CN109031939A - Method and device for switching main equipment and standby equipment - Google Patents

Method and device for switching main equipment and standby equipment Download PDF

Info

Publication number
CN109031939A
CN109031939A CN201810416933.7A CN201810416933A CN109031939A CN 109031939 A CN109031939 A CN 109031939A CN 201810416933 A CN201810416933 A CN 201810416933A CN 109031939 A CN109031939 A CN 109031939A
Authority
CN
China
Prior art keywords
equipment
switching
carry out
operating status
current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810416933.7A
Other languages
Chinese (zh)
Inventor
刘华
刘纯
王升
何玉雪
姜春苗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201810416933.7A priority Critical patent/CN109031939A/en
Publication of CN109031939A publication Critical patent/CN109031939A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B9/00Safety arrangements
    • G05B9/02Safety arrangements electric
    • G05B9/03Safety arrangements electric with multiple-channel loop, i.e. redundant control systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • F24F11/32Responding to malfunctions or emergencies
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • F24F11/32Responding to malfunctions or emergencies
    • F24F11/38Failure diagnosis
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/50Control or safety arrangements characterised by user interfaces or communication
    • F24F11/61Control or safety arrangements characterised by user interfaces or communication using timers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/64Electronic processing using pre-stored data
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/80Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air
    • F24F11/83Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers
    • F24F11/84Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers using valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/80Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air
    • F24F11/83Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers
    • F24F11/85Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers using variable-flow pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2120/00Control inputs relating to users or occupants
    • F24F2120/20Feedback from users

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Signal Processing (AREA)
  • Health & Medical Sciences (AREA)
  • Biomedical Technology (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Human Computer Interaction (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The invention discloses a method and a device for switching main equipment and standby equipment, wherein the method comprises the following steps: acquiring the running state of the current running equipment, and judging whether equipment switching is needed or not according to the running state; and when the equipment is determined to be required to be switched, determining a replacement equipment for replacing the currently running equipment, starting the replacement equipment, and closing the currently running equipment. The invention solves the problem of unbalanced switching time of the main equipment and the standby equipment in the prior art, and effectively prolongs the service life of the whole system.

Description

Primary, spare equipment switching method and device
Technical field
The present invention relates to equipment technical fields, in particular to a kind of primary, spare equipment switching method and device.
Background technique
In enterprise's production, the course of work, important working equipment is all using " one main one is standby " mode, and outfit one Work switching switch can be switched switch by work work is switched to another and intact set when equipment breaks down It is standby upper.Such as control system of machine room air conditioner would generally reserve the equipment such as spare unit, water pump, blower in the design, it is spare to set Standby to be mainly used for: 1. one of equipment/mono- water routes can be switched to spare equipment/water route when failure.2. When loading a water route, that the smallest water route of operation hours is opened.For the application that end refrigeration requirement is more constant Occasion (such as data center, freezer etc.), needs the case where loading water route less, and long-play gets off, it is possible that master sets Standby longtime running, the few situation of stand-by equipment operation duration are unfavorable for the extension of the service life of whole system.
Aiming at the problem that not enough balancing the switching time of primary, spare equipment in the related technology, not yet propose at present effectively Solution.
Summary of the invention
The present invention provides a kind of primary, spare equipment switching method and devices, primary, spare in the prior art at least to solve The problem of switching time of equipment not enough balances.
In order to solve the above technical problems, according to an aspect of an embodiment of the present invention, a kind of primary, spare equipment is provided Switching method, comprising: the operating status for obtaining current running equipment judges whether to need to carry out cutting for equipment according to operating status It changes;When determination needs to carry out the switching of equipment, determine for replacing the replacement equipment of current running equipment, and open replacement and set It is standby, close current running equipment.
Further, operating status includes at least runing time, is judged whether to need to carry out equipment according to operating status Switching, comprising: judge whether runing time reaches default runing time;When determining that runing time reaches default runing time, Determine that current running equipment needs to carry out the switching of equipment.
Further, the switching for needing to carry out equipment is judged whether according to the operating status of the current running equipment of acquisition, Further include: after determining that runing time reaches default runing time, issue the first prompt that characterization needs to carry out equipment switching Information;User is obtained for the feedback information of the first prompt information, is judged whether to need to carry out cutting for equipment according to feedback information It changes.
Further, the switching for needing to carry out equipment is judged whether according to feedback information, comprising: feedback information be agree to When switching, the switching for needing to carry out equipment is determined;When feedback information is to cancel switching, and/or when not receiving feedback information, into Row timing re-emits the first prompt letter that characterization needs to carry out equipment switching when timing time reaches default reminder time Breath, and user is obtained for the feedback information of the first prompt information, judged whether to need to carry out cutting for equipment according to feedback information It changes.
Further, it is determined that the replacement equipment for replacing current running equipment, comprising: obtain the operation shape of redundance unit State;Wherein, redundance unit is the equipment in all devices in addition to current running equipment, and redundance unit sets for one or more It is standby;The replacement equipment for replacing current running equipment is determined according to the operating status of redundance unit.
Further, the operating status of redundance unit includes at least following one: accumulated running time, operational mode are No unlatching, if failure determines the replacement equipment for replacing current running equipment according to the operating status of redundance unit, packet It includes: if the operating status of redundance unit meets preset condition, the shortest equipment of accumulated running time in redundance unit is true It is set to replacement equipment;Wherein, preset condition is: operational mode is remote mode, does not open and fault-free;If redundance unit Operating status does not meet preset condition, then the second prompt information of equipment switching can not be carried out by issuing characterization, and carry out timing, When timing time reaches default reminder time, the first prompt information that characterization needs to carry out equipment switching is re-emitted.
Further, before the operating status for obtaining current running equipment, further includes: the adjustment in response to triggering refers to It enables, shows that window is arranged in the default runing time of each equipment by display interface, wherein window is by presetting communication interface tune The default runing time of whole each equipment, equipment are reserved with default communication interface.
Further, equipment includes at least following one: chilled water pump, cooling water pump, cooling tower, water cooler.
Further, replacement equipment is opened, current running equipment is closed, comprising: if equipment is chilled water pump, and/or Cooling water pump and/or cooling tower open replacement equipment, and control the running frequency of replacement equipment and the fortune of current running equipment Line frequency is consistent;After opening replacement equipment, current running equipment is closed.
Further, it if equipment is water cooler, opens replacement equipment and includes the following steps: to open cooling water pump, control The running frequency of cooling water pump processed and the running frequency of current operation cooling water pump are consistent;Open the blower of cooling tower, control The fan operation frequency of cooling tower processed and the fan operation frequency of current operation cooling tower are consistent;It is cooling to open water cooler The electric butterfly valve of side electric butterfly valve and a cooling tower;Chilled water pump is opened, the running frequency and current fortune of chilled water pump are controlled The running frequency of row chilled water pump is consistent;It opens water cooler and freezes side electric butterfly valve;Judge chilled water pump, cooling water pump Operation quantity and current operation water cooler number of channels it is whether consistent, determine it is consistent after, open water cooler.
Further, current running equipment is closed to include the following steps: to close current operation water cooler;Close current fortune Row unit cold side electric butterfly valve, current operation cooling tower electric butterfly valve;Close current operation cooling water pump with currently run it is cold But tower blower;Close the freezing side electric butterfly valve of current operation water cooler;Close current operation chilled water pump.
According to another aspect of an embodiment of the present invention, a kind of switching device of primary, spare equipment is provided, comprising: obtain Module judges whether the switching for needing to carry out equipment according to operating status for obtaining the operating status of current running equipment;It cuts Block is changed the mold, for determining for replacing the replacement equipment of current running equipment, and open when determination needs to carry out the switching of equipment Replacement equipment is opened, current running equipment is closed.
Further, operating status includes at least runing time, and obtaining module includes: the first judging unit, for judging Whether runing time reaches default runing time;Switch determination unit, for determining that runing time reaches default runing time When, determine that current running equipment needs to carry out the switching of equipment;Prompt unit, for determining that runing time reaches default operation After time, the first prompt information that characterization needs to carry out equipment switching is issued;Second judgment unit, for obtain user for The feedback information of first prompt information judges whether the switching for needing to carry out equipment according to feedback information, comprising: first determines son Unit, for determining the switching for needing to carry out equipment when feedback information is to agree to switching;Second determines subelement, is used for Feedback information is when cancelling switching, and/or when not receiving feedback information, carries out timing, when timing time reaches default and reminds Between when, re-emit characterization and need to carry out the first prompt information of equipment switching, and obtain user for the first prompt information Feedback information judges whether the switching for needing to carry out equipment according to feedback information.
Further, switching module includes: acquiring unit, for obtaining the operating status of redundance unit;Wherein, redundancy is set Standby is the equipment in all devices in addition to current running equipment, and redundance unit is one or more equipment;The fortune of redundance unit Row state includes at least following one: accumulated running time, operational mode, if opens, if failure.Determination unit is replaced, For determining the replacement equipment for replacing current running equipment according to the operating status of redundance unit, comprising: third determines son Unit, it is for when the operating status of redundance unit meets preset condition, then accumulated running time in redundance unit is shortest Equipment is determined as replacement equipment;Wherein, preset condition is: operational mode is remote mode, does not open and fault-free;4th determines Subelement can not carry out equipment switching for when the operating status of redundance unit does not meet preset condition, then issuing characterization Second prompt information, and timing is carried out, when timing time reaches default reminder time, re-emits characterization and need to carry out equipment First prompt information of switching.
In the present invention, in order to balance primary, spare equipment use the time, provide a kind of switching of primary, spare equipment Method can specifically be accomplished in that the operating status for obtaining current running equipment, judge whether need according to operating status The switching for carrying out equipment is determining that determination is set for replacing the replacement of current running equipment when needing to carry out the switching of equipment It is standby, and replacement equipment is opened, close current running equipment.Switching time of the above-mentioned switching method by control equipment, Ke Yiyou Effect ground solves the problems, such as that the switching time of primary, spare equipment in the prior art not enough balances, and effectively extends making for whole system Use the service life.
Detailed description of the invention
Fig. 1 is a kind of optional flow chart of primary, spare equipment switching method according to an embodiment of the present invention;
Fig. 2 is the preset time set interface of primary, spare equipment switching method according to an embodiment of the present invention;
Fig. 3 is the first prompt information interface of primary, spare equipment switching method according to an embodiment of the present invention;
Fig. 4 is the optional flow chart of another kind of primary, spare equipment switching method according to an embodiment of the present invention;And
Fig. 5 is a kind of optional structural block diagram of primary, spare equipment switching device according to an embodiment of the present invention.
Specific embodiment
Example embodiments are described in detail here, and the example is illustrated in the accompanying drawings.Following description is related to When attached drawing, unless otherwise indicated, the same numbers in different drawings indicate the same or similar elements.Following exemplary embodiment Described in embodiment do not represent all embodiments consistented with the present invention.On the contrary, they be only with it is such as appended The example of device and method being described in detail in claims, some aspects of the invention are consistent.
Embodiment 1
A kind of switching method of primary, spare equipment is provided in the preferred embodiment of the invention 1, this method can be direct It is applied in various equipment, it, can be by installing software, APP or the corresponding program of write-in in equipment when specific implementation Mode is realized.Specifically, Fig. 1 shows a kind of optional flow chart of this method, as shown in Figure 1, this method includes as follows Step S102-S104:
S102: obtaining the operating status of current running equipment, is judged whether to need to carry out cutting for equipment according to operating status It changes;
Operating status after the runing time for obtaining current running equipment, judges runing time including at least runing time Whether default runing time is reached, and default runing time is pre-set for judging whether current running equipment needs to switch Time illustrate the runing time of current running equipment long enough when determining that runing time reaches default runing time, when Preceding running equipment needs to carry out the switching of equipment.
Since the usable duration of distinct device is related with equipment own situation, the application allows user to difference Equipment different default runing times is set, when specific implementation, comprising: in response to the adjustment instruction of triggering, pass through display circle Face shows the default runing time setting window of each equipment, it is assumed that equipment includes chilled water pump, cooling water pump, cooling tower, cold Water dispenser group, corresponding default runing time setting window is as shown in Fig. 2, chilled water pump, cooling water pump, cooling can be respectively set The switching time of tower and water cooler, i.e., default runing time.Wherein, window adjusts each equipment by default communication interface Default runing time, equipment are reserved with default communication interface.Window is arranged by default runing time can be to different equipment Different default runing times is set, the flexibility of system is increased, while being more in line with the actual conditions of equipment, helps to prolong The service life of long equipment.
S104: when determination needs to carry out the switching of equipment, determining the replacement equipment for replacing current running equipment, and Replacement equipment is opened, current running equipment is closed.
Reach default runing time in the current running equipment of determination, when needing to carry out the switching of equipment, thus it needs to be determined that For replacing the replacement equipment of current running equipment, it can specifically be determined by following manner: obtain the operating status of redundance unit, Redundance unit is the equipment in all devices in addition to current running equipment, can be one or more equipment, redundance unit Operating status includes at least following one: accumulated running time, operational mode, if opens, if failure;Obtain redundance unit Above-mentioned operating status after, the replacement for replacing current running equipment is determined according to the operating status of the redundance unit of acquisition Equipment, comprising: if the operating status of redundance unit meets preset condition, preset condition is: operational mode is remote mode, not Unlatching and fault-free.Meet above-mentioned condition and then illustrates to have in redundance unit the redundancy of replaceable current running equipment for standby, into one Step ground, is determined as replacement equipment for the shortest equipment of accumulated running time in redundance unit, when use to balance each equipment It is long;If the operating status of redundance unit does not meet preset condition, illustrate that there is no replaceable current in Current redundant equipment The redundancy of running equipment is for standby, and the second prompt information of equipment switching can not be carried out by issuing characterization, and carry out timing, in timing Between when reaching default reminder time, the first prompt information that characterization needs to carry out equipment switching is re-emitted, until determination is used for Replace the replacement equipment of current running equipment.
In actual application, first mentioning for " please determining whether carry out equipment switching " can be shown in the display interface Show information, can also show that " determination " and " cancellation " two choice boxs are clicked for user, determination is according to the user's choice later The no switching for carrying out equipment.In this way, user can be with the more intuitive feedback for being accurately made whether switching equipment.
It is equally possible that showing second prompt information of " equipment switching can not be carried out ", in the display interface with prompt Replacement equipment can not be used at present, can not carry out the switching of equipment, while user can also check whether equipment goes out according to prompt information Existing failure understands equipment state convenient for user.
In the above-described embodiment, in order to balance primary, spare equipment use the time, provide a kind of primary, spare equipment Switching method, can specifically be accomplished in that the operating status for obtaining current running equipment, be judged according to operating status The switching for whether needing to carry out equipment is determined when determination needs to carry out the switching of equipment for replacing current running equipment Replacement equipment, and replacement equipment is opened, close current running equipment.Above-mentioned switching method passes through the switching time of control equipment, The problem of switching time of primary, spare equipment in the prior art can be efficiently solved not enough balancing, whole system is extended Service life.
In one preferred embodiment of the invention, after determining that runing time reaches default runing time, also wrap It includes: issuing the first prompt information that characterization needs to carry out equipment switching, prompt the user whether to carry out equipment switching, it is assumed that equipment packet Chilled water pump, cooling water pump, cooling tower, water cooler are included, corresponding first prompt information interface is as shown in figure 3, remind user Whether chilled water pump, cooling water pump, cooling tower, water cooler are switched, and corresponding selectable option comprises determining that, cancels, user It can according to need the switching for deciding whether to carry out equipment, and prompt information given a response, is i.e. the feedback information of user;It obtains User judges whether the switching for needing to carry out equipment according to feedback information for the feedback information of the first prompt information.It is feeding back Information is when agreeing to switching, to determine the switching for needing to carry out equipment;When feedback information is to cancel switching, and/or do not receive anti- When feedforward information, timing is carried out, when timing time reaches default reminder time, characterization is re-emitted and needs to carry out equipment switching First prompt information, and obtain user for the feedback information of the first prompt information, according to feedback information judge whether to need into The switching of row equipment, until the determining switching for needing to carry out equipment.
Preferably, above equipment includes at least following one: chilled water pump, cooling water pump, cooling tower, water cooler;? When equipment is above-mentioned chilled water pump, cooling water pump, cooling tower, water cooler, replacement equipment is opened, current running equipment is closed, It can be accomplished in that
Chilled water pump, cooling water pump, cooling tower switching control process
Open corresponding accumulated running time the smallest equipment;And frequency is consistent with running frequency before being closed equipment; After new equipment is opened, accumulated running time longest equipment is closed.
The switching control process of water cooler
The first step first opens corresponding accumulated running time the smallest water route, and opening process is as follows:
(a) cooling water pump is opened, frequency is consistent with the cooling water pump run;Open blower fan of cooling tower, frequency with The blower fan of cooling tower run is consistent;
(b) water cooler cold side electric butterfly valve and a cooling tower electric butterfly valve are opened;
(c) chilled water pump is opened, frequency is consistent with the chilled water pump run;
(d) it opens water cooler and freezes side electric butterfly valve;
(e) judge chilled water pump, cooling water pump operation quantity it is consistent with the water cooler number of channels of unlatching after, open Unit;
The cooling water pump opened above, chilled water pump, cooling tower, water cooler be accumulated running time it is most short and do not have The equipment of operation.
Second step after to be opened, closes accumulated running time maximum water route, and closing process is as follows:
(a) water cooler is closed;
(b) unit cold side electric butterfly valve, cooling tower electric butterfly valve are closed;
(c) cooling water pump and blower fan of cooling tower are closed;
(d) the freezing side electric butterfly valve of unit is closed;
(e) chilled water pump is closed.
The cooling water pump closed above, chilled water pump, cooling tower, water cooler are longest to set accumulated running time It is standby.
In the preferred embodiment of the invention 1, the switching method of another primary, spare equipment is additionally provided, such as Fig. 4 institute Show, this method comprises the following steps:
S401: initialization, the time T1=0 of timer 1 start timing, read the equipment switching time T2 of user setting. User can every kind of equipment of sets itself how long switch over.As shown in Figure 2;
S402: system real-time monitoring judges whether the time T1 of timer 1 is equal to equipment switching time T2, in timer 1 Time T1 when being not up to equipment switching time T2, enter step S403;
S403: 1 cumulative time of timer;
S404: host computer interface pops up prompt window, selects for user, and selection interface is as shown in figure 3, include determining and taking Disappear two options;
S405;When user selects to cancel or do not give a response prompt information, S406 is entered step;It is selected in user When determining, S409 is entered step;
S406;2 timing of timer starts;
S407;2 cumulative time of timer;
S408;Judge whether the time T3 of timer 2 is equal to preset value T4, is equal to preset value in the time T3 of timer 2 When T4, S404 is entered step, otherwise, enters step S407;
S409: judging whether there is fault-free and is remote status, and operating status is the equipment (redundance unit) stopped, There is no when the equipment, S410 is entered step;When there are the equipment, S411 is entered step;
S410: host computer pops up prompting frame, prompts user that can not switch over, enters step S406 later;
S411: opening and run cumulative time shortest available devices/water route, and closing operation cumulative time longest equipment/ Water route;
S412: the time T1 clear 0 of timer 1 again the cumulative time, enters step S402 later.
In the above-described embodiment, in order to balance primary, spare equipment use the time, provide a kind of primary, spare equipment Switching method, can specifically be accomplished in that the operating status for obtaining current running equipment, be judged according to operating status The switching for whether needing to carry out equipment is determined when determination needs to carry out the switching of equipment for replacing current running equipment Replacement equipment, and replacement equipment is opened, close current running equipment.Above-mentioned switching method passes through the switching time of control equipment, The problem of switching time of primary, spare equipment in the prior art can be efficiently solved not enough balancing, whole system is extended Service life.
Embodiment 2
The switching method of the primary, spare equipment provided in 1 based on the above embodiment, in the preferred embodiment of the invention 2 A kind of switching device of primary, spare equipment is additionally provided, specifically, Fig. 5 shows a kind of optional structural block diagram of the device, such as Shown in Fig. 5, which includes:
Module 502 is obtained, for obtaining the operating status of current running equipment, judges whether to need according to the operation state Carry out the switching of equipment;
Switching module 504 is connect with module 502 is obtained, for determining that determination is used for when needing to carry out the switching of equipment The replacement equipment of the current running equipment is replaced, and opens the replacement equipment, closes the current running equipment.
In the above-described embodiment, in order to balance primary, spare equipment use the time, provide a kind of primary, spare equipment Switching method, can specifically be accomplished in that the operating status for obtaining current running equipment, be judged according to operating status The switching for whether needing to carry out equipment is determined when determination needs to carry out the switching of equipment for replacing current running equipment Replacement equipment, and replacement equipment is opened, close current running equipment.Above-mentioned switching method passes through the switching time of control equipment, The problem of switching time of primary, spare equipment in the prior art can be efficiently solved not enough balancing, whole system is extended Service life.
In an optional embodiment of the invention, the operating status includes at least runing time, the acquisition mould Block includes: the first judging unit, for judging whether the runing time reaches default runing time;Switch determination unit, uses In when determining that the runing time reaches the default runing time, determining that the current running equipment needs to carry out equipment Switching;Prompt unit needs to carry out for after determining that the runing time reaches the default runing time, issuing characterization First prompt information of equipment switching;Second judgment unit, for obtaining user for the feedback letter of first prompt information Breath, judges whether the switching for needing to carry out equipment according to the feedback information.Preferably, the second judgment unit includes: One determines subelement, for determining the switching for needing to carry out equipment when the feedback information is to agree to switching;Second determines son Unit for when the feedback information is to cancel switching, and/or when not receiving the feedback information, carries out timing, in timing When time reaches default reminder time, re-emits characterization and need to carry out the first prompt information of equipment switching, and obtain user For the feedback information of first prompt information, judge whether the switching for needing to carry out equipment according to the feedback information.
In another optional embodiment of the invention, the switching module includes: acquiring unit, for obtaining redundancy The operating status of equipment;Wherein, the redundance unit is the equipment in all devices in addition to the current running equipment, described Redundance unit is one or more equipment;Determination unit is replaced, for being used for according to the determination of the operating status of the redundance unit Replace the replacement equipment of the current running equipment.
Wherein, the operating status of the redundance unit includes at least following one: accumulated running time, operational mode are No unlatching, if failure, the replacement determination unit includes: that third determines subelement, for the operation in the redundance unit When state meets preset condition, then accumulated running time shortest equipment in the redundance unit is determined as the replacement and set It is standby;Wherein, the preset condition is: operational mode is remote mode, does not open and fault-free;4th determines subelement, is used for When the operating status of the redundance unit does not meet preset condition, then the second prompt of equipment switching can not be carried out by issuing characterization Information, and timing is carried out, when timing time reaches the default reminder time, re-emits the characterization and need to carry out equipment First prompt information of switching.
About the device in above-described embodiment, wherein each unit, module execute the concrete mode of operation related It is described in detail in the embodiment of this method, no detailed explanation will be given here.
Those skilled in the art after considering the specification and implementing the invention disclosed here, will readily occur to of the invention its Its embodiment.This application is intended to cover any variations, uses, or adaptations of the invention, these modifications, purposes or The common knowledge in the art that person's adaptive change follows general principle of the invention and do not invent including the present invention Or conventional techniques.The description and examples are only to be considered as illustrative, and true scope and spirit of the invention are by following Claim is pointed out.
It should be understood that the present invention is not limited to the precise structure already described above and shown in the accompanying drawings, and And various modifications and changes may be made without departing from the scope thereof.The scope of the present invention is limited only by the attached claims.

Claims (14)

1. a kind of primary, spare equipment switching method characterized by comprising
The operating status of current running equipment is obtained, judges whether the switching for needing to carry out equipment according to the operation state;
When determination needs to carry out the switching of equipment, determine for replacing the replacement equipment of the current running equipment, and open The replacement equipment closes the current running equipment.
2. the method according to claim 1, wherein the operating status include at least runing time, described Judge whether the switching for needing to carry out equipment according to the operating status, comprising:
Judge whether the runing time reaches default runing time;
When determining that the runing time reaches the default runing time, determine that the current running equipment needs to carry out equipment Switching.
3. according to the method described in claim 2, it is characterized in that, the operation of the current running equipment according to acquisition State judges whether the switching for needing to carry out equipment, further includes:
After determining that the runing time reaches the default runing time, issues characterization and need to carry out the first of equipment switching Prompt information;
User is obtained for the feedback information of first prompt information, judges whether to be set according to the feedback information Standby switching.
4. according to the method described in claim 3, it is characterized in that, described judge whether to need to carry out according to the feedback information The switching of equipment, comprising:
When the feedback information is to agree to switching, the switching for needing to carry out equipment is determined;
When the feedback information is to cancel switching, and/or when not receiving the feedback information, timing is carried out, in timing time When reaching default reminder time, re-emit characterization and need to carry out the first prompt information of equipment switching, and obtain user for The feedback information of first prompt information, judges whether the switching for needing to carry out equipment according to the feedback information.
5. according to the method described in claim 2, it is characterized in that, the determination is for replacing replacing for the current running equipment Exchange device, comprising:
Obtain the operating status of redundance unit;Wherein, the redundance unit be in all devices except the current running equipment it Outer equipment, the redundance unit are one or more equipment;
The replacement equipment for replacing the current running equipment is determined according to the operating status of the redundance unit.
6. according to the method described in claim 5, it is characterized in that, the operating status of the redundance unit include at least it is following it One: accumulated running time, operational mode, if open, if failure, it is described to be determined according to the operating status of the redundance unit For replacing the replacement equipment of the current running equipment, comprising:
It is if the operating status of the redundance unit meets preset condition, accumulated running time in the redundance unit is most short Equipment be determined as the replacement equipment;Wherein, the preset condition is: operational mode is remote mode, does not open and without reason Barrier;
If the operating status of the redundance unit does not meet preset condition, the second of equipment switching can not be carried out by issuing characterization Prompt information, and timing is carried out, when timing time reaches the default reminder time, re-emits the characterization and need to carry out First prompt information of equipment switching.
7. the method according to claim 1, wherein the operating status for obtaining current running equipment it Before, further includes:
In response to the adjustment instruction of triggering, show that window is arranged in the default runing time of each equipment by display interface, wherein The window adjusts the default runing time of each equipment by presetting communication interface, and the equipment is reserved with the default communication Interface.
8. the method according to claim 1, wherein the equipment includes at least following one: chilled water pump, cold But water pump, cooling tower, water cooler.
9. according to the method described in claim 8, it is characterized in that, described open the replacement equipment, the closing current fortune Row equipment, comprising:
If the equipment is the chilled water pump and/or the cooling water pump and/or the cooling tower, the replacement is opened Equipment, and the running frequency for controlling the replacement equipment is consistent with the running frequency of the current running equipment;It is replaced described in unlatching After exchange device, the current running equipment is closed.
10. according to the method described in claim 9, it is characterized in that, described open the replacement equipment, the closing current fortune Row equipment, further includes:
If the equipment is the water cooler, opens the replacement equipment and include the following steps:
The cooling water pump is opened, the running frequency of the running frequency and current operation cooling water pump that control the cooling water pump is protected It holds consistent;
The blower of the blower for opening the cooling tower, the fan operation frequency and current operation cooling tower that control the cooling tower is transported Line frequency is consistent;
Open the electric butterfly valve of the water cooler cold side electric butterfly valve and a cooling tower;
The chilled water pump is opened, the running frequency of the running frequency and current operation chilled water pump that control the chilled water pump is protected It holds consistent;
Open the water cooler freezing side electric butterfly valve;
Judge the chilled water pump, the operation quantity of the cooling water pump and current operation water cooler number of channels whether one It causes, after determining unanimously, opens the water cooler.
11. according to the method described in claim 10, closing is described current it is characterized in that, described open the replacement equipment Running equipment, further includes:
If the equipment is the water cooler, closes the current running equipment and include the following steps:
Close the current operation water cooler;
Close the current operating unit cold side electric butterfly valve, the current operation cooling tower electric butterfly valve;
Close the current operation cooling water pump and the current operation blower fan of cooling tower;
Close the freezing side electric butterfly valve of the current operation water cooler;
Close the current operation chilled water pump.
12. a kind of primary, spare equipment switching device characterized by comprising
Module is obtained to judge whether to need to carry out according to the operation state for obtaining the operating status of current running equipment The switching of equipment;
Switching module, for determining for replacing replacing for the current running equipment when determination needs to carry out the switching of equipment Exchange device, and the replacement equipment is opened, close the current running equipment.
13. device according to claim 12, which is characterized in that the operating status includes at least runing time, described Obtaining module includes:
First judging unit, for judging whether the runing time reaches default runing time;
Switch determination unit, for when determining that the runing time reaches the default runing time, determining the current fortune Row equipment needs to carry out the switching of equipment;
Prompt unit needs to carry out for after determining that the runing time reaches the default runing time, issuing characterization First prompt information of equipment switching;
Second judgment unit, for obtaining user for the feedback information of first prompt information, according to the feedback information Judge whether the switching for needing to carry out equipment, comprising:
First determines subelement, for determining the switching for needing to carry out equipment when the feedback information is to agree to switching;
Second determines subelement, when being used for when the feedback information is to cancel switching, and/or not receiving the feedback information, Timing is carried out, when timing time reaches default reminder time, re-emits the first prompt that characterization needs to carry out equipment switching Information, and obtain user for the feedback information of first prompt information, according to the feedback information judge whether to need into The switching of row equipment.
14. device according to claim 12, which is characterized in that the switching module includes:
Acquiring unit, for obtaining the operating status of redundance unit;Wherein, the redundance unit is to work as in all devices except described Equipment except preceding running equipment, the redundance unit are one or more equipment;The operating status of the redundance unit is at least Including following one: accumulated running time, operational mode, if open, if failure;
Determination unit is replaced, for determining according to the operating status of the redundance unit for replacing the current running equipment Replacement equipment, comprising:
Third determines subelement, for when the operating status of the redundance unit meets preset condition, then setting the redundancy Standby shortest equipment of middle accumulated running time is determined as the replacement equipment;Wherein, the preset condition is: operational mode is remote Journey mode is not opened and fault-free;
4th determines subelement, for when the operating status of the redundance unit does not meet preset condition, then issuing characterization nothing Method carries out the second prompt information of equipment switching, and carries out timing, when timing time reaches the default reminder time, again Issue first prompt information for characterizing and needing to carry out equipment switching.
CN201810416933.7A 2018-05-03 2018-05-03 Method and device for switching main equipment and standby equipment Pending CN109031939A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810416933.7A CN109031939A (en) 2018-05-03 2018-05-03 Method and device for switching main equipment and standby equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810416933.7A CN109031939A (en) 2018-05-03 2018-05-03 Method and device for switching main equipment and standby equipment

Publications (1)

Publication Number Publication Date
CN109031939A true CN109031939A (en) 2018-12-18

Family

ID=64611309

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810416933.7A Pending CN109031939A (en) 2018-05-03 2018-05-03 Method and device for switching main equipment and standby equipment

Country Status (1)

Country Link
CN (1) CN109031939A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110985362A (en) * 2019-11-06 2020-04-10 中水淮河规划设计研究有限公司 Intelligent alternate working method for leakage drainage pump of pump station
CN111121233A (en) * 2019-12-31 2020-05-08 宁波奥克斯电气股份有限公司 Method and device for evaluating service life of air conditioner and air conditioner
CN112083646A (en) * 2020-08-21 2020-12-15 珠海格力电器股份有限公司 Redundancy control method, device and control system
CN112966976A (en) * 2021-03-31 2021-06-15 英特尔产品(成都)有限公司 Method and device for scheduling production of production facility
CN113485089A (en) * 2021-07-05 2021-10-08 浙江胄天科技股份有限公司 Control method for monitoring system in mobile offshore environment monitoring equipment
CN114066308A (en) * 2021-11-29 2022-02-18 重庆允成互联网科技有限公司 Production work order adjusting method and device and electronic equipment
WO2022194235A1 (en) * 2021-03-18 2022-09-22 杭州三花研究院有限公司 Gas detection apparatus and control method therefor
CN115468273A (en) * 2022-11-14 2022-12-13 蘑菇物联技术(深圳)有限公司 Method of controlling air conditioning system, computing device, and computer-readable storage medium

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102147143A (en) * 2011-04-06 2011-08-10 深圳达实智能股份有限公司 On-off optimization control method and device of central air-conditioning system
US20120040601A1 (en) * 2010-08-10 2012-02-16 Yamatake Corporation Air conditioning controlling device and method
CN103528168A (en) * 2013-11-01 2014-01-22 珠海格力电器股份有限公司 Air conditioning system operation control method, device, system host and air conditioning system
CN104101062A (en) * 2013-11-30 2014-10-15 深圳市作夏科技有限公司 Energy-saving management system for ice storage central air conditioner
CN104635599A (en) * 2014-12-20 2015-05-20 蓝星(北京)技术中心有限公司 Active preventive maintaining method and device for rotating equipment
CN105241005A (en) * 2015-09-28 2016-01-13 珠海格力电器股份有限公司 Air conditioner control method and system based on intelligent wearable device
CN105650809A (en) * 2015-12-30 2016-06-08 青岛海信电器股份有限公司 Control method for smart home equipment, equipment and system
US20180052429A1 (en) * 2016-08-19 2018-02-22 Siemens Industry, Inc. System and Method for Controlling and Monitoring Environmental Conditions in a Building Using an Integrated Rack
CN107975909A (en) * 2017-11-22 2018-05-01 珠海格力电器股份有限公司 Air conditioner standby machine starting control method and device and computer readable storage medium

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120040601A1 (en) * 2010-08-10 2012-02-16 Yamatake Corporation Air conditioning controlling device and method
CN102147143A (en) * 2011-04-06 2011-08-10 深圳达实智能股份有限公司 On-off optimization control method and device of central air-conditioning system
CN103528168A (en) * 2013-11-01 2014-01-22 珠海格力电器股份有限公司 Air conditioning system operation control method, device, system host and air conditioning system
CN104101062A (en) * 2013-11-30 2014-10-15 深圳市作夏科技有限公司 Energy-saving management system for ice storage central air conditioner
CN104635599A (en) * 2014-12-20 2015-05-20 蓝星(北京)技术中心有限公司 Active preventive maintaining method and device for rotating equipment
CN105241005A (en) * 2015-09-28 2016-01-13 珠海格力电器股份有限公司 Air conditioner control method and system based on intelligent wearable device
CN105650809A (en) * 2015-12-30 2016-06-08 青岛海信电器股份有限公司 Control method for smart home equipment, equipment and system
US20180052429A1 (en) * 2016-08-19 2018-02-22 Siemens Industry, Inc. System and Method for Controlling and Monitoring Environmental Conditions in a Building Using an Integrated Rack
CN107975909A (en) * 2017-11-22 2018-05-01 珠海格力电器股份有限公司 Air conditioner standby machine starting control method and device and computer readable storage medium

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110985362A (en) * 2019-11-06 2020-04-10 中水淮河规划设计研究有限公司 Intelligent alternate working method for leakage drainage pump of pump station
CN111121233A (en) * 2019-12-31 2020-05-08 宁波奥克斯电气股份有限公司 Method and device for evaluating service life of air conditioner and air conditioner
CN112083646A (en) * 2020-08-21 2020-12-15 珠海格力电器股份有限公司 Redundancy control method, device and control system
WO2022194235A1 (en) * 2021-03-18 2022-09-22 杭州三花研究院有限公司 Gas detection apparatus and control method therefor
CN115112828A (en) * 2021-03-18 2022-09-27 杭州三花研究院有限公司 Gas detection device and control method thereof
CN112966976A (en) * 2021-03-31 2021-06-15 英特尔产品(成都)有限公司 Method and device for scheduling production of production facility
CN113485089A (en) * 2021-07-05 2021-10-08 浙江胄天科技股份有限公司 Control method for monitoring system in mobile offshore environment monitoring equipment
CN114066308A (en) * 2021-11-29 2022-02-18 重庆允成互联网科技有限公司 Production work order adjusting method and device and electronic equipment
CN115468273A (en) * 2022-11-14 2022-12-13 蘑菇物联技术(深圳)有限公司 Method of controlling air conditioning system, computing device, and computer-readable storage medium

Similar Documents

Publication Publication Date Title
CN109031939A (en) Method and device for switching main equipment and standby equipment
CN104566858B (en) Air conditioner group system and control method for use in air conditioner group system
EP1130333B1 (en) Refrigerating/air-conditioning apparatus and control method therefor
JP5263800B2 (en) Information processing system operation management method and information processing system
US20170010014A1 (en) Air conditioner test operation application, and air conditioner test operation system
US20120053738A1 (en) Remote control system for a room air conditioner and/or heat pump
EP1758225A2 (en) Apparatus, method and program for electric power amount control
US20050159924A1 (en) Ordered record of system-wide fault in an HVAC system
CN101424424A (en) Air conditioner and operating method thereof
JP3680146B2 (en) Facility operation method
CN104697104A (en) Self-operation control method and system of air conditioner
CN111121176B (en) Air condensing units and air conditioner
CN108700871A (en) Predict free love cooling
CN109409621B (en) A kind of train air-conditioning Maintenance Scheduling system and its working method
CN109323419A (en) The method and apparatus and air-conditioning system and equipment of peak of power consumption control air-conditioning
CN101105322A (en) Intelligent control method of air conditioner
CN106196335A (en) Outdoor unit, indoor unit, outdoor unit control method and air conditioner
CN103528168A (en) Air conditioning system operation control method, device, system host and air conditioning system
JP2016196978A (en) Monitoring system for air conditioner, mobile terminal, and information collection application for air conditioner
JP5402679B2 (en) Air conditioner system
WO2011114573A1 (en) Local air-conditioning system, and control device for same
JP2008175466A (en) Electric power consumption control device and electric power consumption control method using this control device
JP2004342005A (en) Device, method, and system for determining parts replacement time
KR20130022295A (en) Apparatus and method for driving an air conditioner
CN107940680B (en) The mode switching method of air-conditioning system and air-conditioning system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181218