CN109025328A - A kind of degree control method in lattice column work progress - Google Patents

A kind of degree control method in lattice column work progress Download PDF

Info

Publication number
CN109025328A
CN109025328A CN201810954350.XA CN201810954350A CN109025328A CN 109025328 A CN109025328 A CN 109025328A CN 201810954350 A CN201810954350 A CN 201810954350A CN 109025328 A CN109025328 A CN 109025328A
Authority
CN
China
Prior art keywords
lattice column
point
column
verticality
steel plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810954350.XA
Other languages
Chinese (zh)
Inventor
黄正刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201810954350.XA priority Critical patent/CN109025328A/en
Publication of CN109025328A publication Critical patent/CN109025328A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements

Abstract

The invention discloses a kind of degree control methods in lattice column work progress, belong to technical field of building construction, the method is the welding setting measuring for verticality steel plate on lattice column, pass through the measuring for verticality to measuring for verticality steel plate at any time in the construction process, the perpendicularity deviation of lattice column is obtained by ratiometric conversion, its construction is simple, it is convenient, it can effectively ensure that construction speed, and the amendment of lattice column can be carried out for the perpendicularity deviation of discovery at any time, meet the requirement of stand column pile construction quality, reduce the overall costs such as artificial, reduce the labor intensity of construction personnel, improve labor productivity, with good practicability.

Description

A kind of degree control method in lattice column work progress
Technical field
The invention belongs to degree control sides in technical field of building construction more particularly to a kind of lattice column work progress Method.
Background technique
Lattice column is used as bending component, is chiefly used in mill building frame column and detached column, section is generally fashioned iron or steel plate design Axial symmetry in pairs or singly symmetric sections.Grid-system component is by limb part and sews material and forms, and limb part is primarily subjected to axial force, sews material Main lateral force resisting (for limbs axial direction).Lattice column, which sews material form, mainly lacing and batten plate.The knot of lattice column Structure feature is, material area is arranged to the place remote apart from the axes of inertia, and can guarantee enhances component under the conditions of same axial drag Anti-bending strength, and save material.Height is required to its perpendicularity deviation when lattice column is constructed, needs to examine at any time in work progress It surveys, however construction requirement is often not achieved to the control of the perpendicularity of lattice column deviation in work progress in the prior art, in turn Influence construction quality.
Summary of the invention
Above-mentioned background technique there are aiming at the problem that, the purpose of the present invention is to propose to vertical in a kind of lattice column work progress Control method is spent, it is convenient to find perpendicularity of lattice column deviation at any time in the construction process and be modified at any time for deviation, it is full Sufficient stand column pile construction quality requirement.
The technical solution that the present invention solves technical problem is as follows:
Degree control method in a kind of lattice column work progress of the present invention, it is fixed that the bottom end of the lattice column is provided with suspension column Position otic placode, the specific steps of which are as follows:
Step 1: measuring for verticality steel plate is welded on the top of lattice column, if at suspension column chucking lug Board position being A point, lattice Structure top end is B point, and the top of measuring for verticality steel plate is C point, and A point to the length between B point is Lab, and B point is between C point Length be Lbc, it is that B point is to the actual measurement perpendicularity deviation of C point section on measuring for verticality steel plate that M, which is surveyed, and actually lattice column is practical vertical by M Straight degree deviation;
Step 2: will weld, integral lattice column and measuring for verticality steel plate construct and measurement verticality is examined at any time B point to the perpendicularity deviation of C point, i.e. M on steel plate is surveyed to survey;
Step 3: according to the length ratio relationship of the numerical value surveyed of M in step 2 and lattice column and measuring for verticality steel plate, Show that the practical perpendicularity deviation of lattice column, i.e. M are real by conversion;
Step 4: survey carries out correction processing to lattice column if the numerical value of the M reality in step 3 exceeds construction requirement, until Lattice column meets construction requirement.
It is further improved as technical solution, the measuring for verticality steel plate is channel steel or angle steel.
It is further improved as technical solution, the M is real to meet following relationship: M reality=M survey × Lab/Lbc with M survey.
It being further improved as technical solution, correction processing is carried out by jack in the step 4, and the one of lattice column End is fixed, and the other end loosens, and is adjusted lattice column in fixing end, until the lattice column is vertical, is then fixed by locator, to mixed It is withdrawn after solidifying soil initial set.
Compared with prior art, its construction letter of degree control method in a kind of lattice column work progress of the present invention It is single, convenient, it can effectively ensure that construction speed, and easily find perpendicularity deviation at any time in lattice column work progress, It is modified at any time for perpendicularity deviation simultaneously, meets the requirement of stand column pile construction quality, reduced the overall costs such as artificial, reduce The labor intensity of construction personnel, improves labor productivity, has good practicability.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and specific embodiments:
Fig. 1 is the schematic diagram of lattice column and the welding of measuring for verticality steel plate in the present invention;
Schematic diagram when Fig. 2 is lattice column of the present invention construction;
Figure label: 1- lattice column, 2- measuring for verticality steel plate, 3- suspension column position otic placode.
Specific embodiment
Embodiment 1:
As depicted in figs. 1 and 2, degree control method in a kind of lattice column work progress of the present invention, the lattice column 1 Bottom end is provided with suspension column positioning otic placode 3, and the method comprises the steps of:
Step 1: measuring for verticality steel plate 2 is welded on the top of lattice column 1, if being A point at suspension column positioning 3 position of otic placode, 1 top of lattice column is B point, and the top of measuring for verticality steel plate 2 is C point, and A point to the length between B point is Lab, B point to C point Between length be Lbc, it is actual measurement perpendicularity deviation of the B point to C point section, actually lattice column 1 M on measuring for verticality steel plate 2 that M, which is surveyed, Practical perpendicularity deviation;
It is constructed Step 2: integral lattice column 1 and measuring for verticality steel plate 2 will be welded and measures verticality at any time B point to the perpendicularity deviation of C point, i.e. M on steel plate 2 is detected to survey;
Step 3: being closed according to the length ratio of the numerical value surveyed of M in step 2 and lattice column 1 and measuring for verticality steel plate 2 System show that the practical perpendicularity deviation of lattice column 1, i.e. M are real by conversion;
Step 4: survey carries out correction processing to lattice column 1 if the numerical value of the M reality in step 3 exceeds construction requirement, until Lattice column 1 meets construction requirement.
In the present embodiment, the measuring for verticality steel plate 2 is channel steel or angle steel.
In the present embodiment, the M is real to meet following relationship: M reality=M survey × Lab/Lbc with M survey.
In the present embodiment, correction processing is carried out by jack in the step 4, and one end of lattice column 1 is fixed, another End loosens, and adjusts lattice column 1 in fixing end, until the lattice column 1 is vertical, is then fixed by locator, to concrete initial set After withdraw, the locator be construction in commonly use construction tool.
It is described further below with specific data, in the present embodiment, the length of measuring for verticality steel plate 2 is 2.5 meters, lattice 1 effective length of structure column is 18-22 meters, after welding, Lbc and Lab ratio is 1:7, the i.e. perpendicularity deviation of measuring for verticality steel plate 2 M surveys numerical value when being 1mm, and the suspension column of lattice column 1 just deviates 7mm, when practical casting concrete, when M is surveyed more than 3mm, i.e. and lattice The suspension column offset of column 1 reaches 20mm, to carry out correction processing to the lattice column 1 at this time.
The present invention can be by having found perpendicularity deviation at any time in lattice column work progress, while being directed to verticality at any time Deviation is modified, and meets the requirement of stand column pile construction quality, and it is strong to reduce overall costs, the labour for reducing construction personnel such as artificial Degree, improves labor productivity, has good practicability.
The foregoing is merely a prefered embodiment of the invention, but scope of protection of the present invention is not limited thereto, any to be familiar with sheet In the technical scope disclosed by the present invention, any changes or substitutions that can be easily thought of by those skilled in the art, should all cover Within protection scope of the present invention.Therefore, the scope of protection of the present invention shall be subject to the scope of protection defined by the claims.
Place is not described in detail by the present invention, is the well-known technique of those skilled in the art of the present technique.

Claims (4)

1. the bottom end of a kind of degree control method in lattice column work progress, the lattice column (1) is provided with suspension column chucking lug Plate (3), characterized in that comprise the steps of:
Step 1: measuring for verticality steel plate (2) are welded on the top of lattice column (1), if being A at suspension column positioning otic placode (3) position Point, lattice column (1) top are B point, and the top of measuring for verticality steel plate (2) is C point, and A point to the length between B point is Lab, B Point is Lbc to the length between C point, and it is that for B point to the actual measurement perpendicularity deviation of C point section, M is real on measuring for verticality steel plate (2) that M, which is surveyed, For lattice column (1) practical perpendicularity deviation;
Step 2: integral lattice column (1) will be welded and measuring for verticality steel plate (2) is constructed and measures verticality at any time B point to the perpendicularity deviation of C point, i.e. M on steel plate (2) is detected to survey;
Step 3: being closed according to the length ratio of the numerical value surveyed of M in step 2 and lattice column (1) and measuring for verticality steel plate (2) System show that lattice column (1) practical perpendicularity deviation, i.e. M are real by conversion;
Step 4: if the numerical value of the M reality in step 3 exceeds construction requirement, survey carries out correction processing to lattice column (1), until lattice Structure column (1) meets construction requirement.
2. degree control method in a kind of lattice column work progress according to claim 1, characterized in that described vertical Degree detection steel plate (2) is channel steel or angle steel.
3. degree control method in a kind of lattice column work progress according to claim 1 or 2, characterized in that the M It is real to meet following relationship: M reality=M survey × Lab/Lbc with M survey.
4. degree control method in a kind of lattice column work progress according to claim 1 or 2, characterized in that described Correction processing is carried out by jack in step 4, and one end of lattice column (1) is fixed, and the other end loosens, and adjusts lattice in fixing end Structure column (1), until the lattice column (1) vertically, is then fixed by locator, withdrawn after concrete initial set.
CN201810954350.XA 2018-08-21 2018-08-21 A kind of degree control method in lattice column work progress Pending CN109025328A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810954350.XA CN109025328A (en) 2018-08-21 2018-08-21 A kind of degree control method in lattice column work progress

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810954350.XA CN109025328A (en) 2018-08-21 2018-08-21 A kind of degree control method in lattice column work progress

Publications (1)

Publication Number Publication Date
CN109025328A true CN109025328A (en) 2018-12-18

Family

ID=64627317

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810954350.XA Pending CN109025328A (en) 2018-08-21 2018-08-21 A kind of degree control method in lattice column work progress

Country Status (1)

Country Link
CN (1) CN109025328A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011117803A (en) * 2009-12-02 2011-06-16 Ohbayashi Corp Method for measuring build-in error of steel pipe, and steel pipe
CN203145064U (en) * 2013-01-31 2013-08-21 中建三局第二建设工程有限责任公司 Perpendicularity detecting device for bored pile lattice column
CN103603506A (en) * 2013-09-23 2014-02-26 云南建工基础工程有限责任公司 Inner-support and reverse-construction-technique column perpendicularity controller
CN104110035A (en) * 2013-04-16 2014-10-22 中冶天工上海十三冶建设有限公司 Perpendicularity correcting device for concrete-filled steel tube columns constructed by top-down process and construction method implemented by perpendicularity correcting device
CN104594646A (en) * 2013-10-31 2015-05-06 中建三局第二建设工程有限责任公司 Simple detection ruler for gradient of structural column
CN106480901A (en) * 2016-09-29 2017-03-08 舜元建设(集团)有限公司 A kind of lattice-type steel column accurate positioning method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011117803A (en) * 2009-12-02 2011-06-16 Ohbayashi Corp Method for measuring build-in error of steel pipe, and steel pipe
CN203145064U (en) * 2013-01-31 2013-08-21 中建三局第二建设工程有限责任公司 Perpendicularity detecting device for bored pile lattice column
CN104110035A (en) * 2013-04-16 2014-10-22 中冶天工上海十三冶建设有限公司 Perpendicularity correcting device for concrete-filled steel tube columns constructed by top-down process and construction method implemented by perpendicularity correcting device
CN103603506A (en) * 2013-09-23 2014-02-26 云南建工基础工程有限责任公司 Inner-support and reverse-construction-technique column perpendicularity controller
CN104594646A (en) * 2013-10-31 2015-05-06 中建三局第二建设工程有限责任公司 Simple detection ruler for gradient of structural column
CN106480901A (en) * 2016-09-29 2017-03-08 舜元建设(集团)有限公司 A kind of lattice-type steel column accurate positioning method

Similar Documents

Publication Publication Date Title
CN103806660B (en) Structural Steel Reinforced Concrete beam-column joint construction method
JP5585059B2 (en) Measuring method of steel pipe installation error
CN206267025U (en) A kind of Spatial Cable catheter positioning control device
CN107264723A (en) A kind of installation method of lateral thruster
CN104895082B (en) Precise large-diameter steel casing deviation rectifying device and method
CN109281688B (en) Tunnel advanced pipe shed accurate positioning system and construction method
CN105696800A (en) Temporary fixed sleeve frame for preventing relative displacement generated during construction of steel-structured anchor bolts
WO2019000752A1 (en) Method for installing foundation beams of cabin storage system
CN103953052A (en) Pile-beam-arch steel pipe column construction method
CN109025328A (en) A kind of degree control method in lattice column work progress
CN106400675B (en) A kind of steel anchor box and its installation method
CN105887917B (en) A kind of foundation bolt sleeve rapid processing, installation, the method for centering
CN205711566U (en) A kind of pre-embedded bolt, sleeve, the auxiliary transverse alignment instrument of ironware Fast Installation
CN204530480U (en) Faulting of slab ends adjusting device
CN204463229U (en) Portable mining area grassland vegetation coverage information acquisition new equipment
CN109252526A (en) Assembled support construction technique based on prestressing force fish belly sill support technology
CN210164421U (en) Visual accurate positioning device for construction of three-axis stirring pile
CN107476327A (en) Narrow base list column step foundation construction method
CN101276466B (en) Method for monitoring large-sized component construction security based on vision difference on site
CN208455634U (en) A kind of gradient review frame of adjustable-angle
CN207577167U (en) A kind of interior connecting plate bender
CN207215095U (en) A kind of mold plate verticality survey tool
CN214363941U (en) Guiding rule device for excavating trapezoidal open ditches in airport drainage engineering
CN212613841U (en) Board seam control tool
CN207620401U (en) A kind of steel construction buried plate installation instrument

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181218