CN107975909A - Air conditioner standby machine starting control method and device and computer readable storage medium - Google Patents

Air conditioner standby machine starting control method and device and computer readable storage medium Download PDF

Info

Publication number
CN107975909A
CN107975909A CN201711174242.2A CN201711174242A CN107975909A CN 107975909 A CN107975909 A CN 107975909A CN 201711174242 A CN201711174242 A CN 201711174242A CN 107975909 A CN107975909 A CN 107975909A
Authority
CN
China
Prior art keywords
air
conditioning
guest
machine
guest machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711174242.2A
Other languages
Chinese (zh)
Other versions
CN107975909B (en
Inventor
陈晓江
于文博
缪玉珍
郭玉华
石静波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201711174242.2A priority Critical patent/CN107975909B/en
Publication of CN107975909A publication Critical patent/CN107975909A/en
Application granted granted Critical
Publication of CN107975909B publication Critical patent/CN107975909B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Air Conditioning Control Device (AREA)

Abstract

The invention discloses a method and a device for controlling the starting of an air conditioner standby machine and a computer readable storage medium. The method comprises the following steps: under the condition that the air conditioner standby machines need to be started, acquiring fault grade parameters, return air temperature parameters, accumulated running time of a compressor, running stopping time of a fan and unit addresses of all the air conditioner standby machines in an air conditioner cluster; and determining the air conditioner standby machine which is started preferentially in all the air conditioner standby machines according to the fault grade parameters, the return air temperature parameters, the accumulated running time of the compressor, the running stopping time of the fan and the unit address of all the air conditioner standby machines.

