A kind of laying of architectural engineering ceramic tile is struck actual load and is set
Technical field
Strike that actual load is set more particularly to a kind of laying of architectural engineering ceramic tile is struck actual load and set the present invention relates to one kind.
Background technique
In construction of buildings, in order to which building is more beautiful, people can be laid with ceramic tile on the ground, and people are laying
After ceramic tile, ceramic tile not consolidation is caused in order to avoid mortar is not full, needs ceramic tile striking reality, is at present usually that staff takes
Rubber hammer squat on ceramic tile gently beat ceramic tile, ceramic tile is struck into reality, the time is long, and the leg of staff is easy numb;For
Alleviation leg fiber crops, staff can often stand up rest, will affect working efficiency in this way.
Summary of the invention
In order to overcome need staff hold rubber hammer squat on ceramic tile gently beat ceramic tile, ceramic tile is struck into reality, work
The leg for making personnel is easy numb disadvantage, and therefore, technical problem of the invention is: providing the leg hair of avoidable staff a kind of
The architectural engineering ceramic tile laying of fiber crops is struck actual load and is set.
Implementer's case of the invention are as follows: a kind of laying of architectural engineering ceramic tile is struck actual load and set, and includes n shape frame, leads
Set, the first screw rod, bearing block, cross bar, guide rod, the first rack gear, the first spring, vertical bar, motor, sector gear, slide bar, sliding sleeve,
Connecting rod and rubber block, the left and right sides on front side of n shape frame is all evenly spaced to be provided with the first screw hole, is all provided at left and right sides of n shape frame
There is a guide sleeve, the second screw hole is provided on front side of guide sleeve, be equipped with the first screw rod in the second screw hole and the first screw hole, in the guide sleeve of the left and right sides
Side is equipped with bearing block, is connected with cross bar between two bearing blocks, and cross bar left part and right part are provided with guide hole, in two guide holes
Equipped with guide rod, two guide rod bottom ends are mounted on the first rack gear, are connected with the first spring between guide rod top and cross bar top, the
One spring pocket is connected with vertical bar on guide rod among cross bar bottom, motor is equipped on vertical bar, is equipped on the output shaft of motor
Sector gear, sector gear are engaged with first rack gear in left side, and the first rack gear outer upper of the left and right sides is connected with slide bar, sliding
Bar is equipped with sliding sleeve, and sliding sleeve bottom is connected with connecting rod, and connecting rod bottom end is connected with rubber block.
It is further preferred that further including having rotating mechanism, rotating mechanism includes 7 shape bars, cylinder, sliding rail, sliding block, second
Rack gear and first gear, the guide sleeve top right side in left side are connected with 7 shape bars, and 7 shape bar inside tops are equipped with cylinder and sliding rail, gas
Cylinder is located on the right side of sliding rail, and slidingtype is equipped with sliding block on sliding rail, is equipped with the second rack gear, the second rack gear top and cylinder on the right side of sliding block
The connection of telescopic rod bottom end, cross bar left part is equipped with first gear, and first gear is engaged with the second rack gear.
It is further preferred that further include having electronic reel, bracing wire and second spring, it is on the inside of the sliding sleeve of the left and right sides and left
Second spring is connected between on the outside of first rack gear of right two sides, second spring is covered in slide bar, and the slide bar outer end of the left and right sides is pacified
Equipped with electronic reel, it is wound with bracing wire on electronic reel, is connected on the left of the bracing wire in left side and the sliding sleeve in left side, the bracing wire on right side
It is connect on the right side of the sliding sleeve on right side.
It is further preferred that further including having link block, mounting rod, wheel and the second screw rod, at left and right sides of n shape frame lower part
It is connected with link block, third screw hole is provided on link block, mounting rod is equipped on the outside of the link block of the left and right sides, is provided on mounting rod
Two the 4th screw holes, the 4th screw hole and third screw hole of top are interior to be equipped with the second screw rod, and mounting rod bottom end is equipped with wheel.
When needing to strike real ceramic tile, the present invention is moved to designated position by staff, then screws off the first screw rod, then
Cross bar is moved up, guide rod and the first rack gear is driven to move up, to move up with moving slide-bar and sliding sleeve, and then drives rubber
Blob of viscose moves up.When rubber block is moved upward to proper height, stopping moves up cross bar, and makes the second screw hole and opposite
It answers the first screw hole of height corresponding, then the first screw rod is screwed in the second screw hole and the first screw hole, guide sleeve is fixed, so as to
Cross bar is fixed.At this point, staff inwardly or outwardly stirs sliding sleeve, connecting rod is driven inwardly or outwardly to move, to drive
Rubber block inwardly or outwardly moves, and the position of rubber block is adjusted.When being adjusted to suitable position, sliding sleeve is stirred in stopping, then
Control motor rotates counterclockwise, and sector gear is driven to rotate counterclockwise, to drive first rack gear in left side and the guide rod in left side
It moves down, first spring in left side is compressed, and first rack gear in left side moves downwards through the slide bar in left side and the cunning in left side
Set drives the connecting rod in left side to move down, and the rubber block in left side moves down therewith, when the first tooth of sector gear and left side
When item does not engage, in left side under the action of the first spring, first rack gear in left side resets upwards, to drive the rubber block in left side
It resets upwards, when sector gear is engaged with first rack gear on right side, the guide rod of the first rack gear and right side that drive right side is upward
Mobile, first spring on right side is stretched, and first rack gear on right side moves upwardly through the slide bar on right side and the sliding sleeve band on right side
The connecting rod on dynamic right side moves up, and the rubber block on right side moves up therewith, when sector gear and first rack gear on right side not
When engagement, under the action of first spring on right side, the rubber block on right side resets downwards, since motor turns counterclockwise continuous
It is dynamic, so as to move up and down the rubber block of the left and right sides constantly, ceramic tile is carried out to strike reality, then for a long time without staff
It squats on ceramic tile, to can avoid the legs become numb of staff.After striking reality, staff closes motor.
After ceramic tile is struck reality, staff controls cylinder and slowly extends, and the second rack gear is driven slowly to move down, thus
It drives first gear slowly to rotate clockwise, and then cross bar is driven slowly to rotate clockwise.When cross bar and its upper-part are slowly suitable
When hour hands are turned to above cross bar, staff closes cylinder, so as to save space.When needing to strike real ceramic tile, work people
Member's control cylinder slowly shortens, and cross bar is driven slowly to rotate counterclockwise.When cross bar and its upper-part are slowly rotated counterclockwise to first
When beginning position, staff closes cylinder.
When initial, second spring is in tensional state.When needing to strike real ceramic tile, staff controls two electronic coilings
Wheel reels line or puts bracing wire, and under the action of second spring, two sliding sleeves are inwardly or outwardly moved, to drive two rubber blocks
It inwardly or outwardly moves, the position of rubber block is adjusted.When being adjusted to suitable position, staff closes two electronic coilings
Wheel, under the action of the bracing wire of second spring sum, can make to slide over it is more steady when moving up and down so that rubber block is upper
It is more steady when lower mobile.
When needing the mobile present invention, staff pushes the present invention, and wheel rolls on the ground, so that the mobile present invention
It is more quick.When the present invention is moved to designated position, staff stops pushing the present invention, then props up n shape frame with hand, then
Second screw rod is screwed out, n shape frame can be decontroled, makes n shape frame and ground face contact.
Beneficial effect is: the present invention rotated counterclockwise by motor can make the left and right sides rubber block it is continuous on move down
It is dynamic, ceramic tile is carried out to strike reality, then is squatted on ceramic tile for a long time without staff, to can avoid the legs become numb of staff;
Rubber block can be made more steady when moving up and down by the bracing wire of second spring sum.
Detailed description of the invention
Fig. 1 is schematic view of the front view of the invention.
The label of each components is as follows in attached drawing: 1 ... n shape frame, 2 ... first screw holes, 3 ... guide sleeves, 4 ... second screw holes, and 5 ...
First screw rod, 6 ... bearing blocks, 7 ... cross bars, 8 ... guide holes, 9 ... guide rods, 10 ... first rack gears, 11 ... first springs, 12 ... is perpendicular
Bar, 13 ... motors, 14 ... sector gears, 15 ... slide bars, 16 ... sliding sleeves, 17 ... connecting rods, 18 ... rubber blocks, 19 ... whirlers
Structure, 191 ... 7 shape bars, 192 ... cylinders, 193 ... sliding rails, 194 ... sliding blocks, 195 ... second rack gears, 196 ... first gears, 20 ...
Electronic reel, 21 ... bracing wires, 22 ... second springs, 23 ... link blocks, 24 ... third screw holes, 25 ... mounting rods, 26 ... wheels,
27 ... the 4th screw holes, 28 ... second screw rods.
Specific embodiment
The invention will be further described for embodiment shown in reference to the accompanying drawing.
Embodiment 1
A kind of laying of architectural engineering ceramic tile is struck actual load and is set, as shown in Figure 1, including n shape frame 1, guide sleeve 3, the first screw rod 5, axis
Hold seat 6, cross bar 7, guide rod 9, the first rack gear 10, the first spring 11, vertical bar 12, motor 13, sector gear 14, slide bar 15, sliding sleeve
16, connecting rod 17 and rubber block 18, the left and right sides of 1 front side of n shape frame is all evenly spaced to be provided with the first screw hole 2, and n shape frame 1 is left
Right two sides are equipped with guide sleeve 3, and the second screw hole 4 is provided on front side of guide sleeve 3, is equipped with the first screw rod 5 in the second screw hole 4 and the first screw hole 2,
Bearing block 6 is installed on the inside of the guide sleeve 3 of the left and right sides, cross bar 7 is connected between two bearing blocks 6,7 left part of cross bar and right part are equal
Be provided with guide hole 8, be equipped with guide rod 9 in two guide holes 8, two 9 bottom ends of guide rod are mounted on the first rack gear 10,9 top of guide rod with
Cross bar is connected with the first spring 11 between 7 top, and for the first 11 sets of spring on guide rod 9, cross bar is connected with vertical bar among 7 bottom
12, motor 13 is installed on vertical bar 12, sector gear 14 is installed on the output shaft of motor 13, the of sector gear 14 and left side
The engagement of one rack gear 10,10 outer upper of the first rack gear of the left and right sides are connected with slide bar 15, and slide bar 15 is equipped with sliding sleeve 16, sliding sleeve
16 bottoms are connected with connecting rod 17, and 17 bottom end of connecting rod is connected with rubber block 18.
Embodiment 2
A kind of laying of architectural engineering ceramic tile is struck actual load and is set, as shown in Figure 1, including n shape frame 1, guide sleeve 3, the first screw rod 5, axis
Hold seat 6, cross bar 7, guide rod 9, the first rack gear 10, the first spring 11, vertical bar 12, motor 13, sector gear 14, slide bar 15, sliding sleeve
16, connecting rod 17 and rubber block 18, the left and right sides of 1 front side of n shape frame is all evenly spaced to be provided with the first screw hole 2, and n shape frame 1 is left
Right two sides are equipped with guide sleeve 3, and the second screw hole 4 is provided on front side of guide sleeve 3, is equipped with the first screw rod 5 in the second screw hole 4 and the first screw hole 2,
Bearing block 6 is installed on the inside of the guide sleeve 3 of the left and right sides, cross bar 7 is connected between two bearing blocks 6,7 left part of cross bar and right part are equal
Be provided with guide hole 8, be equipped with guide rod 9 in two guide holes 8, two 9 bottom ends of guide rod are mounted on the first rack gear 10,9 top of guide rod with
Cross bar is connected with the first spring 11 between 7 top, and for the first 11 sets of spring on guide rod 9, cross bar is connected with vertical bar among 7 bottom
12, motor 13 is installed on vertical bar 12, sector gear 14 is installed on the output shaft of motor 13, the of sector gear 14 and left side
The engagement of one rack gear 10,10 outer upper of the first rack gear of the left and right sides are connected with slide bar 15, and slide bar 15 is equipped with sliding sleeve 16, sliding sleeve
16 bottoms are connected with connecting rod 17, and 17 bottom end of connecting rod is connected with rubber block 18.
Further include having rotating mechanism 19, rotating mechanism 19 include 7 shape bars 191, cylinder 192, sliding rail 193, sliding block 194,
Second rack gear 195 and first gear 196,3 top right side of guide sleeve in left side are connected with 7 191,7 shape bar of shape bar, 191 inside top peace
Equipped with cylinder 192 and sliding rail 193, cylinder 192 is located at 193 right side of sliding rail, and slidingtype is equipped with sliding block 194, sliding block on sliding rail 193
194 right sides are equipped with the second rack gear 195, and 195 top of the second rack gear is connect with the telescopic rod bottom end of cylinder 192,7 left part of cross bar peace
Equipped with first gear 196, first gear 196 is engaged with the second rack gear 195.
Embodiment 3
A kind of laying of architectural engineering ceramic tile is struck actual load and is set, as shown in Figure 1, including n shape frame 1, guide sleeve 3, the first screw rod 5, axis
Hold seat 6, cross bar 7, guide rod 9, the first rack gear 10, the first spring 11, vertical bar 12, motor 13, sector gear 14, slide bar 15, sliding sleeve
16, connecting rod 17 and rubber block 18, the left and right sides of 1 front side of n shape frame is all evenly spaced to be provided with the first screw hole 2, and n shape frame 1 is left
Right two sides are equipped with guide sleeve 3, and the second screw hole 4 is provided on front side of guide sleeve 3, is equipped with the first screw rod 5 in the second screw hole 4 and the first screw hole 2,
Bearing block 6 is installed on the inside of the guide sleeve 3 of the left and right sides, cross bar 7 is connected between two bearing blocks 6,7 left part of cross bar and right part are equal
Be provided with guide hole 8, be equipped with guide rod 9 in two guide holes 8, two 9 bottom ends of guide rod are mounted on the first rack gear 10,9 top of guide rod with
Cross bar is connected with the first spring 11 between 7 top, and for the first 11 sets of spring on guide rod 9, cross bar is connected with vertical bar among 7 bottom
12, motor 13 is installed on vertical bar 12, sector gear 14 is installed on the output shaft of motor 13, the of sector gear 14 and left side
The engagement of one rack gear 10,10 outer upper of the first rack gear of the left and right sides are connected with slide bar 15, and slide bar 15 is equipped with sliding sleeve 16, sliding sleeve
16 bottoms are connected with connecting rod 17, and 17 bottom end of connecting rod is connected with rubber block 18.
Further include having rotating mechanism 19, rotating mechanism 19 include 7 shape bars 191, cylinder 192, sliding rail 193, sliding block 194,
Second rack gear 195 and first gear 196,3 top right side of guide sleeve in left side are connected with 7 191,7 shape bar of shape bar, 191 inside top peace
Equipped with cylinder 192 and sliding rail 193, cylinder 192 is located at 193 right side of sliding rail, and slidingtype is equipped with sliding block 194, sliding block on sliding rail 193
194 right sides are equipped with the second rack gear 195, and 195 top of the second rack gear is connect with the telescopic rod bottom end of cylinder 192,7 left part of cross bar peace
Equipped with first gear 196, first gear 196 is engaged with the second rack gear 195.
It further include having electronic reel 20, bracing wire 21 and second spring 22,16 inside of sliding sleeve and the left and right two of the left and right sides
It is connected with second spring 22 between 10 outside of the first rack gear of side, 22 sets of second spring in slide bar 15, the slide bar 15 of the left and right sides
Outer end is equipped with electronic reel 20, and bracing wire 21 is wound on electronic reel 20, and the bracing wire 21 in left side and the sliding sleeve 16 in left side are left
Side connects, and connects on the right side of the bracing wire 21 on right side and the sliding sleeve 16 on right side.
Embodiment 4
A kind of laying of architectural engineering ceramic tile is struck actual load and is set, as shown in Figure 1, including n shape frame 1, guide sleeve 3, the first screw rod 5, axis
Hold seat 6, cross bar 7, guide rod 9, the first rack gear 10, the first spring 11, vertical bar 12, motor 13, sector gear 14, slide bar 15, sliding sleeve
16, connecting rod 17 and rubber block 18, the left and right sides of 1 front side of n shape frame is all evenly spaced to be provided with the first screw hole 2, and n shape frame 1 is left
Right two sides are equipped with guide sleeve 3, and the second screw hole 4 is provided on front side of guide sleeve 3, is equipped with the first screw rod 5 in the second screw hole 4 and the first screw hole 2,
Bearing block 6 is installed on the inside of the guide sleeve 3 of the left and right sides, cross bar 7 is connected between two bearing blocks 6,7 left part of cross bar and right part are equal
Be provided with guide hole 8, be equipped with guide rod 9 in two guide holes 8, two 9 bottom ends of guide rod are mounted on the first rack gear 10,9 top of guide rod with
Cross bar is connected with the first spring 11 between 7 top, and for the first 11 sets of spring on guide rod 9, cross bar is connected with vertical bar among 7 bottom
12, motor 13 is installed on vertical bar 12, sector gear 14 is installed on the output shaft of motor 13, the of sector gear 14 and left side
The engagement of one rack gear 10,10 outer upper of the first rack gear of the left and right sides are connected with slide bar 15, and slide bar 15 is equipped with sliding sleeve 16, sliding sleeve
16 bottoms are connected with connecting rod 17, and 17 bottom end of connecting rod is connected with rubber block 18.
Further include having rotating mechanism 19, rotating mechanism 19 include 7 shape bars 191, cylinder 192, sliding rail 193, sliding block 194,
Second rack gear 195 and first gear 196,3 top right side of guide sleeve in left side are connected with 7 191,7 shape bar of shape bar, 191 inside top peace
Equipped with cylinder 192 and sliding rail 193, cylinder 192 is located at 193 right side of sliding rail, and slidingtype is equipped with sliding block 194, sliding block on sliding rail 193
194 right sides are equipped with the second rack gear 195, and 195 top of the second rack gear is connect with the telescopic rod bottom end of cylinder 192,7 left part of cross bar peace
Equipped with first gear 196, first gear 196 is engaged with the second rack gear 195.
It further include having electronic reel 20, bracing wire 21 and second spring 22,16 inside of sliding sleeve and the left and right two of the left and right sides
It is connected with second spring 22 between 10 outside of the first rack gear of side, 22 sets of second spring in slide bar 15, the slide bar 15 of the left and right sides
Outer end is equipped with electronic reel 20, and bracing wire 21 is wound on electronic reel 20, and the bracing wire 21 in left side and the sliding sleeve 16 in left side are left
Side connects, and connects on the right side of the bracing wire 21 on right side and the sliding sleeve 16 on right side.
Further include having link block 23, mounting rod 25, wheel 26 and the second screw rod 28, is all connected at left and right sides of 1 lower part of n shape frame
There is link block 23, third screw hole 24 is provided on link block 23, is equipped with mounting rod 25, mounting rod on the outside of the link block 23 of the left and right sides
It is opened on 25 there are two the 4th screw hole 27, the 4th screw hole 27 and third screw hole 24 of top are interior equipped with the second screw rod 28, mounting rod 25
Bottom end is equipped with wheel 26.
When needing to strike real ceramic tile, the present invention is moved to designated position by staff, then screws off the first screw rod 5,
Cross bar 7 is moved up again, and guide rod 9 and the first rack gear 10 is driven to move up, thus moved up with moving slide-bar 15 and sliding sleeve 16,
And then rubber block 18 is driven to move up.When rubber block 18 is moved upward to proper height, stopping moves up cross bar 7, and
Keep the second screw hole 4 and the first screw hole 2 of corresponding height corresponding, then the first screw rod 5 is screwed in into the second screw hole 4 and the first screw hole
It is in 2, guide sleeve 3 is fixed, so as to which cross bar 7 is fixed.At this point, staff inwardly or outwardly stirs sliding sleeve 16, connection is driven
Bar 17 inwardly or outwardly moves, so that rubber block 18 be driven inwardly or outwardly to move, the position of rubber block 18 is adjusted.It adjusts
When to suitable position, sliding sleeve 16 is stirred in stopping, then being controlled motor 13 and is rotated counterclockwise, sector gear 14 is driven to turn counterclockwise
Dynamic, so that first rack gear 10 in left side and the guide rod 9 in left side be driven to move down, first spring 11 in left side is compressed, left side
The first rack gear 10 move downwards through left side slide bar 15 and left side sliding sleeve 16 drive left side connecting rod 17 move down,
The rubber block 18 in left side moves down therewith, when sector gear 14 is not engaged with first rack gear 10 in left side, in left side first
Under the action of spring 11, first rack gear 10 in left side resets upwards, so that the rubber block 18 in left side be driven to reset upwards, works as sector
When gear 14 is engaged with first rack gear 10 on right side, the guide rod 9 of the first rack gear 10 and right side that drive right side is moved up, right side
The first spring 11 be stretched, first rack gear 10 on right side move upwardly through right side slide bar 15 and right side sliding sleeve 16 drive
The connecting rod 17 on right side moves up, and the rubber block 18 on right side moves up therewith, when the first tooth of sector gear 14 and right side
When item 10 does not engage, under the action of first spring 11 on right side, the rubber block 18 on right side resets downwards, since motor 13 is not
Disconnected rotates counterclockwise, and so as to move up and down the rubber block 18 of the left and right sides constantly, carries out striking reality to ceramic tile, is then not necessarily to
Staff squats on ceramic tile for a long time, to can avoid the legs become numb of staff.After striking reality, staff closes motor
13.
After ceramic tile is struck reality, staff controls cylinder 192 and slowly extends, and drives the second rack gear 195 slowly to moving down
It is dynamic, so that first gear 196 be driven slowly to rotate clockwise, and then cross bar 7 is driven slowly to rotate clockwise.When cross bar 7 and its
When upper-part is slowly clockwise to 7 top of cross bar, staff closes cylinder 192, so as to save space.When needs strike
When real ceramic tile, staff controls cylinder 192 and slowly shortens, and cross bar 7 is driven slowly to rotate counterclockwise.When cross bar 7 and upper part
When part is slowly rotated counterclockwise to initial position, staff closes cylinder 192.
When initial, second spring 22 is in tensional state.When needing to strike real ceramic tile, staff control two it is electronic around
Line wheel 20 reels line 21 or puts bracing wire 21, and under the action of second spring 22, two sliding sleeves 16 are inwardly or outwardly moved, thus band
Dynamic two rubber blocks 18 inwardly or outwardly move, and the position of rubber block 18 is adjusted.When being adjusted to suitable position, staff
Close two electronic reels 20, under the action of bracing wire 21 of 22 sum of second spring, can make sliding sleeve 16 when moving up and down more
Add steadily, so that rubber block 18 is more steady when moving up and down.
When needing the mobile present invention, staff pushes the present invention, and wheel 26 rolls on the ground, so that this mobile hair
It is bright more quick.When the present invention is moved to designated position, staff stops pushing the present invention, then props up n shape frame with hand
1, then the second screw rod 28 is screwed out, n shape frame 1 can be decontroled, n shape frame 1 and ground face contact are made.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in spirit of the invention and
Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.