CN109038387A - Electric aerial work auxiliary connection equipment - Google Patents

Electric aerial work auxiliary connection equipment Download PDF

Info

Publication number
CN109038387A
CN109038387A CN201810962642.8A CN201810962642A CN109038387A CN 109038387 A CN109038387 A CN 109038387A CN 201810962642 A CN201810962642 A CN 201810962642A CN 109038387 A CN109038387 A CN 109038387A
Authority
CN
China
Prior art keywords
vertical tube
rectangular hollow
hinge
auxiliary connection
hinge bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810962642.8A
Other languages
Chinese (zh)
Other versions
CN109038387B (en
Inventor
韩衍军
马化臻
刘义强
刘太朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Yuantai Power Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810962642.8A priority Critical patent/CN109038387B/en
Publication of CN109038387A publication Critical patent/CN109038387A/en
Application granted granted Critical
Publication of CN109038387B publication Critical patent/CN109038387B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/14Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for joining or terminating cables

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The invention discloses electric aerial work auxiliary connection equipment, relate generally to high-altitude auxiliary connection device field.Including cross-arm hook, rectangular hollow vertical tube, hinge bar, pulley gear assembly and regulating device assembly, the electric coil winder structure for overlapping convex block, rectangular hollow vertical tube two sides;Articulated shaft is slidably connected in the shaft member slide opening, the hinge bar is symmetrically arranged with two;There are two the pulley gear assembly is set;The regulating device assembly includes adjusting bolt and limited cap;The electric coil winder structure includes servo motor, reel and halliard.The beneficial effects of the present invention are: solve deficiency in the prior art, can it is more convenient to link, wait connect wires carry out wiring and wiring after fix work.

Description

Electric aerial work auxiliary connection equipment
Technical field
The present invention relates to high-altitude auxiliary connection device fields, specifically electric aerial work auxiliary connection equipment.
Background technique
Power grid is being set up, in upkeep operation, high-altitude wiring operation is job content the most frequent.High-altitude wiring Operation is divided into two kinds, and one is carry out wiring to the bracing wire anchor ear on electric pole or pylon or electric wire is connected to insulator On.For by electric wire be connected to high-altitude wiring operation of the bracing wire anchor ear perhaps on insulator it is relatively easy because bracing wire anchor ear or Insulator is each attached in irony cross-arm or pylon, and operation can be completed after electric wire is connect with bracing wire anchor ear or insulator.
Second is to dock two wire terminations using electric wire connecting junction, then uses steel wire tow line by connecing after wiring In line device regulation to irony cross-arm or pylon.It is very difficult for power construction personnel for such high-altitude wiring operation. Present operational method is that link (one end is already affixed on the electric pole or pylon of distant place) other end is passed through pulley It rises at the top of electric pole or pylon, then to electric pole or pylon is taken in one end to be connected wires using another fixed pulley On, construction personnel climbs near two pulleys, and electric wire and link are carried out wiring, use steel wire tow line after wiring again It will be in the electric wire connecting junction regulation to irony cross-arm or pylon after wiring.There are serious risk deficiencies for this construction method:
1, due to link integrated hanging, under the effect of gravity, there is very big drawing in link and pulley bearing Power, because construction personnel's strength is limited, the pulley where this pulling force makes link is just unable to adjusting position, constructor completely Member can only adjust wait the pulley position where connecting wires, and made link with this, be suitable for wait relative position between connecting wires, but Be need to expend very big strength when adjusting the position of pulley where connect wires because it is hanging wait connect wires also have it is larger Weight, and inertia when due to the position of adjustment pulley needs force slowly to carry out position adjusting.Entire positioning construction Operation difficulty is big in the process, and danger level arrives, very consuming physical strength.
2, it is constructed using two individual pulleys, user of service's inconvenience is carried out while being controlled.By the effect of high altitude wind, In the random movement under the action of the wind of a pulley, the change of phase distance between two pulleys will be caused, electric wire is very thick, Be difficult to carry out wire terminations a small range into bending adjustment by wrist strength, thus link, wait connect wires, electric wire connecting junction it Between relative distance have to relatively stable to carry out qualified wiring operation.
3, link, wait the distance between connect wires can only the position by adjusting wait pulley where connecting wires carry out it is laborious Manually adjust, and the accuracy of adjusting position is inadequate, needs to be repeated adjusting to reach reasonable wiring position, causes Work progress is time-consuming and laborious.
Summary of the invention
The purpose of the present invention is to provide electric aerial work auxiliary connection equipment, it solve it is in the prior art not Foot, can it is more convenient to link, wait connect wires carry out wiring and wiring after fix work.
The present invention to achieve the above object, is achieved through the following technical solutions:
Electric aerial work auxiliary connection equipment, including cross-arm hook, rectangular hollow vertical tube, overlap joint convex block, rectangular sky Hinge bar, pulley gear assembly and regulating device assembly, the electric coil winder structure of heart vertical tube two sides;
Cross-arm hook bottom end is fixed at the top of rectangular hollow vertical tube;
The rectangular hollow vertical tube front and rear sides face is equipped with shaft member slide opening, in the rectangular hollow vertical tube left and right sides Equipped with rod piece slide opening, the overlap joint convex block is two pieces, and two pieces of overlap joint convex blocks are located at left and right sides of rectangular hollow vertical tube bottom;
Articulated shaft is slidably connected in the shaft member slide opening, there are two the hinge bar is set, one end point of two hinge bars Not Chuan Guo rod piece slide opening and articulated shaft it is hinged in rectangular hollow vertical tube inner cavity;
There are two the pulley gear assembly is set, the pulley gear assembly includes wheel carrier and fixed pulley, the fixed pulley It is arranged on wheel carrier, the wheel top of the trellis and hinge bar end are hinged;
The rectangular hollow vertical tube intracavity bottom center is equipped with threaded hole, and the regulating device assembly includes adjusting spiral shell Bolt and limited cap, the limited cap setting are equipped with circular trough, the circle channel opening inside articulated shaft bottom, the limited cap Place is equipped with limited step, and the adjusting bolt is threadedly coupled with threaded hole, and the adjusting bolt is equipped with circle far from bolt head one end Platform, the rotary table is arranged in circular trough, and can rotate in circular trough, and the limited step can limit rotary table in circular trough It is interior;
The electric coil winder structure includes servo motor, reel and halliard, and the servo motor and reel are driven Connection, the reel are equipped with halliard, and the halliard beginning hangs around fixed pulley.
Rod piece slide opening is passed through at the top of the hinge bar and is equipped with concave articulation piece, and the concave articulation piece includes the side plate of two sides And the connecting bottom board being connect with the side plate of two sides, the side plate and articulated shaft of two sides are hinged, connecting bottom board and hinged axis connection, institute The position for stating limited cap is located between the side plate of two sides.
The halliard be equipped with self-locking hook, the self-locking hook rise to the bait live wire fastening anchor ear, the electric wire Fastening anchor ear includes the first hinge eyes and the second hinge eyes, and first hinge eyes one end and second hinge eyes one end are hinged, institute It states the first hinge eyes other end and the second hinge eyes other end is equipped with protrusive board, be bolted between two pieces of protrusive boards, it is described Second hinge eyes are equipped with shackle, and the self-locking hook hooks shackle.
The overlap joint convex block end is equipped with limiting slot
The cross-arm hook side is equipped with puller bolt.
The prior art is compared, the beneficial effects of the present invention are:
The present apparatus is symmetrically arranged with two pulley gear assemblies, and the fixed pulley on two pulley gear assemblies is respectively used to consolidate Determine wiring, rise positioning wait connect wires, is positioned since two pulley gear assemblies pass through a rectangular hollow vertical tube, institute When with wind-force to blow the present apparatus, need to overcome link (all hanging), overhanging portion to integrate wait connect wires Load, so that wind-force is not easy to blow the present apparatus or the amplitude of oscillation very little when present apparatus is blown by wind.Since there is certain journey in wind-force When the amplitude of oscillation of degree, positioned since two pulley gear assemblies pass through a rectangular hollow vertical tube, two pulley gears are total Relative position, distance between there will not be larger change, this can make link, wait connect wires, between electric wire connecting junction Relative distance is relatively stable.
Certainly, also need link, the relative distance wait connect wires, between electric wire connecting junction suitable in wiring.The first, Cannot be as shown in a in Figure of description Fig. 7 --- link end, electric wire end waiting interlock, if not right Link end, electric wire end waiting relative position are adjusted, between link end, electric wire end waiting electric wire connecting junction Just it will appear in Figure of description Fig. 7 when being attached as shown in A, electric wire end point waiting a small range carries out bending tune It is whole, but electric wire is very thick, is difficult wire terminations a small range carrying out bending adjustment by wrist strength;The second, also not Can be as shown in b in Figure of description Fig. 8 --- distance is too big between link end, electric wire end waiting, such as says Link end shown in B in bright book attached drawing Fig. 8, electric wire end waiting can not effectively be connected at all between electric wire connecting junction It connects;So needing relative distance between link end, electric wire end waiting, electric wire connecting junction being adjusted to Figure of description Fig. 9 Shown in middle c like that, it will could effectively be connected between link end, electric wire end waiting, electric wire connecting junction in this way, such as In Figure of description Fig. 9 shown in C.By the present apparatus design regulating device total performance can by link end, wait connect wires Relative position is effectively adjusted between end, is adjusted into Figure of description Fig. 9 such shown in c.Specific method: by positive and negative To adjusting bolt is screwed, make articulated shaft realization slide up and down, articulated shaft slide up and down during with the hinge bar of two sides above and below Mobile, hinge bar top moves up and down, mobile against overlap joint convex block due to hinge bar in the process, so hinge bar bottom end has water Square upward displacement, the displacement in this horizontal direction are used to adjust the relative distance between two pulley gear assemblies, i.e., It is adjustable relative distance between link end, electric wire end waiting, as long as to be adjusted to specification attached for the distance between end In figure Fig. 9 shown in c like that, it thus can effectively be connected between link end, electric wire end waiting, electric wire connecting junction, Rotation by adjusting bolt drives hinge bar bottom end to have the displacement in horizontal direction, very laborsaving during adjustment, side Just, and improve adjusting position accuracy, reach reasonable wiring position.
In conclusion the present apparatus solves deficiency in the prior art, it can be more convenient to link, electricity waiting Line fixes work after carrying out wiring and wiring.
Detailed description of the invention
Attached drawing 1 is usage state diagram of the present invention.
Attached drawing 2 is schematic cross-sectional view of the present invention.
Attached drawing 3 is hinge bar and articulated shaft articulated manner structural schematic diagram in the present invention.
Attached drawing 4 is that bolt end head and limited cap connection type structural schematic diagram are adjusted in the present invention.
Attached drawing 5 is middle pulley assembly of devices structural schematic diagram of the present invention.
Attached drawing 6 is that electric wire fastens hooping structure schematic diagram in the present invention.
Attached drawing 7 is structural schematic diagram when link end in the present invention, electric wire end waiting interlock.
Attached drawing 8 is structural schematic diagram when distance is too big between link end in the present invention, electric wire end waiting.
Attached drawing 9 is structural schematic diagram when distance is just suitable between link end in the present invention, electric wire end waiting.
Label shown in attached drawing:
1, cross-arm is linked up with;2, rectangular hollow vertical tube;3, convex block is overlapped;4, hinge bar;5, shaft member slide opening;6, rod piece slide opening; 7, articulated shaft;8, wheel carrier;9, fixed pulley;10, threaded hole;11, bolt is adjusted;12, limited cap;13, circular trough;14, limiting stand Rank;15, rotary table;16, reel;17, halliard;18, concave articulation piece;19, side plate;20, connecting bottom board;21, self-locking is hung Hook;22, electric wire fastens anchor ear;23, the first hinge eyes;24, the second hinge eyes;25, protrusive board;26, shackle;27, limiting slot;28, Race;29, puller bolt;30, reinforcing rib;31, disk is limited;32, sliding bar;33, link;34, wait connect wires.
Specific embodiment
Present invention will be further explained below with reference to specific examples.It should be understood that these embodiments are merely to illustrate the present invention Rather than it limits the scope of the invention.In addition, it should also be understood that, after reading the content taught by the present invention, those skilled in the art Member can make various changes or modifications the present invention, and such equivalent forms equally fall within range defined herein.
Of the present invention is electric aerial work auxiliary connection equipment, and main structure includes cross-arm hook 1, rectangular hollow Vertical tube 2, overlap joint convex block 3, rectangular hollow 2 two sides of vertical tube hinge bar 4, pulley gear assembly and regulating device assembly, it is electronic around Line mechanism;
The cross-arm links up with 1 bottom end and is fixed on rectangular 2 top of hollow vertical tube;The irony that cross-arm hook 1 hangs over electric pole is horizontal In load or on the cross bar of pylon.
The rectangular hollow 2 front and rear sides face of vertical tube is equipped with shaft member slide opening 5, rectangular hollow 2 left and right sides of vertical tube Face is equipped with rod piece slide opening 6, and the overlap joint convex block 3 is two pieces, and two pieces of overlap joint convex blocks 3 are located at rectangular 2 bottom of hollow vertical tube The left and right sides;Overlapping convex block 3 and rectangular hollow 2 bottom of vertical tube is the integral structure welded together, overlap joint convex block 3 with it is rectangular Reinforcing rib 30 is additionally provided between hollow 2 bottom of vertical tube.
Articulated shaft 7 is slidably connected in the shaft member slide opening 5, there are two the hinge bar 4 is set, the one of two hinge bars 4 It is hinged in rectangular hollow 2 inner cavity of vertical tube with articulated shaft 7 that end is each passed through rod piece slide opening 6;The both ends of articulated shaft 7 are equipped with limit disk 31, two limit disks 31 can make the limit of articulated shaft 7 in shaft member slide opening 5.
There are two the pulley gear assembly is set, the pulley gear assembly includes wheel carrier 8 and fixed pulley 9, described to determine cunning Wheel 9 is arranged on wheel carrier 8, and 8 top of wheel carrier is hinged with 4 end of hinge bar;
The rectangular hollow 2 intracavity bottom center of vertical tube is equipped with threaded hole 10, and the regulating device assembly includes adjusting Bolt 11 and limited cap 12 are saved, the limited cap 12, which is arranged inside 7 bottom of articulated shaft, the limited cap 12, is equipped with circular trough 13,13 opening of circular trough is equipped with limited step 14, and the adjusting bolt 11 is threadedly coupled with threaded hole 10, the adjusting Bolt 11 is equipped with rotary table 15 far from bolt head one end, and the rotary table 15 is arranged in circular trough 13, and can turn in circular trough 13 Dynamic, the limited step 14 can limit rotary table 15 in circular trough 13;It adjusts and is equipped with sliding bar 32 at the bolt head of bolt 11, Sliding bar 32 horizontal in bolt head can slide, and holding 32 one end of sliding bar screw more laborsaving when adjusting bolt 11.
The electric coil winder structure includes servo motor, reel 16 and halliard 17, the servo motor and reel 16 transmission connections, the reel 16 are equipped with halliard 17, and 17 beginning of halliard hangs around fixed pulley 9.
It is described in order to realize the rotation connection at 4 top and articulated shaft 7 of hinge bar under the position limitation for avoiding limited cap 12 Pass through rod piece slide opening 6 at the top of hinge bar 4 and be equipped with concave articulation piece 18, the side plate 19 of the concave articulation piece 18 including two sides and The connecting bottom board 20 connecting with the side plate 19 of two sides, the side plate 19 and articulated shaft 7 of two sides are hinged, connecting bottom board 20 and articulated shaft 7 Connection, the position of the limited cap 12 is located between the side plate 19 of two sides.So the side plate 19 of two sides can be by articulated shaft 7 Medium position is available, the position setting limited cap 12 being available.
The halliard 17 be equipped with self-locking hook 21, the self-locking hook 21 rise to the bait live wire fastening anchor ear 22, The electric wire fastening anchor ear 22 includes the first hinge eyes 23 and the second hinge eyes 24, and described first hinge eyes, 23 one end is cut with scissors with second It is hinged to connect 24 one end of ring, 23 other end of the first hinge eyes and 24 other end of the second hinge eyes are equipped with protrusive board 25, and two pieces convex It is bolted between plate 25, second hinge eyes 24 are equipped with shackle 26, and the self-locking hook 21 hooks shackle 26. By link 33, wait connect wires 34 end neighbouring position it is fixed using electric wire fastening anchor ear 22, first bolt is twisted when fixed Pine keeps two pieces of 25 positions of protrusive board no longer fixed, and by link 33, wait connect wires, 34 end neighbouring position is placed on the first hinge It connects between ring 23, the second hinge eyes 24, then again to its two pieces of protrusive boards 25, is bolted again between two pieces of protrusive boards 25, this Sample can by link 33, wait connect wires 34 end neighbouring position it is fixed using electric wire fastening anchor ear 22.
3 end of overlap joint convex block is equipped with limiting slot 27, and limiting slot 27 can limit the sliding of hinge bar 4, make Hinge bar 4 adjusts sliding under the limit of limiting slot 27.
The cross-arm links up with 1 side and is equipped with puller bolt 29.Cross-arm hook 1 is hung on the irony cross-arm of electric pole or electricity After on the cross bar of tower, then puller bolt 29 tightened, by puller bolt 29 make cross-arm hook 1 it is stable be fixed to electric pole On irony cross-arm or on the cross bar of pylon, making device is not in swing.
Application method and principle:
By link 33, wait connect wires 34 end neighbouring position it is fixed using electric wire fastening anchor ear 22.Halliard 17 On self-locking hook 21 hook the shackle 26 set in the second hinge eyes 24.
Using servo motor drive reel 16 rotate, halliard 17 with link 33, wait connect wires 34 end It increases, at the fixed pulley 9 for rising to pulley gear assembly.
Then link 33 is compared again, wait the relative position for 34 two ends of connecting wires, look at the relative position of end In form shown in b in form, Figure of description Fig. 8 shown in a in which kind of following form, that is: Figure of description Fig. 7;Specification Form shown in c in attached drawing Fig. 9.
When a form:
33 end of link, wait connect wires, 34 ends interlock.If not to 33 end of link, wait connect wires 34 End relative position is adjusted, and 33 end of link will go out when being attached between 34 end electric wire connecting junctions of connecting wires As A is shown in existing Figure of description Fig. 7, bending adjustment is carried out wait 34 end point a small ranges of connecting wires, but it is electric Line is very thick, is difficult wire terminations a small range carrying out bending adjustment by wrist strength.Make to cut with scissors by screwing adjusting bolt 11 Spindle 7 decline, articulated shaft 7 decline when moved down with the hinge bar 4 of two sides, 4 top of hinge bar move down during by Mobile against overlap joint convex block 3 in hinge bar 4, the angle on hinge bar 4 and horizontal direction reduces, and 4 bottom end of hinge bar has level Displacement on direction, the displacement in this horizontal direction are used to adjust the relative distance between two pulley gear assemblies, can Adjust 33 end of link, wait relative distance between 34 ends of connecting wires, two pulley gears always horizontally on position Shifting be it is reversed, two pulley gear assemblies away from each other, so 33 end of link, wait also can between 34 ends of connecting wires Away from each other, until the distance between end is adjusted in Figure of description Fig. 9 shown in c like that.It reaches in Figure of description Fig. 9 Shown in c like that after, can effectively be connected between 34 ends, electric wire connecting junction to 33 end of link, wait connect wires.
When b form:
It is 33 end of link, too big wait distance between 34 ends of connecting wires.If not to 33 end of link, electricity waiting 34 end relative position of line is adjusted, 33 end of link, when being attached between 34 end electric wire connecting junctions of connecting wires just It will appear in Figure of description Fig. 7 as shown in B, 33 end of link under this form, wait 34 ends, wiring of connecting wires It can not be effectively attached at all between device.
It adjusts bolt 11 by screwing and increase articulated shaft 7, the hinge bar 4 when articulated shaft 7 rises with two sides is to moving up It is dynamic, 4 top of hinge bar move up during since hinge bar 4 is mobile against overlap joint convex block 3, on hinge bar 4 and horizontal direction Angle increase, 4 bottom end of hinge bar has the displacement in horizontal direction, and the displacement in this horizontal direction is used to adjust two cunnings Relative distance between wheel apparatus assembly is adjustable 33 end of link, wait relative distance between 34 ends of connecting wires, and two A pulley gear always horizontally on displacement be it is reversed, two pulley gear assemblies are adjacent to each other, so link 33 ends, wait also can be adjacent to each other between 34 ends of connecting wires, until the distance between end is adjusted in Figure of description Fig. 9 Shown in c like that.After reaching in Figure of description Fig. 9 shown in c like that, can to 33 end of link, wait 34 ends of connecting wires, It is effectively connected between electric wire connecting junction.
When c form:
33 end of link, wait connect wires, distance between 34 ends, electric wire connecting junction is reasonable, can directly carry out wiring.
In conclusion driving about 7 articulated shaft by the rotation for adjusting bolt 11,4 bottom end of hinge bar has horizontal direction On displacement, so that 33 end of link will be adjusted, wait relative distance between 34 ends of connecting wires be adjusted to Figure of description In Fig. 9 shown in c like that, very laborsaving, conveniently during adjustment, and the accuracy of adjusting position is improved, reach reasonable Wiring position.By the above method, the present apparatus solves deficiency in the prior art, can be more convenient to link 33, wait fix work after connect wires 34 carry out wiring and wiring.
Fixed pulley 9 on two pulley gear assemblies of the present apparatus is respectively used to by link 33, wait connect wires 34 liters Positioning is played, is positioned since two pulley gear assemblies pass through a rectangular hollow vertical tube 2, so wind-force is to blow this When device, need to overcome link 33 (all hanging), overhanging portion wait 34 loads integrated of connecting wires, make wind-force It is not easy to blow the present apparatus or the amplitude of oscillation very little when present apparatus is blown by wind.When there is a degree of amplitude of oscillation due to wind-force, by Pass through a rectangular hollow vertical tube 2 in two pulley gear assemblies to be positioned, it is opposite between two pulley gear assemblies Position, distance there will not be larger change, this can make link 33, wait the relative distance between 34, electric wire connecting junction of connecting wires It is relatively stable.

Claims (6)

1. electric aerial work auxiliary connection equipment, it is characterised in that: including cross-arm hook (1), rectangular hollow vertical tube (2), Overlap hinge bar (4), pulley gear assembly, the regulating device assembly, electronic coiling of convex block (3), rectangular hollow vertical tube (2) two sides Mechanism;
The cross-arm hook (1) bottom end is fixed at the top of rectangular hollow vertical tube (2);
Rectangular hollow vertical tube (2) the front and rear sides face is equipped with shaft member slide opening (5), rectangular hollow vertical tube (2) left and right two Side is equipped with rod piece slide opening (6), and the overlap joint convex block (3) is two pieces, and two pieces of overlap joint convex blocks (3) are located at rectangular hollow perpendicular It manages at left and right sides of (2) bottom;
It slidably connects articulated shaft (7) in the shaft member slide opening (5), there are two the hinge bar (4) sets, two hinge bars (4) To be each passed through rod piece slide opening (6) hinged in rectangular hollow vertical tube (2) inner cavity with articulated shaft (7) for one end;
There are two the pulley gear assembly is set, the pulley gear assembly includes wheel carrier (8) and fixed pulley (9), described to determine cunning (9) are taken turns to be arranged on wheel carrier (8), it is hinged with hinge bar (4) end at the top of the wheel carrier (8);
Rectangular hollow vertical tube (2) the intracavity bottom center is equipped with threaded hole (10), and the regulating device assembly includes adjusting Bolt (11) and limited cap (12) are saved, limited cap (12) setting is set inside articulated shaft (7) bottom, the limited cap (12) Have circular trough (13), circular trough (13) opening is equipped with limited step (14), the adjusting bolt (11) and threaded hole (10) it is threadedly coupled, the adjusting bolt (11) is equipped with rotary table (15) far from bolt head one end, and the rotary table (15) is arranged in circle It in shape slot (13), and can be rotated in circular trough (13), the limited step (14) can limit rotary table (15) in circular trough (13) in;
The electric coil winder structure includes servo motor, reel (16) and halliard (17), the servo motor and reel (16) it is sequentially connected, the reel (16) is equipped with halliard (17), and halliard (17) beginning hangs down around fixed pulley (9) It falls.
2. electric aerial work auxiliary connection equipment according to claim 1, it is characterised in that: hinge bar (4) top Portion pass through rod piece slide opening (6) be equipped with concave articulation piece (18), the concave articulation piece (18) include two sides side plate (19) and The connecting bottom board (20) connecting with the side plate (19) of two sides, the side plate (19) of two sides and articulated shaft (7) are rotatablely connected, connecting bottom board (20) it is connect with hinge bar (4), the position of the limited cap (12) is located between the side plate (19) of two sides.
3. electric aerial work auxiliary connection equipment according to claim 1, it is characterised in that: on the halliard (17) Equipped with self-locking hook (21), the self-locking hook (21) is risen to the bait live wire fastening anchor ear (22), and the electric wire fastens anchor ear It (22) include the first hinge eyes (23) and the second hinge eyes (24), described first hinge eyes (23) one end and the second hinge eyes (24) One end is hinged, and the first hinge eyes (23) other end and the second hinge eyes (24) other end are equipped with protrusive board (25), and two pieces convex Plate is bolted between (25), and second hinge eyes (24) are equipped with shackle (26), self-locking hook (21) hook Firmly shackle (26).
4. electric aerial work auxiliary connection equipment according to claim 1, it is characterised in that: the overlap joint convex block (3) End is equipped with limiting slot (27), and the hinge bar (4) adjusts sliding in limiting slot (27).
5. electric aerial work auxiliary connection equipment according to claim 1, it is characterised in that: on the fixed pulley (9) Equipped with race (28).
6. electric aerial work auxiliary connection equipment according to claim 1, it is characterised in that: the cross-arm links up with (1) Side is equipped with puller bolt (29).
CN201810962642.8A 2018-08-22 2018-08-22 Auxiliary wiring equipment for electric power high-altitude operation Active CN109038387B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810962642.8A CN109038387B (en) 2018-08-22 2018-08-22 Auxiliary wiring equipment for electric power high-altitude operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810962642.8A CN109038387B (en) 2018-08-22 2018-08-22 Auxiliary wiring equipment for electric power high-altitude operation

Publications (2)

Publication Number Publication Date
CN109038387A true CN109038387A (en) 2018-12-18
CN109038387B CN109038387B (en) 2020-08-21

Family

ID=64628045

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810962642.8A Active CN109038387B (en) 2018-08-22 2018-08-22 Auxiliary wiring equipment for electric power high-altitude operation

Country Status (1)

Country Link
CN (1) CN109038387B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204089044U (en) * 2014-11-11 2015-01-07 国网河北饶阳县供电公司 Portable overhead conductor shift unit
CN204886031U (en) * 2015-07-30 2015-12-16 国网山东省电力公司菏泽供电公司 Device of supplementary wiring
CN205863799U (en) * 2016-06-14 2017-01-04 嘉兴市恒欣电力建设有限公司 End auxiliary calibrator device
CN206976942U (en) * 2017-07-31 2018-02-06 齐寓乾 A kind of power construction wire-sending device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204089044U (en) * 2014-11-11 2015-01-07 国网河北饶阳县供电公司 Portable overhead conductor shift unit
CN204886031U (en) * 2015-07-30 2015-12-16 国网山东省电力公司菏泽供电公司 Device of supplementary wiring
CN205863799U (en) * 2016-06-14 2017-01-04 嘉兴市恒欣电力建设有限公司 End auxiliary calibrator device
CN206976942U (en) * 2017-07-31 2018-02-06 齐寓乾 A kind of power construction wire-sending device

Also Published As

Publication number Publication date
CN109038387B (en) 2020-08-21

Similar Documents

Publication Publication Date Title
CN108002269B (en) A kind of simple pole type transformer lifting device
CN208508376U (en) A kind of stranded repair apparatus of grounded-line
CN112045091B (en) Stay wire manufacturing device
CN108915339A (en) Electric pole repairing device
CN109038387A (en) Electric aerial work auxiliary connection equipment
CN219643444U (en) Stringing device for high-voltage power construction
CN201738893U (en) Electric balance-adjusting oil pumping unit
CN204559008U (en) A kind of cable construction pay off rack
CN207108092U (en) One kind can self-discharging heavy in section steel strand wires vertical type winding equipment
CN216052350U (en) Height-adjustable's interim strutting arrangement is used to optic fibre cable way overhead line
CN212799053U (en) Cable paying-off pulley
CN210348020U (en) Automatic cable hooking mechanism
CN113507078A (en) Power transmission and transformation circuit fixing device
CN211176139U (en) Meteorological wind pole lift
CN213111940U (en) Door profile line frame
CN210866988U (en) Auxiliary device for electric power construction
CN208666768U (en) A kind of spliced telescopic arm for cable drum
CN206992648U (en) A kind of portable wire tensioning device
CN208539111U (en) One kind being based on gear-driven tested rotating platform novel component
CN207597989U (en) A kind of electric power tower with illumination functions
CN110107139B (en) High-voltage power transmission tower with cable suspension degree adjusting function
CN206558962U (en) A kind of installation tool of electric pole bird-proof device
CN107262989B (en) Lifting motor drive type welding robot
CN217296684U (en) Steel wire pay-off is used in high altitude
CN219635073U (en) Fan blade conveying device for wind power generation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200724

Address after: Building 12, North District, Shandong design and Creative Industry Park, No. 868, Tangye West Road, Licheng District, Jinan City, Shandong Province 250109

Applicant after: Shandong Yuantai Power Technology Co.,Ltd.

Address before: Huaiyin District of Ji'nan City, Shandong province 250022 Dexing Street No. 29

Applicant before: Liu Yiqiang

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant