CN109052266B - A kind of lossless leveling method in jack jacking work - Google Patents

A kind of lossless leveling method in jack jacking work Download PDF

Info

Publication number
CN109052266B
CN109052266B CN201810828776.0A CN201810828776A CN109052266B CN 109052266 B CN109052266 B CN 109052266B CN 201810828776 A CN201810828776 A CN 201810828776A CN 109052266 B CN109052266 B CN 109052266B
Authority
CN
China
Prior art keywords
jacking
jack
structure glue
high thixotropic
paste structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810828776.0A
Other languages
Chinese (zh)
Other versions
CN109052266A (en
Inventor
潘宇翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Oda Smart Technology Co Ltd
Original Assignee
Nanjing Oda Smart Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Oda Smart Technology Co Ltd filed Critical Nanjing Oda Smart Technology Co Ltd
Priority to CN201810828776.0A priority Critical patent/CN109052266B/en
Publication of CN109052266A publication Critical patent/CN109052266A/en
Application granted granted Critical
Publication of CN109052266B publication Critical patent/CN109052266B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F13/00Common constructional features or accessories
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09JADHESIVES; NON-MECHANICAL ASPECTS OF ADHESIVE PROCESSES IN GENERAL; ADHESIVE PROCESSES NOT PROVIDED FOR ELSEWHERE; USE OF MATERIALS AS ADHESIVES
    • C09J163/00Adhesives based on epoxy resins; Adhesives based on derivatives of epoxy resins

Landscapes

  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Adhesives Or Adhesive Processes (AREA)

Abstract

The present invention relates to field of mechanical technique, lossless leveling method in particular a kind of jack jacking work, the following steps are included: Step 1: production uncovered steel case: jacking is preceding to be obtained by jacking object outer dimension data, according to by the lifting weight of jacking object, the comprehensive determining uncovered steel case specific size of jacking displacement and jacking operating space.The present invention forms levelling module, so that jack be facilitated to jack in conjunction with customization and the uncovered steel case agreed with by jacking object shape using characteristic high-intensitive after high thixotropic, quick setting capabilities and solidification before the solidification of modified epoxy high thixotropic paste structure glue;The present invention can carry out levelling jacking to any form of object in outer surface, contact uniform, intensity stabilization, smooth reliable contact surface can be provided for jacking work and object is effectively prevent to generate damage in jacking, expanded the use scope of jack significantly, improved the economy of jacking work.

Description

A kind of lossless leveling method in jack jacking work
Technical field
Lossless leveling method the present invention relates to field of mechanical technique, in specially a kind of jack jacking work.
Background technique
Jack is widely used in the enterprises such as electric power, chemical industry, steel, bridge, machinery, can be used for equipment top lifting, and the disaster relief is rescued It helps, electric power maintenance, bridge maintaining, weight jacking, static press piling, foundation settlement, Ship Building and Repairing etc. can be also suitably used for finely tuning Operation, small gap, height space are limited occasion and use.The outstanding advantage of jack is exactly that flexible, light, reliable, economy is high. No matter which kind of jack, the most basic demand of work is smooth working face.When jacking work in face of such as pipe-line system, When the object of the surface irregularities such as spherical equipment, often it is forced to replace jacking scheme using other lifting equipments, economy is often not Such as the former.If being jacked by force using jack, it may be deformed since local stress is excessive by jacking object and even destroy, It destroys again or because bias causes jack that scuffing of cylinder bore occurs.Take reasonable levelling measure can be to avoid the above problem, sufficiently Play the good economy of jack.
Existing leveling method still has significant limitation, such as used in Bridge Support Replacement lifting operation quickly Cement leveling method is only applicable in the opposed flattened rough surface in surface.And the industrial equipment or pipeline for certain cast irons can be with The method for setting up jacking table top using welding support, there is also following 3 problems for such method: 1. pairs of existing equipments or pipeline produce Raw irreversible damage;2. the high temperature requirement halt device in welding process uses;3. there are still local stress phenomenon, or top Discontinuity during rising.Under conditions of not damaging by jacking object, keeps stablizing, uniformly contact, be suitable for simultaneously Deep camber or the leveling method on extremely irregular surface are urgent problems.In consideration of it, it is proposed that a kind of jack Jack the lossless leveling method in work.
Summary of the invention
The purpose of the present invention is to provide the lossless leveling methods in a kind of jacking work of jack, to solve above-mentioned background The problem of being proposed in technology.
To achieve the above object, the invention provides the following technical scheme:
A kind of lossless leveling method in jack jacking work, comprising the following steps:
Step 1: production uncovered steel case: obtaining before jacking by jacking object outer dimension data, according to by jacking object Lifting weight, jacking displacement and jacking operating space is comprehensive determines uncovered steel case specific size, and make with by jacking object Shape complementation and the enough uncovered steel casees of rigidity at jacking;
Step 2: making levelling module: excessive modified epoxy high thixotropic paste structure glue is added into uncovered steel case, Brown paper bed course is being pasted by jacking object and uncovered steel case contact area outer surface, under by the gravity of jacking object, Modified epoxy high thixotropic paste structure glue is pressed, until modified epoxy high thixotropic paste structure glue is fitted in completely by stitching surface By jacking body surface, after epoxy high thixotropic paste structure glue to be modified is fully cured, levelling module is formed;
Step 3: levelling module is utilized to complete subsequent jacking work: levelling module is installed on jack ontology, it will be by Jacking object is placed in levelling module, is can be completed under the action of jack ontology to by the jacking work of jacking object, Object jacking is in place and after fixing, and unloads jack ontology, removes levelling module and clear up body surface brown paper bed course.
As a preference of the present invention, jack ontology bottom end is equipped with billet.
As a preference of the present invention, being equipped with inside the uncovered steel case in criss-cross floor of putting more energy into, and uncovered steel case Two sides be equipped with gum outlet, be equipped in each gum outlet prevent modified epoxy high thixotropic paste structure glue overflow Stopper.
As a preference of the present invention, the compression strength of the modified epoxy high thixotropic paste structure glue is more than or equal to 65MPa, the tensile strength of modified epoxy high thixotropic paste structure glue are C30 concrete rank, and modified epoxy high thixotropic The solidification temperature of paste structure glue is 20 to 30 DEG C.
As a preference of the present invention, the modified epoxy high thixotropic paste structure glue include epoxy pre-reaction object, filler, Thixotropic agent, curing agent and plasticizer, and the component ratio between epoxy pre-reaction object, filler, thixotropic agent, curing agent and plasticizer It constitutes are as follows: 35 to 45 parts of object of epoxy pre-reaction, 30 to 40 parts of filler, 10 to 15 parts of thixotropic agent, 12 to 18 parts of curing agent, plasticizer 8 to 16 parts.
As a preference of the present invention, the modified epoxy high thixotropic paste structure glue preparation process is as follows:
Step 1: prepared by component: weighing five kinds of originals of composition modified epoxy high thixotropic paste structure glue in specific proportions Material;
Step 2: being stirred: the mixture that ready epoxy pre-reaction object and filler form first being poured into stirring and is set In standby, it is slowly added to thixotropic agent under the stirring rate of 150-250r/min, revolving speed is then adjusted to 300-500r/min, is added Curing agent finally adjusts revolving speed to 250-350r/min, plasticizer is added, the high thixotroping of modified epoxy is made after stirring 20-50min Property paste structure glue finished product.
Compared with prior art, the beneficial effects of the present invention are:
1, the present invention jacks the unusual object of shape encountered in work for jack and provides a kind of lossless leveling method, benefit With spy high-intensitive after high thixotropic, quick setting capabilities and solidification before the solidification of modified epoxy high thixotropic paste structure glue Property, in conjunction with customization and the uncovered steel case agreed with by jacking object shape, levelling module is formed, so that jack be facilitated to jack.
2, the present invention can carry out levelling jacking to any form of object in outer surface, contact uniform, intensity stabilization, Neng Gouwei Jacking work provides smooth reliable contact surface and object is effectively prevent to generate damage in jacking, has expanded jack significantly Use scope improves the economy of jacking work.
Detailed description of the invention
Fig. 1 is organigram of the invention;
Fig. 2 is leveling procedures front view of the present invention;
Fig. 3 is that effect picture is jacked after the present invention is levelling;
Fig. 4 is the front view of Fig. 3;
Fig. 5 is the schematic diagram of uncovered steel case of the present invention;
Fig. 6 is the front view of uncovered steel case of the present invention;
Fig. 7 is the top view of uncovered steel case of the present invention.
In figure: 1, jack ontology;2, uncovered steel case;3, it puts more energy into floor;4, gum outlet;5, stopper;6, modified epoxy is high Thixotropy paste structure glue;7, brown paper bed course;8, by jacking object.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that, term " center ", " longitudinal direction ", " transverse direction ", " length ", " width ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside", " up time The orientation or positional relationship of the instructions such as needle ", " counterclockwise " is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of The description present invention and simplified description, rather than the equipment of indication or suggestion meaning or element must have a particular orientation, with spy Fixed orientation construction and operation, therefore be not considered as limiting the invention.
Embodiment 1
A kind of lossless leveling method in jack jacking work, comprising the following steps:
Step 1: production uncovered steel case 2: obtaining before jacking by 8 outer dimension data of jacking object, according to by jacking object 8 lifting weight, jacking displacement and jacking operating space synthesis determines 2 specific size of uncovered steel case, and makes and jacked Shape complementation and the enough uncovered steel casees 2 of rigidity at 8 jacking of object;
Step 2: making levelling module: excessive modified epoxy high thixotropic paste structure glue being added into uncovered steel case 2 6, brown paper bed course 7 is being pasted by jacking object 8 and 2 contact area outer surface of uncovered steel case, by the gravity work of jacking object 8 Under, modified epoxy high thixotropic paste structure glue 6 is pressed, until modified epoxy high thixotropic paste structure glue 6 is complete by stitching surface It fits in entirely by 8 surface of jacking object, after epoxy high thixotropic paste structure glue 6 to be modified is fully cured, levelling module is formed;
Step 3: completing subsequent jacking work using levelling module: levelling module is installed on jack ontology 1, it will It is placed in levelling module by jacking object 8, can be completed under the action of jack ontology 1 to by the jacking of jacking object 8 Work, object jacking is in place and after fixing, and unloads jack ontology 1, removes levelling module and clear up body surface brown paper Bed course 7.
In the present embodiment, 1 bottom end of jack ontology is equipped with billet.
In the present embodiment, it is equipped with inside uncovered steel case 2 in criss-cross floor 3 of putting more energy into, and the two sides of uncovered steel case 2 It is equipped with gum outlet 4, the stopper 5 for preventing modified epoxy high thixotropic paste structure glue 6 from overflowing is equipped in each gum outlet 4.
In the present embodiment, the compression strength of modified epoxy high thixotropic paste structure glue 6 is more than or equal to 65MPa, modified ring The tensile strength of oxygen high thixotropic paste structure glue 6 is C30 concrete rank, and modified epoxy high thixotropic paste structure glue 6 Solidification temperature be 20 DEG C.
In the present embodiment, modified epoxy high thixotropic paste structure glue 6 includes epoxy pre-reaction object, filler, thixotropic agent, consolidates Agent and plasticizer, and the component ratio between epoxy pre-reaction object, filler, thixotropic agent, curing agent and plasticizer is constituted are as follows: ring 35 parts of oxygen pre-reaction object, 30 parts of filler, 10 parts of thixotropic agent, 12 parts of curing agent, 8 parts of plasticizer.
In the present embodiment, modified epoxy high thixotropic paste 6 preparation processes of structure glue are as follows:
Step 1: prepared by component: weighing five kinds of originals of composition modified epoxy high thixotropic paste structure glue 6 in specific proportions Material;
Step 2: being stirred: the mixture that ready epoxy pre-reaction object and filler form first being poured into stirring and is set In standby, it is slowly added to thixotropic agent under the stirring rate of 150r/min, then adjusting revolving speed to 300r/min, curing agent is added, Revolving speed is finally adjusted to 250r/min, plasticizer is added, modified epoxy high thixotropic paste structure glue 6 is made after stirring 20min Finished product.
Embodiment 2
A kind of lossless leveling method in jack jacking work, comprising the following steps:
Step 1: production uncovered steel case 2: obtaining before jacking by 8 outer dimension data of jacking object, according to by jacking object 8 lifting weight, jacking displacement and jacking operating space synthesis determines 2 specific size of uncovered steel case, and makes and jacked Shape complementation and the enough uncovered steel casees 2 of rigidity at 8 jacking of object;
Step 2: making levelling module: excessive modified epoxy high thixotropic paste structure glue being added into uncovered steel case 2 6, brown paper bed course 7 is being pasted by jacking object 8 and 2 contact area outer surface of uncovered steel case, by the gravity work of jacking object 8 Under, modified epoxy high thixotropic paste structure glue 6 is pressed, until modified epoxy high thixotropic paste structure glue 6 is complete by stitching surface It fits in entirely by 8 surface of jacking object, after epoxy high thixotropic paste structure glue 6 to be modified is fully cured, levelling module is formed;
Step 3: completing subsequent jacking work using levelling module: levelling module is installed on jack ontology 1, it will It is placed in levelling module by jacking object 8, can be completed under the action of jack ontology 1 to by the jacking of jacking object 8 Work, object jacking is in place and after fixing, and unloads jack ontology 1, removes levelling module and clear up body surface brown paper Bed course 7.
In the present embodiment, 1 bottom end of jack ontology is equipped with billet.
In the present embodiment, it is equipped with inside uncovered steel case 2 in criss-cross floor 3 of putting more energy into, and the two sides of uncovered steel case 2 It is equipped with gum outlet 4, the stopper 5 for preventing modified epoxy high thixotropic paste structure glue 6 from overflowing is equipped in each gum outlet 4.
In the present embodiment, the compression strength of modified epoxy high thixotropic paste structure glue 6 is more than or equal to 65MPa, modified ring The tensile strength of oxygen high thixotropic paste structure glue 6 is C30 concrete rank, and modified epoxy high thixotropic paste structure glue 6 Solidification temperature be 25 DEG C.
In the present embodiment, modified epoxy high thixotropic paste structure glue 6 includes epoxy pre-reaction object, filler, thixotropic agent, consolidates Agent and plasticizer, and the component ratio between epoxy pre-reaction object, filler, thixotropic agent, curing agent and plasticizer is constituted are as follows: ring 40 parts of oxygen pre-reaction object, 35 parts of filler, 12.5 parts of thixotropic agent, 15 parts of curing agent, 12 parts of plasticizer.
In the present embodiment, modified epoxy high thixotropic paste 6 preparation processes of structure glue are as follows:
Step 1: prepared by component: weighing five kinds of originals of composition modified epoxy high thixotropic paste structure glue 6 in specific proportions Material;
Step 2: being stirred: the mixture that ready epoxy pre-reaction object and filler form first being poured into stirring and is set In standby, it is slowly added to thixotropic agent under the stirring rate of 200r/min, then adjusting revolving speed to 400r/min, curing agent is added, Revolving speed is finally adjusted to 300r/min, plasticizer is added, modified epoxy high thixotropic paste structure glue 6 is made after stirring 35min Finished product.
Embodiment 3
A kind of lossless leveling method in jack jacking work, comprising the following steps:
Step 1: production uncovered steel case 2: obtaining before jacking by 8 outer dimension data of jacking object, according to by jacking object 8 lifting weight, jacking displacement and jacking operating space synthesis determines 2 specific size of uncovered steel case, and makes and jacked Shape complementation and the enough uncovered steel casees 2 of rigidity at 8 jacking of object;
Step 2: making levelling module: excessive modified epoxy high thixotropic paste structure glue being added into uncovered steel case 2 6, brown paper bed course 7 is being pasted by jacking object 8 and 2 contact area outer surface of uncovered steel case, by the gravity work of jacking object 8 Under, modified epoxy high thixotropic paste structure glue 6 is pressed, until modified epoxy high thixotropic paste structure glue 6 is complete by stitching surface It fits in entirely by 8 surface of jacking object, after epoxy high thixotropic paste structure glue 6 to be modified is fully cured, levelling module is formed;
Step 3: completing subsequent jacking work using levelling module: levelling module is installed on jack ontology 1, it will It is placed in levelling module by jacking object 8, can be completed under the action of jack ontology 1 to by the jacking of jacking object 8 Work, object jacking is in place and after fixing, and unloads jack ontology 1, removes levelling module and clear up body surface brown paper Bed course 7.
In the present embodiment, 1 bottom end of jack ontology is equipped with billet.
In the present embodiment, it is equipped with inside uncovered steel case 2 in criss-cross floor 3 of putting more energy into, and the two sides of uncovered steel case 2 It is equipped with gum outlet 4, the stopper 5 for preventing modified epoxy high thixotropic paste structure glue 6 from overflowing is equipped in each gum outlet 4.
In the present embodiment, the compression strength of modified epoxy high thixotropic paste structure glue 6 is more than or equal to 65MPa, modified ring The tensile strength of oxygen high thixotropic paste structure glue 6 is C30 concrete rank, and modified epoxy high thixotropic paste structure glue 6 Solidification temperature be 30 DEG C.
In the present embodiment, modified epoxy high thixotropic paste structure glue 6 includes epoxy pre-reaction object, filler, thixotropic agent, consolidates Agent and plasticizer, and the component ratio between epoxy pre-reaction object, filler, thixotropic agent, curing agent and plasticizer is constituted are as follows: ring 45 parts of oxygen pre-reaction object, 40 parts of filler, 15 parts of thixotropic agent, 18 parts of curing agent, 16 parts of plasticizer.
In the present embodiment, modified epoxy high thixotropic paste 6 preparation processes of structure glue are as follows:
Step 1: prepared by component: weighing five kinds of originals of composition modified epoxy high thixotropic paste structure glue 6 in specific proportions Material;
Step 2: being stirred: the mixture that ready epoxy pre-reaction object and filler form first being poured into stirring and is set In standby, it is slowly added to thixotropic agent under the stirring rate of 250r/min, then adjusting revolving speed to 500r/min, curing agent is added, Revolving speed is finally adjusted to 350r/min, plasticizer is added, modified epoxy high thixotropic paste structure glue 6 is made after stirring 50min Finished product.
The basic principles, main features and advantages of the present invention have been shown and described above.The technology of the industry For personnel it should be appreciated that the present invention is not limited to the above embodiments, described in the above embodiment and specification is only the present invention Preference, be not intended to limit the invention, without departing from the spirit and scope of the present invention, the present invention also has various Changes and improvements, these changes and improvements all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by institute Attached claims and its equivalent thereof.

Claims (6)

1. the lossless leveling method in a kind of jack jacking work, it is characterised in that: the following steps are included:
Step 1: production uncovered steel case (2): obtaining before jacking by jacking object (8) outer dimension data, according to by jacking object (8) lifting weight, comprehensive determining uncovered steel case (2) specific size of jacking displacement and jacking operating space, and production and quilt Jack shape complementation and the enough uncovered steel casees (2) of rigidity at object (8) jacking;
Step 2: making levelling module: to the excessive modified epoxy high thixotropic paste structure glue of addition in uncovered steel case (2) (6), brown paper bed course (7) are being pasted by jacking object (8) and uncovered steel case (2) contact area outer surface, by jacking object (8) it under gravity, presses modified epoxy high thixotropic paste structure glue (6), until modified epoxy high thixotropic paste structure Glue (6) is fitted in by stitching surface completely by jacking object (8) surface, and epoxy high thixotropic paste structure glue (6) to be modified is complete After solidification, levelling module is formed;
Step 3: levelling module is utilized to complete subsequent jacking work: levelling module is installed on jack ontology (1), it will be by Jacking object (8) is placed in levelling module, can be completed under the action of jack ontology (1) to by jacking object (8) Jack work, object jacking is in place and after fixing, and unloads jack ontology (1), removes levelling module and clear up body surface Brown paper bed course (7).
2. the lossless leveling method in jack jacking work according to claim 1, it is characterised in that: the jack Ontology (1) bottom end is equipped with billet.
3. the lossless leveling method in jack jacking work according to claim 1, it is characterised in that: the uncovered steel It is equipped with inside case (2) in criss-cross floor of putting more energy into (3), and the two sides of uncovered steel case (2) are equipped with gum outlet (4), often The stopper (5) for preventing modified epoxy high thixotropic paste structure glue (6) from overflowing is equipped in a gum outlet (4).
4. the lossless leveling method in jack jacking work according to claim 1, it is characterised in that: the modified ring The compression strength of oxygen high thixotropic paste structure glue (6) is more than or equal to 65MPa, modified epoxy high thixotropic paste structure glue (6) Tensile strength be C30 concrete rank, and the solidification temperature of modified epoxy high thixotropic paste structure glue (6) be 20 to 30 ℃。
5. the lossless leveling method in jack jacking work according to claim 1, it is characterised in that: the modified ring Oxygen high thixotropic paste structure glue (6) includes epoxy pre-reaction object, filler, thixotropic agent, curing agent and plasticizer, and epoxy is pre- anti- The component ratio between object, filler, thixotropic agent, curing agent and plasticizer is answered to constitute are as follows: 35 to 45 parts of object of epoxy pre-reaction, filler 30 to 40 parts, 10 to 15 parts of thixotropic agent, 12 to 18 parts of curing agent, 8 to 16 parts of plasticizer.
6. the lossless leveling method in jack jacking work according to claim 5, it is characterised in that: the modified ring Oxygen high thixotropic paste structure glue (6) preparation process is as follows:
Step 1: prepared by component: weighing five kinds of originals of composition modified epoxy high thixotropic paste structure glue (6) in specific proportions Material;
Step 2: being stirred: first the mixture that ready epoxy pre-reaction object and filler form is poured into mixing plant, It is slowly added to thixotropic agent under the stirring rate of 150-250r/min, revolving speed is then adjusted to 300-500r/min, solidification is added Agent finally adjusts revolving speed to 250-350r/min, plasticizer is added, modified epoxy high thixotropic cream is made after stirring 20-50min Shape structure glue (6) finished product.
CN201810828776.0A 2018-07-25 2018-07-25 A kind of lossless leveling method in jack jacking work Active CN109052266B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810828776.0A CN109052266B (en) 2018-07-25 2018-07-25 A kind of lossless leveling method in jack jacking work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810828776.0A CN109052266B (en) 2018-07-25 2018-07-25 A kind of lossless leveling method in jack jacking work

Publications (2)

Publication Number Publication Date
CN109052266A CN109052266A (en) 2018-12-21
CN109052266B true CN109052266B (en) 2019-09-27

Family

ID=64835412

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810828776.0A Active CN109052266B (en) 2018-07-25 2018-07-25 A kind of lossless leveling method in jack jacking work

Country Status (1)

Country Link
CN (1) CN109052266B (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4209166A (en) * 1979-05-25 1980-06-24 Derouen Adrian J Universal jack and work positioning mechanism
CN201396138Y (en) * 2009-04-22 2010-02-03 中国海洋石油总公司 Hydraulic lift type instrument regulator
US20110088336A1 (en) * 2009-10-19 2011-04-21 Larsen Jr John E Integrated post and jack system
CN102807174A (en) * 2012-08-09 2012-12-05 中国海洋石油总公司 Synchronous jacking process of rolled pipes for ultra-large deepwater jacket
CN103706673B (en) * 2013-12-11 2015-10-28 安徽伟宏钢结构集团股份有限公司 A kind of node component radial location method of dome-like roof
CN104988845B (en) * 2015-07-17 2016-08-17 重庆桥都桥梁技术有限公司 A kind of Bridge Support Replacement and newly installed time leveling method

Also Published As

Publication number Publication date
CN109052266A (en) 2018-12-21

Similar Documents

Publication Publication Date Title
CN103938796B (en) Cast-in-situ reinforced concrete column construction
CN105699203B (en) A kind of experimental rig and method for measuring construction material compression strength under confined pressure
CN207794327U (en) A kind of precast assembly structure of Subway Station Platform plate
CN110044705A (en) A kind of concrete anti-compression method for testing performance based on construction
CN106087772B (en) Sliding varus constructing device and method outside Bridge High-pier
CN105133487B (en) Construction method for using combined type bridge temporary support to rapidly build continuous beams
CN205713084U (en) Cast-in-situ template
CN109052266B (en) A kind of lossless leveling method in jack jacking work
CN206681359U (en) One kind cheats new formwork system in hole
CN205382488U (en) Water conservancy project concrete dam body job -specific formwork
CN107601974A (en) A kind of carbon fiber reinforced concrete thin plate and preparation method thereof
CN207044407U (en) A kind of dismountable truck mixer of agitating device
CN207685853U (en) Anti-floating is exempted to tear type concrete equipment basis hole to be provided template open
CN203113515U (en) Slip form jacking integrated device
CN215760498U (en) Machine is demolishd to building engineering concrete form
CN209277586U (en) A kind of concrete column core cushion block for building jacking increasing layer
CN205035732U (en) Interim support of combined type bridge
CN107893537A (en) High-precision concrete leveling unit and construction method
CN206707264U (en) A kind of form for construction engineering
CN207996910U (en) Steel structure node plate bending process equipment
CN203795854U (en) Preformed hole formwork fixing device for bare concrete floor
CN207260178U (en) Steel structure base
CN206440572U (en) It is easy to load the slump device of sample
CN206477251U (en) Transverse prestress overall with reinforced concrete bridge deck plate prefab-form system
CN205291221U (en) Prefabricated mould of concrete guardrail

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant