一种抱箍式钢管混凝土加固单柱桥墩施工装置 Download PDFInfo
- Publication number
- CN203866716U CN203866716U CN201420278051.6U CN201420278051U CN203866716U CN 203866716 U CN203866716 U CN 203866716U CN 201420278051 U CN201420278051 U CN 201420278051U CN 203866716 U CN203866716 U CN 203866716U
- Authority
- CN
- China
- Prior art keywords
- concrete
- anchor
- steel
- steel pipe
- anchor ear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 134
- 239000010959 steel Substances 0.000 title claims abstract description 134
- 239000004567 concrete Substances 0.000 title claims abstract description 87
- 238000010276 construction Methods 0.000 title claims abstract description 35
- 230000003014 reinforcing effect Effects 0.000 title abstract description 8
- 230000002787 reinforcement Effects 0.000 claims description 20
- 238000003466 welding Methods 0.000 claims description 5
- 238000005516 engineering process Methods 0.000 abstract description 6
- 238000004873 anchoring Methods 0.000 abstract description 3
- 239000011150 reinforced concrete Substances 0.000 abstract description 3
- 230000000694 effects Effects 0.000 abstract description 2
- 238000009434 installation Methods 0.000 description 12
- 241000406668 Loxodonta cyclotis Species 0.000 description 5
- 238000002347 injection Methods 0.000 description 5
- 239000007924 injection Substances 0.000 description 5
- 238000004140 cleaning Methods 0.000 description 4
- 238000005728 strengthening Methods 0.000 description 4
- 238000006243 chemical reaction Methods 0.000 description 2
- 238000007906 compression Methods 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 239000000428 dust Substances 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000008439 repair process Effects 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000011440 grout Substances 0.000 description 1
- 230000010412 perfusion Effects 0.000 description 1
- 239000003755 preservative agent Substances 0.000 description 1
- 230000002335 preservative effect Effects 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420278051.6U CN203866716U (zh) | 2014-02-19 | 2014-05-28 | 一种抱箍式钢管混凝土加固单柱桥墩施工装置 |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420070478 | 2014-02-19 | ||
CN201420070478.7 | 2014-02-19 | ||
CN201420278051.6U CN203866716U (zh) | 2014-02-19 | 2014-05-28 | 一种抱箍式钢管混凝土加固单柱桥墩施工装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203866716U true CN203866716U (zh) | 2014-10-08 |
Family
ID=51647686
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420278051.6U Expired - Lifetime CN203866716U (zh) | 2014-02-19 | 2014-05-28 | 一种抱箍式钢管混凝土加固单柱桥墩施工装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203866716U (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103966956A (zh) * | 2014-02-19 | 2014-08-06 | 科达集团股份有限公司 | 一种抱箍式钢管混凝土加固单柱桥墩施工装置和施工方法 |
CN106049563A (zh) * | 2016-07-20 | 2016-10-26 | 天津大学 | 地震受损桥墩基础补强加固系统 |
CN107780343A (zh) * | 2017-10-25 | 2018-03-09 | 金勇� | 一种高架桥墩横梁及其施工工艺 |
CN110258363A (zh) * | 2019-05-21 | 2019-09-20 | 大连理工大学 | 一种用于地下工程下穿既有桥梁变形控制的可回收式装置 |
CN110409619A (zh) * | 2019-08-30 | 2019-11-05 | 华神建设集团有限公司 | 钢管混凝土柱与钢筋混凝土梁组合结构及施工方法 |
CN113445435A (zh) * | 2021-01-06 | 2021-09-28 | 广州交通投资集团有限公司营运分公司 | 一种应用微膨胀混凝土填充钢抱箍增大墩顶钢筋混凝土盖梁的构造和安装方法 |
-
2014
- 2014-05-28 CN CN201420278051.6U patent/CN203866716U/zh not_active Expired - Lifetime
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103966956A (zh) * | 2014-02-19 | 2014-08-06 | 科达集团股份有限公司 | 一种抱箍式钢管混凝土加固单柱桥墩施工装置和施工方法 |
CN103966956B (zh) * | 2014-02-19 | 2015-10-14 | 江苏五环建设有限公司 | 一种抱箍式钢管混凝土加固单柱桥墩施工装置和施工方法 |
CN106049563A (zh) * | 2016-07-20 | 2016-10-26 | 天津大学 | 地震受损桥墩基础补强加固系统 |
CN106049563B (zh) * | 2016-07-20 | 2018-08-07 | 天津大学 | 地震受损桥墩基础补强加固系统 |
CN107780343A (zh) * | 2017-10-25 | 2018-03-09 | 金勇� | 一种高架桥墩横梁及其施工工艺 |
CN110258363A (zh) * | 2019-05-21 | 2019-09-20 | 大连理工大学 | 一种用于地下工程下穿既有桥梁变形控制的可回收式装置 |
CN110409619A (zh) * | 2019-08-30 | 2019-11-05 | 华神建设集团有限公司 | 钢管混凝土柱与钢筋混凝土梁组合结构及施工方法 |
CN113445435A (zh) * | 2021-01-06 | 2021-09-28 | 广州交通投资集团有限公司营运分公司 | 一种应用微膨胀混凝土填充钢抱箍增大墩顶钢筋混凝土盖梁的构造和安装方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203866716U (zh) | 一种抱箍式钢管混凝土加固单柱桥墩施工装置 | |
CN103966956B (zh) | 一种抱箍式钢管混凝土加固单柱桥墩施工装置和施工方法 | |
CN105926470B (zh) | 高架桥梁改造方法 | |
CN105625188A (zh) | 基于BIM技术的客运专线48m节段梁施工方法 | |
CN103866693B (zh) | 一种钢筋混凝土系杆拱桥拱肋的安装方法 | |
CN103290784B (zh) | 拱梁结合桥吊装施工方法 | |
CN107100069A (zh) | 一种混凝土圆柱墩盖梁和系梁逆序施工方法 | |
CN205662837U (zh) | 高架桥梁改造结构 | |
CN104652293A (zh) | 一种用于加固psc连续箱梁桥的斜拉桥结构及施工方法 | |
CN107964870A (zh) | 一种可拆卸装配式钢筋混凝土桥墩承台连接结构 | |
CN109162204B (zh) | 一种桥梁下部结构横向分块快速组拼的施工方法 | |
CN207749409U (zh) | 可拆卸装配式钢筋混凝土桥墩承台连接结构 | |
CN208844417U (zh) | 一种用于桥墩柱的外预制结构及其外预制内现浇桥墩柱 | |
CN102605785A (zh) | 锚杆静压桩预加压力封桩装置 | |
CN207714108U (zh) | 一种大跨度多连拱拱式渡槽或桥梁的支撑系统 | |
CN203200745U (zh) | 一种逆作法施工中地下连续墙的加固支撑 | |
CN106759563A (zh) | 一种用于桩基修补加固的装置及采用该装置的施工方法 | |
CN207700746U (zh) | 既有建筑隔震加固的上支墩构造 | |
CN105088961A (zh) | 一种边跨合拢段与现浇段合并的施工方法 | |
CN206233115U (zh) | 一种桥梁施工支撑托架 | |
CN206902719U (zh) | 预拼装支撑梁组合支撑体系 | |
CN206591552U (zh) | 一种用于桩基修补加固的装置 | |
CN207314179U (zh) | 一种声屏障用整体式杯口安装结构 | |
CN205857260U (zh) | 一种公路桥梁桩基加固装置 | |
CN110284520A (zh) | 一种干湿混合连接的大跨径闭合框架板-柱装配体系 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Liu Jilin Inventor after: Song Zhenlin Inventor after: Chen Gangquan Inventor after: Li Lei Inventor after: Chen Lanchuan Inventor before: Wang Weikai Inventor before: Cao Zhenqing Inventor before: Chen Gangquan Inventor before: Li Lei |
|
CB03 | Change of inventor or designer information | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170623 Address after: 257000, the Yellow River Road, Dongying District, Shandong City, Dongying Province, planning five West Road Science and technology enterprise accelerator E2-4-403 Patentee after: SHANDONG KEDA INFRASTRUCTURE Co.,Ltd. Address before: 257091 Shandong city of Dongying province Dongying District Front Street No. 65 Patentee before: KEDA GROUP Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
CX01 | Expiry of patent term |
Granted publication date: 20141008 |
|
CX01 | Expiry of patent term |