CN109038387A - Electric aerial work auxiliary connection equipment - Google Patents
Electric aerial work auxiliary connection equipment Download PDFInfo
- Publication number
- CN109038387A CN109038387A CN201810962642.8A CN201810962642A CN109038387A CN 109038387 A CN109038387 A CN 109038387A CN 201810962642 A CN201810962642 A CN 201810962642A CN 109038387 A CN109038387 A CN 109038387A
- Authority
- CN
- China
- Prior art keywords
- vertical tube
- rectangular hollow
- hinge
- auxiliary connection
- hinge bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000001105 regulatory effect Effects 0.000 claims abstract description 9
- 230000007246 mechanism Effects 0.000 claims description 2
- 230000007812 deficiency Effects 0.000 abstract description 4
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 230000000712 assembly Effects 0.000 description 12
- 238000000429 assembly Methods 0.000 description 12
- 238000006073 displacement reaction Methods 0.000 description 9
- 238000010586 diagram Methods 0.000 description 8
- 238000000034 method Methods 0.000 description 7
- 238000005452 bending Methods 0.000 description 5
- 238000010276 construction Methods 0.000 description 5
- 239000012212 insulator Substances 0.000 description 4
- 230000010355 oscillation Effects 0.000 description 4
- 230000008859 change Effects 0.000 description 3
- 230000005611 electricity Effects 0.000 description 3
- 210000000707 wrist Anatomy 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000033228 biological regulation Effects 0.000 description 2
- 230000007423 decrease Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 235000008331 Pinus X rigitaeda Nutrition 0.000 description 1
- 235000011613 Pinus brutia Nutrition 0.000 description 1
- 241000018646 Pinus brutia Species 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 210000003128 head Anatomy 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/14—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for joining or terminating cables
Landscapes
- Electric Cable Installation (AREA)
Abstract
The invention discloses electric aerial work auxiliary connection equipment, relate generally to high-altitude auxiliary connection device field.Including cross-arm hook, rectangular hollow vertical tube, hinge bar, pulley gear assembly and regulating device assembly, the electric coil winder structure for overlapping convex block, rectangular hollow vertical tube two sides;Articulated shaft is slidably connected in the shaft member slide opening, the hinge bar is symmetrically arranged with two;There are two the pulley gear assembly is set;The regulating device assembly includes adjusting bolt and limited cap;The electric coil winder structure includes servo motor, reel and halliard.The beneficial effects of the present invention are: solve deficiency in the prior art, can it is more convenient to link, wait connect wires carry out wiring and wiring after fix work.
Description
Technical field
The present invention relates to high-altitude auxiliary connection device fields, specifically electric aerial work auxiliary connection equipment.
Background technique
Power grid is being set up, in upkeep operation, high-altitude wiring operation is job content the most frequent.High-altitude wiring
Operation is divided into two kinds, and one is carry out wiring to the bracing wire anchor ear on electric pole or pylon or electric wire is connected to insulator
On.For by electric wire be connected to high-altitude wiring operation of the bracing wire anchor ear perhaps on insulator it is relatively easy because bracing wire anchor ear or
Insulator is each attached in irony cross-arm or pylon, and operation can be completed after electric wire is connect with bracing wire anchor ear or insulator.
Second is to dock two wire terminations using electric wire connecting junction, then uses steel wire tow line by connecing after wiring
In line device regulation to irony cross-arm or pylon.It is very difficult for power construction personnel for such high-altitude wiring operation.
Present operational method is that link (one end is already affixed on the electric pole or pylon of distant place) other end is passed through pulley
It rises at the top of electric pole or pylon, then to electric pole or pylon is taken in one end to be connected wires using another fixed pulley
On, construction personnel climbs near two pulleys, and electric wire and link are carried out wiring, use steel wire tow line after wiring again
It will be in the electric wire connecting junction regulation to irony cross-arm or pylon after wiring.There are serious risk deficiencies for this construction method:
1, due to link integrated hanging, under the effect of gravity, there is very big drawing in link and pulley bearing
Power, because construction personnel's strength is limited, the pulley where this pulling force makes link is just unable to adjusting position, constructor completely
Member can only adjust wait the pulley position where connecting wires, and made link with this, be suitable for wait relative position between connecting wires, but
Be need to expend very big strength when adjusting the position of pulley where connect wires because it is hanging wait connect wires also have it is larger
Weight, and inertia when due to the position of adjustment pulley needs force slowly to carry out position adjusting.Entire positioning construction
Operation difficulty is big in the process, and danger level arrives, very consuming physical strength.
2, it is constructed using two individual pulleys, user of service's inconvenience is carried out while being controlled.By the effect of high altitude wind,
In the random movement under the action of the wind of a pulley, the change of phase distance between two pulleys will be caused, electric wire is very thick,
Be difficult to carry out wire terminations a small range into bending adjustment by wrist strength, thus link, wait connect wires, electric wire connecting junction it
Between relative distance have to relatively stable to carry out qualified wiring operation.
3, link, wait the distance between connect wires can only the position by adjusting wait pulley where connecting wires carry out it is laborious
Manually adjust, and the accuracy of adjusting position is inadequate, needs to be repeated adjusting to reach reasonable wiring position, causes
Work progress is time-consuming and laborious.
Summary of the invention
The purpose of the present invention is to provide electric aerial work auxiliary connection equipment, it solve it is in the prior art not
Foot, can it is more convenient to link, wait connect wires carry out wiring and wiring after fix work.
The present invention to achieve the above object, is achieved through the following technical solutions:
Electric aerial work auxiliary connection equipment, including cross-arm hook, rectangular hollow vertical tube, overlap joint convex block, rectangular sky
Hinge bar, pulley gear assembly and regulating device assembly, the electric coil winder structure of heart vertical tube two sides;
Cross-arm hook bottom end is fixed at the top of rectangular hollow vertical tube;
The rectangular hollow vertical tube front and rear sides face is equipped with shaft member slide opening, in the rectangular hollow vertical tube left and right sides
Equipped with rod piece slide opening, the overlap joint convex block is two pieces, and two pieces of overlap joint convex blocks are located at left and right sides of rectangular hollow vertical tube bottom;
Articulated shaft is slidably connected in the shaft member slide opening, there are two the hinge bar is set, one end point of two hinge bars
Not Chuan Guo rod piece slide opening and articulated shaft it is hinged in rectangular hollow vertical tube inner cavity;
There are two the pulley gear assembly is set, the pulley gear assembly includes wheel carrier and fixed pulley, the fixed pulley
It is arranged on wheel carrier, the wheel top of the trellis and hinge bar end are hinged;
The rectangular hollow vertical tube intracavity bottom center is equipped with threaded hole, and the regulating device assembly includes adjusting spiral shell
Bolt and limited cap, the limited cap setting are equipped with circular trough, the circle channel opening inside articulated shaft bottom, the limited cap
Place is equipped with limited step, and the adjusting bolt is threadedly coupled with threaded hole, and the adjusting bolt is equipped with circle far from bolt head one end
Platform, the rotary table is arranged in circular trough, and can rotate in circular trough, and the limited step can limit rotary table in circular trough
It is interior;
The electric coil winder structure includes servo motor, reel and halliard, and the servo motor and reel are driven
Connection, the reel are equipped with halliard, and the halliard beginning hangs around fixed pulley.
Rod piece slide opening is passed through at the top of the hinge bar and is equipped with concave articulation piece, and the concave articulation piece includes the side plate of two sides
And the connecting bottom board being connect with the side plate of two sides, the side plate and articulated shaft of two sides are hinged, connecting bottom board and hinged axis connection, institute
The position for stating limited cap is located between the side plate of two sides.
The halliard be equipped with self-locking hook, the self-locking hook rise to the bait live wire fastening anchor ear, the electric wire
Fastening anchor ear includes the first hinge eyes and the second hinge eyes, and first hinge eyes one end and second hinge eyes one end are hinged, institute
It states the first hinge eyes other end and the second hinge eyes other end is equipped with protrusive board, be bolted between two pieces of protrusive boards, it is described
Second hinge eyes are equipped with shackle, and the self-locking hook hooks shackle.
The overlap joint convex block end is equipped with limiting slot
The cross-arm hook side is equipped with puller bolt.
The prior art is compared, the beneficial effects of the present invention are:
The present apparatus is symmetrically arranged with two pulley gear assemblies, and the fixed pulley on two pulley gear assemblies is respectively used to consolidate
Determine wiring, rise positioning wait connect wires, is positioned since two pulley gear assemblies pass through a rectangular hollow vertical tube, institute
When with wind-force to blow the present apparatus, need to overcome link (all hanging), overhanging portion to integrate wait connect wires
Load, so that wind-force is not easy to blow the present apparatus or the amplitude of oscillation very little when present apparatus is blown by wind.Since there is certain journey in wind-force
When the amplitude of oscillation of degree, positioned since two pulley gear assemblies pass through a rectangular hollow vertical tube, two pulley gears are total
Relative position, distance between there will not be larger change, this can make link, wait connect wires, between electric wire connecting junction
Relative distance is relatively stable.
Certainly, also need link, the relative distance wait connect wires, between electric wire connecting junction suitable in wiring.The first,
Cannot be as shown in a in Figure of description Fig. 7 --- link end, electric wire end waiting interlock, if not right
Link end, electric wire end waiting relative position are adjusted, between link end, electric wire end waiting electric wire connecting junction
Just it will appear in Figure of description Fig. 7 when being attached as shown in A, electric wire end point waiting a small range carries out bending tune
It is whole, but electric wire is very thick, is difficult wire terminations a small range carrying out bending adjustment by wrist strength;The second, also not
Can be as shown in b in Figure of description Fig. 8 --- distance is too big between link end, electric wire end waiting, such as says
Link end shown in B in bright book attached drawing Fig. 8, electric wire end waiting can not effectively be connected at all between electric wire connecting junction
It connects;So needing relative distance between link end, electric wire end waiting, electric wire connecting junction being adjusted to Figure of description Fig. 9
Shown in middle c like that, it will could effectively be connected between link end, electric wire end waiting, electric wire connecting junction in this way, such as
In Figure of description Fig. 9 shown in C.By the present apparatus design regulating device total performance can by link end, wait connect wires
Relative position is effectively adjusted between end, is adjusted into Figure of description Fig. 9 such shown in c.Specific method: by positive and negative
To adjusting bolt is screwed, make articulated shaft realization slide up and down, articulated shaft slide up and down during with the hinge bar of two sides above and below
Mobile, hinge bar top moves up and down, mobile against overlap joint convex block due to hinge bar in the process, so hinge bar bottom end has water
Square upward displacement, the displacement in this horizontal direction are used to adjust the relative distance between two pulley gear assemblies, i.e.,
It is adjustable relative distance between link end, electric wire end waiting, as long as to be adjusted to specification attached for the distance between end
In figure Fig. 9 shown in c like that, it thus can effectively be connected between link end, electric wire end waiting, electric wire connecting junction,
Rotation by adjusting bolt drives hinge bar bottom end to have the displacement in horizontal direction, very laborsaving during adjustment, side
Just, and improve adjusting position accuracy, reach reasonable wiring position.
In conclusion the present apparatus solves deficiency in the prior art, it can be more convenient to link, electricity waiting
Line fixes work after carrying out wiring and wiring.
Detailed description of the invention
Attached drawing 1 is usage state diagram of the present invention.
Attached drawing 2 is schematic cross-sectional view of the present invention.
Attached drawing 3 is hinge bar and articulated shaft articulated manner structural schematic diagram in the present invention.
Attached drawing 4 is that bolt end head and limited cap connection type structural schematic diagram are adjusted in the present invention.
Attached drawing 5 is middle pulley assembly of devices structural schematic diagram of the present invention.
Attached drawing 6 is that electric wire fastens hooping structure schematic diagram in the present invention.
Attached drawing 7 is structural schematic diagram when link end in the present invention, electric wire end waiting interlock.
Attached drawing 8 is structural schematic diagram when distance is too big between link end in the present invention, electric wire end waiting.
Attached drawing 9 is structural schematic diagram when distance is just suitable between link end in the present invention, electric wire end waiting.
Label shown in attached drawing:
1, cross-arm is linked up with;2, rectangular hollow vertical tube;3, convex block is overlapped;4, hinge bar;5, shaft member slide opening;6, rod piece slide opening;
7, articulated shaft;8, wheel carrier;9, fixed pulley;10, threaded hole;11, bolt is adjusted;12, limited cap;13, circular trough;14, limiting stand
Rank;15, rotary table;16, reel;17, halliard;18, concave articulation piece;19, side plate;20, connecting bottom board;21, self-locking is hung
Hook;22, electric wire fastens anchor ear;23, the first hinge eyes;24, the second hinge eyes;25, protrusive board;26, shackle;27, limiting slot;28,
Race;29, puller bolt;30, reinforcing rib;31, disk is limited;32, sliding bar;33, link;34, wait connect wires.
Specific embodiment
Present invention will be further explained below with reference to specific examples.It should be understood that these embodiments are merely to illustrate the present invention
Rather than it limits the scope of the invention.In addition, it should also be understood that, after reading the content taught by the present invention, those skilled in the art
Member can make various changes or modifications the present invention, and such equivalent forms equally fall within range defined herein.
Of the present invention is electric aerial work auxiliary connection equipment, and main structure includes cross-arm hook 1, rectangular hollow
Vertical tube 2, overlap joint convex block 3, rectangular hollow 2 two sides of vertical tube hinge bar 4, pulley gear assembly and regulating device assembly, it is electronic around
Line mechanism;
The cross-arm links up with 1 bottom end and is fixed on rectangular 2 top of hollow vertical tube;The irony that cross-arm hook 1 hangs over electric pole is horizontal
In load or on the cross bar of pylon.
The rectangular hollow 2 front and rear sides face of vertical tube is equipped with shaft member slide opening 5, rectangular hollow 2 left and right sides of vertical tube
Face is equipped with rod piece slide opening 6, and the overlap joint convex block 3 is two pieces, and two pieces of overlap joint convex blocks 3 are located at rectangular 2 bottom of hollow vertical tube
The left and right sides;Overlapping convex block 3 and rectangular hollow 2 bottom of vertical tube is the integral structure welded together, overlap joint convex block 3 with it is rectangular
Reinforcing rib 30 is additionally provided between hollow 2 bottom of vertical tube.
Articulated shaft 7 is slidably connected in the shaft member slide opening 5, there are two the hinge bar 4 is set, the one of two hinge bars 4
It is hinged in rectangular hollow 2 inner cavity of vertical tube with articulated shaft 7 that end is each passed through rod piece slide opening 6;The both ends of articulated shaft 7 are equipped with limit disk
31, two limit disks 31 can make the limit of articulated shaft 7 in shaft member slide opening 5.
There are two the pulley gear assembly is set, the pulley gear assembly includes wheel carrier 8 and fixed pulley 9, described to determine cunning
Wheel 9 is arranged on wheel carrier 8, and 8 top of wheel carrier is hinged with 4 end of hinge bar;
The rectangular hollow 2 intracavity bottom center of vertical tube is equipped with threaded hole 10, and the regulating device assembly includes adjusting
Bolt 11 and limited cap 12 are saved, the limited cap 12, which is arranged inside 7 bottom of articulated shaft, the limited cap 12, is equipped with circular trough
13,13 opening of circular trough is equipped with limited step 14, and the adjusting bolt 11 is threadedly coupled with threaded hole 10, the adjusting
Bolt 11 is equipped with rotary table 15 far from bolt head one end, and the rotary table 15 is arranged in circular trough 13, and can turn in circular trough 13
Dynamic, the limited step 14 can limit rotary table 15 in circular trough 13;It adjusts and is equipped with sliding bar 32 at the bolt head of bolt 11,
Sliding bar 32 horizontal in bolt head can slide, and holding 32 one end of sliding bar screw more laborsaving when adjusting bolt 11.
The electric coil winder structure includes servo motor, reel 16 and halliard 17, the servo motor and reel
16 transmission connections, the reel 16 are equipped with halliard 17, and 17 beginning of halliard hangs around fixed pulley 9.
It is described in order to realize the rotation connection at 4 top and articulated shaft 7 of hinge bar under the position limitation for avoiding limited cap 12
Pass through rod piece slide opening 6 at the top of hinge bar 4 and be equipped with concave articulation piece 18, the side plate 19 of the concave articulation piece 18 including two sides and
The connecting bottom board 20 connecting with the side plate 19 of two sides, the side plate 19 and articulated shaft 7 of two sides are hinged, connecting bottom board 20 and articulated shaft 7
Connection, the position of the limited cap 12 is located between the side plate 19 of two sides.So the side plate 19 of two sides can be by articulated shaft 7
Medium position is available, the position setting limited cap 12 being available.
The halliard 17 be equipped with self-locking hook 21, the self-locking hook 21 rise to the bait live wire fastening anchor ear 22,
The electric wire fastening anchor ear 22 includes the first hinge eyes 23 and the second hinge eyes 24, and described first hinge eyes, 23 one end is cut with scissors with second
It is hinged to connect 24 one end of ring, 23 other end of the first hinge eyes and 24 other end of the second hinge eyes are equipped with protrusive board 25, and two pieces convex
It is bolted between plate 25, second hinge eyes 24 are equipped with shackle 26, and the self-locking hook 21 hooks shackle 26.
By link 33, wait connect wires 34 end neighbouring position it is fixed using electric wire fastening anchor ear 22, first bolt is twisted when fixed
Pine keeps two pieces of 25 positions of protrusive board no longer fixed, and by link 33, wait connect wires, 34 end neighbouring position is placed on the first hinge
It connects between ring 23, the second hinge eyes 24, then again to its two pieces of protrusive boards 25, is bolted again between two pieces of protrusive boards 25, this
Sample can by link 33, wait connect wires 34 end neighbouring position it is fixed using electric wire fastening anchor ear 22.
3 end of overlap joint convex block is equipped with limiting slot 27, and limiting slot 27 can limit the sliding of hinge bar 4, make
Hinge bar 4 adjusts sliding under the limit of limiting slot 27.
The cross-arm links up with 1 side and is equipped with puller bolt 29.Cross-arm hook 1 is hung on the irony cross-arm of electric pole or electricity
After on the cross bar of tower, then puller bolt 29 tightened, by puller bolt 29 make cross-arm hook 1 it is stable be fixed to electric pole
On irony cross-arm or on the cross bar of pylon, making device is not in swing.
Application method and principle:
By link 33, wait connect wires 34 end neighbouring position it is fixed using electric wire fastening anchor ear 22.Halliard 17
On self-locking hook 21 hook the shackle 26 set in the second hinge eyes 24.
Using servo motor drive reel 16 rotate, halliard 17 with link 33, wait connect wires 34 end
It increases, at the fixed pulley 9 for rising to pulley gear assembly.
Then link 33 is compared again, wait the relative position for 34 two ends of connecting wires, look at the relative position of end
In form shown in b in form, Figure of description Fig. 8 shown in a in which kind of following form, that is: Figure of description Fig. 7;Specification
Form shown in c in attached drawing Fig. 9.
When a form:
33 end of link, wait connect wires, 34 ends interlock.If not to 33 end of link, wait connect wires 34
End relative position is adjusted, and 33 end of link will go out when being attached between 34 end electric wire connecting junctions of connecting wires
As A is shown in existing Figure of description Fig. 7, bending adjustment is carried out wait 34 end point a small ranges of connecting wires, but it is electric
Line is very thick, is difficult wire terminations a small range carrying out bending adjustment by wrist strength.Make to cut with scissors by screwing adjusting bolt 11
Spindle 7 decline, articulated shaft 7 decline when moved down with the hinge bar 4 of two sides, 4 top of hinge bar move down during by
Mobile against overlap joint convex block 3 in hinge bar 4, the angle on hinge bar 4 and horizontal direction reduces, and 4 bottom end of hinge bar has level
Displacement on direction, the displacement in this horizontal direction are used to adjust the relative distance between two pulley gear assemblies, can
Adjust 33 end of link, wait relative distance between 34 ends of connecting wires, two pulley gears always horizontally on position
Shifting be it is reversed, two pulley gear assemblies away from each other, so 33 end of link, wait also can between 34 ends of connecting wires
Away from each other, until the distance between end is adjusted in Figure of description Fig. 9 shown in c like that.It reaches in Figure of description Fig. 9
Shown in c like that after, can effectively be connected between 34 ends, electric wire connecting junction to 33 end of link, wait connect wires.
When b form:
It is 33 end of link, too big wait distance between 34 ends of connecting wires.If not to 33 end of link, electricity waiting
34 end relative position of line is adjusted, 33 end of link, when being attached between 34 end electric wire connecting junctions of connecting wires just
It will appear in Figure of description Fig. 7 as shown in B, 33 end of link under this form, wait 34 ends, wiring of connecting wires
It can not be effectively attached at all between device.
It adjusts bolt 11 by screwing and increase articulated shaft 7, the hinge bar 4 when articulated shaft 7 rises with two sides is to moving up
It is dynamic, 4 top of hinge bar move up during since hinge bar 4 is mobile against overlap joint convex block 3, on hinge bar 4 and horizontal direction
Angle increase, 4 bottom end of hinge bar has the displacement in horizontal direction, and the displacement in this horizontal direction is used to adjust two cunnings
Relative distance between wheel apparatus assembly is adjustable 33 end of link, wait relative distance between 34 ends of connecting wires, and two
A pulley gear always horizontally on displacement be it is reversed, two pulley gear assemblies are adjacent to each other, so link
33 ends, wait also can be adjacent to each other between 34 ends of connecting wires, until the distance between end is adjusted in Figure of description Fig. 9
Shown in c like that.After reaching in Figure of description Fig. 9 shown in c like that, can to 33 end of link, wait 34 ends of connecting wires,
It is effectively connected between electric wire connecting junction.
When c form:
33 end of link, wait connect wires, distance between 34 ends, electric wire connecting junction is reasonable, can directly carry out wiring.
In conclusion driving about 7 articulated shaft by the rotation for adjusting bolt 11,4 bottom end of hinge bar has horizontal direction
On displacement, so that 33 end of link will be adjusted, wait relative distance between 34 ends of connecting wires be adjusted to Figure of description
In Fig. 9 shown in c like that, very laborsaving, conveniently during adjustment, and the accuracy of adjusting position is improved, reach reasonable
Wiring position.By the above method, the present apparatus solves deficiency in the prior art, can be more convenient to link
33, wait fix work after connect wires 34 carry out wiring and wiring.
Fixed pulley 9 on two pulley gear assemblies of the present apparatus is respectively used to by link 33, wait connect wires 34 liters
Positioning is played, is positioned since two pulley gear assemblies pass through a rectangular hollow vertical tube 2, so wind-force is to blow this
When device, need to overcome link 33 (all hanging), overhanging portion wait 34 loads integrated of connecting wires, make wind-force
It is not easy to blow the present apparatus or the amplitude of oscillation very little when present apparatus is blown by wind.When there is a degree of amplitude of oscillation due to wind-force, by
Pass through a rectangular hollow vertical tube 2 in two pulley gear assemblies to be positioned, it is opposite between two pulley gear assemblies
Position, distance there will not be larger change, this can make link 33, wait the relative distance between 34, electric wire connecting junction of connecting wires
It is relatively stable.
Claims (6)
1. electric aerial work auxiliary connection equipment, it is characterised in that: including cross-arm hook (1), rectangular hollow vertical tube (2),
Overlap hinge bar (4), pulley gear assembly, the regulating device assembly, electronic coiling of convex block (3), rectangular hollow vertical tube (2) two sides
Mechanism;
The cross-arm hook (1) bottom end is fixed at the top of rectangular hollow vertical tube (2);
Rectangular hollow vertical tube (2) the front and rear sides face is equipped with shaft member slide opening (5), rectangular hollow vertical tube (2) left and right two
Side is equipped with rod piece slide opening (6), and the overlap joint convex block (3) is two pieces, and two pieces of overlap joint convex blocks (3) are located at rectangular hollow perpendicular
It manages at left and right sides of (2) bottom;
It slidably connects articulated shaft (7) in the shaft member slide opening (5), there are two the hinge bar (4) sets, two hinge bars (4)
To be each passed through rod piece slide opening (6) hinged in rectangular hollow vertical tube (2) inner cavity with articulated shaft (7) for one end;
There are two the pulley gear assembly is set, the pulley gear assembly includes wheel carrier (8) and fixed pulley (9), described to determine cunning
(9) are taken turns to be arranged on wheel carrier (8), it is hinged with hinge bar (4) end at the top of the wheel carrier (8);
Rectangular hollow vertical tube (2) the intracavity bottom center is equipped with threaded hole (10), and the regulating device assembly includes adjusting
Bolt (11) and limited cap (12) are saved, limited cap (12) setting is set inside articulated shaft (7) bottom, the limited cap (12)
Have circular trough (13), circular trough (13) opening is equipped with limited step (14), the adjusting bolt (11) and threaded hole
(10) it is threadedly coupled, the adjusting bolt (11) is equipped with rotary table (15) far from bolt head one end, and the rotary table (15) is arranged in circle
It in shape slot (13), and can be rotated in circular trough (13), the limited step (14) can limit rotary table (15) in circular trough
(13) in;
The electric coil winder structure includes servo motor, reel (16) and halliard (17), the servo motor and reel
(16) it is sequentially connected, the reel (16) is equipped with halliard (17), and halliard (17) beginning hangs down around fixed pulley (9)
It falls.
2. electric aerial work auxiliary connection equipment according to claim 1, it is characterised in that: hinge bar (4) top
Portion pass through rod piece slide opening (6) be equipped with concave articulation piece (18), the concave articulation piece (18) include two sides side plate (19) and
The connecting bottom board (20) connecting with the side plate (19) of two sides, the side plate (19) of two sides and articulated shaft (7) are rotatablely connected, connecting bottom board
(20) it is connect with hinge bar (4), the position of the limited cap (12) is located between the side plate (19) of two sides.
3. electric aerial work auxiliary connection equipment according to claim 1, it is characterised in that: on the halliard (17)
Equipped with self-locking hook (21), the self-locking hook (21) is risen to the bait live wire fastening anchor ear (22), and the electric wire fastens anchor ear
It (22) include the first hinge eyes (23) and the second hinge eyes (24), described first hinge eyes (23) one end and the second hinge eyes (24)
One end is hinged, and the first hinge eyes (23) other end and the second hinge eyes (24) other end are equipped with protrusive board (25), and two pieces convex
Plate is bolted between (25), and second hinge eyes (24) are equipped with shackle (26), self-locking hook (21) hook
Firmly shackle (26).
4. electric aerial work auxiliary connection equipment according to claim 1, it is characterised in that: the overlap joint convex block (3)
End is equipped with limiting slot (27), and the hinge bar (4) adjusts sliding in limiting slot (27).
5. electric aerial work auxiliary connection equipment according to claim 1, it is characterised in that: on the fixed pulley (9)
Equipped with race (28).
6. electric aerial work auxiliary connection equipment according to claim 1, it is characterised in that: the cross-arm links up with (1)
Side is equipped with puller bolt (29).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810962642.8A CN109038387B (en) | 2018-08-22 | 2018-08-22 | Auxiliary wiring equipment for electric power high-altitude operation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810962642.8A CN109038387B (en) | 2018-08-22 | 2018-08-22 | Auxiliary wiring equipment for electric power high-altitude operation |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109038387A true CN109038387A (en) | 2018-12-18 |
CN109038387B CN109038387B (en) | 2020-08-21 |
Family
ID=64628045
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810962642.8A Active CN109038387B (en) | 2018-08-22 | 2018-08-22 | Auxiliary wiring equipment for electric power high-altitude operation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109038387B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204089044U (en) * | 2014-11-11 | 2015-01-07 | 国网河北饶阳县供电公司 | Portable overhead conductor shift unit |
CN204886031U (en) * | 2015-07-30 | 2015-12-16 | 国网山东省电力公司菏泽供电公司 | Device of supplementary wiring |
CN205863799U (en) * | 2016-06-14 | 2017-01-04 | 嘉兴市恒欣电力建设有限公司 | End auxiliary calibrator device |
CN206976942U (en) * | 2017-07-31 | 2018-02-06 | 齐寓乾 | A kind of power construction wire-sending device |
-
2018
- 2018-08-22 CN CN201810962642.8A patent/CN109038387B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204089044U (en) * | 2014-11-11 | 2015-01-07 | 国网河北饶阳县供电公司 | Portable overhead conductor shift unit |
CN204886031U (en) * | 2015-07-30 | 2015-12-16 | 国网山东省电力公司菏泽供电公司 | Device of supplementary wiring |
CN205863799U (en) * | 2016-06-14 | 2017-01-04 | 嘉兴市恒欣电力建设有限公司 | End auxiliary calibrator device |
CN206976942U (en) * | 2017-07-31 | 2018-02-06 | 齐寓乾 | A kind of power construction wire-sending device |
Also Published As
Publication number | Publication date |
---|---|
CN109038387B (en) | 2020-08-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108002269B (en) | A kind of simple pole type transformer lifting device | |
CN208508376U (en) | A kind of stranded repair apparatus of grounded-line | |
CN112045091B (en) | Stay wire manufacturing device | |
CN108915339A (en) | Electric pole repairing device | |
CN109038387A (en) | Electric aerial work auxiliary connection equipment | |
CN219643444U (en) | Stringing device for high-voltage power construction | |
CN201738893U (en) | Electric balance-adjusting oil pumping unit | |
CN204559008U (en) | A kind of cable construction pay off rack | |
CN207108092U (en) | One kind can self-discharging heavy in section steel strand wires vertical type winding equipment | |
CN216052350U (en) | Height-adjustable's interim strutting arrangement is used to optic fibre cable way overhead line | |
CN212799053U (en) | Cable paying-off pulley | |
CN210348020U (en) | Automatic cable hooking mechanism | |
CN113507078A (en) | Power transmission and transformation circuit fixing device | |
CN211176139U (en) | Meteorological wind pole lift | |
CN213111940U (en) | Door profile line frame | |
CN210866988U (en) | Auxiliary device for electric power construction | |
CN208666768U (en) | A kind of spliced telescopic arm for cable drum | |
CN206992648U (en) | A kind of portable wire tensioning device | |
CN208539111U (en) | One kind being based on gear-driven tested rotating platform novel component | |
CN207597989U (en) | A kind of electric power tower with illumination functions | |
CN110107139B (en) | High-voltage power transmission tower with cable suspension degree adjusting function | |
CN206558962U (en) | A kind of installation tool of electric pole bird-proof device | |
CN107262989B (en) | Lifting motor drive type welding robot | |
CN217296684U (en) | Steel wire pay-off is used in high altitude | |
CN219635073U (en) | Fan blade conveying device for wind power generation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200724 Address after: Building 12, North District, Shandong design and Creative Industry Park, No. 868, Tangye West Road, Licheng District, Jinan City, Shandong Province 250109 Applicant after: Shandong Yuantai Power Technology Co.,Ltd. Address before: Huaiyin District of Ji'nan City, Shandong province 250022 Dexing Street No. 29 Applicant before: Liu Yiqiang |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |