CN109026143A - A kind of interim concentration ejectment device and its application method for lithologic character stratum Tunnel Gushing - Google Patents

A kind of interim concentration ejectment device and its application method for lithologic character stratum Tunnel Gushing Download PDF

Info

Publication number
CN109026143A
CN109026143A CN201810823427.XA CN201810823427A CN109026143A CN 109026143 A CN109026143 A CN 109026143A CN 201810823427 A CN201810823427 A CN 201810823427A CN 109026143 A CN109026143 A CN 109026143A
Authority
CN
China
Prior art keywords
ejectment
tunnel
hole
round tube
rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810823427.XA
Other languages
Chinese (zh)
Inventor
姚占虎
郝纯宗
阳军生
郑静
李林毅
李尊武
张城瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
Original Assignee
CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN201810823427.XA priority Critical patent/CN109026143A/en
Publication of CN109026143A publication Critical patent/CN109026143A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a kind of interim concentration ejectment devices and its application method for lithologic character stratum Tunnel Gushing, device includes the shell mechanism for country rock pore-forming and support hole wall, the shell mechanism front-end surface uniformly digs apertured hole, and hole drainage hole wall seeps water to internal drainage space;The device further includes the ejectment structure for collecting discharge infiltration, and ejectment structure side outer wall is close to shell mechanism inner wall, the other side is connected to exterior space.The present invention solves the problems, such as that lithologic character stratum tunnel needs to carry out temporary drainage to face during excavation, ensure that working security, shortens the constructing tunnel period, reduce project cost.

Description

It is a kind of for the interim concentration ejectment device of lithologic character stratum Tunnel Gushing and its use Method
Technical field
The present invention relates to constructing tunnel field, specially a kind of interim concentration ejectment for lithologic character stratum Tunnel Gushing is filled It sets and its application method.
Background technique
Tunnel Gushing is to influence one of construction safety and the principal element of construction speed.When Tunnel Passing Karst Area Or when rich water fault belt, underground water, which will wash away rock stratum, causes face to excavate difficulty increase, or even face water burst occurs Situations such as, it causes construction equipment or even tunnel to be flooded, seriously affects construction safety and construction speed.Currently, for lithology Common administering method when layer constructing tunnel water burst are as follows: advance borehole draining, service gallery draining and water plugged by grouting.Advance drilling Hole drainage hole depth is larger, and speed of application is slower, the situation less abundant suitable for underground water, and in groundwater pressure mistake Drilling draining is difficult to realize at big shear-zone;Service gallery should be with tunnel main tunnel keeping parallelism or close to parallel, and requires super Preceding 10~20m, drainage effect becomes apparent compared with advance borehole draining, but higher cost;Subsurface flow can be truncated in water plugged by grouting, Reduce percolating water and flow into work surface, create good operating condition for construction, but there is also speed of application slowly with construction cost height The problems such as.
Therefore, it is necessary to the methods that front of tunnel heading underground water can be quickly and efficiently discharged in one kind, can meet construction Convenient, fast, safe requirement, and can guarantee construction of the tunnel when passing through Karst Area and rich water fault belt Efficiency.
Summary of the invention
The invention aims to solve the deficiency of above-mentioned background technique, provide that a kind of structure is simple, cost is relatively low, uses The interim concentration ejectment device and its application method for lithologic character stratum Tunnel Gushing that be convenient and being capable of quick ejectment.
In order to solve the above technical problems, a kind of technical solution that the present invention uses are as follows: one kind is gushed for lithologic character stratum tunnel The interim concentration ejectment device of water, including shell mechanism and ejectment structure, the shell mechanism wrap up ejectment structure, the ejectment Structure one end outer wall is close to shell mechanism inner wall, and the ejectment structure other end is connected to exterior space, the shell mechanism packet Conehead hollow circular tube and fixed disc are included, the conehead end of the conehead hollow circular tube is used for country rock pore-forming, the hollow circle of conehead The round tube end of pipe is connected and fixed disk, and the ejectment structure includes selective filter layer, catchment fixing layer and ejectment round tube, described Selective filter layer wraps up catchment fixing layer and ejectment round tube, and the selective filter layer outside is tight with conehead hollow circular tube inner wall Patch;The fixing layer that catchments is set between selective filter layer and ejectment round tube, and is segmented and is wrapped in except ejectment round tube.
As a kind of perferred technical scheme, it is permeable to be equipped with hollow circular tube for conehead hollow circular tube front end even tube wall chisel Hole.
As a kind of perferred technical scheme, the fixed disc is drilled with fixed circular hole, by fixing circular hole to country rock Set fixed screw.
As a kind of perferred technical scheme, the ejectment tube wall, which is uniformly dug, is equipped with the permeable hole of ejectment round tube.
In order to solve the above technical problems, the another technical solution that the present invention uses are as follows: one kind is used for lithologic character stratum tunnel The step of application method of the interim concentration ejectment device of water burst, the application method, is as follows:
(1) shift to an earlier date the prefabricated Each part for completing ejectment device;
(2) by specific spacing will catchment fixing layer segmentation be wrapped in outside ejectment round tube, and using selective filter layer will collect Hydropexis layer is wrapped up with ejectment round tube, forms ejectment structure;
(3) ejectment structure is placed in shell mechanism and is fixed, form the interim collection for being used for lithologic character stratum Tunnel Gushing Middle ejectment device, the device must just can be carried out embedded work after preliminary bracing is completed in tunnel;
(4) the lithologic character stratum country rock situation passed through when being constructed by tunnel is different, by the method for embedding of device with It passes through hard rock and soft rock is divided into following two method for embedding:
1. sentencing one using hand-held drifter is more apparent to face percolating water when tunnel tunnel face rock matter is hard rock Determine angle to drill, the bit size and face of hand-held drifter pierce depth should be with the size phase of shell mechanism Match, ejectment device is placed in hole after the completion of drilling, is in close contact fixed disc and country rock;
2. by way of manually setting, ejectment device is beaten at a certain angle when tunnel tunnel face rock matter is soft rock Enter the more apparent position of face percolating water, when in device merging hole, is in close contact fixed disc and country rock;
(5) fixed screw is set to country rock by fixed circular hole, ejectment device, which is fixed on face, to be arranged Device taking-up can be carried out next step constructing tunnel process after the completion by water, temporary drainage.
A kind of application method of the interim concentration ejectment device for lithologic character stratum Tunnel Gushing, it is characterised in that this method Use steps are as follows:
(1) shift to an earlier date the prefabricated Each part for completing ejectment device;
(2) by specific spacing will catchment fixing layer segmentation be wrapped in outside ejectment round tube, and using selective filter layer will collect Hydropexis layer is wrapped up with ejectment round tube, forms ejectment structure;
(3) ejectment structure is placed in shell mechanism and is fixed, form the interim collection for being used for lithologic character stratum Tunnel Gushing Middle ejectment device, the device must just can be carried out embedded work after preliminary bracing is completed in tunnel;
(4) the lithologic character stratum country rock situation passed through when being constructed by tunnel is different, by the method for embedding of device with It passes through hard rock and soft rock is divided into following two method for embedding:
1. sentencing one using hand-held drifter is more apparent to face percolating water when tunnel tunnel face rock matter is hard rock Determine angle to drill, the bit size and face of hand-held drifter pierce depth should be with the size phase of shell mechanism Match, ejectment device is placed in hole after the completion of drilling, is in close contact fixed disc and country rock;
2. by way of manually setting, ejectment device is beaten at a certain angle when tunnel tunnel face rock matter is soft rock Enter the more apparent position of face percolating water, when in device merging hole, is in close contact fixed disc and country rock;
(5) fixed screw is set to country rock by fixed circular hole, ejectment device, which is fixed on face, to be arranged Device taking-up can be carried out next step constructing tunnel process after the completion by water, temporary drainage.
Compared with prior art, the beneficial effects of the present invention are: Tunnel Gushing of the invention temporarily concentrates ejectment device Structure is simple and can be prefabricated in advance, and when site operation only needs prefabricated ejectment device squeezing into the more apparent place of face percolating water i.e. It can effectively drain.Underground water in rock stratum enters ejectment round tube by the permeable hole of shell mechanism and selective filter layer In, water is expelled directly out by ejectment round tube.Compared with the prior art, which can not only preferably solve area and face When the demand that drains, and tiny rubble can be effectively isolated to solve the problems, such as plugging, guarantee drainage arrangement working efficiency, and And can be recycled after use, save cost;In addition, application method of the invention is easily operated, scene is not necessarily to Other heavy duty work machines, possess that cost is relatively low and advantage easy to use, can be fast in the more rich lithologic character stratum of underground water Speed efficiently solves burst problem, guarantees construction safety and construction speed.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention without any creative labor, may be used also for those of ordinary skill in the art To obtain other drawings based on these drawings.
Fig. 1 is the schematic perspective view that Tunnel Gushing of the present invention temporarily concentrates ejectment device.
Fig. 2 is the schematic view of the front view that Tunnel Gushing of the present invention temporarily concentrates ejectment device.
Fig. 3 is A-A schematic cross-sectional view in Fig. 2.
Fig. 4 is that Tunnel Gushing of the present invention temporarily concentrates ejectment device for the interim central drainage schematic diagram of face.
Wherein: 1, shell mechanism;11, conehead hollow circular tube;111, the permeable hole of hollow circular tube;12, fixed disc;121, Fixed circular hole;122, fixed screw;2, ejectment structure;21, selective filter layer;22, catchment fixing layer;23, ejectment round tube; 231, the permeable hole of ejectment round tube.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Embodiment one
As shown in Figures 1 to 4, the Tunnel Gushing of the present embodiment temporarily concentrates ejectment device, including shell mechanism 1 and ejectment Structure 2, shell mechanism 1 wrap up ejectment structure 2, and 2 side outer wall of ejectment structure is close to 1 inner wall of shell mechanism, the other side and outside Space connection.The Tunnel Gushing temporarily concentrates ejectment apparatus structure simple and can be prefabricated in advance, and when site operation only needs will be pre- Ejectment device processed is squeezed into the more apparent place of face percolating water and can effectively be drained.Underground water in rock stratum is permeable by shell mechanism Hole and selective filter layer enter in ejectment round tube, are expelled directly out water by ejectment round tube.Compared with the prior art, should Ejectment device can not only preferably solve the demand of face temporary drainage, and can be effectively isolated tiny rubble to solve Certainly plugging problem guarantees drainage arrangement working efficiency, and can be recycled after use, saves cost;In addition, Application method of the invention is easily operated, and scene is not necessarily to other heavy duty work machines, possesses that cost is relatively low and easy to use excellent Point can fast and effeciently solve burst problem in the more rich lithologic character stratum of underground water, guarantee construction safety and construct into Degree.
In the present embodiment, shell mechanism 1 includes conehead hollow circular tube 11 and fixed disc 12,11 conehead of conehead hollow circular tube End is used for country rock pore-forming, and round tube end is connected and fixed disk 12.The shell mechanism 1 of the present embodiment is by squeezing into cone to face country rock Head hollow circular tube 11 forms circular hole and supports hole wall, protects its internal drainage space i.e. ejectment structure 2.Fixed disc position In 1 end of shell mechanism, guarantees the fixation of shell mechanism 1 by the connection with country rock, prevent device during ejectment from sliding It is dynamic even to fall off.The conehead hollow circular tube 11 and fixed disc 12 of the present embodiment are carried out using welding electrode arc welding in the prior art Connection.
In the present embodiment, conehead hollow circular tube conehead uses diameter for 10cm~15cm, and depth is the metal of 5cm~10cm Taper bit, hollow circular tube are equal to or slightly less than conehead using outer diameter, and pipe thickness is 4mm~10mm, pipe range 50cm~100cm Hollow metal round tube, conehead and hollow circular tube are attached using welding electrode arc welding in the prior art.The cone of the present embodiment Head hollow circular tube front end even tube wall chisel is equipped with the permeable hole 111 of hollow circular tube, and country rock water burst passes through the permeable hole of hollow circular tube 111 flow into ejectment structure 2.The permeable hole 111 of hollow circular tube in conehead hollow circular tube front end carry out cloth hole, cloth hole length 20cm~ 40cm, cloth hole density are 8~15/ring, and interannular spacing is 2cm~4cm, and hole form is preferentially heavy using cone in the prior art Hole, aperture is 9.6mm~12.8mm on the outside of hole, and medial aperture is 4.4mm~6.6mm, is fed depth 2.7mm~3.3mm, can also Using circular hole, elliptical aperture etc..Chisel sets the different cone counterbore of inside and outside lateral aperture and can make to pour in ejectment structure on conehead hollow circular tube Under the premise of water is basicly stable, it can be relieved the underground water that has been flowed into device and pass through the feelings of permeable hole bleeder again Condition guarantees ejectment device drainage efficiency.
In the present embodiment, fixed disc 12 is drilled with fixed circular hole 121, sets fixation to country rock by fixed circular hole 121 Screw 122.The fixed disc 12 of the present embodiment uses hollow metal disk, and internal diameter is equal with hollow circular tube 112, and outer diameter is compared with internal diameter Long 5cm~10cm, thickness 5mm~10mm, fixed screw 122 use setscrew in the prior art, screw specification be M6~ M10, screw length are 80mm~120mm, fixed circular hole 121 can be used drilling machine drill through it is corresponding with 122 specification of fixed screw Screw hole obtain.
In the present embodiment, ejectment structure 2 includes selective filter layer 21, catchment fixing layer 22 and ejectment round tube 23, selection Property filter layer 21 wrap collection water layer 22 and ejectment round tube 23, outside is close to 11 inner wall of conehead hollow circular tube;It catchments solid Given layer 22 is set between selective filter layer 21 and ejectment round tube 23, and is segmented and is wrapped in except ejectment round tube 23, is set between section There is spacing.Selective filter layer 21 is located at 2 outermost layer of ejectment structure, has the function of the selective filter of permeable resistance sand, Neng Gouyou Effect ground prevents tiny rubble from entering in ejectment structure 2, to solve the problems, such as ejectment device plugging, guarantees drainage arrangement work effect Rate.The fixing layer 22 that catchments is located at 2 middle layer of ejectment structure, and segmentation is wrapped in except ejectment round tube 23, can squeeze country rock and lead The bad deformation of the device of cause is buffered, and offset, torsion of the ejectment round tube 23 during ejectment is avoided, to ejectment round tube 23 play positioning and protective effect, and have stronger water absorbing properties, can absorb the initial stage infiltration of ejectment rapidly, improve device and draw Arrange efficiency.The selective filter layer 21 of the present embodiment uses acupuncture nonwoven geotextiles, weight specification 150g/m2~300g/m2, Thickness is greater than or equal to 0.9mm, and the fixing layer 22 that catchments is segmented using PVA foaming sponge and wraps up ejectment round tube 23, and Duan Kuanwei 2cm~ 3cm, spacing is 3cm~5cm between section, and thickness is equal to or more than 5mm.Ejectment round tube 23 is hard PVC pipe in the prior art, firmly It is 10cm~20cm long compared with hollow circular tube 112 that the outer diameter of pvc pipe is slightly smaller than 112 internal diameter of hollow circular tube, length.Hard PVC pipe can reach The standard requirements of drainpipe, tensile yield strength are greater than 40MPa, and falling weight impact test is less than 10%.PVA foaming sponge, needle thorn Non-woven geotextile and hard PVC pipe, which all have, is easy to materials, advantage low in cost.
In the present embodiment, 23 even tube wall of ejectment round tube chisel is equipped with the permeable hole 231 of ejectment round tube, ejectment round tube permeable hole 231 cloth hole density of hole is 10~15/ring, and interannular is away from being 2~3cm, and using circular hole in the prior art, aperture is hole form Elliptical aperture, square hole etc. can also be used in 6~10mm.
Embodiment two
The Tunnel Gushing of the present embodiment temporarily concentrates the implementation steps of ejectment device as follows:
(1) pipe thickness 8mm, pipe range 80cm, outer diameter 11.6cm are taken, taper bit diameter 12cm, in the conehead of depth 8cm Empty metal circular tube uses drilling instrument permeable in setting in the form of boring counterbore within the scope of conehead hollow metal round tube front end 30cm Hole, boring aperture on the outside of counterbore is 10mm, medial aperture 5mm, is fed depth 3mm, and cloth hole density is 15/ring, interannular spacing 3cm;Outer diameter 10cm is taken, the hard PVC pipe of length 90cm sets aperture 8mm, 15/ring of cloth hole density, interannular using drilling machine Away from the permeable circular hole for 3cm;
(2) the wide 3cm of section, the PVA foaming sponge of thickness 1cm, interval 5cm segmentation package hard PVC pipe are taken;Thickness 2mm is taken, weight Gauge lattice are 200g/m2Acupuncture nonwoven geotextiles, be wrapped in except PVA foam sponge and hard PVC pipe and form ejectment structure;
(3) outer diameter 18cm, the hollow metal disk of internal diameter 11.6mm, thickness 7mm, using drilling machine in hollow metal are taken Disc surfaces drill through 3 8mm circular screwholes, using welding electrode arc welding by conehead hollow circular tube in hollow metal disk and step 1 Pipe end is welded, and shell mechanism is formed.The ejectment structure formed in step 2 is placed in shell mechanism and is fixed, is formed Interim concentration ejectment device for lithologic character stratum Tunnel Gushing;
(4) after the completion of Tunnel, the lithologic character stratum situation passed through when being constructed according to tunnel is different, draws The embedded work of arranging device is divided into two kinds of situations:
1. when tunnel tunnel face rock matter is hard rock, the hand-held rock drilling that is matched using drill bit and ejectment plant bulk Machine offsets up 5 ° on the basis of face normal direction and drills in face percolating water more apparent sentence, and face pierces Depth should be 80cm, and the ejectment device in step 3 is placed in hole after the completion of drilling, keep hollow metal disk and country rock close Contact;
2. when tunnel tunnel face rock matter is soft rock, by the ejectment device in step 3 by way of manually setting, with 5 ° are offset up on the basis of face normal direction and squeezes into the more apparent position of face percolating water, and are made hollow metal disk and enclosed Rock is in close contact;
(5) by diameter 8mm, the M8 setscrew of length 95mm squeezes into country rock at the circular screwhole on hollow metal disk In to fix ejectment device, to temporary drainage after by ejectment device taking-up can carry out next step constructing tunnel process.
The Tunnel Gushing of the present embodiment temporarily concentrates ejectment device and its application method to be suitable for lithologic character stratum tunnel face The water burst situation that face occurs, is particularly suitable for the water burst feelings occurred when Tunnel Passing Karst Area or rich water fault belt Condition.The device overcomes the defect of existing Water outburst treatment method, on the more rich stratum of underground water, can fast and effeciently solve Face burst problem guarantees construction safety and construction speed, and the device is able to carry out recycles after use, saves Cost, with considerable engineering significance and significant economic advantages, raising and improvement to constructing tunnel field technology have weight Want meaning.
The above is only a preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-mentioned implementation Example.To those of ordinary skill in the art, obtained improvement and change in the case where not departing from the technology of the present invention concept thereof It changes and also should be regarded as protection scope of the present invention.

Claims (5)

1. a kind of interim concentration ejectment device for lithologic character stratum Tunnel Gushing, which is characterized in that including shell mechanism (1) and Ejectment structure (2), the shell mechanism (1) wrap up ejectment structure (2), and ejectment structure (2) one end outer wall is close to shell knot Structure (1) inner wall, ejectment structure (2) other end are connected to exterior space, and the shell mechanism (1) includes conehead hollow circular tube (11) and fixed disc (12), the conehead end of the conehead hollow circular tube (11) are used for country rock pore-forming, the conehead hollow circular tube (11) round tube end is connected and fixed disk (12), and the ejectment structure (2) includes selective filter layer (21), catchment fixing layer (22) and ejectment round tube (23), selective filter layer (21) package catchments fixing layer (22) and ejectment round tube (23), described It is close on the outside of selective filter layer (21) with conehead hollow circular tube (11) inner wall;The fixing layer that catchments (22) is set to selectivity Between filter layer (21) and ejectment round tube (23), and it is segmented and is wrapped in except ejectment round tube (23).
2. a kind of interim concentration ejectment device for lithologic character stratum Tunnel Gushing according to claim 1, feature exist In: conehead hollow circular tube (11) the front end even tube wall chisel is equipped with the permeable hole of hollow circular tube (111).
3. a kind of interim concentration ejectment device for lithologic character stratum Tunnel Gushing according to claim 1, feature exist In: the fixed disc (12) is drilled with fixed circular hole (121), sets fixed screw to country rock by fixed circular hole (121) (122)。
4. a kind of interim concentration ejectment device for lithologic character stratum Tunnel Gushing according to claim 1, feature exist In: ejectment round tube (23) the even tube wall chisel is equipped with the permeable hole of ejectment round tube (231).
5. a kind of application method of the interim concentration ejectment device for lithologic character stratum Tunnel Gushing, it is characterised in that the user The step of method, is as follows:
(1) shift to an earlier date the prefabricated Each part for completing ejectment device;
(2) by specific spacing will catchment fixing layer (22) segmentation be wrapped in ejectment round tube (23) outside, and use selective filter layer (21) fixing layer (22) that will catchment is wrapped up with ejectment round tube (23), is formed ejectment structure (2);
(3) ejectment structure (2) is placed in shell mechanism (1) and is fixed, formed for the interim of lithologic character stratum Tunnel Gushing Ejectment device is concentrated, which must just can be carried out embedded work after preliminary bracing is completed in tunnel;
(4) the lithologic character stratum country rock situation passed through when being constructed by tunnel is different, by the method for embedding of device to pass through Hard rock and soft rock are divided into following two method for embedding:
1. sentencing certain angle using hand-held drifter is more apparent to face percolating water when tunnel tunnel face rock matter is hard rock Degree drills, and the bit size and face of hand-held drifter pierce depth should be with the size phase of shell mechanism (1) Match, ejectment device is placed in hole after the completion of drilling, is in close contact fixed disc (12) and country rock;
2. by way of manually setting, ejectment device is squeezed into the palm at a certain angle when tunnel tunnel face rock matter is soft rock The sub- more apparent position of face percolating water is in close contact fixed disc (12) and country rock when in device merging hole;
(5) fixed screw (122) are set to country rock by fixed circular hole (121), ejectment device is fixed on face It is drained, device taking-up can be subjected to next step constructing tunnel process after the completion of temporary drainage.
CN201810823427.XA 2018-07-25 2018-07-25 A kind of interim concentration ejectment device and its application method for lithologic character stratum Tunnel Gushing Pending CN109026143A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810823427.XA CN109026143A (en) 2018-07-25 2018-07-25 A kind of interim concentration ejectment device and its application method for lithologic character stratum Tunnel Gushing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810823427.XA CN109026143A (en) 2018-07-25 2018-07-25 A kind of interim concentration ejectment device and its application method for lithologic character stratum Tunnel Gushing

Publications (1)

Publication Number Publication Date
CN109026143A true CN109026143A (en) 2018-12-18

Family

ID=64644961

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810823427.XA Pending CN109026143A (en) 2018-07-25 2018-07-25 A kind of interim concentration ejectment device and its application method for lithologic character stratum Tunnel Gushing

Country Status (1)

Country Link
CN (1) CN109026143A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110985120A (en) * 2019-12-31 2020-04-10 中铁十六局集团北京轨道交通工程建设有限公司 Precipitation construction method and system for tunnel connection channel of fractured clay layer
CN112855261A (en) * 2020-12-30 2021-05-28 山东大学 Drainage device, system and method suitable for TBM tunnel induced polarization instrument
CN113738444A (en) * 2021-09-18 2021-12-03 同济大学 Tunnel is prevented and treated with double-barrelled gravel of filling and impress anti-thorn formula ball valve device
CN113914927A (en) * 2021-10-29 2022-01-11 同济大学 Combined film bag type gravel pasting filtering and water draining device for high-water-pressure tunnel

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010090500A2 (en) * 2009-02-09 2010-08-12 주식회사 상신산업 Expandable rock bolt tube
KR100978007B1 (en) * 2009-08-07 2010-08-25 조경순 Stainless steel holes pipe
CN106436727A (en) * 2016-09-27 2017-02-22 中铁五局集团有限公司 Extreme geological tunnel portal construction method
CN206487508U (en) * 2017-02-27 2017-09-12 湖南科技大学 A kind of draining steel pipe device for rich water class earth tunnel face
CN206512733U (en) * 2016-12-27 2017-09-22 西安理工大学 A kind of two-layer equation drainage arrangement
CN206737950U (en) * 2017-05-08 2017-12-12 山西交科桥梁隧道加固维护工程有限公司 A kind of stainless steel floral tube structure of tunnel arch foot draining
CN207295691U (en) * 2017-08-28 2018-05-01 中铁二院工程集团有限责任公司 A kind of drain structure of arc capillary diversion passage
CN208486912U (en) * 2018-07-25 2019-02-12 中交第一公路工程局有限公司 A kind of interim concentration ejectment device for lithologic character stratum Tunnel Gushing

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010090500A2 (en) * 2009-02-09 2010-08-12 주식회사 상신산업 Expandable rock bolt tube
KR100978007B1 (en) * 2009-08-07 2010-08-25 조경순 Stainless steel holes pipe
CN106436727A (en) * 2016-09-27 2017-02-22 中铁五局集团有限公司 Extreme geological tunnel portal construction method
CN206512733U (en) * 2016-12-27 2017-09-22 西安理工大学 A kind of two-layer equation drainage arrangement
CN206487508U (en) * 2017-02-27 2017-09-12 湖南科技大学 A kind of draining steel pipe device for rich water class earth tunnel face
CN206737950U (en) * 2017-05-08 2017-12-12 山西交科桥梁隧道加固维护工程有限公司 A kind of stainless steel floral tube structure of tunnel arch foot draining
CN207295691U (en) * 2017-08-28 2018-05-01 中铁二院工程集团有限责任公司 A kind of drain structure of arc capillary diversion passage
CN208486912U (en) * 2018-07-25 2019-02-12 中交第一公路工程局有限公司 A kind of interim concentration ejectment device for lithologic character stratum Tunnel Gushing

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110985120A (en) * 2019-12-31 2020-04-10 中铁十六局集团北京轨道交通工程建设有限公司 Precipitation construction method and system for tunnel connection channel of fractured clay layer
CN112855261A (en) * 2020-12-30 2021-05-28 山东大学 Drainage device, system and method suitable for TBM tunnel induced polarization instrument
CN113738444A (en) * 2021-09-18 2021-12-03 同济大学 Tunnel is prevented and treated with double-barrelled gravel of filling and impress anti-thorn formula ball valve device
CN113738444B (en) * 2021-09-18 2023-02-10 同济大学 Tunnel is prevented and treated with double-barrelled gravel of filling and impress anti-thorn formula ball valve device
CN113914927A (en) * 2021-10-29 2022-01-11 同济大学 Combined film bag type gravel pasting filtering and water draining device for high-water-pressure tunnel

Similar Documents

Publication Publication Date Title
CN109026143A (en) A kind of interim concentration ejectment device and its application method for lithologic character stratum Tunnel Gushing
CN107288657B (en) The weak cementing rock mass seepage failure area slip casting integrated control method of top of underground
JP4848553B2 (en) Injection pipe device and injection method
CN103061785A (en) Borehole casing pressure-proof seepage sealing grouting device and process for roadway breaking water burst surrounding rock
CN102979535B (en) Draining type section of jurisdiction is used in a kind of tunnel lining
CN113073983B (en) Enclosure type grouting construction method for submarine tunnel to penetrate through water-rich fault fracture zone
CN101736732A (en) Pressure and water reduction construction method of ultra-deep foundation pit confined water
CN206233951U (en) Depressurize drainage system in a kind of high-speed railway double track tunnel base
CN112253070B (en) Method for sectional seam making, coal washing and outburst elimination of thick coal seam top-bottom linkage horizontal well
CN110939137A (en) Vibration drainage anchor rod supporting structure for sand soil layer and construction method thereof
CN203035203U (en) Pressure-isolating, permeating and cementing grouting device of borehole casing for roadway water-surrounded broken rock
CN207847605U (en) Hydrogeologic drilling is the same as the multiple water plug of diameter
CN208486912U (en) A kind of interim concentration ejectment device for lithologic character stratum Tunnel Gushing
KR101524355B1 (en) Tunnel grouting reinforcement method
CN206144587U (en) Odd -shaped cross section cavity self -drilling stock
CN208502786U (en) Multilevel hierarchy suspension device for rich water sandy gravel stratum tunnel
CN111944997A (en) Horizontal hole electroosmosis pipeline liquid collecting method
CN102561998A (en) Gas extraction bored well and forming method
CN108240011A (en) Construction method of high-pressure recharging well
CN112324471A (en) Tunnel face advanced precipitation anchor rod for water-rich red sandstone stratum and construction method
CN205444232U (en) Stock - gravity type infiltration retaining wall
CN107542469A (en) A kind of underground mould bag stake method for protecting support
CN214993798U (en) Double-layer steel pile casing structure for rotary drilling pile in quicksand layer
KR101340646B1 (en) Absorption pipe for slope stability
CN106401487B (en) The retaining wall elastic network(s) automatic releasing device of prevention drilling collapse hole

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181218