CN109029405A - A kind of construction survey master reference point coordinate system review method - Google Patents

A kind of construction survey master reference point coordinate system review method Download PDF

Info

Publication number
CN109029405A
CN109029405A CN201810886637.3A CN201810886637A CN109029405A CN 109029405 A CN109029405 A CN 109029405A CN 201810886637 A CN201810886637 A CN 201810886637A CN 109029405 A CN109029405 A CN 109029405A
Authority
CN
China
Prior art keywords
point
station
total station
master reference
survey
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810886637.3A
Other languages
Chinese (zh)
Inventor
范泽宇
李志军
王玉超
康普辉
李智刚
李海银
孟应磊
王勇
李梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Construction and Investment Holding Group Co Ltd
YCIH No 2 Construction Co Ltd
Original Assignee
Yunnan Construction and Investment Holding Group Co Ltd
YCIH No 2 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Construction and Investment Holding Group Co Ltd, YCIH No 2 Construction Co Ltd filed Critical Yunnan Construction and Investment Holding Group Co Ltd
Priority to CN201810886637.3A priority Critical patent/CN109029405A/en
Publication of CN109029405A publication Critical patent/CN109029405A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
    • G01C15/02Means for marking measuring points
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C25/00Manufacturing, calibrating, cleaning, or repairing instruments or devices referred to in the other groups of this subclass

Abstract

A kind of construction survey master reference point coordinate system review method selects the master reference point in the relatively positive north as survey station point and sets up total station, and another master reference point for selecting construction unit to provide is backsight point 1 and sets up prism;Total station is opened, three-dimensional coordinate, 1 three-dimensional coordinate of backsight point of survey station point are inputted, collimation axis is aimed at into 1 prism centers time point "Yes" of backsight point, completes to build a station;The coordinate of the master reference point backsight point 2 provided in total station backsight point 1 and other construction units is checked;Polaris is found in positioning later, and eyepiece " ten " the word silk for finely tuning total station is directed at Polaris center;According to survey station point coordinate, the survey station point convergence of meridians is calculated;The azimuth angle of total station at this time is checked, if azimuth angle and calculated gisement angle error are 3 " interior with regard to point " OK ", otherwise test review, if error is consistently greater than 3 ", the original measurement datum mark coordinate for being speculated as construction unit's offer is wrong.The method of the present invention is simple, and measurement accuracy rate is high.

Description

A kind of construction survey master reference point coordinate system review method
Technical field
The present invention relates to building construction measurement method and technology fields, and in particular to construction survey master reference point coordinate system Review method.
Background technique
It is built, in the construction in highway, railway, tunnel in room, construction survey is the intermediary to devise and draw the blueprint between engineering construction, The purpose is in the construction process building, structures on drawing etc. plan-position and elevation, project on ground, make For the foundation of engineering construction, through in entire work progress.The success or not of measurement work is directly determined and is affected entirely The success or failure of engineering construction.The datum mark of measurement provides the master reference point coordinate of measurement for the preceding construction unit that constructs.And it is at present Only, the whether wrong method of master reference point that review construction unit provides is that master reference point measures closure, but this Method can only check master reference point relative tertiary location accuracy, cannot check the accurate of the coordinate system of master reference point composition Property.
Summary of the invention
That It is an object of the present invention to solve the deficiency of the existing technology and provide a kind of measurement methods is simple, accuracy rate is high Construction survey master reference point coordinate system checks method.
The purpose of the present invention is achieved through the following technical solutions:
A kind of construction survey master reference point coordinate system review method, comprising the following steps:
(1) the selection review date: the night that selection is fine, stars are bright carries out construction survey master reference point coordinate System's review;
(2) instrument sets up and builds a station:
A. the master reference point for selecting the relatively positive northern visual field more open is survey station point, and total station instrument is erected at survey After website, multi-angle rotary total station adjusts the level and accuracy of alignment of instrument;
B. another master reference point for selecting construction unit to provide is backsight point 1, and prism is erected at backsight point 1 and is guaranteed Prism sets up vertical;
C. total station is opened, three-dimensional coordinate (X, Y, H) and instrument height, the prism for inputting survey station point are high, and backsight point 1 is three-dimensional Coordinate (X1,Y1,H1), collimation axis is aimed at into 1 prism centers time point "Yes" of backsight point, confirmation is completed to build a station;
D. measurement of coordinates function is used in total station, the master reference point provided backsight point 1 and other construction units The coordinate of backsight point 2 is checked, and error, with regard to point " OK ", otherwise searches reason until adjusting within 3 millimeters;
(3) Polaris is positioned:
A. Polaris position is found, is directed at Polaris with total station sighting device;
B. cellphone GPS function is opened, then the longitude and latitude of site location is surveyed in inquiry, and the total station elevation angle is then adjusted to 90 Degree subtracts the degree that the latitude in the place obtains, and the total station elevation angle is locked;
C. azimuth and the focal length for adjusting total station, find Polaris;
D. azimuth, the elevation angle and the focal length for finely tuning total station, make eyepiece " ten " word silk be directed at Polaris center;
E. according to survey station point coordinate, the survey station point convergence of meridians is calculated;
F. the azimuth angle of total station at this time is checked, if azimuth angle and calculated gisement angle error exist 3 " with regard to point " OK " in, otherwise need repeatedly to test review, if error is consistently greater than 3 ", the original of construction unit's offer is provided Datum mark coordinate is wrong, must be reported to construction unit.
The present invention provides a kind of construction survey master reference point coordinate systems to check method, is avoided from the root because of construction The construction survey master reference point that unit passes through occurs measuring quality problems caused by error.Measurement method of the present invention is simple, real With being built suitable for room, the construction survey in highway, railway, tunnel etc..
The present invention will be further described below with reference to the drawings.
Detailed description of the invention
Fig. 1 is the schematic diagram that the method for the present invention carries out the review of master reference point coordinate system.
Specific embodiment
Referring to Fig.1, construction survey master reference point coordinate system review method of the invention the following steps are included:
(1) the selection review date: the night that selection is fine, stars are bright carries out construction survey master reference point coordinate System's review;
(2) instrument sets up and builds a station:
A. the master reference point for selecting the relatively positive northern visual field more open is survey station point, and total station instrument is erected at survey After website, multi-angle rotary total station adjusts the level and accuracy of alignment of instrument;
B. another master reference point for selecting construction unit to provide is backsight point 1, and prism is erected at backsight point 1 and is guaranteed Prism sets up vertical;
C. total station is opened, three-dimensional coordinate (X, Y, H) and instrument height, the prism for inputting survey station point are high, and backsight point 1 is three-dimensional Coordinate (X1,Y1,H1), collimation axis is aimed at into 1 prism centers time point "Yes" of backsight point, confirmation is completed to build a station;
D. measurement of coordinates function is used in total station, the master reference point provided backsight point 1 and other construction units The coordinate of backsight point 2 is checked, and error, with regard to point " OK ", otherwise searches reason until adjusting within 3 millimeters;
(3) Polaris is positioned:
A. Polaris position is found, is directed at Polaris with total station sighting device;
B. cellphone GPS function is opened, then the longitude and latitude of site location is surveyed in inquiry, and the total station elevation angle is then adjusted to 90 Degree subtracts the degree that the latitude in the place obtains, and the total station elevation angle is locked;
C. azimuth and the focal length for adjusting total station, find Polaris;
D. azimuth, the elevation angle and the focal length for finely tuning total station, make eyepiece " ten " word silk be directed at Polaris center;
E. according to survey station point coordinate, the survey station point convergence of meridians is calculated;
F. the azimuth angle of total station at this time is checked, if azimuth angle and calculated gisement angle error exist 3 " with regard to point " OK " in, otherwise need repeatedly to test review, if error is consistently greater than 3 ", the original of construction unit's offer is provided Datum mark coordinate is wrong, must be reported to construction unit.

Claims (1)

1. a kind of construction survey master reference point coordinate system checks method, which comprises the following steps:
(1) the selection review date: it is multiple that the night that selection is fine, stars are bright carries out construction survey master reference point coordinate system Core;
(2) it sets up instrument and builds a station:
A. the master reference point for selecting the relatively positive northern visual field more open is survey station point, and total station instrument is erected at survey station point Afterwards, the level and accuracy of alignment of multi-angle rotary total station adjustment instrument;
B. another master reference point for selecting construction unit to provide is backsight point 1, and prism is erected at backsight point 1 and guarantees prism It sets up vertical;
C. total station is opened, three-dimensional coordinate (X, Y, H) and instrument height, the prism for inputting survey station point are high, 1 three-dimensional coordinate of backsight point (X1,Y1,H1), collimation axis is aimed at into backsight point prism centers time point "Yes", confirmation is completed to build a station;
D. measurement of coordinates function is used in total station, the master reference point backsight provided backsight point 1 and other construction units The coordinate of point 2 is checked, and error, with regard to point " OK ", otherwise searches reason until adjusting within 3 millimeters;
(3) Polaris is positioned:
A. Polaris position is found, is directed at Polaris with total station sighting device;
B. cellphone GPS function is opened, then the longitude and latitude of site location is surveyed in inquiry, and the total station elevation angle is then adjusted to 90 degree and is subtracted The degree for going the latitude in the place to obtain, and the total station elevation angle is locked;
C. azimuth and the focal length for adjusting total station, find Polaris;
D. azimuth, the elevation angle and the focal length for finely tuning total station, make eyepiece " ten " word silk be directed at Polaris center;
E. according to survey station point coordinate, the survey station point convergence of meridians is calculated;
F. the azimuth angle of total station at this time is checked, if azimuth angle and calculated gisement angle error are 3 " in With regard to point " OK ", otherwise need repeatedly to test review, if error is consistently greater than 3 ", the original measurement of construction unit's offer is provided Datum mark coordinate is wrong, must be reported to construction unit.
CN201810886637.3A 2018-08-06 2018-08-06 A kind of construction survey master reference point coordinate system review method Pending CN109029405A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810886637.3A CN109029405A (en) 2018-08-06 2018-08-06 A kind of construction survey master reference point coordinate system review method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810886637.3A CN109029405A (en) 2018-08-06 2018-08-06 A kind of construction survey master reference point coordinate system review method

Publications (1)

Publication Number Publication Date
CN109029405A true CN109029405A (en) 2018-12-18

Family

ID=64649821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810886637.3A Pending CN109029405A (en) 2018-08-06 2018-08-06 A kind of construction survey master reference point coordinate system review method

Country Status (1)

Country Link
CN (1) CN109029405A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB677346A (en) * 1949-10-06 1952-08-13 Benjamin Thomas Harries Pole star corrector and course finder
CN102590841A (en) * 2011-12-20 2012-07-18 北京卫星环境工程研究所 Method for marking coordinate system in indoor or outdoor testing field and dynamic measuring method for lunar vehicle position and attitude
CN103852057A (en) * 2014-02-18 2014-06-11 中国人民解放军92859部队 Astro-observation-based isolated small reef magnetic declination measurement method
CN107340530A (en) * 2017-09-05 2017-11-10 北京奥博泰科技有限公司 A kind of split type GNSS geographical north orienting device based on RTK

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB677346A (en) * 1949-10-06 1952-08-13 Benjamin Thomas Harries Pole star corrector and course finder
CN102590841A (en) * 2011-12-20 2012-07-18 北京卫星环境工程研究所 Method for marking coordinate system in indoor or outdoor testing field and dynamic measuring method for lunar vehicle position and attitude
CN103852057A (en) * 2014-02-18 2014-06-11 中国人民解放军92859部队 Astro-observation-based isolated small reef magnetic declination measurement method
CN107340530A (en) * 2017-09-05 2017-11-10 北京奥博泰科技有限公司 A kind of split type GNSS geographical north orienting device based on RTK

Similar Documents

Publication Publication Date Title
CN108871266B (en) Automatic settlement monitoring method based on intermediate method triangle elevation method
CN106526636B (en) High-precision deformation monitoring device and method based on Beidou positioning
CN110849338B (en) Control network measuring method
CN108253946B (en) Multifunctional vertical measurement and connection measurement integrated three-dimensional coordinate transmission device and method
CN106979769B (en) The reverse coordinate of tunnel shaft transmits cultellation construction survey method
CN102890281A (en) High-accuracy GPS (global position system) positioning measurement method for high-rise buildings
US5631732A (en) Surveyor device
CN103499340A (en) Measurement device and measurement method for vertical great-height difference height transmission
CN108680103A (en) A kind of cable-stayed bridge superelevation bridge tower pier anchor structure Rapid precision locating measurement method
CN103292795A (en) A method for accurate measurement by using dual prisms, and a measuring rod
CN102433827A (en) Pavement construction lofting method for high-speed loop in skid pad
CN106908048B (en) The reverse coordinate of deep shaft transmits cultellation measurement method
CN103115610A (en) Leveling method suitable for compound level gauge
CN106323229A (en) Orienting theodolite based on satellite orientation
CN104535042B (en) Measuring method based on non-orthogonal axes system laser transit
CN107462264B (en) Dynamic gyro north-seeking calibration device
CN109112937A (en) A kind of surface evenness fining method for fast measuring
CN106979768B (en) The reverse coordinate of deep shaft transmits cultellation construction survey method
CN109238253B (en) Building surveying and mapping method and system based on projection principle
CN109029405A (en) A kind of construction survey master reference point coordinate system review method
CN109112936A (en) A kind of surface evenness fining rapid measurement device
CN106468549B (en) Construction verticality measuring method based on RTK system
CN105258566B (en) Method for obtaining reference azimuth by means of rocket aiming system through aiming scaleplate and reference point
CN110231055A (en) A kind of calibration method of plumb aligner and zenith instrument
CN104103902A (en) Compass and gradienter based point-to-point alignment method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181218

WD01 Invention patent application deemed withdrawn after publication