CN109038829A - Electricity consumption subregion control system and method - Google Patents
Electricity consumption subregion control system and method Download PDFInfo
- Publication number
- CN109038829A CN109038829A CN201811012754.3A CN201811012754A CN109038829A CN 109038829 A CN109038829 A CN 109038829A CN 201811012754 A CN201811012754 A CN 201811012754A CN 109038829 A CN109038829 A CN 109038829A
- Authority
- CN
- China
- Prior art keywords
- intelligent
- intelligent socket
- terminal
- power equipment
- electricity consumption
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000005611 electricity Effects 0.000 title claims abstract description 86
- 238000000034 method Methods 0.000 title claims abstract description 15
- 238000005259 measurement Methods 0.000 claims description 11
- 239000003990 capacitor Substances 0.000 claims description 4
- 238000012544 monitoring process Methods 0.000 abstract description 13
- 238000004891 communication Methods 0.000 abstract description 2
- 239000000463 material Substances 0.000 description 6
- 238000012545 processing Methods 0.000 description 5
- 238000013461 design Methods 0.000 description 4
- 238000007689 inspection Methods 0.000 description 3
- 230000006855 networking Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
Classifications
-
- H02J13/0017—
Landscapes
- Power Sources (AREA)
Abstract
The present embodiments relate to communication equipment fields, disclose a kind of electricity consumption subregion control system and method.Wherein, electricity consumption subregion control system includes terminal and is applied to unit area, and unit area includes at least two subregions, and each subregion is respectively provided with an intelligent socket and intelligent power equipment.Intelligent power equipment accesses intelligent socket by way of grafting.Intelligent socket measures the power information of intelligent power equipment when intelligent power equipment accesses intelligent socket, and power information is sent to terminal in the form of data packet.Terminal carries out statistics to power information and the intelligent socket in control work zone domain is in close state within a preset period of time.Compared with prior art, the present invention can directly pass through the electricity of intelligent socket monitoring intelligent electrical equipment, the analysis to electricity is realized convenient for the subsequent data according to intelligent socket monitoring, facilitates basis and power supply is adjusted flexibly to the analysis result of electricity, and can be with using electricity wisely.
Description
Technical field
The present embodiments relate to communication equipment fields, in particular to electricity consumption subregion control system and method.
Background technique
At present for resident, one electricity measuring instrument usually is installed to measure household electricity by unit each household of family
Amount.Or for incorporated business, an electricity measuring instrument is installed to survey by each incorporated business usually as unit of incorporated business
Measure the electricity consumption of incorporated business.With the raising of Living consumption, a greater variety of smart home equipments come into huge numbers of families,
A greater variety of Intelligent office equipment enter office space.In addition, with the raising of development level, rent is higher and higher, then
Appearance much shares phenomenon, including office shares or residential quarter is shared.
Summary of the invention
Embodiment of the present invention is designed to provide a kind of electricity consumption subregion control system and method, allows to directly
By the electricity of intelligent socket monitoring intelligent electrical equipment, realize convenient for the subsequent data according to intelligent socket monitoring to electricity
Analysis facilitates basis and power supply is adjusted flexibly to the analysis result of electricity, and can be with using electricity wisely.
In order to solve the above technical problems, embodiments of the present invention provide a kind of electricity consumption subregion control system, it is described
Electricity consumption subregion control system includes terminal and is applied to unit area, and the unit area includes at least two subregions, often
A subregion is respectively provided at least one intelligent socket and at least one intelligent power equipment.The intelligent power equipment is logical
The mode for crossing grafting accesses the intelligent socket.The intelligent socket is used to access intelligent socket in the intelligent power equipment
When, the power information of the intelligent power equipment is measured, and the power information is sent to the end in the form of data packet
End.The terminal is for counting the power information.The terminal is also used to control the son within a preset period of time
Intelligent socket in region is in close state.
Embodiments of the present invention additionally provide a kind of electricity consumption area-control method, are controlled based on above-mentioned electricity consumption subregion
System;The electricity consumption area-control method includes: the intelligent socket when the intelligent power equipment accesses intelligent socket,
The power information of the intelligent power equipment is measured, and the power information is sent to the terminal in the form of data packet.
The terminal counts the power information, and the intelligent socket controlled in the subregion within a preset period of time is in
Closed state.
Embodiment of the present invention is inserted in intelligent power equipment access intelligence in terms of existing technologies, by intelligent socket
Seat when, measure intelligent power equipment power information so that the intelligent power equipment for being connected to intelligent socket do not need it is additional
Monitoring, and can be directly by the electricity of intelligent socket monitoring intelligent electrical equipment, convenient for subsequent according to intelligent socket monitoring
Data realize the analysis to electricity, facilitate basis and power supply is adjusted flexibly to the analysis result of electricity.Intelligent socket will use telecommunications
Breath is sent to terminal in the form of data packet;Power information is counted by terminal, and control work zone within a preset period of time
Intelligent socket in domain is in close state, and allows to using electricity wisely.
In addition, the intelligent socket and the intelligent power equipment in each subregion pass through bluetooth group
Mode interconnects, and the intelligent socket is specifically used for that the power information is sent to institute in the form of data packet by gateway
State terminal.In this way, it provides in the flexible and changeable unit area of one kind between intelligent socket and intelligent power equipment
Networking mode.
In addition, the intelligent socket is also used to show the power information of measurement.In this way, so that user can
Intuitively to observe the power information of each subregion by intelligent socket.
In addition, the intelligent socket is also used to be uploaded to the power information described when the intelligent socket powers off
Terminal.In this way, the power-off reason of intelligent socket is analyzed according to power information convenient for the later period.
In addition, setting is for maintaining the intelligent socket to work normally the battery or electricity of preset time in the intelligent socket
Hold.In this way, it is ensured that intelligent socket can work normally preset time when power is off, to guarantee intelligent socket energy
It is enough that power information is smoothly uploaded to terminal.
In addition, the intelligent power equipment be used for count itself be powered when power information, and by the power information with
The form of data packet is sent to the terminal;The terminal is for analyzing the received data packet, if default
The intelligent power equipment is not turned off in period, and the terminal is also used to issue information warning.It, can by issuing information warning
To remind staff to close intelligent power equipment, using electricity wisely, and make an inspection tour which intelligence checked in turn compared to staff
It can also save human and material resources for the scheme that energy electrical equipment is not turned off.Information warning can be, but not limited to as acoustic intelligence or light
Information, such as light flash or sending caution sound.
In addition, the terminal is also used to issue warning letter when it is more than preset duration that the intelligent power equipment is using duration
Breath, so as to avoid forgetting the generation for leading to accident due to closing intelligent power equipment because of user.
In addition, electricity consumption subregion control system further includes server;The intelligent power equipment is for counting itself
Power information when energization, and the power information is sent to the server in the form of data packet;The server pair
The received data packet is analyzed, if the intelligent power equipment is not turned off within a preset period of time, the server
It is also used to control the intelligent power equipment to close.By the way that intelligent power equipment, Ke Yijin are automatically closed within a preset period of time
One step using electricity wisely simultaneously further saves human and material resources.
In addition, the server is also used to when it is more than preset duration that the intelligent power equipment is using duration described in control
Intelligent power equipment is closed, so as to avoid forgetting the generation for leading to accident due to closing intelligent power equipment because of user.
Detailed description of the invention
One or more embodiments are illustrated by the picture in corresponding attached drawing, these exemplary theorys
The bright restriction not constituted to embodiment, the element in attached drawing with same reference numbers label are expressed as similar element, remove
Non- to have special statement, composition does not limit the figure in attached drawing.
Fig. 1 is the structural block diagram of first embodiment electricity consumption subregion control system according to the present invention;
Fig. 2 is the structural block diagram of second embodiment electricity consumption subregion control system according to the present invention;
Fig. 3 is the flow chart of third embodiment electricity consumption area-control method according to the present invention.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with attached drawing to the present invention
Each embodiment be explained in detail.However, it will be understood by those skilled in the art that in each embodiment party of the present invention
In formula, in order to make the reader understand this application better, many technical details are proposed.But even if without these technical details
And various changes and modifications based on the following respective embodiments, the application technical solution claimed also may be implemented.
The first embodiment of the present invention is related to a kind of electricity consumption subregion control systems.As shown in Figure 1, the electricity consumption subregion
Domain control system includes terminal 11 and is applied to unit area 12, and the unit area 12 includes at least two subregions 121, often
A subregion 121 is respectively provided at least one intelligent socket 1211 and at least one intelligent power equipment 1212.The intelligence
Energy electrical equipment 1212 accesses the intelligent socket 1211 by way of grafting.The intelligent socket 1211 is used in the intelligence
When energy electrical equipment 1212 accesses intelligent socket 1211, the power information of the intelligent power equipment 1212 is measured.Power information
May include it is following any one or any combination thereof: electricity consumption, current time, the mark of intelligent power equipment 1212.In reality
In the design on border, electrical measurement unit is can be set in the inside of the intelligent socket 1211.It is accessed in intelligent power equipment 1212
When intelligent socket 1211, the power information of intelligent power equipment 1212 is measured by electrical measurement unit.Specifically, electricity is surveyed
Measuring unit may include: acquisition module, timing module and processing module.Acquisition module and timing module are electrically connected in place
Manage module.Wherein, acquisition module is electrically connected to the jack of intelligent socket 1211, accesses intelligence for acquiring intelligent power equipment 1212
The current/voltage generated when energy socket 1211.Timing module accesses intelligent socket for real-time statistics intelligent power equipment 1212
1211 time.Processing module is used to count electricity according to current/voltage and time.By this design method, provide
A kind of specific implementation of electrical measurement unit, helps to ensure that feasibility of the invention.The intelligent socket 1211 will be surveyed
The power information of amount is sent to the terminal 11 in the form of data packet.The terminal 11 be used for the power information into
Row statistics.The terminal 11 is also used to control the intelligent socket 1211 in the subregion 121 within a preset period of time and is in pass
Closed state.
Through intelligent socket 1211 when intelligent power equipment 1212 accesses intelligent socket 1211, intelligent power equipment is measured
1212 power information, so that the intelligent power equipment 1212 for being connected to intelligent socket 1211 does not need additionally to be monitored, and can
Directly to pass through the electricity of 1211 monitoring intelligent electrical equipment 1212 of intelligent socket, monitored convenient for subsequent according to intelligent socket 1211
Data realize analysis to electricity, facilitate according to power supply is adjusted flexibly to the analysis result of electricity.Intelligent socket 1211 will
Power information is sent to terminal 11 in the form of data packet, is counted by terminal 11 to power information, and in preset time period
Intelligent socket 1211 in internal control system region 121 is in close state, and allows to using electricity wisely.
It is noted that the intelligent socket 1211 and the intelligent power in each subregion 121 are set
Standby 1212 are interconnected by way of bluetooth group, and the intelligent socket 1211 is specifically used for using telecommunications for described by gateway
Breath is sent to the terminal 11 in the form of data packet.In this way, a kind of flexible and changeable unit area 12 is provided
Networking mode between interior intelligent socket 1211 and intelligent power equipment 1212.
For example, unit area 12 can be a set of house or a set of office.It is one set of house in unit area 12
When, which may include public domain and at least two subregions 121.Wherein, public domain can be following any one
Kind or any combination thereof: dining room, kitchen, toilet, parlor, subregion 121 can be bedroom.Alternatively, being in unit area 12
When a set of office, which may include public domain and at least two subregions 121.Wherein, public domain can be with
For it is following any one or any combination thereof: meeting room, Tea Room, toilet, subregion 121 can be station.
It is illustrated so that unit area 12 is one set of house as an example: assuming that one set of house includes that a kitchen and two are sleeping
Room.Two bedrooms are respectively bedroom A and bedroom B.Bedroom A has been leased, and bedroom B is not leased.Landlord can lead to
The intelligent socket 1211 that terminal 11 controls in the B of bedroom is crossed to be in close state.Specifically, intelligent socket 1211 and terminal 11 can be with
It is attached by bluetooth, is in close state so that landlord controls the intelligent socket 1211 in the B of bedroom by terminal 11, it can be with
Ensure safety utilization of electric power and can be with power saving.Or intelligent socket 1211 and terminal 11 can be by network connections, so that landlord
The intelligent socket 1211 in the B of bedroom remotely can be controlled by terminal 11 to be in close state.
Compared with prior art, present embodiment can directly pass through 1211 monitoring intelligent electrical equipment 1212 of intelligent socket
Electricity, realize analysis to electricity convenient for the subsequent data monitored according to intelligent socket 1211, facilitate according to electricity
Power supply is adjusted flexibly in analysis result, and can be with using electricity wisely.
Second embodiment of the present invention is related to a kind of electricity consumption subregion control system.Present embodiment is implemented first
It is further improved on the basis of mode, mainly thes improvement is that: in present embodiment, if intelligence within a preset period of time
Energy electrical equipment is not turned off, and terminal is also used to issue information warning.
As shown in Fig. 2, electricity consumption subregion control system includes terminal 11 and is applied to unit area 12, the unit
Region 12 includes at least two subregions 121, and each subregion 121 is respectively provided at least one intelligent socket 1211 and extremely
Few intelligent power equipment 1212.The intelligent power equipment 1212 accesses the intelligent socket by way of grafting
1211.The intelligent socket 1211 is used to measure the intelligence when the intelligent power equipment 1212 accesses intelligent socket 1211
The power information of energy electrical equipment 1212.Power information may include it is following any one or any combination thereof: it is electricity consumption, current
Time, intelligent power equipment 1212 mark.Also, the intelligent socket 1211 can also show that the described of measurement uses telecommunications
Breath.In this way, user is allowed to use telecommunications by the intuitive observation each subregion 121 of intelligent socket 1211
Breath.In actual design, electrical measurement unit is can be set in the inside of the intelligent socket 1211.In intelligent power equipment
When 1212 access intelligent socket 1211, the power information of intelligent power equipment 1212 is measured by electrical measurement unit.Specifically
It says, electrical measurement unit may include: acquisition module, timing module and processing module.Acquisition module and timing module difference
It is electrically connected to processing module.Wherein, acquisition module is electrically connected to the jack of intelligent socket 1211, for acquiring intelligent power equipment
The current/voltage generated when 1212 access intelligent socket 1211.Timing module connects for real-time statistics intelligent power equipment 1212
Enter the time of intelligent socket 1211.Processing module is used to count electricity according to current/voltage and time.Pass through this design side
Formula provides a kind of specific implementation of electrical measurement unit, helps to ensure that feasibility of the invention.The intelligent socket
The power information of measurement is sent to the terminal 11 by 1211 in the form of data packet.The terminal 11 is used for the use
Power information is counted.The terminal 11 is also used to control the intelligent socket in the subregion 121 within a preset period of time
1211 are in close state.
Through intelligent socket 1211 when intelligent power equipment 1212 accesses intelligent socket 1211, intelligent power equipment is measured
1212 power information, so that the intelligent power equipment 1212 for being connected to intelligent socket 1211 does not need additionally to be monitored, and can
Directly to pass through the electricity of 1211 monitoring intelligent electrical equipment 1212 of intelligent socket, monitored convenient for subsequent according to intelligent socket 1211
Data realize analysis to electricity, facilitate according to power supply is adjusted flexibly to the analysis result of electricity.Intelligent socket 1211 will
Power information is sent to terminal 11 in the form of data packet, is counted by terminal 11 to power information, and in preset time period
Intelligent socket 1211 in internal control system region 121 is in close state, and allows to using electricity wisely.
It is noted that the intelligent socket 1211 and the intelligent power in each subregion 121 are set
Standby 1212 are interconnected by way of bluetooth group, and the intelligent socket 1211 is specifically used for using telecommunications for described by gateway
Breath is sent to the terminal 11 in the form of data packet.In this way, a kind of flexible and changeable unit area 12 is provided
Networking mode between interior intelligent socket 1211 and intelligent power equipment 1212.
In addition, the intelligent power equipment 1212 is used to count power information when itself being powered, and telecommunications is used by described
Breath is sent to the terminal 11 in the form of data packet.The terminal 11 is for analyzing the received data packet, such as
The intelligent power equipment 1212 is not turned off fruit within a preset period of time, and the terminal 11 is also used to issue information warning.Pass through
Information warning is issued, staff can be reminded to close intelligent power equipment 1212, using electricity wisely, and compared to staff
It makes an inspection tour in turn and checks for scheme which intelligent power equipment 1212 is not turned off and can also save human and material resources.Information warning can
With but be not limited to acoustic intelligence or optical information, for example light flash or issue caution sound.In actual application, the terminal 11
Be also used to the intelligent power equipment 1212 using duration be more than preset duration when issue information warning, so as to avoid because
User forgets to close intelligent power equipment 1212 and lead to the generation of accident.
For example, unit area 12 can be a set of house or a set of office.It is one set of house in unit area 12
When, which may include public domain and at least two subregions 121.Wherein, public domain can be following any one
Kind or any combination thereof: dining room, kitchen, toilet, parlor, subregion 121 can be bedroom.Alternatively, being in unit area 12
When a set of office, which may include public domain and at least two subregions 121.Wherein, public domain can be with
For it is following any one or any combination thereof: meeting room, Tea Room, toilet, subregion 121 can be station.
It is illustrated so that unit area 12 is a set of office as an example: assuming that a set of office includes meeting room and more
A station, such as 500 stations.After coming off duty, if reaching preset time (such as) at 9 points at night, there is intelligent use
The power information of electric equipment 1212 is sent to terminal 11 in the form of data packet.Terminal 11 analyzes received data packet,
It obtains intelligent power within a preset period of time and sets to be not turned off, then issue information warning.Which security personnel can obtain according to information warning
The computer or display of one station are not turned off, and are then directly arrived the station and are closed computer or display, and do not have to
500 stations are checked in turn, are saved human and material resources.
In addition, electricity consumption subregion control system can also include server 13.The intelligent power equipment 1212 is used
Power information when counting itself energization, and the power information is sent to the server 13 in the form of data packet.
The server 13 analyzes the received data packet, if the intelligent power equipment 1212 within a preset period of time
It is not turned off, the server 13 is also used to control the intelligent power equipment 1212 and closes.By automatic within a preset period of time
Intelligent power equipment 1212 is closed, electricity consumption can be further saved and further saved human and material resources.In actual application, clothes
Business device 13 is also used to control the intelligent power equipment when the intelligent power equipment 1212 is more than preset duration using duration
1212 close, so as to avoid forgetting the generation for leading to accident due to closing intelligent power equipment 1212 because of user.
In addition, the intelligent socket 1211 is also used to when the intelligent socket 1211 powers off, it will be in the power information
Reach the terminal 11.In this way, the power-off reason of intelligent socket 1211 is analyzed according to power information convenient for the later period.Institute
State the battery or capacitor being arranged in intelligent socket 1211 for maintaining the intelligent socket 1211 to work normally preset time.In reality
The battery or capacitor being arranged in the application on border, in intelligent socket 1211 are able to maintain that intelligent socket 1211 works normally 10 to 20
Second, such as 15 seconds, the specific time sets according to the capacity of actual battery or capacitor.In this way, it is ensured that intelligence
Socket 1211 can work normally preset time when power is off, to guarantee that intelligent socket 1211 can smoothly upload power information
To terminal 11.
For example, when thering are multiple intelligent power equipment 1212 to access intelligent socket 1211 simultaneously, so that intelligent socket
1211 immediate current is very big, and intelligent socket 1211 is caused to power off.For example, the intelligent power for accessing intelligent socket 1211 simultaneously is set
Standby 1212 be intelligent air condition and intelligent TV set.Power information can be uploaded to terminal 11, wherein electricity consumption by intelligent socket 1211
Information includes the title of intelligent power equipment 1212 and the electricity consumption of each intelligent power equipment 1212.Terminal 11 can be according to intelligence
It is that the title of energy electrical equipment 1212 and the analysis of electric power consumption of each intelligent power equipment 1212 go out for which intelligent power equipment
1211 circut breaking of intelligent socket caused by 1212 is convenient for later maintenance.
Compared with prior art, present embodiment can directly pass through 1211 monitoring intelligent electrical equipment 1212 of intelligent socket
Electricity, realize analysis to electricity convenient for the subsequent data monitored according to intelligent socket 1211, facilitate according to electricity
Power supply is adjusted flexibly in analysis result, and can be with using electricity wisely.Also, intelligent power equipment 1212 is not closed within a preset period of time
When closing, terminal 11 by issue information warning, can remind staff close intelligent power equipment 1212, using electricity wisely, and
And it is maked an inspection tour in turn compared to staff and checks for scheme which intelligent power equipment 1212 is not turned off and can also save people
Power material resources.
Third embodiment of the invention is related to a kind of electricity consumption area-control method, based on first or second embodiment
Electricity consumption subregion control system.
As shown in figure 3, electricity consumption area-control method specifically includes:
Intelligent power equipment is accessed intelligent socket by step S31.
Step S32, intelligent socket measure the power information of intelligent power equipment.
Power information is sent to terminal by step S33, intelligent socket in the form of data packet.
Step S34, terminal count power information, and according to statistical information control work zone domain within a preset period of time
In intelligent socket be in close state.
It is not difficult to find that present embodiment is embodiment of the method corresponding with first or second embodiment, this embodiment party
Formula can work in coordination implementation with first or second embodiment.The relevant technical details mentioned in first or second embodiment exist
In present embodiment still effectively, in order to reduce repetition, which is not described herein again.Correspondingly, the correlation mentioned in present embodiment
Technical detail is also applicable in first or second embodiment.
Compared with prior art, present embodiment can directly pass through the electricity of intelligent socket monitoring intelligent electrical equipment,
The analysis to electricity is realized convenient for the subsequent data according to intelligent socket monitoring, is facilitated according to flexible to the analysis result of electricity
Adjustment power supply, and can be with using electricity wisely.
It will be understood by those skilled in the art that the respective embodiments described above are to realize specific embodiments of the present invention,
And in practical applications, can to it, various changes can be made in the form and details, without departing from the spirit and scope of the present invention.
Claims (10)
1. a kind of electricity consumption subregion control system, which is characterized in that electricity consumption subregion control system includes terminal and application
In unit area, the unit area includes at least two subregions, and each subregion is respectively provided at least one and intelligently inserts
Seat and at least one intelligent power equipment;
The intelligent power equipment accesses the intelligent socket by way of grafting;
The intelligent socket is used to measure the use of the intelligent power equipment when the intelligent power equipment accesses intelligent socket
Power information, and the power information is sent to the terminal in the form of data packet;
The terminal is for counting the power information;
The intelligent socket that the terminal is also used to control within a preset period of time in the subregion is in close state.
2. electricity consumption subregion according to claim 1 control system, which is characterized in that described in each subregion
Intelligent socket and the intelligent power equipment are interconnected by way of bluetooth group, and the intelligent socket is specifically used for leading to
It crosses gateway and the power information is sent to the terminal in the form of data packet.
3. electricity consumption subregion according to claim 1 control system, which is characterized in that the intelligent socket is also used to show
The power information of measurement.
4. electricity consumption subregion according to claim 1 control system, which is characterized in that the intelligent socket is also used in institute
When stating intelligent socket power-off, the power information is uploaded to the terminal.
5. electricity consumption subregion according to claim 4 control system, which is characterized in that setting is used in the intelligent socket
The intelligent socket is maintained to work normally the battery or capacitor of preset time.
6. electricity consumption subregion according to claim 1 control system, which is characterized in that the intelligent power equipment is for uniting
Power information when itself being powered is counted, and the power information is sent to the terminal in the form of data packet;
The terminal is for analyzing the received data packet, if the intelligent power equipment within a preset period of time
It is not turned off, the terminal is also used to issue information warning.
7. electricity consumption subregion according to claim 6 control system, which is characterized in that the terminal is also used in the intelligence
Energy electrical equipment issues information warning when being more than preset duration using duration.
8. electricity consumption subregion according to claim 1 control system, which is characterized in that electricity consumption subregion control system
It further include server;
The intelligent power equipment is used to count power information when itself being powered, and by the power information with the shape of data packet
Formula is sent to the server;
The server analyzes the received data packet, if the intelligent power equipment is not within a preset period of time
It closes, the server is also used to control the intelligent power equipment and closes.
9. electricity consumption subregion according to claim 8 control system, which is characterized in that the server is also used to described
Intelligent power equipment controls the intelligent power equipment and closes when being more than preset duration using duration.
10. a kind of electricity consumption area-control method, which is characterized in that based on electricity consumption described in any one of claim 1 to 9
Subregion control system;
The electricity consumption area-control method includes:
For the intelligent socket when the intelligent power equipment accesses intelligent socket, measure the intelligent power equipment uses telecommunications
Breath, and the power information is sent to the terminal in the form of data packet;
The terminal counts the power information, and controls the intelligent socket in the subregion within a preset period of time
It is in close state.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811012754.3A CN109038829A (en) | 2018-08-31 | 2018-08-31 | Electricity consumption subregion control system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811012754.3A CN109038829A (en) | 2018-08-31 | 2018-08-31 | Electricity consumption subregion control system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109038829A true CN109038829A (en) | 2018-12-18 |
Family
ID=64622661
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811012754.3A Pending CN109038829A (en) | 2018-08-31 | 2018-08-31 | Electricity consumption subregion control system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109038829A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111738681A (en) * | 2020-06-17 | 2020-10-02 | 浙江大学 | Intelligent disinfection behavior judgment system and method based on deep learning and intelligent socket |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104362756A (en) * | 2014-11-28 | 2015-02-18 | 国家电网公司 | Household electricity consumption real-time analyzing system |
CN106125709A (en) * | 2016-08-31 | 2016-11-16 | 上海青橙实业有限公司 | A kind of smart jack and intelligent domestic system thereof |
CN107359487A (en) * | 2017-09-05 | 2017-11-17 | 兰州交通大学 | Distributed remote control apparatus socket and management of power use method |
CN108063349A (en) * | 2018-01-12 | 2018-05-22 | 湖南金鹤科技有限公司 | Intelligent socket and intelligent socket control system |
CN108134456A (en) * | 2018-01-26 | 2018-06-08 | 江南大学 | A kind of intelligent sharing jack system and control method |
-
2018
- 2018-08-31 CN CN201811012754.3A patent/CN109038829A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104362756A (en) * | 2014-11-28 | 2015-02-18 | 国家电网公司 | Household electricity consumption real-time analyzing system |
CN106125709A (en) * | 2016-08-31 | 2016-11-16 | 上海青橙实业有限公司 | A kind of smart jack and intelligent domestic system thereof |
CN107359487A (en) * | 2017-09-05 | 2017-11-17 | 兰州交通大学 | Distributed remote control apparatus socket and management of power use method |
CN108063349A (en) * | 2018-01-12 | 2018-05-22 | 湖南金鹤科技有限公司 | Intelligent socket and intelligent socket control system |
CN108134456A (en) * | 2018-01-26 | 2018-06-08 | 江南大学 | A kind of intelligent sharing jack system and control method |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111738681A (en) * | 2020-06-17 | 2020-10-02 | 浙江大学 | Intelligent disinfection behavior judgment system and method based on deep learning and intelligent socket |
CN111738681B (en) * | 2020-06-17 | 2021-09-03 | 浙江大学 | Intelligent disinfection behavior judgment system and method based on deep learning and intelligent socket |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104504598A (en) | U home smart community business management system | |
CN107732583B (en) | The remote monitoring intelligent socket and its system of a kind of network-oriented enterprise exhibition booth | |
CN108445776A (en) | A kind of intelligent home control system | |
CN104618206A (en) | Family core accessing device for realizing intelligent community service and system thereof | |
CN104808505A (en) | ARM-based interactive indoor environment monitoring control and abnormality alarming system and method | |
CN103795598A (en) | Intelligent home system | |
CN1457007A (en) | Guest room managing system and method | |
CN103578241A (en) | Intelligent home security and protection system based on fourth generation mobile communication technology | |
CN107846335A (en) | A kind of intelligent domestic system based on wireless communication | |
CN111179486A (en) | Intelligent passing system | |
CN111931956A (en) | Management system for isolated monitoring of operation and maintenance of medical equipment | |
EP3384733B1 (en) | Power control device | |
CN109038829A (en) | Electricity consumption subregion control system and method | |
CN202735782U (en) | Comprehensive intelligent home control system | |
CN110169052A (en) | Integrated audio/video collaboration system for meeting | |
CN113568358A (en) | Green official working intelligence power consumption monitoring control system based on thing networking | |
CN109274180A (en) | A kind of public power distribution room unattended system | |
CN109120351A (en) | A kind of data transmission method and system applied in Internet of Things | |
CN108683259A (en) | Intelligent gateway terminal and control system for power distribution room | |
CN106656830A (en) | Household energy router and control method thereof | |
CN204733268U (en) | Based on the all-digital visible talkback system of cloud service | |
CN208569729U (en) | A kind of gateway type intelligent fingerprint lock | |
CN208337239U (en) | Intelligent gateway terminal and control system for power distribution room | |
CN203909519U (en) | Smart classroom controller | |
CN103198576A (en) | House rent intelligence system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20181218 |