CN109025328A - A kind of degree control method in lattice column work progress - Google Patents
A kind of degree control method in lattice column work progress Download PDFInfo
- Publication number
- CN109025328A CN109025328A CN201810954350.XA CN201810954350A CN109025328A CN 109025328 A CN109025328 A CN 109025328A CN 201810954350 A CN201810954350 A CN 201810954350A CN 109025328 A CN109025328 A CN 109025328A
- Authority
- CN
- China
- Prior art keywords
- lattice column
- point
- column
- verticality
- steel plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
- E04G21/1841—Means for positioning building parts or elements
Abstract
The invention discloses a kind of degree control methods in lattice column work progress, belong to technical field of building construction, the method is the welding setting measuring for verticality steel plate on lattice column, pass through the measuring for verticality to measuring for verticality steel plate at any time in the construction process, the perpendicularity deviation of lattice column is obtained by ratiometric conversion, its construction is simple, it is convenient, it can effectively ensure that construction speed, and the amendment of lattice column can be carried out for the perpendicularity deviation of discovery at any time, meet the requirement of stand column pile construction quality, reduce the overall costs such as artificial, reduce the labor intensity of construction personnel, improve labor productivity, with good practicability.
Description
Technical field
The invention belongs to degree control sides in technical field of building construction more particularly to a kind of lattice column work progress
Method.
Background technique
Lattice column is used as bending component, is chiefly used in mill building frame column and detached column, section is generally fashioned iron or steel plate design
Axial symmetry in pairs or singly symmetric sections.Grid-system component is by limb part and sews material and forms, and limb part is primarily subjected to axial force, sews material
Main lateral force resisting (for limbs axial direction).Lattice column, which sews material form, mainly lacing and batten plate.The knot of lattice column
Structure feature is, material area is arranged to the place remote apart from the axes of inertia, and can guarantee enhances component under the conditions of same axial drag
Anti-bending strength, and save material.Height is required to its perpendicularity deviation when lattice column is constructed, needs to examine at any time in work progress
It surveys, however construction requirement is often not achieved to the control of the perpendicularity of lattice column deviation in work progress in the prior art, in turn
Influence construction quality.
Summary of the invention
Above-mentioned background technique there are aiming at the problem that, the purpose of the present invention is to propose to vertical in a kind of lattice column work progress
Control method is spent, it is convenient to find perpendicularity of lattice column deviation at any time in the construction process and be modified at any time for deviation, it is full
Sufficient stand column pile construction quality requirement.
The technical solution that the present invention solves technical problem is as follows:
Degree control method in a kind of lattice column work progress of the present invention, it is fixed that the bottom end of the lattice column is provided with suspension column
Position otic placode, the specific steps of which are as follows:
Step 1: measuring for verticality steel plate is welded on the top of lattice column, if at suspension column chucking lug Board position being A point, lattice
Structure top end is B point, and the top of measuring for verticality steel plate is C point, and A point to the length between B point is Lab, and B point is between C point
Length be Lbc, it is that B point is to the actual measurement perpendicularity deviation of C point section on measuring for verticality steel plate that M, which is surveyed, and actually lattice column is practical vertical by M
Straight degree deviation;
Step 2: will weld, integral lattice column and measuring for verticality steel plate construct and measurement verticality is examined at any time
B point to the perpendicularity deviation of C point, i.e. M on steel plate is surveyed to survey;
Step 3: according to the length ratio relationship of the numerical value surveyed of M in step 2 and lattice column and measuring for verticality steel plate,
Show that the practical perpendicularity deviation of lattice column, i.e. M are real by conversion;
Step 4: survey carries out correction processing to lattice column if the numerical value of the M reality in step 3 exceeds construction requirement, until
Lattice column meets construction requirement.
It is further improved as technical solution, the measuring for verticality steel plate is channel steel or angle steel.
It is further improved as technical solution, the M is real to meet following relationship: M reality=M survey × Lab/Lbc with M survey.
It being further improved as technical solution, correction processing is carried out by jack in the step 4, and the one of lattice column
End is fixed, and the other end loosens, and is adjusted lattice column in fixing end, until the lattice column is vertical, is then fixed by locator, to mixed
It is withdrawn after solidifying soil initial set.
Compared with prior art, its construction letter of degree control method in a kind of lattice column work progress of the present invention
It is single, convenient, it can effectively ensure that construction speed, and easily find perpendicularity deviation at any time in lattice column work progress,
It is modified at any time for perpendicularity deviation simultaneously, meets the requirement of stand column pile construction quality, reduced the overall costs such as artificial, reduce
The labor intensity of construction personnel, improves labor productivity, has good practicability.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and specific embodiments:
Fig. 1 is the schematic diagram of lattice column and the welding of measuring for verticality steel plate in the present invention;
Schematic diagram when Fig. 2 is lattice column of the present invention construction;
Figure label: 1- lattice column, 2- measuring for verticality steel plate, 3- suspension column position otic placode.
Specific embodiment
Embodiment 1:
As depicted in figs. 1 and 2, degree control method in a kind of lattice column work progress of the present invention, the lattice column 1
Bottom end is provided with suspension column positioning otic placode 3, and the method comprises the steps of:
Step 1: measuring for verticality steel plate 2 is welded on the top of lattice column 1, if being A point at suspension column positioning 3 position of otic placode,
1 top of lattice column is B point, and the top of measuring for verticality steel plate 2 is C point, and A point to the length between B point is Lab, B point to C point
Between length be Lbc, it is actual measurement perpendicularity deviation of the B point to C point section, actually lattice column 1 M on measuring for verticality steel plate 2 that M, which is surveyed,
Practical perpendicularity deviation;
It is constructed Step 2: integral lattice column 1 and measuring for verticality steel plate 2 will be welded and measures verticality at any time
B point to the perpendicularity deviation of C point, i.e. M on steel plate 2 is detected to survey;
Step 3: being closed according to the length ratio of the numerical value surveyed of M in step 2 and lattice column 1 and measuring for verticality steel plate 2
System show that the practical perpendicularity deviation of lattice column 1, i.e. M are real by conversion;
Step 4: survey carries out correction processing to lattice column 1 if the numerical value of the M reality in step 3 exceeds construction requirement, until
Lattice column 1 meets construction requirement.
In the present embodiment, the measuring for verticality steel plate 2 is channel steel or angle steel.
In the present embodiment, the M is real to meet following relationship: M reality=M survey × Lab/Lbc with M survey.
In the present embodiment, correction processing is carried out by jack in the step 4, and one end of lattice column 1 is fixed, another
End loosens, and adjusts lattice column 1 in fixing end, until the lattice column 1 is vertical, is then fixed by locator, to concrete initial set
After withdraw, the locator be construction in commonly use construction tool.
It is described further below with specific data, in the present embodiment, the length of measuring for verticality steel plate 2 is 2.5 meters, lattice
1 effective length of structure column is 18-22 meters, after welding, Lbc and Lab ratio is 1:7, the i.e. perpendicularity deviation of measuring for verticality steel plate 2
M surveys numerical value when being 1mm, and the suspension column of lattice column 1 just deviates 7mm, when practical casting concrete, when M is surveyed more than 3mm, i.e. and lattice
The suspension column offset of column 1 reaches 20mm, to carry out correction processing to the lattice column 1 at this time.
The present invention can be by having found perpendicularity deviation at any time in lattice column work progress, while being directed to verticality at any time
Deviation is modified, and meets the requirement of stand column pile construction quality, and it is strong to reduce overall costs, the labour for reducing construction personnel such as artificial
Degree, improves labor productivity, has good practicability.
The foregoing is merely a prefered embodiment of the invention, but scope of protection of the present invention is not limited thereto, any to be familiar with sheet
In the technical scope disclosed by the present invention, any changes or substitutions that can be easily thought of by those skilled in the art, should all cover
Within protection scope of the present invention.Therefore, the scope of protection of the present invention shall be subject to the scope of protection defined by the claims.
Place is not described in detail by the present invention, is the well-known technique of those skilled in the art of the present technique.
Claims (4)
1. the bottom end of a kind of degree control method in lattice column work progress, the lattice column (1) is provided with suspension column chucking lug
Plate (3), characterized in that comprise the steps of:
Step 1: measuring for verticality steel plate (2) are welded on the top of lattice column (1), if being A at suspension column positioning otic placode (3) position
Point, lattice column (1) top are B point, and the top of measuring for verticality steel plate (2) is C point, and A point to the length between B point is Lab, B
Point is Lbc to the length between C point, and it is that for B point to the actual measurement perpendicularity deviation of C point section, M is real on measuring for verticality steel plate (2) that M, which is surveyed,
For lattice column (1) practical perpendicularity deviation;
Step 2: integral lattice column (1) will be welded and measuring for verticality steel plate (2) is constructed and measures verticality at any time
B point to the perpendicularity deviation of C point, i.e. M on steel plate (2) is detected to survey;
Step 3: being closed according to the length ratio of the numerical value surveyed of M in step 2 and lattice column (1) and measuring for verticality steel plate (2)
System show that lattice column (1) practical perpendicularity deviation, i.e. M are real by conversion;
Step 4: if the numerical value of the M reality in step 3 exceeds construction requirement, survey carries out correction processing to lattice column (1), until lattice
Structure column (1) meets construction requirement.
2. degree control method in a kind of lattice column work progress according to claim 1, characterized in that described vertical
Degree detection steel plate (2) is channel steel or angle steel.
3. degree control method in a kind of lattice column work progress according to claim 1 or 2, characterized in that the M
It is real to meet following relationship: M reality=M survey × Lab/Lbc with M survey.
4. degree control method in a kind of lattice column work progress according to claim 1 or 2, characterized in that described
Correction processing is carried out by jack in step 4, and one end of lattice column (1) is fixed, and the other end loosens, and adjusts lattice in fixing end
Structure column (1), until the lattice column (1) vertically, is then fixed by locator, withdrawn after concrete initial set.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810954350.XA CN109025328A (en) | 2018-08-21 | 2018-08-21 | A kind of degree control method in lattice column work progress |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810954350.XA CN109025328A (en) | 2018-08-21 | 2018-08-21 | A kind of degree control method in lattice column work progress |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109025328A true CN109025328A (en) | 2018-12-18 |
Family
ID=64627317
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810954350.XA Pending CN109025328A (en) | 2018-08-21 | 2018-08-21 | A kind of degree control method in lattice column work progress |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109025328A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011117803A (en) * | 2009-12-02 | 2011-06-16 | Ohbayashi Corp | Method for measuring build-in error of steel pipe, and steel pipe |
CN203145064U (en) * | 2013-01-31 | 2013-08-21 | 中建三局第二建设工程有限责任公司 | Perpendicularity detecting device for bored pile lattice column |
CN103603506A (en) * | 2013-09-23 | 2014-02-26 | 云南建工基础工程有限责任公司 | Inner-support and reverse-construction-technique column perpendicularity controller |
CN104110035A (en) * | 2013-04-16 | 2014-10-22 | 中冶天工上海十三冶建设有限公司 | Perpendicularity correcting device for concrete-filled steel tube columns constructed by top-down process and construction method implemented by perpendicularity correcting device |
CN104594646A (en) * | 2013-10-31 | 2015-05-06 | 中建三局第二建设工程有限责任公司 | Simple detection ruler for gradient of structural column |
CN106480901A (en) * | 2016-09-29 | 2017-03-08 | 舜元建设(集团)有限公司 | A kind of lattice-type steel column accurate positioning method |
-
2018
- 2018-08-21 CN CN201810954350.XA patent/CN109025328A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011117803A (en) * | 2009-12-02 | 2011-06-16 | Ohbayashi Corp | Method for measuring build-in error of steel pipe, and steel pipe |
CN203145064U (en) * | 2013-01-31 | 2013-08-21 | 中建三局第二建设工程有限责任公司 | Perpendicularity detecting device for bored pile lattice column |
CN104110035A (en) * | 2013-04-16 | 2014-10-22 | 中冶天工上海十三冶建设有限公司 | Perpendicularity correcting device for concrete-filled steel tube columns constructed by top-down process and construction method implemented by perpendicularity correcting device |
CN103603506A (en) * | 2013-09-23 | 2014-02-26 | 云南建工基础工程有限责任公司 | Inner-support and reverse-construction-technique column perpendicularity controller |
CN104594646A (en) * | 2013-10-31 | 2015-05-06 | 中建三局第二建设工程有限责任公司 | Simple detection ruler for gradient of structural column |
CN106480901A (en) * | 2016-09-29 | 2017-03-08 | 舜元建设(集团)有限公司 | A kind of lattice-type steel column accurate positioning method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103806660B (en) | Structural Steel Reinforced Concrete beam-column joint construction method | |
JP5585059B2 (en) | Measuring method of steel pipe installation error | |
CN206267025U (en) | A kind of Spatial Cable catheter positioning control device | |
CN107264723A (en) | A kind of installation method of lateral thruster | |
CN104895082B (en) | Precise large-diameter steel casing deviation rectifying device and method | |
CN109281688B (en) | Tunnel advanced pipe shed accurate positioning system and construction method | |
CN105696800A (en) | Temporary fixed sleeve frame for preventing relative displacement generated during construction of steel-structured anchor bolts | |
WO2019000752A1 (en) | Method for installing foundation beams of cabin storage system | |
CN103953052A (en) | Pile-beam-arch steel pipe column construction method | |
CN109025328A (en) | A kind of degree control method in lattice column work progress | |
CN106400675B (en) | A kind of steel anchor box and its installation method | |
CN105887917B (en) | A kind of foundation bolt sleeve rapid processing, installation, the method for centering | |
CN205711566U (en) | A kind of pre-embedded bolt, sleeve, the auxiliary transverse alignment instrument of ironware Fast Installation | |
CN204530480U (en) | Faulting of slab ends adjusting device | |
CN204463229U (en) | Portable mining area grassland vegetation coverage information acquisition new equipment | |
CN109252526A (en) | Assembled support construction technique based on prestressing force fish belly sill support technology | |
CN210164421U (en) | Visual accurate positioning device for construction of three-axis stirring pile | |
CN107476327A (en) | Narrow base list column step foundation construction method | |
CN101276466B (en) | Method for monitoring large-sized component construction security based on vision difference on site | |
CN208455634U (en) | A kind of gradient review frame of adjustable-angle | |
CN207577167U (en) | A kind of interior connecting plate bender | |
CN207215095U (en) | A kind of mold plate verticality survey tool | |
CN214363941U (en) | Guiding rule device for excavating trapezoidal open ditches in airport drainage engineering | |
CN212613841U (en) | Board seam control tool | |
CN207620401U (en) | A kind of steel construction buried plate installation instrument |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181218 |