Description

Air-conditioning guest machine method for controlling opening and closing, device and computer-readable recording medium
Technical field
The present invention relates to air-conditioning technical field, in particular to a kind of air-conditioning guest machine method for controlling opening and closing, device and Computer-readable recording medium.
Background technology
Under normal conditions, data center, computer room or base station can plan air conditioner in machine room according to demand when building computer room Usage quantity, in order to improve the service life of air-conditioner set or preparation case of emergency, in addition to the operation machine for meeting refrigeration requirement It can also additionally configure the guest machine of respective numbers.Guest machine switches with operation machine according to certain time, in emergency such as temperature When too high or too low, emergency opening guest machine puts into operation, and guest machine is closed after emergency releasing.Air conditioner in machine room is opened at present Opening the method for guest machine has two kinds, first, being opened according to group address, the small preferential unlatching in guest machine address;Second, according to unit The height of region temperature value is opened.
For example, the temperature value that a kind of method of the specific unlatching guest machine provided in the prior art is air conditioning area exceedes certain One temperature threshold and reach after a certain period of time, open this guest machine.If guest machine start-stop time is excessive in a period of time, Then temperature threshold adaptively adjusts, and avoids frequent starting.
Data center, computer room or base station require environment temperature, humidity to keep stablizing and reaching certain precision, above-mentioned existing Though the scheme of technology is conducive to avoid frequent starting, extends service life of equipment, cannot ensure that computer room temperature control is accurate very well.
The effect of guest machine might not can be played using single factors as the condition for opening guest machine, tends to produce Raw control deviation.For example, when computer room load is uneven, guest machine regional environment temperature/humidity of unlatching and overall building environment temperature/ When humidity difference is larger, or the guest machine opened it is faulty and when cannot effectively realize refrigerating/heating, computer room temperature control can be caused Effect is poor, wastes electric energy, even reduces the situation of service life of equipment.
The content of the invention
A kind of air-conditioning guest machine method for controlling opening and closing, device and computer-readable storage medium are provided in the embodiment of the present invention Matter, to solve to make it easy to produce asking for control deviation in the prior art using single factors as the condition for opening guest machine Topic.
To achieve the above object, the embodiment of the present invention provides a kind of air-conditioning guest machine method for controlling opening and closing, including:Needing In the case of opening air-conditioning guest machine, the fault level parameter of all air-conditioning guest machines in air-conditioning cluster, return air temperature ginseng are obtained Number, compressor add up operation duration, wind turbine duration out of service and group address;Failure according to all air-conditioning guest machines etc. Level parameter, return air temperature parameter, compressor add up operation duration, wind turbine duration out of service and group address, are having time Adjust the air-conditioning guest machine for determining preferentially to open in guest machine.
According to another aspect of the present invention, there is provided a kind of computer-readable recording medium, the computer-readable storage Media storage has one or more program, and one or more of programs can be performed by one or more processor, with Realize any of the above-described method.
According to another aspect of the present invention, there is provided a kind of air-conditioning guest machine control device for opening, including:Parameter acquiring mould Block, in the case where needing to open air-conditioning guest machine, obtaining the fault level ginseng of all air-conditioning guest machines in air-conditioning cluster Number, return air temperature parameter, compressor add up operation duration, wind turbine duration out of service and group address;Open control module, Add up operation duration for the fault level parameter according to all air-conditioning guest machines, return air temperature parameter, compressor, wind turbine stops Operation duration and group address, determine the air-conditioning guest machine preferentially opened in all air-conditioning guest machines.
Apply the technical scheme of the present invention, air-conditioning guest machine method for controlling opening and closing includes:Needing to open air-conditioning guest machine In the case of, obtain the fault level parameter of all air-conditioning guest machines, return air temperature parameter, compressor in air-conditioning cluster and add up to transport Row duration, wind turbine duration out of service and group address;According to the fault level parameter of all air-conditioning guest machines, return air temperature Parameter, compressor add up operation duration, wind turbine duration out of service and group address, are determined in all air-conditioning guest machines excellent The air-conditioning guest machine first opened.The air-conditioning guest machine method for controlling opening and closing of the present invention, considers failure of air-conditioning guest machine etc. Level parameter, return air temperature parameter, compressor add up the parameters such as operation duration, wind turbine duration out of service and group address, select The air-conditioning guest machine preferentially first opened;In the normal switching on duty by turns of unit and or in emergency circumstances, be conducive to spare in all air-conditionings The spare function of the air-conditioning preferentially opened selected in machine plays the maximum efficiency of guest machine, is conducive to reach Rapid reversal urgent The purpose of situation and accurate temperature control;It is also beneficial to unit usage time in average air-conditioning cluster, improves unit service life, lifting The energy-saving effect of computer room etc..
Brief description of the drawings
Fig. 1 is the flow chart of the air-conditioning guest machine method for controlling opening and closing of the embodiment of the present invention;
Using the flow of above-mentioned air-conditioning guest machine method for controlling opening and closing when Fig. 2 is the normal switching on duty by turns of the embodiment of the present invention Figure;
Fig. 3 is the flow chart in emergency circumstances using above-mentioned air-conditioning guest machine method for controlling opening and closing of the embodiment of the present invention;
Fig. 4 is the structure diagram of the air-conditioning guest machine control device for opening of the embodiment of the present invention.
Embodiment
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings, but not as the limit to the present invention It is fixed.
Shown in Figure 1, according to an embodiment of the invention, air-conditioning guest machine method for controlling opening and closing includes:
Step 101:In the case where needing to open air-conditioning guest machine, the event of all air-conditioning guest machines in air-conditioning cluster is obtained Barrier class parameter, return air temperature parameter, compressor add up operation duration, wind turbine duration out of service and group address;
Step 102:Add up to run according to the fault level parameter, return air temperature parameter, compressor of all air-conditioning guest machines Duration, wind turbine duration out of service and group address, determine the air-conditioning guest machine preferentially opened in all air-conditioning guest machines.
The air-conditioning guest machine method for controlling opening and closing of the present invention, considers fault level parameter, the return air of air-conditioning guest machine Temperature parameter, compressor add up the parameters such as operation duration, wind turbine duration out of service and group address, what selection was preferentially opened Air-conditioning guest machine;In the normal switching on duty by turns of unit and or in emergency circumstances, be conducive to what is selected in all air-conditioning guest machines The spare function of air-conditioning preferentially opened plays the maximum efficiency of guest machine, is conducive to reach Rapid reversal emergency and precisely control The purpose of temperature;It is also beneficial to unit usage time in average air-conditioning cluster, improves the energy saving of unit service life, winding houses etc. Effect.
When it is implemented, in the normal switching on duty by turns of unit and in emergency circumstances, in order to ensure preferentially opening of selecting The spare function of air-conditioning plays the maximum efficiency of guest machine, in the present embodiment, it is contemplated that the fault level situation of guest machine and Return air temperature parameter, for example, adding up to transport according to the fault level parameter, return air temperature parameter, compressor of all air-conditioning guest machines Row duration, wind turbine duration out of service and group address, determine that the air-conditioning preferentially opened is spare in all air-conditioning guest machines Machine, including:Select what is do not broken down at present in all air-conditioning guest machines according to the fault level parameter of each air-conditioning guest machine Air-conditioning guest machine;In the air-conditioning guest machine not broken down at present selected, according to the return air temperature of each air-conditioning guest machine Parameter selects the highest air-conditioning guest machine of return air temperature, and indicates preferentially to open the highest air-conditioning guest machine of the return air temperature.
Specifically, above-mentioned return air temperature parameter can be the average value of the return air temperature of all operation machines in air-conditioning cluster, The average value of the return air temperature can also be as the ambient temperature value of computer room etc..
If specifically, according to the fault level parameter of each air-conditioning guest machine, judge that all air-conditioning guest machines are equal at present In the case of failure;The air-conditioning guest machine of fault level value maximum is then selected, and indicates to open the fault level value most Big air-conditioning guest machine, wherein, fault level value is bigger, and the degree that the failure of air-conditioning guest machine influences to run is lower.
For example, fault level can be according to following division:
1 grade of failure:Inner blower cannot be opened.
2 grades of failures:Inner blower can be opened, compressor/water valve failure, lose refrigerating capacity.
3 grades of failures:Inner blower can be opened, and refrigeration is normal, electrical heating/humidifier failure.
4 grades of failures:Insignificant load faulty and restorability failure, such as:Excessive/too low alarm of temperature.
At this point it is possible to opened according to the descending order of fault level value (for example, order of fault level value 4,3,2) Air-conditioning guest machine, the air-conditioning guest machine that fault level value is 1 cannot start.
When it is implemented, in order to further be conducive to the usage time of unit in average air-conditioning cluster, making for unit is improved With the energy-saving effect of service life, winding houses etc., in the present embodiment, in the air-conditioning guest machine that selection is preferentially opened, it is also contemplated that The compressor of air-conditioning guest machine adds up the parameters such as operation duration, for example, according to the fault level parameters of all air-conditioning guest machines, Return air temperature parameter, compressor add up operation duration, wind turbine duration out of service and group address, in all air-conditioning guest machines In determine the air-conditioning guest machine preferentially opened, including:
In the air-conditioning guest machine not broken down at present selected, join according to the return air temperature of each air-conditioning guest machine Number is selected in the case that the highest air-conditioning guest machine of return air temperature has more, in the more air-conditioning guest machines, selects pressure Contracting machine adds up the shortest air-conditioning guest machine of operation duration, and indicates that preferentially opening the compressor adds up the shortest air-conditioning of operation duration Guest machine.
Specifically, in the more air-conditioning guest machines, selecting compressor, to add up the shortest air-conditioning of operation duration spare In the case that machine there are more, then add up in the shortest more air-conditioning guest machines of operation duration to select group address minimum in compressor Air-conditioning guest machine, and indicate preferentially to open the air-conditioning guest machine of group address minimum.
When it is implemented, the situation for opening air-conditioning guest machine is needed to include any one or any combination in following item: Operation of air conditioner machine and the switching on duty by turns of air-conditioning guest machine (i.e. when meeting the cycle on duty by turns, close an operation of air conditioner machine, start one The air-conditioning guest machine of shutdown), environment temperature higher than the first preset temperature threshold value, environment temperature less than the second preset temperature threshold value with And operation of air conditioner machine disorderly closedown.
When it is implemented, need to open the situation of air-conditioning guest machine in operation of air conditioner machine and the switching on duty by turns of air-conditioning guest machine Under, select the current air-conditioning not broken down standby in all air-conditioning guest machines according to the fault level parameter of each air-conditioning guest machine With machine, including:Wind turbine duration out of service is first selected to be more than the air-conditioning guest machine in cycle on duty by turns in all air-conditioning guest machines;So Afterwards, select the current air-conditioning not broken down standby in all air-conditioning guest machines that wind turbine duration out of service is more than the cycle on duty by turns Use machine.
When it is implemented, air-conditioning group system includes host groups and from unit, host groups are except running itself unit function Outside logic, it is also responsible for dispatching all operations from unit.From unit receiving host group control command, while run itself unit work( Energy logic, when itself function logic conflicts with host groups control command, host groups control command of being subject to is run.Host groups meter The average value of return air temperature/humidity of all operation machines in air-conditioning cluster is calculated, and in this, as temperature/humidity value of computer room, the application In computer room temperature be return air temperature for this average value.Specifically, above-mentioned air-conditioning guest machine method for controlling opening and closing can be run In host groups.
Above-mentioned air-conditioning guest machine method for controlling opening and closing is described below in conjunction with specific example, to be opened under normal switch instances on duty by turns Exemplified by opening air-conditioning guest machine, the process in all air-conditioning guest machines as shown in Fig. 2, determine whether wind turbine duration out of service The air-conditioning guest machine in >=cycle on duty by turns, when there is more air-conditioning guest machines all to meet condition, is more than in wind turbine duration out of service Judge whether that each air-conditioning guest machine breaks down at present in all air-conditioning guest machines in cycle on duty by turns;If it is not, in no event The highest air-conditioning guest machine of return air temperature is first opened in the air-conditioning guest machine of barrier;If the more highest air-conditionings of return air temperature are standby With machine, then in the more air-conditioning guest machines, select compressor to add up the shortest air-conditioning guest machine of operation duration and first start;If Compressor, which adds up the shortest air-conditioning guest machine of operation duration, more, then adds up the shortest more air-conditionings of operation duration in compressor The air-conditioning guest machine of group address minimum is selected preferentially to open in guest machine.When the sky in wind turbine duration out of service >=cycle on duty by turns Adjust guest machine in the event of failure, preferentially opened according to the order of fault level 4,3,2, the air-conditioning guest machine that fault level is 1 is not Open.Because the unit wind turbine that fault level is 1 cannot be opened, unit cuts little ice at this time, it should which efficiency can be played by allowing Air-conditioning guest machine is opened.
Above-mentioned air-conditioning guest machine method for controlling opening and closing is described below in conjunction with specific example, it is default higher than first with environment temperature Exemplified by the emergency of temperature threshold and operation of air conditioner machine disorderly closedown, the process is as shown in figure 3, environment temperature is pre- higher than first In the case that if temperature threshold opens air-conditioning guest machine, when the environment temperature of computer room is excessive (for example, being higher than the first preset temperature Threshold value), for example, when continuous 5min detects 5 DEG C of return air temperature T (t)-desired temperature (i.e. the first preset temperature threshold value) >, An air-conditioning guest machine is opened by following steps:Judge whether each air-conditioning guest machine in all air-conditioning guest machines at present Break down;If it is not, the highest air-conditioning guest machine of return air temperature is first opened in not having faulty air-conditioning guest machine;If more The highest air-conditioning guest machine of platform return air temperature, then in the more air-conditioning guest machines, select compressor to add up operation duration most short Air-conditioning guest machine first start;If compressor adds up operation duration, shortest air-conditioning guest machine has more, tires out in compressor The air-conditioning guest machine of group address minimum is selected preferentially to open in the meter shortest more air-conditioning guest machines of operation duration.When having time Adjust guest machine in the event of failure, preferentially opened according to the order of fault level 4,3,2, the air-conditioning guest machine that fault level is 1 is not Open.
If after opening an air-conditioning guest machine 30min, also not up to guest machine closedown condition, i.e., continuous 5min are detected back Air temperature T (t)-desired temperature > design temperature precision, then be then turned on an air-conditioning guest machine, until all air-conditioning guest machines It is all turned on.
When operation of air conditioner machine, which breaks down, shuts down, an air-conditioning guest machine is opened by following steps:In all air-conditionings Judge whether that each air-conditioning guest machine breaks down at present in guest machine;If it is not, in not having faulty air-conditioning guest machine first Open the highest air-conditioning guest machine of return air temperature;If the highest air-conditioning guest machine of more return air temperatures, then in the more skies Adjust in guest machine, select compressor to add up the shortest air-conditioning guest machine of operation duration and first start;If compressor adds up operation Long shortest air-conditioning guest machine has more, then adds up in the shortest more air-conditioning guest machines of operation duration to select unit in compressor The air-conditioning guest machine of address minimum is preferentially opened.When all air-conditioning guest machines in the event of failure, judge whether that each air-conditioning is spare The fault level of machine is all higher than the fault level of operation of air conditioner machine, if it is not, in fault level higher than failure of operation of air conditioner machine etc. In the air-conditioning guest machine of level, preferentially opened according to the order of fault level 4,3,2, the air-conditioning guest machine that fault level is 1 is not opened Open;If so, operation of air conditioner machine is then kept to continue current operation.
It is described computer-readable to deposit when it is implemented, provide a kind of computer-readable recording medium in the present embodiment Storage media is stored with one or more program, and one or more of programs can be performed by one or more processor, To realize any of the above-described kind of air-conditioning guest machine method for controlling opening and closing.
When it is implemented, providing a kind of air-conditioning guest machine control device for opening in the present embodiment, which includes:Ginseng Number acquisition module, in the case where needing to open air-conditioning guest machine, obtaining the event of all air-conditioning guest machines in air-conditioning cluster Barrier class parameter, return air temperature parameter, compressor add up operation duration, wind turbine duration out of service and group address;Open Control module, when adding up operation for the fault level parameter according to all air-conditioning guest machines, return air temperature parameter, compressor Long, wind turbine duration out of service and group address, determine the air-conditioning guest machine preferentially opened in all air-conditioning guest machines.
In one embodiment, the Open control module, including:Breakdown judge unit, for spare according to each air-conditioning The fault level parameter of machine selects the air-conditioning guest machine not broken down at present in all air-conditioning guest machines;Temperature judges single Member, in the air-conditioning guest machine that does not break down at present selected, according to the return air temperature parameter of each air-conditioning guest machine Select the highest air-conditioning guest machine of return air temperature;Control unit is opened, for indicating preferentially to open the highest sky of the return air temperature Adjust guest machine.
In one embodiment, further include:Operation duration judging unit, for not breaking down at present what is selected In air-conditioning guest machine, have selecting the highest air-conditioning guest machine of return air temperature according to the return air temperature parameter of each air-conditioning guest machine In the case of more, in the more air-conditioning guest machines, select compressor and add up the shortest air-conditioning guest machine of operation duration;Open Control unit is opened, is additionally operable to indicate that preferentially opening the compressor adds up the shortest air-conditioning guest machine of operation duration.
In one embodiment, further include:Group address judging unit, in the more air-conditioning guest machines, selecting Compressor is selected out to add up in the case that the shortest air-conditioning guest machine of operation duration there are more, then to add up operation duration most in compressor The air-conditioning guest machine of group address minimum is selected in more short air-conditioning guest machines;Control unit is opened, it is preferential to be additionally operable to instruction Open the air-conditioning guest machine of group address minimum.
In one embodiment, breakdown judge unit, is additionally operable to the fault level parameter according to each air-conditioning guest machine, judges Go out in the case that all air-conditioning guest machines break down at present, select the air-conditioning guest machine of fault level value maximum;Open Control unit, is additionally operable to the air-conditioning guest machine that the fault level value maximum is opened in instruction, wherein, fault level value is bigger, air-conditioning The degree that the failure of guest machine influences operation is lower.
In one embodiment, it is necessary to opening the situation of air-conditioning guest machine includes any one in following item or any group Close:Operation of air conditioner machine and the switching on duty by turns of air-conditioning guest machine, environment temperature are higher than the first preset temperature threshold value, environment temperature less than the Two preset temperature threshold values and operation of air conditioner machine disorderly closedown.
In one embodiment, above-mentioned breakdown judge unit, is additionally operable in operation of air conditioner machine and air-conditioning guest machine is on duty by turns cuts Needed when changing in the case of opening air-conditioning guest machine, select wind turbine duration out of service to be more than in all air-conditioning guest machines on duty by turns The air-conditioning guest machine in cycle;Select not go out at present in all air-conditioning guest machines that wind turbine duration out of service is more than the cycle on duty by turns The air-conditioning guest machine of existing failure.
Certainly, above is the preferred embodiment of the present invention.It should be pointed out that for those skilled in the art For, on the premise of its general principles are not departed from, some improvements and modifications can also be made, these improvements and modifications It is considered as protection scope of the present invention.

Claims (10)

  1. A kind of 1. air-conditioning guest machine method for controlling opening and closing, it is characterised in that including:
    Need open air-conditioning guest machine in the case of, obtain air-conditioning cluster in all air-conditioning guest machines fault level parameter, Return air temperature parameter, compressor add up operation duration, wind turbine duration out of service and group address;
    Operation duration is added up according to the fault level parameter, return air temperature parameter, compressor of all air-conditioning guest machines, wind turbine stops Operation duration and group address, determine the air-conditioning guest machine preferentially opened in all air-conditioning guest machines.
  2. 2. air-conditioning guest machine method for controlling opening and closing according to claim 1, it is characterised in that according to all air-conditioning guest machines Fault level parameter, return air temperature parameter, compressor add up operation duration, wind turbine duration out of service and group address, The air-conditioning guest machine preferentially opened is determined in all air-conditioning guest machines, including:
    The current air-conditioning not broken down is selected in all air-conditioning guest machines according to the fault level parameter of each air-conditioning guest machine Guest machine;
    In the air-conditioning guest machine not broken down at present selected, selected according to the return air temperature parameter of each air-conditioning guest machine The highest air-conditioning guest machine of return air temperature, and indicate preferentially to open the highest air-conditioning guest machine of the return air temperature.
  3. 3. air-conditioning guest machine method for controlling opening and closing according to claim 2, it is characterised in that according to all air-conditioning guest machines Fault level parameter, return air temperature parameter, compressor add up operation duration, wind turbine duration out of service and group address, The air-conditioning guest machine preferentially opened is determined in all air-conditioning guest machines, including:
    In the air-conditioning guest machine not broken down at present selected, selected according to the return air temperature parameter of each air-conditioning guest machine In the case of selecting out the highest air-conditioning guest machine of return air temperature and there are more, in the more air-conditioning guest machines, compressor is selected The accumulative shortest air-conditioning guest machine of operation duration, and indicate preferentially to open the compressor to add up the shortest air-conditioning of operation duration spare Machine.
  4. 4. air-conditioning guest machine method for controlling opening and closing according to claim 3, it is characterised in that according to all air-conditioning guest machines Fault level parameter, return air temperature parameter, compressor add up operation duration, wind turbine duration out of service and group address, The air-conditioning guest machine preferentially opened is determined in all air-conditioning guest machines, including:
    In the more air-conditioning guest machines, there are the feelings of more selecting compressor and adding up the shortest air-conditioning guest machine of operation duration Under condition, then add up in the shortest more air-conditioning guest machines of operation duration to select the air-conditioning of group address minimum spare in compressor Machine, and indicate preferentially to open the air-conditioning guest machine of group address minimum.
  5. 5. air-conditioning guest machine method for controlling opening and closing according to claim 2, it is characterised in that according to all air-conditioning guest machines Fault level parameter, return air temperature parameter, compressor add up operation duration, wind turbine duration out of service and group address, The air-conditioning guest machine preferentially opened is determined in all air-conditioning guest machines, including:
    According to the fault level parameter of each air-conditioning guest machine, the situation that all air-conditioning guest machines break down at present is judged Under, the air-conditioning guest machine of fault level value maximum is selected, and indicate to open the air-conditioning guest machine of the fault level value maximum, its In, fault level value is bigger, and the degree that the failure of air-conditioning guest machine influences to run is lower.
  6. 6. air-conditioning guest machine method for controlling opening and closing according to any one of claim 1 to 5, it is characterised in that needs are opened Opening the situation of air-conditioning guest machine includes any one or any combination in following item:
    Operation of air conditioner machine and the switching on duty by turns of air-conditioning guest machine, environment temperature are less than higher than the first preset temperature threshold value, environment temperature Second preset temperature threshold value and operation of air conditioner machine disorderly closedown.
  7. 7. the air-conditioning guest machine method for controlling opening and closing according to any one of claim 2 to 5, it is characterised in that In the case of needing to open air-conditioning guest machine in operation of air conditioner machine and the switching on duty by turns of air-conditioning guest machine, according to each air-conditioning guest machine Fault level parameter the air-conditioning guest machine that does not break down at present is selected in all air-conditioning guest machines, including:
    Wind turbine duration out of service is selected to be more than the air-conditioning guest machine in cycle on duty by turns in all air-conditioning guest machines;Stop in wind turbine Operation duration is more than the air-conditioning guest machine for selecting not break down at present in all air-conditioning guest machines in cycle on duty by turns.
  8. A kind of 8. computer-readable recording medium, it is characterised in that the computer-readable recording medium storage have one or Multiple programs, one or more of programs can be performed by one or more processor, to realize in claim 1 to 7 Any one of them method.
  9. A kind of 9. air-conditioning guest machine control device for opening, it is characterised in that including:
    Parameter acquisition module, it is spare in the case where needing to open air-conditioning guest machine, obtaining all air-conditionings in air-conditioning cluster The fault level parameter of machine, return air temperature parameter, compressor are with adding up operation duration, wind turbine duration out of service and unit Location;
    Open control module, adds up for the fault level parameter according to all air-conditioning guest machines, return air temperature parameter, compressor Operation duration, wind turbine duration out of service and group address, determine that the air-conditioning preferentially opened is standby in all air-conditioning guest machines Use machine.
  10. 10. air-conditioning guest machine control device for opening according to claim 9, it is characterised in that the Open control module, Including:
    Breakdown judge unit, selects at present for the fault level parameter according to each air-conditioning guest machine in all air-conditioning guest machines The air-conditioning guest machine not broken down;
    Temperature judging unit, in the air-conditioning guest machine that does not break down at present selected, according to each air-conditioning guest machine Return air temperature parameter selection the highest air-conditioning guest machine of return air temperature;
    Control unit is opened, for indicating preferentially to open the highest air-conditioning guest machine of the return air temperature.
CN201711174242.2A 2017-11-22 2017-11-22 Air conditioner standby machine starting control method and device and computer readable storage medium Active CN107975909B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711174242.2A CN107975909B (en) 2017-11-22 2017-11-22 Air conditioner standby machine starting control method and device and computer readable storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711174242.2A CN107975909B (en) 2017-11-22 2017-11-22 Air conditioner standby machine starting control method and device and computer readable storage medium

Publications (2)

Publication Number Publication Date
CN107975909A true CN107975909A (en) 2018-05-01
CN107975909B CN107975909B (en) 2020-02-14

Family

ID=62011010

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711174242.2A Active CN107975909B (en) 2017-11-22 2017-11-22 Air conditioner standby machine starting control method and device and computer readable storage medium

Country Status (1)

Country Link
CN (1) CN107975909B (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108826580A (en) * 2018-07-17 2018-11-16 珠海格力电器股份有限公司 Load replacement method, air conditioning unit, module of air conditioning unit and module controller
CN109031939A (en) * 2018-05-03 2018-12-18 珠海格力电器股份有限公司 Method and device for switching main equipment and standby equipment
CN109442677A (en) * 2018-09-18 2019-03-08 平安科技(深圳)有限公司 Fault control method, the electronic equipment of air-conditioning system
CN109883006A (en) * 2019-02-18 2019-06-14 珠海格力电器股份有限公司 Air conditioner group system capable of improving reliability and group control method
CN110131844A (en) * 2019-05-22 2019-08-16 广东美的暖通设备有限公司 Air conditioner and its control method, computer readable storage medium
CN110542188A (en) * 2019-09-12 2019-12-06 广东美的暖通设备有限公司 group control method and system of air conditioners and computer readable storage medium
CN111339069A (en) * 2018-12-19 2020-06-26 珠海格力电器股份有限公司 Multi-online data statistical analysis method and system and intelligent terminal
CN112066513A (en) * 2020-08-31 2020-12-11 珠海格力电器股份有限公司 Method, device, equipment and medium for adjusting equipment operation parameter range
CN113279996A (en) * 2021-06-15 2021-08-20 河南艾牧智能设备有限公司 Method for balancing running of fans of environment-friendly controller fan control system
CN113465122A (en) * 2021-06-21 2021-10-01 北京纪新泰富机电技术股份有限公司 Air conditioner host model selection method and device
CN113687603A (en) * 2021-08-19 2021-11-23 筑加智慧城市建设有限公司 Building emergency prevention method, device, equipment and storage medium based on intelligent operation and maintenance
CN114183859A (en) * 2021-12-10 2022-03-15 珠海格力电器股份有限公司 Ice storage system, control method and air conditioner
CN115264780A (en) * 2022-08-18 2022-11-01 珠海格力电器股份有限公司 Air conditioner double-machine control method and device and air conditioner
WO2023124781A1 (en) * 2021-12-28 2023-07-06 上海美控智慧建筑有限公司 Polling loop control method and system, electronic device, and storage medium
CN117404775A (en) * 2023-12-11 2024-01-16 珠海格力电器股份有限公司 Air conditioner room cutting method and device, computer equipment and storage medium

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101315560A (en) * 2008-07-10 2008-12-03 四川长虹电器股份有限公司 Control method for improving service life of water chilling unit system
JP2011007415A (en) * 2009-06-25 2011-01-13 Ntt Facilities Inc Air conditioner control method in information communication machine room
CN102147143A (en) * 2011-04-06 2011-08-10 深圳达实智能股份有限公司 On-off optimization control method and device of central air-conditioning system
CN103939997A (en) * 2014-04-29 2014-07-23 中国通信建设集团设计院有限公司 Air conditioner system and use method thereof
CN104930668A (en) * 2015-07-08 2015-09-23 中国电信股份有限公司南京分公司 Cluster control method for computer room precise air conditioners
JP2015183899A (en) * 2014-03-24 2015-10-22 大日本印刷株式会社 Air conditioning control system
CN105258290A (en) * 2015-10-22 2016-01-20 珠海格力电器股份有限公司 Air conditioner onboard group control system
CN105605842A (en) * 2015-12-28 2016-05-25 重庆美的通用制冷设备有限公司 Control method for multi-module set
CN106765976A (en) * 2017-01-05 2017-05-31 广东志高空调有限公司 A kind of remote air conditioner monitoring system and its method with load balance control ability
CN106968929A (en) * 2017-04-25 2017-07-21 北京清控洁能科技有限公司 A kind of many automatic pump methods of controlling system of central air conditioner
CN106980274A (en) * 2016-01-19 2017-07-25 珠海格力电器股份有限公司 air conditioning unit control method
US20170277816A1 (en) * 2016-03-22 2017-09-28 Chu-Fu Chen Method of verifying and analyzing energy efficiency ratio EER of a heating ventilation and air conditioning HVAC chiller unit

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101315560A (en) * 2008-07-10 2008-12-03 四川长虹电器股份有限公司 Control method for improving service life of water chilling unit system
JP2011007415A (en) * 2009-06-25 2011-01-13 Ntt Facilities Inc Air conditioner control method in information communication machine room
CN102147143A (en) * 2011-04-06 2011-08-10 深圳达实智能股份有限公司 On-off optimization control method and device of central air-conditioning system
JP2015183899A (en) * 2014-03-24 2015-10-22 大日本印刷株式会社 Air conditioning control system
CN103939997A (en) * 2014-04-29 2014-07-23 中国通信建设集团设计院有限公司 Air conditioner system and use method thereof
CN104930668A (en) * 2015-07-08 2015-09-23 中国电信股份有限公司南京分公司 Cluster control method for computer room precise air conditioners
CN105258290A (en) * 2015-10-22 2016-01-20 珠海格力电器股份有限公司 Air conditioner onboard group control system
CN105605842A (en) * 2015-12-28 2016-05-25 重庆美的通用制冷设备有限公司 Control method for multi-module set
CN106980274A (en) * 2016-01-19 2017-07-25 珠海格力电器股份有限公司 air conditioning unit control method
US20170277816A1 (en) * 2016-03-22 2017-09-28 Chu-Fu Chen Method of verifying and analyzing energy efficiency ratio EER of a heating ventilation and air conditioning HVAC chiller unit
CN106765976A (en) * 2017-01-05 2017-05-31 广东志高空调有限公司 A kind of remote air conditioner monitoring system and its method with load balance control ability
CN106968929A (en) * 2017-04-25 2017-07-21 北京清控洁能科技有限公司 A kind of many automatic pump methods of controlling system of central air conditioner

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109031939A (en) * 2018-05-03 2018-12-18 珠海格力电器股份有限公司 Method and device for switching main equipment and standby equipment
CN108826580A (en) * 2018-07-17 2018-11-16 珠海格力电器股份有限公司 Load replacement method, air conditioning unit, module of air conditioning unit and module controller
CN109442677A (en) * 2018-09-18 2019-03-08 平安科技(深圳)有限公司 Fault control method, the electronic equipment of air-conditioning system
CN111339069B (en) * 2018-12-19 2023-07-25 珠海格力电器股份有限公司 Multi-split data statistical analysis method, system and intelligent terminal
CN111339069A (en) * 2018-12-19 2020-06-26 珠海格力电器股份有限公司 Multi-online data statistical analysis method and system and intelligent terminal
CN109883006A (en) * 2019-02-18 2019-06-14 珠海格力电器股份有限公司 Air conditioner group system capable of improving reliability and group control method
CN110131844A (en) * 2019-05-22 2019-08-16 广东美的暖通设备有限公司 Air conditioner and its control method, computer readable storage medium
CN110131844B (en) * 2019-05-22 2021-07-23 广东美的暖通设备有限公司 Air conditioner, control method thereof, and computer-readable storage medium
CN110542188A (en) * 2019-09-12 2019-12-06 广东美的暖通设备有限公司 group control method and system of air conditioners and computer readable storage medium
CN112066513A (en) * 2020-08-31 2020-12-11 珠海格力电器股份有限公司 Method, device, equipment and medium for adjusting equipment operation parameter range
CN113279996A (en) * 2021-06-15 2021-08-20 河南艾牧智能设备有限公司 Method for balancing running of fans of environment-friendly controller fan control system
CN113465122A (en) * 2021-06-21 2021-10-01 北京纪新泰富机电技术股份有限公司 Air conditioner host model selection method and device
CN113465122B (en) * 2021-06-21 2023-03-03 北京纪新泰富机电技术股份有限公司 Air conditioner host model selection method and device
CN113687603A (en) * 2021-08-19 2021-11-23 筑加智慧城市建设有限公司 Building emergency prevention method, device, equipment and storage medium based on intelligent operation and maintenance
CN114183859A (en) * 2021-12-10 2022-03-15 珠海格力电器股份有限公司 Ice storage system, control method and air conditioner
CN114183859B (en) * 2021-12-10 2022-12-13 珠海格力电器股份有限公司 Ice storage system, control method and air conditioner
WO2023124781A1 (en) * 2021-12-28 2023-07-06 上海美控智慧建筑有限公司 Polling loop control method and system, electronic device, and storage medium
CN115264780A (en) * 2022-08-18 2022-11-01 珠海格力电器股份有限公司 Air conditioner double-machine control method and device and air conditioner
CN117404775A (en) * 2023-12-11 2024-01-16 珠海格力电器股份有限公司 Air conditioner room cutting method and device, computer equipment and storage medium
CN117404775B (en) * 2023-12-11 2024-02-13 珠海格力电器股份有限公司 Air conditioner room cutting method and device, computer equipment and storage medium

Also Published As

Publication number Publication date
CN107975909B (en) 2020-02-14

Similar Documents

Publication Publication Date Title
CN107975909A (en) Air conditioner standby machine starting control method and device and computer readable storage medium
CN108534394B (en) Group control optimization control method for loading and unloading of double units of ground source heat pump
CN108386972B (en) Energy-saving control system and method for air conditioner of machine room
CN105757876B (en) A kind of air conditioner air deflector control method and device
CN112594904A (en) Energy-saving optimization control system of refrigeration station
CN109059195B (en) Control method and control system for central air conditioner for reducing load peak value of power grid
CN108917112B (en) Method for graded control self-adaption of variable frequency outdoor unit and air conditioner
CN104390311B (en) Air conditioner refrigeration method, system and device aiming at high-temperature server
CN106288236B (en) Air conditioner compress control method and air conditioner
CN108361912A (en) Control method, control system and the air conditioner of air conditioner
CN111121222B (en) Fluorine-lack protection method for air conditioner, air conditioner and readable storage medium
CN105258290A (en) Air conditioner onboard group control system
CN110542188A (en) group control method and system of air conditioners and computer readable storage medium
JPWO2016075769A1 (en) Air conditioning management device and air conditioning system
CN104390305A (en) Control method of precision air conditioner system
CN102022799B (en) Energy-saving control method for central air conditioner system
CN102799201A (en) Communication machine room temperature energy-saving control method and system based on equipment life factors
CN112393341A (en) Ice storage control method and device, air conditioning system, storage medium and processor
CN111207485A (en) Anti-freezing control method and device, storage medium and water multi-connected system
CN103528168A (en) Air conditioning system operation control method, device, system host and air conditioning system
CN113959069B (en) Air conditioning system
CN108361929A (en) Control method and control device, storage medium and mobile air-conditioner
CN103322640A (en) Air-conditioner energy saving control method, air-conditioner energy saving control system and air-conditioner switching system of comprehensive energy-saving building
CN110345603A (en) Air conditioner and its operation control system, progress control method and computer media
CN116430755A (en) Automatic optimizing start-stop control method for equipment, storage medium and equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant