CN109024928A - One kind going out layer Steel Structure waterproof construction and its construction method - Google Patents

One kind going out layer Steel Structure waterproof construction and its construction method Download PDF

Info

Publication number
CN109024928A
CN109024928A CN201810935246.6A CN201810935246A CN109024928A CN 109024928 A CN109024928 A CN 109024928A CN 201810935246 A CN201810935246 A CN 201810935246A CN 109024928 A CN109024928 A CN 109024928A
Authority
CN
China
Prior art keywords
layer
fixed plate
movable plate
water
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810935246.6A
Other languages
Chinese (zh)
Inventor
王骏
褚立强
宋自杰
顾佳玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai No 7 Construction Co Ltd
Original Assignee
Shanghai No 7 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No 7 Construction Co Ltd filed Critical Shanghai No 7 Construction Co Ltd
Priority to CN201810935246.6A priority Critical patent/CN109024928A/en
Publication of CN109024928A publication Critical patent/CN109024928A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/665Sheets or foils impervious to water and water vapor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers
    • E04B1/94Protection against other undesired influences or dangers against fire
    • E04B1/945Load-supporting structures specially adapted therefor

Abstract

The invention discloses one kind to go out layer Steel Structure waterproof construction, including a Double-wing-plate component and water-proofing composition layer, double-vane board member includes the fixed plate being flexibly connected and movable plate, fixed plate is perpendicularly fixed on steel column, fireproof coating layer is equipped on the outside of steel column, water-proofing composition layer is laid with along roofing and turns over a preset distance in the intersection of steel column and roofing, movable plate energy opposing fixed plate rotation before the construction of water-proofing composition layer is completed, therefore fixed plate can be welded on steel column in factory, it can not only guarantee welding quality, and it can avoid fixed plate and the welding procedure of steel column to fireproof coating layer and combine waterproof layer and damage.Being flexibly connected of movable plate and fixed plate is fully welded closing after being in the construction of water-proofing composition layer, turning over for water-proofing composition layer is protruded at the top of part in the space that movable plate, fixed plate and fireproof coating layer are formed, so that double wings component plays the role of drip, it avoids rainwater from flowing backward in waterproof roll layer, realizes that waterproof construction receives head processing.

Description

One kind going out layer Steel Structure waterproof construction and its construction method
Technical field
The present invention relates to a kind of the realm of building construction, more particularly to a kind of layer Steel Structure waterproof construction and its construction party out Method.
Background technique
In steel structure technique, the structural system of roofing is mostly steel structure, such as window cleaning equipment supporting structure out, so During roof waterproof construction, necessary technical measures must be taken to carry out roof waterproof structure properly to receive head processing, to guarantee Durability and reliability of the water-proof system in normal service life.
Common metal bead nail pressure receives header structure or the indentation of reserved groove receives header structure and is not suitable for steel structure system In, therefore layer Steel Structure waterproof construction and its construction method out for having good waterproof performance must be designed.
Summary of the invention
The purpose of the present invention is to provide one kind to go out layer Steel Structure waterproof construction and its construction method, and room may be implemented out The receipts head of face steel construction waterproof construction is handled, and can carry out the welding procedure between steel column and fixed plate in factory, is kept away Exempt from steel construction site welding, can not only guarantee welding quality, and can construct to avoid steel column site welding to steel column The fireproof coating layer and combination waterproof layer of outer surface damage.
In order to solve the above technical problems, the invention provides the following technical scheme:
One kind going out layer Steel Structure waterproof construction, including a Double-wing-plate component and water-proofing composition layer, the Double-wing-plate structure Part includes fixed plate and movable plate, is flexibly connected between fixed plate and movable plate, and the fixed plate is vertically solid by welding manner Due on steel column, being equipped with fireproof coating layer on the outside of the steel column, the water-proofing composition layer is laid with along roofing and in the steel The intersection of column and roofing turns over a preset distance, and the fixed plate is located at the top for turning over part of water-proofing composition layer, institute State movable plate before the construction of water-proofing composition layer is completed can opposing fixed plate rotation, the movable plate is flexibly connected with fixed plate It is fully welded closing after being in the construction of water-proofing composition layer, so that movable plate is perpendicular with fixed plate and is located at the lower section of fixed plate, Turning over for the water-proofing composition layer is protruded at the top of part in the space that movable plate, fixed plate and fireproof coating layer are formed.
Preferably, go out in layer Steel Structure waterproof construction in above-mentioned, the preset distance is 800~1000mm.
Preferably, go out in layer Steel Structure waterproof construction in above-mentioned, the movable plate and the fixed plate pass through hinge Connection.
Preferably, go out in layer Steel Structure waterproof construction in above-mentioned, the movable plate and the fixed plate are steel plate.
The invention also discloses a kind of construction methods of layer Steel Structure waterproof construction out as described above, including walk as follows It is rapid:
Step 1, fixed plate is perpendicularly fixed on steel column by welding manner in factory;
Step 2, Construction of Steel Structure, the steel construction include the steel column for stretching out roofing;
Step 3, fireproof coating layer is arranged in the outer surface of steel column;
Step 4, movable plate is rotated up, the laying for subsequent water-proofing composition layer provides operating space;
Step 5, be laid with water-proofing composition layer in roofing, and the water-proofing composition layer along roofing in the steel column and roofing Intersection turns over a preset distance;
Step 6, movable plate is rotated down, so that movable plate is perpendicular with fixed plate and is located at the lower section of fixed plate, institute Turning over for water-proofing composition layer is stated to protrude at the top of part in the space that movable plate, fixed plate and fireproof coating layer are formed;
Step 7, the active connection place of the movable plate and fixed plate is fully welded closing.Being fully welded closing is to movable plate and to consolidate The gap of fixed board active connection place is welded, so that gap closing, which will not make it far from fireproof coating layer It is gone at damage, and influence of the welding procedure compared to the welding procedure of fixed plate and steel construction to water-proofing composition layer is small.
Preferably, go out in the construction method of layer Steel Structure waterproof construction in above-mentioned, the step 5 includes:
Step 51, cement mortar base is set in roofing and with the outside of the fireproof coating layer of the steel column of the boundary of roofing Layer, the transverse direction cement mortar base and vertical cement mortar base integrated construction;
Step 52, one waterproof roll is set in the outside of the lateral cement mortar base and vertical cement mortar base Layer;
Step 53, sealing compound is set between the top and fireproof coating layer of vertical cement mortar base;
Step 54, pea gravel concreten layer is poured, so that pea gravel concreten layer is covered in the top of sealing compound, waterproof roll layer End above and waterproof roll layer outside.
By techniques disclosed above scheme it is found that compared with prior art, beneficial effects of the present invention are as follows:
Layer Steel Structure waterproof construction out provided by the invention, is flexibly connected, in waterproof group between fixed plate and movable plate Close layer construction before, movable plate can opposing fixed plate be flipped up, on the one hand, behaviour can be provided for the construction of water-proofing composition layer Make space;On the other hand, it will not influence the construction of water-proofing composition layer after being flipped up due to movable plate opposing fixed plate, Fixed plate can be welded in the outside of steel column in factory, without that will consolidate again after live water-proofing composition layer construction Fixed board is welded on steel column, is welded in factory, can not only be guaranteed welding quality, and can be to avoid fixed plate and steel column Welding procedure the fireproof coating layer of steel column outer surface and combination waterproof layer are damaged.
Also, layer Steel Structure waterproof construction out provided by the invention can be by work after the construction of water-proofing composition layer Movable plate rotates down, so that movable plate is perpendicular with fixed plate and is located at the lower section of fixed plate, the water-proofing composition layer is turned over It is protruded at the top of partial in the space that movable plate, fixed plate and fireproof coating layer are formed, at this time by the movable plate and fixation The active connection place of plate is fully welded closing, movable plate and fixed relative position can not only be fixed, and can be to avoid Rainwater flows into lower section from the gap of movable plate with the junction of fixed plate and combines on waterproof layer, so that movable plate and fixed plate form Double wings component play the role of drip, avoid rainwater from flowing backward in waterproof roll layer, realize waterproof construction receipts head processing.
Detailed description of the invention
Fig. 1 is the structural schematic diagram for layer Steel Structure waterproof construction of one embodiment of the invention.
In figure: 1- steel column, 2- fixed plate, 3- movable plate, 4- fireproof coating layer, 5- hinge, 6- cement mortar base, 7- Waterproof roll layer, 8- sealing compound, 9- pea gravel concreten layer.
Specific embodiment
The present invention is described in further detail below in conjunction with the drawings and specific embodiments.It below will be by cited implementation Example is in conjunction with attached drawing, the technology contents and feature that the present invention will be described in detail.Need in addition it illustrate, attached drawing is all made of very simplified Form and use non-accurate ratio, only for the purpose of facilitating and clarifying the purpose of the embodiments of the invention.For narration side Just, "upper" described below, "lower" are consistent with the upper and lower direction of attached drawing, but this can't be technical solution of the present invention Limitation.
Referring to Fig. 1, present embodiments providing a kind of layer Steel Structure waterproof construction out, should go out layer Steel Structure is to stretch out The steel column 1 of roofing (not shown).The layer Steel Structure waterproof construction, an including Double-wing-plate component and water-proofing composition out Layer, the double-vane board member includes fixed plate 2 and movable plate 3, is flexibly connected between fixed plate 2 and movable plate 3, the fixed plate 2 are perpendicularly fixed on steel column 1, and fireproof coating layer 4 is equipped on the outside of the steel column 1, and the water-proofing composition layer is laid with along roofing And a preset distance is turned in the intersection of the steel column 1 and roofing, the preset distance is 800~1000mm, described solid Fixed board 2 is located at the top for turning over part of water-proofing composition layer, and the movable plate 3 can be opposite before the construction of water-proofing composition layer is completed Fixed plate 2 rotates, and being flexibly connected to be in after water-proofing composition layer is constructed of the movable plate 3 and fixed plate 2 is fully welded closing, makes Movable plate 3 and fixed plate 2 it is perpendicular and be located at the lower section of fixed plate 2, turning over for the water-proofing composition layer stretch at the top of part Enter in the space that movable plate 3, fixed plate 2 and fireproof coating layer 4 are formed.
Layer Steel Structure waterproof construction out provided in this embodiment, is flexibly connected, anti-between fixed plate 2 and movable plate 3 Before the construction of water combination layer, movable plate 3 can be flipped up with opposing fixed plate 2, on the one hand, can be the construction of water-proofing composition layer Operating space is provided;On the other hand, it will not influence applying for water-proofing composition layer after being flipped up due to 3 opposing fixed plate 2 of movable plate Work, therefore, fixed plate 2 can be welded in the outside of steel column 1 in factory, without having constructed until live water-proofing composition layer Fixed plate 2 is welded on steel column 1 by Bi Houzai, is welded in factory, can not only guarantee welding quality, and can be to avoid solid Fixed board 2 and the welding procedure of steel column 1 are to the fireproof coating layer 4 of 1 outer surface of steel column and combine waterproof layer and damage.
Preferably, going out in layer Steel Structure waterproof construction in the present embodiment, the movable plate 3 and the fixed plate 2 are logical Cross the connection of hinge 5.Hinge 5 is also known as hinge and is for connection to two solids, and the mechanical device for allowing to rotate between the two.It is logical The setting hinge 5 between fixed plate 2 and movable plate 3 is crossed, the rotation of 3 opposing fixed plate 2 of movable plate may be implemented.
Preferably, going out in layer Steel Structure waterproof construction in the present embodiment, the movable plate 3 and the fixed plate 2 are equal For steel plate.Movable plate 3 made of steel plate and fixed plate 2, it is durable, it will not get rusty.
Please continue to refer to Fig. 1, the present embodiment also discloses a kind of applying for layer Steel Structure waterproof construction out as described above Work method, includes the following steps:
Step 1, fixed plate 2 is perpendicularly fixed on steel column 1 by welding manner in factory.Since welding procedure is in work Factory carries out, it is ensured that welding quality, and can to avoid fixed plate 2 and steel column 1 welding procedure to 1 outer surface of steel column Fireproof coating layer 4 and combination waterproof layer damage.
Step 2, Construction of Steel Structure, the steel construction include the steel column 1 for stretching out roofing.
Step 3, fireproof coating layer 4 is arranged in the outer surface of steel column 1.
Step 4, movable plate 3 is rotated up, the laying for subsequent water-proofing composition layer provides operating space.
Step 5, roofing be laid with water-proofing composition layer, and the water-proofing composition layer along roofing in the steel column 1 and roofing Intersection turn over a preset distance, the preset distance is 800~1000mm.
Step 6, movable plate 3 is rotated down, so that movable plate 3 is perpendicular with fixed plate 2 and is located under fixed plate 2 Side, forms L-type structure, and movable plate 3, fixed plate 2 and fireproof coating are protruded into turning over for the water-proofing composition layer at the top of part In the space that layer 4 is formed.
Step 7, the movable plate 3 and the active connection place of fixed plate 2 are fully welded closing, not only can by movable plate 3 and Fixed relative position is fixed, and can be to avoid rainwater under the inflow of the gap of movable plate 3 Yu the junction of fixed plate 2 On Fang Zuhe waterproof layer, so that the double wings component that movable plate 3 and fixed plate 2 form plays the role of drip, rainwater is avoided to fall It pours into waterproof roll layer 7, realizes the receipts head processing of waterproof construction.
Preferably, go out in the construction method of layer Steel Structure waterproof construction in above-mentioned, the step 5 includes:
Step 51, cement mortar is set in roofing and with the outside of the fireproof coating layer 4 of the steel column 1 of the boundary of roofing Base 6.By cement mortar base 6, close laying water-proof coiled material layer 7 can be convenient.
Step 52, one waterproof roll is set in the outside of the lateral cement mortar base 6 and vertical cement mortar base 6 Layer 7.
Step 53, sealing compound 8 is set between the top and fireproof coating layer 4 of vertical cement mortar base 6.Pass through setting Sealing compound 8 can flow into room to avoid gap of the rainwater between vertical cement mortar base 6 and the fireproof coating floor 4 of steel column 1 It is interior.
Step 54, pea gravel concreten layer 9 is poured, so that pea gravel concreten layer 9 is covered in the top of sealing compound 8, waterproof roll Above the end of the material layer 7 and outside of waterproof roll layer 7.Pea gravel concreten layer 9 can play the work of protection waterproof roll layer 7 With.
Foregoing description is only the description to present pre-ferred embodiments, not to any restriction of the scope of the invention, this hair Any change, the modification that the those of ordinary skill in bright field does according to the disclosure above content, belong to the protection of claims Range.

Claims (6)

1. one kind goes out layer Steel Structure waterproof construction, which is characterized in that described including a Double-wing-plate component and water-proofing composition layer Double-vane board member includes fixed plate and movable plate, is flexibly connected between fixed plate and movable plate, and the fixed plate is perpendicularly fixed at On steel column, fireproof coating layer is equipped on the outside of the steel column, the water-proofing composition layer is laid with along roofing and in the steel column A preset distance is turned over the intersection of roofing, the fixed plate is located at the top for turning over part of water-proofing composition layer, the work Movable plate before the construction of water-proofing composition layer is completed can opposing fixed plate rotation, the movable plate is in being flexibly connected for fixed plate Water-proofing composition layer is fully welded closing after constructing, so that movable plate is perpendicular with fixed plate and is located at the lower section of fixed plate, it is described Turning over for water-proofing composition layer is protruded at the top of part in the space that movable plate, fixed plate and fireproof coating layer are formed.
2. as described in claim 1 go out layer Steel Structure waterproof construction, which is characterized in that the preset distance be 800~ 1000mm。
3. going out layer Steel Structure waterproof construction as described in claim 1, which is characterized in that the movable plate and the fixed plate It is connected by a hinge.
4. going out layer Steel Structure waterproof construction as described in claim 1, which is characterized in that the movable plate and the fixed plate It is steel plate.
5. a kind of construction method for going out layer Steel Structure waterproof construction as described in any one of claim 1-4, feature It is, includes the following steps:
Step 1, fixed plate is perpendicularly fixed on steel column by welding manner in factory;
Step 2, Construction of Steel Structure, the steel construction include the steel column for stretching out roofing;
Step 3, fireproof coating layer is arranged in the outer surface of steel column;
Step 4, movable plate is rotated up, the laying for subsequent water-proofing composition layer provides operating space;
Step 5, roofing be laid with water-proofing composition layer, and the water-proofing composition layer along roofing in the boundary of the steel column and roofing Place turns over a preset distance;
Step 6, movable plate is rotated down, so that movable plate is perpendicular with fixed plate and is located at the lower section of fixed plate, it is described anti- Turning over for water combination layer is protruded at the top of part in the space that movable plate, fixed plate and fireproof coating layer are formed;
Step 7, the active connection place of the movable plate and fixed plate is fully welded closing.
6. going out the construction method of layer Steel Structure waterproof construction as claimed in claim 5, which is characterized in that step 5 packet It includes:
Step 51, cement mortar base is set in roofing and with the outside of the fireproof coating layer of the steel column of the boundary of roofing, The transverse direction cement mortar base and vertical cement mortar base integrated construction;
Step 52, one waterproof roll layer is set in the outside of the lateral cement mortar base and vertical cement mortar base;
Step 53, sealing compound is set between the top and fireproof coating layer of vertical cement mortar base;
Step 54, pea gravel concreten layer is poured, so that pea gravel concreten layer is covered in the end of the top of sealing compound, waterproof roll layer Above the portion and outside of waterproof roll layer.
CN201810935246.6A 2018-08-16 2018-08-16 One kind going out layer Steel Structure waterproof construction and its construction method Pending CN109024928A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810935246.6A CN109024928A (en) 2018-08-16 2018-08-16 One kind going out layer Steel Structure waterproof construction and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810935246.6A CN109024928A (en) 2018-08-16 2018-08-16 One kind going out layer Steel Structure waterproof construction and its construction method

Publications (1)

Publication Number Publication Date
CN109024928A true CN109024928A (en) 2018-12-18

Family

ID=64631738

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810935246.6A Pending CN109024928A (en) 2018-08-16 2018-08-16 One kind going out layer Steel Structure waterproof construction and its construction method

Country Status (1)

Country Link
CN (1) CN109024928A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004132057A (en) * 2002-10-10 2004-04-30 Yamagata Tokushu Koji Kk Waterproofing layer scattering prevention structure and waterproofing layer scattering prevention method making use thereof
CN103741896A (en) * 2014-01-23 2014-04-23 深圳大学建筑设计研究院 Roof elevation seam, cornice and roof pipeline waterproof structure and construction method thereof
CN106351407A (en) * 2016-08-24 2017-01-25 安徽瑶海钢构建设集团股份有限公司 Waterproof structure used in steel structure roof
CN206752864U (en) * 2017-03-02 2017-12-15 中国建筑第八工程局有限公司 The waterproof construction of roofing vertical member
CN206987211U (en) * 2017-06-19 2018-02-09 湖北中江建筑设计院有限公司 A kind of puncture-resistant roofing wears roof pipeline node
CN209211660U (en) * 2018-08-16 2019-08-06 上海建工七建集团有限公司 One kind going out layer Steel Structure waterproof construction

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004132057A (en) * 2002-10-10 2004-04-30 Yamagata Tokushu Koji Kk Waterproofing layer scattering prevention structure and waterproofing layer scattering prevention method making use thereof
CN103741896A (en) * 2014-01-23 2014-04-23 深圳大学建筑设计研究院 Roof elevation seam, cornice and roof pipeline waterproof structure and construction method thereof
CN106351407A (en) * 2016-08-24 2017-01-25 安徽瑶海钢构建设集团股份有限公司 Waterproof structure used in steel structure roof
CN206752864U (en) * 2017-03-02 2017-12-15 中国建筑第八工程局有限公司 The waterproof construction of roofing vertical member
CN206987211U (en) * 2017-06-19 2018-02-09 湖北中江建筑设计院有限公司 A kind of puncture-resistant roofing wears roof pipeline node
CN209211660U (en) * 2018-08-16 2019-08-06 上海建工七建集团有限公司 One kind going out layer Steel Structure waterproof construction

Similar Documents

Publication Publication Date Title
DE202020106398U1 (en) Waterproof side wall structure for subway stations
CN106703084A (en) Waterproofing treatment method and system of construction joint structure of plane and elevation structure junction areas of basement
KR101661417B1 (en) Swimming pool
CN209211660U (en) One kind going out layer Steel Structure waterproof construction
CN104047427A (en) Anti-seepage and thermal-insulation construction method for external wall and external window
CN106013471A (en) Anti-seepage construction method for expansion joint
CN109024928A (en) One kind going out layer Steel Structure waterproof construction and its construction method
CN213626105U (en) Waterproof structure of roof deformation joint
CN112376848A (en) Bearing connecting tool for flue and using method thereof
CN109339355B (en) Construction method of aluminum plate roof waterproof joint adopting ALC (autoclaved lightweight concrete) plate as structural plate
CN207296121U (en) A kind of Roof system and low-rise building
CN111706031A (en) Socket type joint finished product flue installation device and method for preventing smoke leakage
CN213268014U (en) Corrugated cover plate mounting structure for advanced construction of roof post-cast strip
CN105239732B (en) A kind of construction method of the stretching roofing pipe of rainwater leakage prevention
CN212562218U (en) Roof deformation joint leakage-proof structure
CN209760313U (en) Underground totally-enclosed pile head waterproof structure
CN212176331U (en) Roof structure
CN108589793A (en) A kind of poured band of outer wall of basement postposition assembled advance water stop construction method
EP3851582A1 (en) Discharge device, in particular drain cup or spout
CN107605055A (en) A kind of dash sill and its seepage-proof structure and construction method
CN205976148U (en) Side fascia installation node
CN211948581U (en) Pre-closed waterproof post-cast strip structure
CN205976151U (en) Side fascia installation node
CN205935583U (en) Arm of plastering of automatic semi -automatic mechanical float of wall
CN217782611U (en) Parapet waterproof construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination