CN108824786A - The operation platform of building engineering - Google Patents
The operation platform of building engineering Download PDFInfo
- Publication number
- CN108824786A CN108824786A CN201810645800.7A CN201810645800A CN108824786A CN 108824786 A CN108824786 A CN 108824786A CN 201810645800 A CN201810645800 A CN 201810645800A CN 108824786 A CN108824786 A CN 108824786A
- Authority
- CN
- China
- Prior art keywords
- plate
- building engineering
- operation platform
- matched
- engineering according
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/24—Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
- E04G2001/157—Extensible platforms, e.g. telescopic platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/24—Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
- E04G2001/248—Inclined struts
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
The invention discloses a kind of operation platforms of building engineering, including frame body, the platform component matched with the frame body and the driving part matched with the platform component, the platform component includes multiple first plates, the second plate between adjacent two first plate, attaching plate elements and actuator for connecting first plate and the second plate, first plate and the second plate are flexibly connected, and the actuator is matched with first, second plate to drive the fan-shaped opening of the first, second plate.The present invention is by the first plate of setting and the second plate, and under the driving of actuator, the first plate and the second plate will form and be similar to sector, facilitate worker to construct as far as possible close to wall in construction period convenient for worker, improves worker's working security, construction efficiency is improved, construction intensity is reduced.
Description
Technical field
The invention belongs to technical field of building construction, more particularly, to a kind of operation platform of building engineering.
Background technique
In building construction process, cement layer and sprayed coating on External Wall are needed, therefore for the ease of construction, is needed outside
Hanging basket or scaffold are set in order to which worker stands in upper surface construction, existing scaffold needs a large amount of when construction at wall
The equipment such as steel pipe and plate, erroneous for installation, time-consuming;Existing building has a large amount of curved wall for beauty, because
The metope is arc, and plate or hanging basket are square plate, therefore the both ends of hanging basket or plate are usually separate when construction
Wall, entire human needs is protruding when worker being caused to construct, and causes the center of gravity of entire people hanging outward, and safe thing easily occurs
Therefore and because hand need it is protruding energetically, construction intensity is big, and construction efficiency is low.
Summary of the invention
The present invention for overcome the deficiencies in the prior art, provide it is a kind of facilitate construction, reduce difficulty of construction, improve construction effect
The operation platform of the building engineering of rate.
To achieve the goals above, the present invention uses following technical scheme:A kind of operation platform of building engineering, packet
Include frame body, the platform component matched with the frame body and the driving part matched with the platform component, the platform part
Part includes multiple first plates, the second plate between adjacent two first plate, for connecting first plate and second
The attaching plate elements and actuator of plate, first plate and the second plate are flexibly connected, the actuator with described first, the
Two plates are matched to drive the fan-shaped opening of the first, second plate.The present invention passes through the first plate of setting and the second plate
Part, under the driving of actuator, the first plate and the second plate will form and be similar to sector, so that entire platform component can be more
Stick on and close curved wall, convenient for worker in construction period as far as possible close to wall, to facilitate worker's construction, avoids work
The entire center of gravity of people's construction period is outside platform component, to improve the safety in worker's work progress, improves construction effect
Rate reduces construction intensity;First plate and the second plate are flexibly connected, ensure that the first plate and the second plate are being bent
During cannot come off, stability is high, and actuator can then push the first plate and the second plate to open automatically, without artificial
Operation, it is time saving and energy saving.
Further, described actuator one end is connected by a fixed frame with second plate, the other end and described the
One plate is flexibly connected;Actuator can push the first plate to be bent with respect to the second plate, thus the first plate and second
Certain angle is formed, so as to preferably be bonded curved wall, and actuator, the first plate and the second plate will form
One triangular shape, therefore its whole stability and highly-safe, and actuator can also be real to the first plate and the second plate
Existing support effect.
Further, the attaching plate elements includes that the support plate of fan-shaped setting is connected frame with the support plate, and described the
One plate is equipped with the supporting track matched with the frame;Setting supporting track can be supported frame, to realize
Attaching plate elements is supported, and supporting track can also convenient for during the first panel movement, along supporting track into
Row movement, the stability which had both improved in motion process also improve the safety of whole device.
Further, the frame side wall is equipped with multiple rolling members, and the supporting track inner wall is equipped with and the rolling
The sliding recess portion that moving part matches;Rolling member, which is arranged, can be convenient for when actuator pushes the first panel movement, the first plate
Frictional resistance between rolling member is small, and sliding recess portion is arranged, and rolling member is caught in sliding recess portion, one side rolling member
It can be moved along sliding recess portion, the stability of movement is strong, and the inner wall on the other hand sliding recess portion limits rolling member, rises
To the effect of support, supporting track is further enhanced to the support effect of attaching plate elements.
Further, the support plate side wall is equipped with the shovel matched with the upper end face of support plate and moves portion, the shovel
In dynamic portion there is the shovel being from top to bottom obliquely installed to move inclined-plane;Setting is shoveled dynamic portion and can withdrawn in the first plate and the second plate
The substances such as the cement fallen in attaching plate elements are scooped up later, play the effect of automatic dust removing, avoid the substances such as cement be caught in
Between attaching plate elements and the first plate, the dynamic inclined-plane of setting shovel, which can then facilitate, scoops up impurity, reduces the dynamic objects such as portion and cement of shovel
Resistance between matter improves impurity-eliminating effect.
Further, the platform component further includes multiple first protectors and multiple second protectors, and adjacent two first
It is flexibly connected between protector, adjacent two second protector is connected by an elastic component;Adjacent two first protector is flexibly connected, can
Convenient for the bending of the first protector, convenient for being bent in company with the first plate and the second plate;And be arranged elastic component connect it is adjacent
Two second protectors can ensure that gap still has protective equipment between the second protector of guarantee during deformation, from
And improve the safety of whole device.
Further, second protector includes multiple plumbing bars and the cross bar that is connected with the plumbing bar, on the cross bar
Equipped with accommodating cavity, the elastic component is detachably connected by a connection structure and the accommodating cavity wall;Elastic component and cross bar can
Dismantling connection replaces elastic component from convenient, avoids elastic component aging due to long-time uses, causes safety accident;And
And on the one hand setting accommodating cavity can protect elastic component, on the other hand convenient for taking in entire elastic component to accommodating cavity
When not having to elastic component, elastic component is avoided to impact construction, improves construction efficiency.
Further, the connection structure includes the link block being connected with the elastic component and for fixing the link block
With the fixing piece of the cross bar, the cross bar is equipped with the aperture penetrated for the fixing piece;Fixing piece is set in aperture
It penetrates, fixing piece can realize two kinds of fixed forms to link block, and one is screw hole is arranged on link block, fixing piece is screwed to spiral shell
In hole, fixed block is realized and is fixed, another kind is mutually limited by the side wall of fixing piece and the side wall of link block, thus real
Now link block is limited, effectively ensures that link block will not be from accommodating intracavitary disengagement, therefore elastic component by the fixed form
Will not be from intracavitary disengagement be accommodated, structure is simple, easy to operate.
Further, the accommodating cavity wall is equipped with positioning convex portion, and the link block is equipped with and the positioning convex portion
The location indentations matched, the aperture is through the positioning convex portion;Positioning convex portion is set and location indentations can be convenient for even
When connecing block and be inserted into accommodating cavity, link block not can rotate, and the stability of connection is high, but also can be accurate convenient for fixing piece
Be inserted into link block, it is easy to connect;It, can be through positioning convex portion by aperture because the thickness of positioning convex portion is big
When fixing piece is inserted into accommodating cavity the inner wall of accommodating cavity will not deformation, improve fixed effect, extend stability.
Further, multiple balls matched with the elastic component are equipped at the accommodating cavity port, the ball is
Wear-resistant material;Ball is set in the port of accommodating cavity, bullet when actuator pushes out the first panel movement can be convenient for
Property part side wall ball match, so that elastic component be facilitated to be drawn out, at the same the port for avoiding elastic component and accommodating cavity occur it is hard
It rubs and accommodating cavity port is caused to deform, and ball is used into wear-resistant material, then improve the durability of ball, extend and use the longevity
Life.
In conclusion the present invention is by setting the first plate and the second plate, under the driving of actuator, the first plate and
Second plate, which will form, is similar to sector, facilitate worker to construct as far as possible close to wall in construction period convenient for worker, mention
High worker's working security improves construction efficiency, reduces construction intensity.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the embodiment of the present invention one.
Fig. 2 is the platform component top view of the embodiment of the present invention one.
Fig. 3 is the platform component partial bottom view of the embodiment of the present invention one.
Fig. 4 is the partial schematic diagram one of the embodiment of the present invention one.
Fig. 5 is the partial schematic diagram two of the embodiment of the present invention one.
Fig. 6 is the partial schematic diagram three of the embodiment of the present invention one.
Fig. 7 is the structural schematic diagram of the embodiment of the present invention two.
Fig. 8 is the enlarged drawing of A in Fig. 7.
Fig. 9 is the partial enlarged view of the embodiment of the present invention two.
Figure 10 is the structural schematic diagram of the embodiment of the present invention three.
Figure 11 is the enlarged drawing of B in Figure 10.
Specific embodiment
In order to make those skilled in the art better understand the present invention program, below in conjunction in the embodiment of the present invention
Attached drawing, the technical scheme in the embodiment of the invention is clearly and completely described.
Embodiment one
As shown in figures 1 to 6, a kind of operation platform of building engineering, including frame body 1, platform component 2 and driving part
3, wherein the frame body 1 is metal frame, which is two, and the frame body 1 is arranged along the short transverse of building, described
Platform component 2 includes two the first plates 21, the second plate 22, attaching plate elements 23 and actuator 24,21 He of the first plate
Second plate 22 is rectangular metal plate, and second plate 22 is located between two adjacent the first plates 21, Er Qiesuo
An angle for stating the first plate 21 is flexibly connected with an angle of the second plate 22, which is to be connected by bearing, from
And the first plate can be rotated relative to the second plate;The actuator 24 is cylinder, one end of the actuator 24 and first plate
Part 21 is flexibly connected, and actuator 24 is fixed on the second plate 22 by the other end by fixed frame 25, and the fixed frame 24 is
Metal frame, the fixed frame 24 are connected by screw with second plate 22, and 24 part of actuator is located at the fixed frame
In 24;At work, the actuator 24 pushes first plate 21 open to the actuator 24, thus the first plate 21
It is similar to sector with the formation of the second plate 22;23 side of attaching plate elements is fixedly connected with second plate 21, the other end
It is flexibly connected with first plate 21.
Specifically, the attaching plate elements 23 includes the support plate 231 of fan-shaped setting and the side for being welded on 231 edge of support plate
Frame 232, the support plate 231 are metal plate, and the frame 232 is metal frame, and supporting rail is equipped on first plate 21
Road 26, the supporting track 26 be a curved metal item, 26 upper end of supporting track downwards concave shape at track 260, institute
It states frame 232 and is located at and be inserted into the supporting track 26;Rolling member 233, the rolling member are equipped on the frame 232
233 be metal ball, is recessed inwardly to form sliding recess portion 261 in the wall of the supporting track 26, and the rolling member 233 is located at institute
It states in sliding recess portion 261;Rolling member, which is arranged, can be convenient for the first plate and rolling when actuator pushes the first panel movement
Frictional resistance between part is small, and sliding recess portion is arranged, and rolling member is caught in sliding recess portion, and one side rolling member can be along
Recess portion movement is slided, the stability of movement is strong, and the inner wall on the other hand sliding recess portion limits rolling member, plays support
Effect, further enhance supporting track to the support effect of attaching plate elements.
Further, it is equipped with the dynamic portion 211 that shovels in the end of first plate 21, the dynamic portion 211 of shovel is a metal
Item, the shovel move portion 211 and are equipped with the dynamic inclined-plane 212 of the shovel being from top to bottom obliquely installed, glue on the lower end surface in the dynamic portion 211 of the shovel
It is connected to wearing plate 213, the upper surface of the wearing plate 213 and the support plate 231 is near fitting;Simultaneously described second
The identical dynamic portion of shovel is again provided on plate 21, details are not described herein;Dynamic portion is shoveled in setting can be in the first plate and the second plate
The substances such as the cement fallen in attaching plate elements are scooped up after withdrawal, play the effect of automatic dust removing, avoid the substances such as cement
It is caught between attaching plate elements and the first plate, the dynamic inclined-plane of setting shovel can then facilitate and scoops up impurity, reduce the dynamic portion of shovel and water
Resistance between the substances such as mud improves impurity-eliminating effect.
Further, the platform component 2 further includes three the first protectors 27 and three the second protectors 28, described
First protector 27 is metal grid, and three the first protectors 27 are separately fixed at the side of the first plate 21 and the second plate 22,
And two adjacent the first protectors 27 are flexibly connected;Second protector 28, which is similarly, is located at the first plate 21 and second
On plate 22, two adjacent the first protectors 27 are connected by an elastic component 29;Elastic component is detachably connected with cross bar, from side
Just elastic component is replaced, avoids elastic component aging due to long-time uses, causes safety accident;And setting accommodating cavity can
Convenient for taking in entire elastic component to accommodating cavity, on the one hand elastic component being protected, is not on the other hand having to elastic component
When, it avoids elastic component from impacting construction, improves construction efficiency;Specifically, second protector 22 includes multiple hangs down
Bar 281 and cross bar 282, described 281 one end of plumbing bar are connected with first, second plate, the other end and 282 phase of cross bar
Even, an accommodating cavity 280 is equipped on the both ends of the cross bar 282, the accommodating cavity 280 is the chamber of a tubular, the bullet
The end of property part 29 is detachably connected by a connection structure 50 and the inner wall of the accommodating cavity 280.
Specifically, the connection structure 50 includes the link block 51 and fixing piece 52 with the welding of 29 end of elastic component, it is described
Link block 51 is cylindrical metal block, and the link block 51 welds together with the elastic component 29, and the link block 51 is inserted into
In to the accommodating cavity 280, an aperture 283 is equipped on the cross bar 282, which is round hole;The fixation
Part 52 is a screw rod, which can penetrate to accommodating cavity 280 in aperture 283, be equipped on the link block 51
Screw hole, the fixing piece 52 can be penetrated to the screw hole;Setting fixing piece penetrates in aperture, and fixing piece can to link block
Realize two kinds of fixed forms, one is screw hole is arranged on link block, fixing piece is screwed in screw hole, is realized to fixed block solid
Fixed, another kind is mutually limited by the side wall of fixing piece and the side wall of link block, is limited to realize to link block, by this
Fixed form effectively ensure link block will not from accommodating intracavitary disengagement, therefore elastic component will not from accommodating intracavitary disengagement,
Structure is simple, easy to operate.
Positioning convex portion 285 is equipped on 280 inner wall of accommodating cavity, the link block 51 is equipped with location indentations 515,
The positioning convex portion 285 is inserted into the location indentations 515, and the aperture 283 penetrates through the convex
In portion 285;Multiple balls 286 are equipped at the port of the accommodating cavity 280, the ball 286 is that wear-resisting plastic bead is set
It sets positioning convex portion and location indentations can be convenient for when link block is inserted into accommodating cavity, link block not can rotate, connection
Stability is high, but also can accurately be inserted into link block convenient for fixing piece, easy to connect;Because of the thickness of positioning convex portion
Greatly, thus by aperture through positioning convex portion can when fixing piece is inserted into accommodating cavity the inner wall of accommodating cavity will not shape
Become, improves fixed effect, extend stability;Ball is set in the port of accommodating cavity, can be convenient for pushing out in actuator
When dynamic first panel movement, the side wall ball of elastic component matches, so that elastic component be facilitated to be drawn out, while avoiding elasticity
The port of part and accommodating cavity occurs hard friction and accommodating cavity port is caused to deform, and ball is used wear-resistant material, then improves rolling
The durability of pearl, prolongs the service life.
Further, on the frame body 1 be equipped with rack gear 11, the rack gear 11 be a metal strip, the rack gear 11 along
The length direction of the frame body 1 is arranged, and the driving part 3 includes motor 31 and the gear 32 being connected with motor 31, institute
It states gear 32 to be meshed with the rack gear 31, the motor 31 is set to the end of the first plate 21, and the driving part 3
It is two, two driving parts 3 are matched with the rack gear 11 on the frame body 1.
Embodiment two:
As Figure 7-9, the difference between this embodiment and the first embodiment lies in, the frame of the specific structure of frame body and embodiment one
Body is different, specifically:The frame body 1 includes pedestal 12, multiple brackets 13, the first strut 15 and the second strut 16, wherein described
Pedestal 12 is metal pedestal, and the bracket 13 is fixed by screws on the pedestal 12, and two adjacent brackets 13 equally pass through
Screw is fixed together;First, second strut is metallic rod, which is located at second strut 16
Lower section;The upper end of first strut 15 is flexibly connected with bracket 13, and the lower end of first strut 15 is welded with fixed feet
17, which is a metal plate, and an inserted link 171 is connected in the fixed feet 17, which is metal cone, institute
Inserted link 171 is stated to be inserted into ground, thus the first strut 15 is fixed, and the inserted link 171 is to be obliquely installed, because
The first strut 15 described in this realizes fixation to bracket 13.
Further, second strut 16, which is similarly, is obliquely installed, the upper end of second strut 16 and bracket 13
It is connected, lower end is equipped with supporting plate 18, and anti-skidding recess portion 170 is equipped in the fixed feet 17, and the supporting plate 18 is embeddable to institute
It states in anti-skidding recess portion 170, the supporting plate 18 is detachably connected with the fixed feet 17 by a disconnecting prevention structure 19;The anticreep knot
Structure 19 includes first positioning hole 191, second location hole 192 and locking bar 193;The first positioning hole 191 is anti-skidding recessed to be located at
Circular hole in portion 170 on two sidewalls, second location hole 192 are the hole in the circle becket being located on supporting plate 18, the locking bar
193 be screw rod, which passes through from first positioning hole 191, and penetrates into second location hole 192.
Anticreep protuberance 175 is equipped on the inner wall of the anti-skidding recess portion 170,18 side wall of supporting plate is equipped with anticreep
Recess portion 185, the therefore when supporting plate 18 is embedded in anti-skidding recess portion 170, the anticreep protuberance 175 can be caught in
In the anticreep recess portion 185;A positioning rod 156, the locating rod are additionally provided between first strut 15 and the second strut 16
156 be metallic rod, and one end of the locating rod 156 is connected with first strut 15, and the other end is connected with second strut 16.
Embodiment three:
As shown in figs. 10-11, the difference between this embodiment and the first embodiment lies in, the specific structure of frame body and embodiment one
Frame body is different, specifically:The frame body includes that the frame body 1 includes pedestal 12 and multiple brackets 13, and the bracket 13 passes through spiral shell
Nail is fixed on the pedestal 12, and two adjacent brackets 13 are equally fixed by screws in together;The pedestal 12 is metal
Seat, the pedestal 12 are equipped with and are welded with two extending tube pieces 121, which is metal side tube, in the pedestal 12 stated
Portion is equipped with a driving motor 122, the driving motor 122 be in the market it is conventional can positive and negative rotation motor, in the extending tube piece
121 are equipped with fixed link 123, which is cone-shaped metal bar, the driving motor 122 by a drive mechanism 13 with
The fixed link 123 is matched to drive the fixed link 123 to move up and down.
Further, the drive mechanism 13 includes the driving gear 131 being connected with the driving motor 122, driven tooth
Wheel 132 and casing 134, the driving gear 131 are metal gear, which is connected with driving motor 122, described
Driven gear 132 be meshed with the driving gear 131,134 outer wall of described sleeve pipe be equipped with ring gear 135, the ring gear 135 with
The driven gear 132 is meshed, so that driven gear 132 rotates, casing 134 is driven to rotate;Specifically, described sleeve pipe 134
It is connected by a ball bearing 136 with the extending tube piece 121 on lower end, 136 outer ring of ball bearing and the extension
Pipe fitting 121 welds, and 136 inner ring of ball bearing and described sleeve pipe 134 are welded;Interior spiral shell is equipped on 134 inner wall of described sleeve pipe
Line, 123 outer wall of fixed link are equipped with the external screw thread matched with the internal screw thread;Therefore when casing 134 rotates,
Casing 134 is able to drive the fixed link 123 and moves up and down.
Obviously, described embodiment is only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment should fall within the scope of the present invention.
Claims (10)
1. a kind of operation platform of building engineering, including frame body (1), the platform component (2) matched with the frame body (1)
And the driving part (3) matched with the platform component (2), it is characterised in that:The platform component packet (2) includes multiple first
Plate (21), the second plate (22) being set between adjacent two first plate (21), for connecting first plate (21) and the
The attaching plate elements (23) and actuator (24) of two plates (22), first plate (21) and the second plate (22) are flexibly connected,
The actuator (24) is matched with first, second plate to drive the fan-shaped opening of the first, second plate.
2. a kind of operation platform of building engineering according to claim 1, it is characterised in that:The actuator (24)
One end is connected by fixed frame (25) with second plate (22), and the other end is flexibly connected with first plate (21).
3. a kind of operation platform of building engineering according to claim 1, it is characterised in that:The attaching plate elements
(23) frame (232) for including the support plate (231) of fan-shaped setting and being connected with the support plate (231), first plate
(21) it is equipped with the supporting track (26) matched with the frame (232).
4. a kind of operation platform of building engineering according to claim 3, it is characterised in that:The frame (232)
Side wall is equipped with multiple rolling members (233), and supporting track (26) inner wall is equipped with and matches with the rolling member (233)
It slides recess portion (261).
5. a kind of operation platform of building engineering according to claim 4, it is characterised in that:First plate
(21) it is equipped with the shovel matched with the attaching plate elements (23) upper surface and moves portion (211), which, which moves on portion (211), has by upper
The shovel being obliquely installed under moves inclined-plane (212).
6. a kind of operation platform of building engineering according to claim 1, it is characterised in that:The platform component
(2) further include multiple first protectors (27) and multiple second protectors (28), live between adjacent two first protector (27)
Dynamic connection, adjacent two second protector (28) are connected by an elastic component (29).
7. a kind of operation platform of building engineering according to claim 6, it is characterised in that:Second protector
It (28) include multiple plumbing bars (281) and the cross bar (282) being connected with the plumbing bar (281), the cross bar (282) is equipped with accommodating
Chamber (280), the elastic component (29) are detachably connected by a connection structure (50) and the accommodating cavity (280) inner wall.
8. a kind of operation platform of building engineering according to claim 7, it is characterised in that:The connection structure
(50) include the link block (51) being connected with the elastic component (29) and for fixing the link block (51) and the cross bar
(282) fixing piece (52), the cross bar (282) are equipped with the aperture (283) penetrated for the fixing piece (52).
9. a kind of operation platform of building engineering according to claim 8, it is characterised in that:The accommodating cavity
(280) inner wall is equipped with positioning convex portion (285), and the link block (51) is equipped with and matches with the positioning convex portion (285)
Location indentations (515), the aperture (283) is through the positioning convex portion (285).
10. a kind of operation platform of building engineering according to claim 7, it is characterised in that:The accommodating cavity
(280) multiple balls (286) matched with the elastic component (29) are equipped at port, the ball (286) is wear-resistant material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810645800.7A CN108824786B (en) | 2018-06-21 | 2018-06-21 | Construction platform for building construction engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810645800.7A CN108824786B (en) | 2018-06-21 | 2018-06-21 | Construction platform for building construction engineering |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108824786A true CN108824786A (en) | 2018-11-16 |
CN108824786B CN108824786B (en) | 2020-12-04 |
Family
ID=64143140
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810645800.7A Expired - Fee Related CN108824786B (en) | 2018-06-21 | 2018-06-21 | Construction platform for building construction engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108824786B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111997334A (en) * | 2020-08-31 | 2020-11-27 | 孟远航 | Application method of safety protection device of building outer wall construction platform |
EP3748106A1 (en) * | 2019-06-04 | 2020-12-09 | Scanclimber Oy | Work platform system with an adjusting bridge |
CN112227698A (en) * | 2020-10-21 | 2021-01-15 | 湖南安邦名匠建筑安装工程有限公司 | House building engineering's construction platform |
CN113503031A (en) * | 2021-08-16 | 2021-10-15 | 哈尔滨职业技术学院 | Beam frame for building construction |
CN113530186A (en) * | 2021-08-01 | 2021-10-22 | 刘洋洋 | Tripod type construction engineering construction platform |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2749871A1 (en) * | 1996-06-14 | 1997-12-19 | Entrepose Echafaudages | Flooring panel for scaffolding |
CN200984000Y (en) * | 2006-10-27 | 2007-12-05 | 林如群 | Multi-function buttcover plate |
AU2013100896A4 (en) * | 2013-02-11 | 2013-08-01 | 4 Ken Pty Ltd | Method and system for oblique scaffold connection |
EP2789767A1 (en) * | 2013-04-12 | 2014-10-15 | ALTRAD plettac assco GmbH | Adapter system, compensation scaffold base and compensation scaffold base system |
CN207377104U (en) * | 2017-11-06 | 2018-05-18 | 郑州祥中脚手架有限公司 | A kind of turnable scaffold board for crane |
-
2018
- 2018-06-21 CN CN201810645800.7A patent/CN108824786B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2749871A1 (en) * | 1996-06-14 | 1997-12-19 | Entrepose Echafaudages | Flooring panel for scaffolding |
CN200984000Y (en) * | 2006-10-27 | 2007-12-05 | 林如群 | Multi-function buttcover plate |
AU2013100896A4 (en) * | 2013-02-11 | 2013-08-01 | 4 Ken Pty Ltd | Method and system for oblique scaffold connection |
EP2789767A1 (en) * | 2013-04-12 | 2014-10-15 | ALTRAD plettac assco GmbH | Adapter system, compensation scaffold base and compensation scaffold base system |
CN207377104U (en) * | 2017-11-06 | 2018-05-18 | 郑州祥中脚手架有限公司 | A kind of turnable scaffold board for crane |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3748106A1 (en) * | 2019-06-04 | 2020-12-09 | Scanclimber Oy | Work platform system with an adjusting bridge |
CN111997334A (en) * | 2020-08-31 | 2020-11-27 | 孟远航 | Application method of safety protection device of building outer wall construction platform |
CN111997334B (en) * | 2020-08-31 | 2021-11-19 | 成都建工第三建筑工程有限公司 | Application method of safety protection device of building outer wall construction platform |
CN112227698A (en) * | 2020-10-21 | 2021-01-15 | 湖南安邦名匠建筑安装工程有限公司 | House building engineering's construction platform |
CN112227698B (en) * | 2020-10-21 | 2022-01-04 | 湖南安邦名匠建筑安装工程有限公司 | House building engineering's construction platform |
CN113530186A (en) * | 2021-08-01 | 2021-10-22 | 刘洋洋 | Tripod type construction engineering construction platform |
CN113530186B (en) * | 2021-08-01 | 2022-11-18 | 刘洋洋 | Tripod type construction engineering construction platform |
CN113503031A (en) * | 2021-08-16 | 2021-10-15 | 哈尔滨职业技术学院 | Beam frame for building construction |
CN113503031B (en) * | 2021-08-16 | 2023-02-28 | 哈尔滨职业技术学院 | Beam frame for building construction |
Also Published As
Publication number | Publication date |
---|---|
CN108824786B (en) | 2020-12-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108824786A (en) | The operation platform of building engineering | |
CN206971148U (en) | One kind swings avoidance rotating mechanism | |
CN106300201B (en) | A kind of cable deicer | |
CN112360020A (en) | Tensile aluminium veneer of building curtain | |
CN211474615U (en) | Special expansion bolt for mounting stair railing column | |
CN107988903B (en) | A kind of bridge protective fence | |
CN109025229A (en) | Platform for construction | |
CN111332370A (en) | Automobile mudguard convenient to installation is dismantled | |
CN109025230A (en) | Operation platform for building | |
CN209663921U (en) | A kind of pipe cleaning device | |
CN207988648U (en) | A kind of gardens guardrail of high stability | |
CN210690302U (en) | Floor hardness detection device | |
CN207277414U (en) | A kind of loading machine lip abrasion-proof structure | |
CN107035135B (en) | A kind of door-type scaffold | |
CN208490535U (en) | The slurry scraper of adaptive pig farm coprodaecum barrier | |
CN113391609B (en) | Safety production monitoring system for mine and urban underground pipe gallery | |
CN108816379A (en) | A kind of engineering material processing equipment for building field of centrifugal force solution sand block | |
CN210151734U (en) | Anti-toppling ground anchor for snow-proof net | |
CN105484702B (en) | A kind of drilling tool outer wall mud cleaning plant | |
CN210447931U (en) | Fire-fighting spray device for high-rise building construction external scaffold | |
CN211164542U (en) | Automatic spraying and maintaining device for highway bridge precast beam field | |
CN203611134U (en) | Filter net of steel pipe rust remover | |
CN206815782U (en) | A kind of door-type scaffold | |
CN201004026Y (en) | Middle sampler for large belt | |
CN110259245A (en) | A kind of serial combination type concrete wire |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201204 Termination date: 20210621 |