CN109025230A - Operation platform for building - Google Patents

Operation platform for building Download PDF

Info

Publication number
CN109025230A
CN109025230A CN201810645016.6A CN201810645016A CN109025230A CN 109025230 A CN109025230 A CN 109025230A CN 201810645016 A CN201810645016 A CN 201810645016A CN 109025230 A CN109025230 A CN 109025230A
Authority
CN
China
Prior art keywords
plate
building
matched
frame body
operation platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810645016.6A
Other languages
Chinese (zh)
Other versions
CN109025230B (en
Inventor
王哲孟
潘月芬
肖克
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Yuda Intelligent Technology Co ltd
Original Assignee
Zhejiang Guang Shun Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Guang Shun Construction Co Ltd filed Critical Zhejiang Guang Shun Construction Co Ltd
Priority to CN201810645016.6A priority Critical patent/CN109025230B/en
Publication of CN109025230A publication Critical patent/CN109025230A/en
Application granted granted Critical
Publication of CN109025230B publication Critical patent/CN109025230B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/18Scaffolds primarily resting on the ground adjustable in height

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Transmission Devices (AREA)

Abstract

The invention discloses a kind of operation platforms for building, including frame body, the platform component matched with the frame body and the driving part matched with the platform component, the frame body includes pedestal and multiple brackets, the pedestal is equipped with multiple extending tube pieces being laterally arranged, the extending tube piece is equipped with multiple fixed links and for driving the fixed link to be inserted into the driving motor in ground, and the driving motor is matched by drive mechanism with the fixed link.The present invention improves the stability of entire frame body, avoids frame body from shaking either mobile, therefore when worker's operation, safety is good;And driven by driving motor, it is without human intervention, time saving and energy saving.

Description

Operation platform for building
Technical field
The invention belongs to technical field of building construction, more particularly, to a kind of operation platform for building.
Background technique
In building construction process, cement layer and sprayed coating on External Wall are needed, therefore for the ease of construction, is needed outside Hanging basket or scaffold are set in order to which worker stands in upper surface construction, existing scaffold needs a large amount of when construction at wall The equipment such as steel pipe and plate, erroneous for installation, time-consuming;Existing hanging basket can be fixed by bracket, but existing branch Frame pedestal is usually that four stabilizer blades are fixed, but the fixed effect is poor, easily causes entire frame body to shake, causes safety Performance is poor.
Summary of the invention
The present invention for overcome the deficiencies in the prior art, provides a kind of security performance high operation platform for building.
To achieve the goals above, the invention adopts the following technical scheme: a kind of operation platform for building, including frame Body, the platform component matched with the frame body and the driving part matched with the platform component, the frame body include bottom Seat and multiple brackets, the pedestal are equipped with multiple extending tube pieces being laterally arranged, and the extending tube piece is equipped with multiple fixations Bar and for driving the fixed link to be inserted into the driving motor in ground, the driving motor by drive mechanism with it is described solid Fixed pole matches.The present invention drives fixed link to be inserted into ground by setting driving motor, so that pedestal can have with respect to ground Effect is fixed, so that pedestal will not move in use, should improve the stability of entire frame body in the process, Frame body is avoided to shake either mobile, therefore when worker's operation, safety is good;And it is driven by driving motor It is dynamic, it is without human intervention, time saving and energy saving.
Further, the drive mechanism includes the driving gear matched with the driving motor and the driving cog It takes turns the driven gear matched and matches the casing to drive the fixed link to move up and down with the driven gear.
Further, described sleeve pipe outer wall is equipped with the ring gear being meshed with the driven gear;Setting ring gear can be convenient for The rotation of driven gear drive sleeve.
Further, described sleeve pipe inner wall is equipped with internal screw thread, and the fixed link outer wall is equipped with and the internal screw thread phase The external screw thread of cooperation;Internal screw thread is arranged in casing and external screw thread cooperates, so that casing rotates, can effectively drive described solid Fixed pole moves up and down, and then fixed link is inserted into ground.
Further, it is connected by a ball bearing with the extending tube piece on described sleeve pipe lower end, the ball axis It holds outer ring and the extending tube piece welds, the ball bearing inner ring and described sleeve pipe are welded;The set-up mode can be occasionally effective Lower part is carried out to siphunculus to be fixed, and is ensured that casing will not move up and down, is improved the stability of casing.
Further, the platform component include multiple first plates, the second plate between adjacent two first plate, For connecting the attaching plate elements and actuator of first plate and the second plate, first plate and the second plate activity connect It connects, the actuator is matched with first, second plate to drive the fan-shaped opening of the first, second plate.This hair It is bright by setting the first plate and the second plate, under the driving of actuator, the first plate and the second plate will form and be similar to Sector, so that entire platform component can more be bonded curved wall, convenient for worker in construction period as far as possible close to wall Wall avoids the entire center of gravity of worker's construction period outside platform component to facilitate worker's construction, to improve worker's construction Safety in the process improves construction efficiency, reduces construction intensity;First plate and the second plate are flexibly connected, Ensure that the first plate and the second plate cannot come off during bending, stability is high, and actuator can then push the automatically One plate and the second plate are opened, without human intervention, time saving and energy saving.
Further, described actuator one end is connected by a fixed frame with second plate, the other end and described the One plate is flexibly connected;Actuator can push the first plate to be bent with respect to the second plate, thus the first plate and second Certain angle is formed, so as to preferably be bonded curved wall, and actuator, the first plate and the second plate will form One triangular shape, therefore its whole stability and highly-safe, and actuator can also be real to the first plate and the second plate Existing support effect.
Further, the attaching plate elements includes that the support plate of fan-shaped setting is connected frame with the support plate, and described the One plate is equipped with the supporting track matched with the frame;Setting supporting track can be supported frame, to realize Attaching plate elements is supported, and supporting track can also convenient for during the first panel movement, along supporting track into Row movement, the stability which had both improved in motion process also improve the safety of whole device.
In conclusion the present invention improves the stability of entire frame body, frame body is avoided to shake either mobile, therefore When worker's operation, safety is good;And driven by driving motor, it is without human intervention, time saving and energy saving.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the embodiment of the present invention one.
Fig. 2 is the platform component top view of the embodiment of the present invention one.
Fig. 3 is the platform component partial bottom view of the embodiment of the present invention one.
Fig. 4 is the partial schematic diagram one of the embodiment of the present invention one.
Fig. 5 is the partial schematic diagram two of the embodiment of the present invention one.
Fig. 6 is the partial schematic diagram three of the embodiment of the present invention one.
Fig. 7 is the structural schematic diagram of the embodiment of the present invention two.
Fig. 8 is the enlarged drawing of A in Fig. 7.
Fig. 9 is the partial enlarged view of the embodiment of the present invention two.
Figure 10 is the structural schematic diagram of the embodiment of the present invention three.
Figure 11 is the enlarged drawing of B in Figure 10.
Specific embodiment
In order to make those skilled in the art better understand the present invention program, below in conjunction in the embodiment of the present invention Attached drawing, the technical scheme in the embodiment of the invention is clearly and completely described.
Embodiment one
As shown in figures 1 to 6, a kind of operation platform for building, including frame body 1, platform component 2 and driving part 3, wherein The frame body 1 is metal frame, which is two, and the frame body 1 is arranged along the short transverse of building, the platform part Part 2 includes two the first plates 21, the second plate 22, attaching plate elements 23 and actuator 24, first plate 21 and the second plate Part 22 is rectangular metal plate, and second plate 22 is located between two adjacent the first plates 21, and described first One angle of plate 21 is flexibly connected with an angle of the second plate 22, which is to be connected by bearing, thus first Plate can be rotated relative to the second plate;The actuator 24 is cylinder, and one end of the actuator 24 and first plate 21 are living Actuator 24 is fixed on the second plate 22 by dynamic connection, the other end by fixed frame 25, and the fixed frame 24 is metal frame, The fixed frame 24 is connected by screw with second plate 22, and 24 part of actuator is located in the fixed frame 24;Institute State actuator 24 at work, the actuator 24 pushes first plate 21 open, thus the first plate 21 and second The formation of plate 22 is similar to sector;23 side of attaching plate elements is fixedly connected with second plate 21, the other end with it is described First plate 21 is flexibly connected.
Specifically, the attaching plate elements 23 includes the support plate 231 of fan-shaped setting and the side for being welded on 231 edge of support plate Frame 232, the support plate 231 are metal plate, and the frame 232 is metal frame, and supporting rail is equipped on first plate 21 Road 26, the supporting track 26 be a curved metal item, 26 upper end of supporting track downwards concave shape at track 260, institute It states frame 232 and is located at and be inserted into the supporting track 26;Rolling member 233, the rolling member are equipped on the frame 232 233 be metal ball, is recessed inwardly to form sliding recess portion 261 in the wall of the supporting track 26, and the rolling member 233 is located at institute It states in sliding recess portion 261;Rolling member, which is arranged, can be convenient for the first plate and rolling when actuator pushes the first panel movement Frictional resistance between part is small, and sliding recess portion is arranged, and rolling member is caught in sliding recess portion, and one side rolling member can be along Recess portion movement is slided, the stability of movement is strong, and the inner wall on the other hand sliding recess portion limits rolling member, plays support Effect, further enhance supporting track to the support effect of attaching plate elements.
Further, it is equipped with the dynamic portion 211 that shovels in the end of first plate 21, the dynamic portion 211 of shovel is a metal Item, the shovel move portion 211 and are equipped with the dynamic inclined-plane 212 of the shovel being from top to bottom obliquely installed, glue on the lower end surface in the dynamic portion 211 of the shovel It is connected to wearing plate 213, the upper surface of the wearing plate 213 and the support plate 231 is near fitting;Simultaneously described second The identical dynamic portion of shovel is again provided on plate 21, details are not described herein;Dynamic portion is shoveled in setting can be in the first plate and the second plate The substances such as the cement fallen in attaching plate elements are scooped up after withdrawal, play the effect of automatic dust removing, avoid the substances such as cement It is caught between attaching plate elements and the first plate, the dynamic inclined-plane of setting shovel can then facilitate and scoops up impurity, reduce the dynamic portion of shovel and water Resistance between the substances such as mud improves impurity-eliminating effect.
Further, the platform component 2 further includes three the first protectors 27 and three the second protectors 28, described First protector 27 is metal grid, and three the first protectors 27 are separately fixed at the side of the first plate 21 and the second plate 22, And two adjacent the first protectors 27 are flexibly connected;Second protector 28, which is similarly, is located at the first plate 21 and second On plate 22, two adjacent the first protectors 27 are connected by an elastic component 29;Elastic component is detachably connected with cross bar, from side Just elastic component is replaced, avoids elastic component aging due to long-time uses, causes safety accident;And setting accommodating cavity can Convenient for taking in entire elastic component to accommodating cavity, on the one hand elastic component being protected, is not on the other hand having to elastic component When, it avoids elastic component from impacting construction, improves construction efficiency;Specifically, second protector 22 includes multiple hangs down Bar 281 and cross bar 282, described 281 one end of plumbing bar are connected with first, second plate, the other end and 282 phase of cross bar Even, an accommodating cavity 280 is equipped on the both ends of the cross bar 282, the accommodating cavity 280 is the chamber of a tubular, the bullet The end of property part 29 is detachably connected by a connection structure 50 and the inner wall of the accommodating cavity 280.
Specifically, the connection structure 50 includes the link block 51 and fixing piece 52 with the welding of 29 end of elastic component, it is described Link block 51 is cylindrical metal block, and the link block 51 welds together with the elastic component 29, and the link block 51 is inserted into In to the accommodating cavity 280, an aperture 283 is equipped on the cross bar 282, which is round hole;The fixation Part 52 is a screw rod, which can penetrate to accommodating cavity 280 in aperture 283, be equipped on the link block 51 Screw hole, the fixing piece 52 can be penetrated to the screw hole;Setting fixing piece penetrates in aperture, and fixing piece can to link block Realize two kinds of fixed forms, one is screw hole is arranged on link block, fixing piece is screwed in screw hole, is realized to fixed block solid Fixed, another kind is mutually limited by the side wall of fixing piece and the side wall of link block, is limited to realize to link block, by this Fixed form effectively ensure link block will not from accommodating intracavitary disengagement, therefore elastic component will not from accommodating intracavitary disengagement, Structure is simple, easy to operate.
Positioning convex portion 285 is equipped on 280 inner wall of accommodating cavity, the link block 51 is equipped with location indentations 515, The positioning convex portion 285 is inserted into the location indentations 515, and the aperture 283 penetrates through the convex In portion 285;Multiple balls 286 are equipped at the port of the accommodating cavity 280, the ball 286 is that wear-resisting plastic bead is set It sets positioning convex portion and location indentations can be convenient for when link block is inserted into accommodating cavity, link block not can rotate, connection Stability is high, but also can accurately be inserted into link block convenient for fixing piece, easy to connect;Because of the thickness of positioning convex portion Greatly, thus by aperture through positioning convex portion can when fixing piece is inserted into accommodating cavity the inner wall of accommodating cavity will not shape Become, improves fixed effect, extend stability;Ball is set in the port of accommodating cavity, can be convenient for pushing out in actuator When dynamic first panel movement, the side wall ball of elastic component matches, so that elastic component be facilitated to be drawn out, while avoiding elasticity The port of part and accommodating cavity occurs hard friction and accommodating cavity port is caused to deform, and ball is used wear-resistant material, then improves rolling The durability of pearl, prolongs the service life.
Further, on the frame body 1 be equipped with rack gear 11, the rack gear 11 be a metal strip, the rack gear 11 along The length direction of the frame body 1 is arranged, and the driving part 3 includes motor 31 and the gear 32 being connected with motor 31, institute It states gear 32 to be meshed with the rack gear 31, the motor 31 is set to the end of the first plate 21, and the driving part 3 It is two, two driving parts 3 are matched with the rack gear 11 on the frame body 1.
Embodiment two:
As Figure 7-9, the difference between this embodiment and the first embodiment lies in, the frame of the specific structure of frame body and embodiment one Body is different, specific: the frame body 1 includes pedestal 12, multiple brackets 13, the first strut 15 and the second strut 16, wherein described Pedestal 12 is metal pedestal, and the bracket 13 is fixed by screws on the pedestal 12, and two adjacent brackets 13 equally pass through Screw is fixed together;First, second strut is metallic rod, which is located at second strut 16 Lower section;The upper end of first strut 15 is flexibly connected with bracket 13, and the lower end of first strut 15 is welded with fixed feet 17, which is a metal plate, and an inserted link 171 is connected in the fixed feet 17, which is metal cone, institute Inserted link 171 is stated to be inserted into ground, thus the first strut 15 is fixed, and the inserted link 171 is to be obliquely installed, because The first strut 15 described in this realizes fixation to bracket 13.
Further, second strut 16, which is similarly, is obliquely installed, the upper end of second strut 16 and bracket 13 It is connected, lower end is equipped with supporting plate 18, and anti-skidding recess portion 170 is equipped in the fixed feet 17, and the supporting plate 18 is embeddable to institute It states in anti-skidding recess portion 170, the supporting plate 18 is detachably connected with the fixed feet 17 by a disconnecting prevention structure 19;The anticreep knot Structure 19 includes first positioning hole 191, second location hole 192 and locking bar 193;The first positioning hole 191 is anti-skidding recessed to be located at Circular hole in portion 170 on two sidewalls, second location hole 192 are the hole in the circle becket being located on supporting plate 18, the locking bar 193 be screw rod, which passes through from first positioning hole 191, and penetrates into second location hole 192.
Anticreep protuberance 175 is equipped on the inner wall of the anti-skidding recess portion 170,18 side wall of supporting plate is equipped with anticreep Recess portion 185, the therefore when supporting plate 18 is embedded in anti-skidding recess portion 170, the anticreep protuberance 175 can be caught in In the anticreep recess portion 185;A positioning rod 156, the locating rod are additionally provided between first strut 15 and the second strut 16 156 be metallic rod, and one end of the locating rod 156 is connected with first strut 15, and the other end is connected with second strut 16.
Embodiment three:
As shown in figs. 10-11, the difference between this embodiment and the first embodiment lies in, the specific structure of frame body and embodiment one Frame body is different, specific: the frame body includes that the frame body 1 includes pedestal 12 and multiple brackets 13, and the bracket 13 passes through spiral shell Nail is fixed on the pedestal 12, and two adjacent brackets 13 are equally fixed by screws in together;The pedestal 12 is metal Seat, the pedestal 12 are equipped with and are welded with two extending tube pieces 121, which is metal side tube, in the pedestal 12 stated Portion is equipped with a driving motor 122, the driving motor 122 be in the market it is conventional can positive and negative rotation motor, in the extending tube piece 121 are equipped with fixed link 123, which is cone-shaped metal bar, the driving motor 122 by a drive mechanism 13 with The fixed link 123 is matched to drive the fixed link 123 to move up and down.
Further, the drive mechanism 13 includes the driving gear 131 being connected with the driving motor 122, driven tooth Wheel 132 and casing 134, the driving gear 131 are metal gear, which is connected with driving motor 122, described Driven gear 132 be meshed with the driving gear 131,134 outer wall of described sleeve pipe be equipped with ring gear 135, the ring gear 135 with The driven gear 132 is meshed, so that driven gear 132 rotates, casing 134 is driven to rotate;Specifically, described sleeve pipe 134 It is connected by a ball bearing 136 with the extending tube piece 121 on lower end, 136 outer ring of ball bearing and the extension Pipe fitting 121 welds, and 136 inner ring of ball bearing and described sleeve pipe 134 are welded;Interior spiral shell is equipped on 134 inner wall of described sleeve pipe Line, 123 outer wall of fixed link are equipped with the external screw thread matched with the internal screw thread;Therefore when casing 134 rotates, Casing 134 is able to drive the fixed link 123 and moves up and down.
Obviously, described embodiment is only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment should fall within the scope of the present invention.

Claims (8)

1. a kind of operation platform for building, including frame body (1), the platform component (2) matched with the frame body (1) and with institute State the driving part (3) that platform component (2) matches, it is characterised in that: the frame body (1) includes pedestal (12) and multiple brackets (13), the pedestal (12) is equipped with multiple extending tube pieces (121) and driving motor (122) being laterally arranged, the extension Part (121) is equipped with multiple fixed links (123), and the driving motor (122) passes through drive mechanism (13) and the fixed link (123) it matches to drive the fixed link (123) to move up and down.
2. one kind according to claim 1 operation platform for building, it is characterised in that: the drive mechanism (13) includes The driving gear (131) matched with the driving motor (122), the driven gear matched with the driving gear (131) (132) and with the driven gear (132) casing (134) to drive the fixed link (123) to move up and down is matched.
3. one kind according to claim 2 operation platform for building, it is characterised in that: on described sleeve pipe (134) outer wall Equipped with the ring gear (135) being meshed with the driven gear (132).
4. one kind according to claim 3 operation platform for building, it is characterised in that: on described sleeve pipe (134) inner wall Equipped with internal screw thread, fixed link (123) outer wall is equipped with the external screw thread matched with the internal screw thread.
5. one kind according to claim 4 operation platform for building, it is characterised in that: described sleeve pipe (134) lower end It is upper to be connected by a ball bearing (136) with the extending tube piece (121), ball bearing (136) outer ring and the extension Pipe fitting (121) welding, ball bearing (136) inner ring and described sleeve pipe (134) are welded.
6. one kind according to claim 1 operation platform for building, it is characterised in that: the platform component packet (2) includes Multiple first plates (21), be set to adjacent two first plate (21) between the second plate (22), for connecting first plate (21) and the attaching plate elements (23) and actuator (24) of the second plate (22), first plate (21) and the second plate (22) are living Dynamic connection, the actuator (24) are matched with first, second plate to drive first, second plate is fan-shaped to beat It opens.
7. one kind according to claim 1 operation platform for building, it is characterised in that: described actuator (24) one end is logical It crosses fixed frame (25) to be connected with second plate (22), the other end is flexibly connected with first plate (21).
8. one kind according to claim 1 operation platform for building, it is characterised in that: the attaching plate elements (23) includes The support plate (231) of sector setting and the frame (232) that is connected with the support plate (231) are set on first plate (21) There is the supporting track (26) matched with the frame (232).
CN201810645016.6A 2018-06-21 2018-06-21 Construction platform for building Active CN109025230B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810645016.6A CN109025230B (en) 2018-06-21 2018-06-21 Construction platform for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810645016.6A CN109025230B (en) 2018-06-21 2018-06-21 Construction platform for building

Publications (2)

Publication Number Publication Date
CN109025230A true CN109025230A (en) 2018-12-18
CN109025230B CN109025230B (en) 2021-04-27

Family

ID=64610652

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810645016.6A Active CN109025230B (en) 2018-06-21 2018-06-21 Construction platform for building

Country Status (1)

Country Link
CN (1) CN109025230B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576925A (en) * 2020-04-29 2020-08-25 张达芬 Quick building steel support frame and implementation method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2013100896A4 (en) * 2013-02-11 2013-08-01 4 Ken Pty Ltd Method and system for oblique scaffold connection
CN106013765A (en) * 2016-07-21 2016-10-12 广东运达科技股份有限公司 Scaffold sidewalk deformation device for arc corner building
CN206467991U (en) * 2016-12-30 2017-09-05 河北亿安工程技术股份有限公司 The operation platform that a kind of building main body construction protection and exterior wall finishing are integrated
CN206625522U (en) * 2017-03-08 2017-11-10 上海建工集团股份有限公司 Saddle climbing type Work platform system with lossless wall-attaching equipment
CN207392710U (en) * 2017-10-02 2018-05-22 北京城建亚泰建设集团有限公司 A kind of adjustable scaffold

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2013100896A4 (en) * 2013-02-11 2013-08-01 4 Ken Pty Ltd Method and system for oblique scaffold connection
CN106013765A (en) * 2016-07-21 2016-10-12 广东运达科技股份有限公司 Scaffold sidewalk deformation device for arc corner building
CN206467991U (en) * 2016-12-30 2017-09-05 河北亿安工程技术股份有限公司 The operation platform that a kind of building main body construction protection and exterior wall finishing are integrated
CN206625522U (en) * 2017-03-08 2017-11-10 上海建工集团股份有限公司 Saddle climbing type Work platform system with lossless wall-attaching equipment
CN207392710U (en) * 2017-10-02 2018-05-22 北京城建亚泰建设集团有限公司 A kind of adjustable scaffold

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576925A (en) * 2020-04-29 2020-08-25 张达芬 Quick building steel support frame and implementation method thereof

Also Published As

Publication number Publication date
CN109025230B (en) 2021-04-27

Similar Documents

Publication Publication Date Title
CN108824786A (en) The operation platform of building engineering
CN109162344B (en) Sealing element of floor drain core
CN108296235A (en) A kind of sewer pipe cleaning device
CN109025230A (en) Operation platform for building
CN109025229A (en) Platform for construction
CN208566452U (en) A kind of construction night Mobile high brightness LED energy-saving lamp
CN107035135B (en) A kind of door-type scaffold
CN218707481U (en) High-energy micro-mist hopper spraying water curtain with good dust suppression effect
CN208870407U (en) A kind of building concrete concrete sprayer
CN2622392Y (en) Hollow high strength anchor-bolt grouting anchorage piece
CN207277414U (en) A kind of loading machine lip abrasion-proof structure
CN208435556U (en) Sealing strip for dish-washing machine and the dish-washing machine with it
CN209722833U (en) Sweeper sweeps disk avoidance protective device
CN208598300U (en) A kind of clean robot
CN205975889U (en) Connection structure of hanging closestool
CN208627035U (en) A kind of ceramic membrane movable cleaning device
CN110036831A (en) A kind of gardens turf doctoring apparatus
CN208306551U (en) A kind of interior trim plug-hole part of automobile-used low VOC
CN106321127B (en) The anchor shaft anchor cable shell anchor head that rises
CN215803445U (en) House water leakage repairing structure
CN2601806Y (en) Tipping bucket device for concrete mixer
CN108080189A (en) A kind of flusher
CN209637330U (en) A kind of stereo garage anti-falling structure
KR20060104509A (en) Golf swing practice device
CN110016957A (en) A kind of bathroom floor drain apparatus using water flow trend circumgyration incision cigarette butt

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210114

Address after: 317203 98 group 1, Xinqiao village, Lei Feng Township, Tiantai County, Taizhou, Zhejiang

Applicant after: Ding Wuxuan

Address before: 325000 room 605, building 1, Haihui center, 4559 Binhai Third Road, Wenzhou Economic and Technological Development Zone, Wenzhou City, Zhejiang Province

Applicant before: ZHEJIANG GUANGSHUN CONSTRUCTION Co.,Ltd.

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210401

Address after: 523000 room 218, 2nd floor, building B, Huizhong center, 204 Guanwen Road, Dajingtou, Zhushan, Dongcheng Street, Dongguan City, Guangdong Province

Applicant after: Baizi Construction Co.,Ltd.

Address before: 317203 98 group 1, Xinqiao village, Lei Feng Township, Tiantai County, Taizhou, Zhejiang

Applicant before: Ding Wuxuan

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240311

Address after: No. 223, Building A, Huizhong Center, No.204, Guanwen Road, Zhushan Dajingtou, Dongcheng Street, Dongguan City, Guangdong Province, 523000

Patentee after: Guangdong Yuda Intelligent Technology Co.,Ltd.

Country or region after: China

Address before: 523000 room 218, 2nd floor, building B, Huizhong center, 204 Guanwen Road, Dajingtou, Zhushan, Dongcheng Street, Dongguan City, Guangdong Province

Patentee before: Baizi Construction Co.,Ltd.

Country or region before: China