 | 一种桥梁钢构支撑装置 |
CN207003821U (zh) * | 2017-06-30 | 2018-02-13 | 肇庆市现代筑美家居有限公司 | 一种移动折叠式托架 |
-
2018
- 2018-08-29 CN CN201810993600.0A patent/CN109056542B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20130001458A (ko) * | 2011-06-27 | 2013-01-04 | 동도산업 주식회사 | 프리캐스트 박스 거더용 철근망 조립대 |
CN102733299A (zh) * | 2012-07-13 | 2012-10-17 | 福州大学 | 一种新型装配式钢筋混凝土简支板桥铰缝及其施工方法 |
CN205529865U (zh) * | 2016-01-29 | 2016-08-31 | 赵艳 | 一种桥梁支撑座 |
CN205557338U (zh) * | 2016-02-03 | 2016-09-07 | 江苏瑞沃建设集团有限公司 | 一种桥梁钢构支撑装置 |
CN207003821U (zh) * | 2017-06-30 | 2018-02-13 | 肇庆市现代筑美家居有限公司 | 一种移动折叠式托架 |
Also Published As
Publication number | Publication date |
---|---|
CN109056542B (zh) | 2020-11-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105908777A (zh) | 一种综合管廊滑动模具及其使用方法 | |
CN106088330B (zh) | 基于3d打印的装配式框架梁和框架柱的连接结构及其施工方法 | |
CN105442838A (zh) | 一种短线匹配预制u形节段梁模板及其收模方法 | |
CN204644882U (zh) | 一种水中桥梁承台预制有底钢吊箱围堰固定装置 | |
WO2017045625A1 (zh) | 一种桩架及其使用安装方法 | |
CN205243003U (zh) | 一种短线匹配预制u形节段梁模板 | |
CN207143733U (zh) | 一种先简支后连续桥梁体系转换系统 | |
CN203866716U (zh) | 一种抱箍式钢管混凝土加固单柱桥墩施工装置 | |
CN108103949A (zh) | 一种斜拉桥主塔多层钢锚梁整体拼装工艺 | |
CN207828792U (zh) | 用于城市钢桥梁安装的移动式支架 | |
CN105568854A (zh) | 水上曲线形鱼腹式现浇钢筋混凝土箱梁施工方法 | |
CN105908843A (zh) | 一种双层拱顶储罐同步倒装施工方法 | |
CN103966956B (zh) | 一种抱箍式钢管混凝土加固单柱桥墩施工装置和施工方法 | |
CN206800220U (zh) | 一种用于跨高速公路旧桥拆除快速安装可调支架 | |
CN109056542A (zh) | 一种桥梁施工支撑托架及其使用方法 | |
CN209584813U (zh) | 框架桥系统 | |
CN217325035U (zh) | 一种双曲钢箱梁安装无损单元节支撑构造 | |
CN108086165A (zh) | 用于城市钢桥梁安装的移动式支架 | |
CN107476334A (zh) | 预制管节拼装设备及其施工方法 | |
JPH04161566A (ja) | 大空間建物の構築装置 | |
CN205443964U (zh) | 一种用于装配式重型钢管支撑装置的交叉支撑件 | |
CN205400118U (zh) | 一种偏心外墙托换结构 | |
CN214939308U (zh) | 一种移动支腿 | |
CN213116337U (zh) | 一种折叠式加宽段专用隧道衬砌台车 | |
CN214574101U (zh) | 一种建筑施工用塔吊基础用格构柱连接结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhou Yefei Inventor after: Jiang Yong Inventor after: Wang Yu Inventor after: Wen Lijun Inventor after: Cui Hongjin Inventor after: Li Ran Inventor after: Su Zhibin Inventor before: Wen Lijun Inventor before: Cui Hongjin Inventor before: Li Ran Inventor before: Su Zhibin |
|
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20201019 Address after: 200070 new road, Jingan District, Jingan District, Shanghai, 6 Applicant after: CHINA RAILWAY 15TH BUREAU GROUP Co.,Ltd. Applicant after: China Railway 15th Bureau Group Fourth Engineering Co.,Ltd. Address before: 451000 79 Kou Kou Wan Gou, Kou Jia Wan Village, Zhi Tian Town, Gongyi, Zhengzhou, Henan Applicant before: Wen Lijun Applicant before: Cui Hongjin Applicant before: Li Ran Applicant before: Su Zhibin |
|
GR01 | Patent grant | ||
GR01 | Patent grant |