fixed plate
layer
water
movable plate
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821325934.2U
Other languages
Chinese (zh)
Inventor
王骏
褚立强
宋自杰
顾佳玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 7 Group Co Ltd
Shanghai No 7 Construction Co Ltd
Original Assignee
Shanghai No 7 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No 7 Construction Co Ltd filed Critical Shanghai No 7 Construction Co Ltd
Priority to CN201821325934.2U priority Critical patent/CN209211660U/en
Application granted granted Critical
Publication of CN209211660U publication Critical patent/CN209211660U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)
  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The utility model is a kind of layer Steel Structure waterproof construction out, including a Double-wing-plate component and water-proofing composition layer, double-vane board member includes the fixed plate being flexibly connected and movable plate, fixed plate is perpendicularly fixed on steel column, fireproof coating layer is equipped on the outside of steel column, water-proofing composition layer is laid with along roofing and turns over a preset distance in the intersection of steel column and roofing, movable plate energy opposing fixed plate rotation before the construction of water-proofing composition layer is completed, therefore fixed plate can be welded on steel column in factory, it can not only guarantee welding quality, and it can avoid fixed plate and the welding procedure of steel column to fireproof coating layer and combine waterproof layer and damage.Being flexibly connected of movable plate and fixed plate is fully welded closing after being in the construction of water-proofing composition layer, turning over for water-proofing composition layer is protruded at the top of part in the space that movable plate, fixed plate and fireproof coating layer are formed, so that double wings component plays the role of drip, it avoids rainwater from flowing backward in waterproof roll layer, realizes that waterproof construction receives head processing.

Description

One kind going out layer Steel Structure waterproof construction
Technical field
The utility model relates to a kind of the realm of building construction, more particularly to a kind of layer Steel Structure waterproof construction out.
Background technique
In steel structure technique, the structural system of roofing is mostly steel structure, such as window cleaning equipment supporting structure out, so During roof waterproof construction, necessary technical measures must be taken to carry out roof waterproof structure properly to receive head processing, to guarantee Durability and reliability of the water-proof system in normal service life.
Existing metal bead nail pressure receives header structure or the indentation of reserved groove receives header structure and is not suitable for steel structure system In, therefore the layer Steel Structure waterproof construction out for having good waterproof performance must be designed.
Utility model content
The purpose of this utility model is to provide one kind to go out layer Steel Structure waterproof construction, and layer Steel Structure may be implemented out The receipts head of waterproof construction is handled, and can carry out the welding procedure between steel column and fixed plate in factory, avoids steel construction Site welding can not only guarantee welding quality, and can construct to avoid steel column site welding to steel column outer surface Fireproof coating layer and combination waterproof layer damage.
In order to solve the above technical problems, the utility model provides the following technical solutions:
One kind going out layer Steel Structure waterproof construction, including a Double-wing-plate component and water-proofing composition layer, the Double-wing-plate structure Part includes fixed plate and movable plate, is flexibly connected between fixed plate and movable plate, and the fixed plate is vertically solid by welding manner Due on steel column, being equipped with fireproof coating layer on the outside of the steel column, the water-proofing composition layer is laid with along roofing and in the steel The intersection of column and roofing turns over a preset distance, and the fixed plate is located at the top for turning over part of water-proofing composition layer, institute State movable plate before the construction of water-proofing composition layer is completed can opposing fixed plate rotation, the movable plate is flexibly connected with fixed plate It is fully welded closing after being in the construction of water-proofing composition layer, so that movable plate is perpendicular with fixed plate and is located at the lower section of fixed plate, Turning over for the water-proofing composition layer is protruded at the top of part in the space that movable plate, fixed plate and fireproof coating layer are formed.
Preferably, go out in layer Steel Structure waterproof construction in above-mentioned, the preset distance is 800~1000mm.
Preferably, go out in layer Steel Structure waterproof construction in above-mentioned, the movable plate and the fixed plate pass through hinge Connection.
Preferably, go out in layer Steel Structure waterproof construction in above-mentioned, the movable plate and the fixed plate are steel plate.
By techniques disclosed above scheme it is found that compared with prior art, the beneficial effects of the utility model are as follows:
Layer Steel Structure waterproof construction out provided by the utility model, is flexibly connected, anti-between fixed plate and movable plate Before the construction of water combination layer, movable plate can opposing fixed plate be flipped up, on the one hand, can be mentioned for the construction of water-proofing composition layer For operating space;On the other hand, the construction that will not influence water-proofing composition layer after being flipped up due to movable plate opposing fixed plate, because This, fixed plate can be welded in the outside of steel column in factory, without after live water-proofing composition layer construction again Fixed plate is welded on steel column, is welded in factory, can not only guarantee welding quality, and can be to avoid fixed plate and steel The welding procedure of column damages the fireproof coating layer and combination waterproof layer of steel column outer surface.
Also, it is provided by the utility model go out layer Steel Structure waterproof construction can be with after the construction of water-proofing composition layer Movable plate is rotated down, so that movable plate is perpendicular with fixed plate and is located at the lower section of fixed plate, the water-proofing composition layer Turn over and protrude into movable plate at the top of part, in the space that fixed plate and fireproof coating layer are formed, at this time by the movable plate with The active connection place of fixed plate is fully welded closing, movable plate and fixed relative position can not only be fixed, and can be with It avoids rainwater from flowing into lower section from the gap of movable plate with the junction of fixed plate to combine on waterproof layer, so that movable plate and fixed plate The double wings component of composition plays the role of drip, and rainwater is avoided to flow backward in waterproof roll layer, realizes the receipts head of waterproof construction Processing.
Detailed description of the invention
Fig. 1 is the structural schematic diagram for layer Steel Structure waterproof construction of an embodiment of the present invention.
In figure: 1- steel column, 2- fixed plate, 3- movable plate, 4- fireproof coating layer, 5- hinge, 6- cement mortar base, 7- Waterproof roll layer, 8- sealing compound, 9- pea gravel concreten layer.
Specific embodiment
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.Below will by it is cited it The technology contents and feature of the utility model are described in detail in embodiment combination attached drawing.Need in addition it illustrate, attached drawing is all made of non- Often simplified form and use non-accurate ratio, only to it is convenient, lucidly aid in illustrating the utility model embodiment Purpose.For sake of convenience, "upper" described below, "lower" are consistent with the upper and lower direction of attached drawing, but this can't be this reality With the limitation of new technique scheme.
Referring to Fig. 1, present embodiments providing a kind of layer Steel Structure waterproof construction out, should go out layer Steel Structure is to stretch out The steel column 1 of roofing (not shown).The layer Steel Structure waterproof construction, an including Double-wing-plate component and water-proofing composition out Layer, the double-vane board member includes fixed plate 2 and movable plate 3, is flexibly connected between fixed plate 2 and movable plate 3, the fixed plate 2 are perpendicularly fixed on steel column 1, and fireproof coating layer 4 is equipped on the outside of the steel column 1, and the water-proofing composition layer is laid with along roofing And a preset distance is turned in the intersection of the steel column 1 and roofing, the preset distance is 800~1000mm, described solid Fixed board 2 is located at the top for turning over part of water-proofing composition layer, and the movable plate 3 can be opposite before the construction of water-proofing composition layer is completed Fixed plate 2 rotates, and being flexibly connected to be in after water-proofing composition layer is constructed of the movable plate 3 and fixed plate 2 is fully welded closing, makes Movable plate 3 and fixed plate 2 it is perpendicular and be located at the lower section of fixed plate 2, turning over for the water-proofing composition layer stretch at the top of part Enter in the space that movable plate 3, fixed plate 2 and fireproof coating layer 4 are formed.
Layer Steel Structure waterproof construction out provided in this embodiment, is flexibly connected, anti-between fixed plate 2 and movable plate 3 Before the construction of water combination layer, movable plate 3 can be flipped up with opposing fixed plate 2, on the one hand, can be the construction of water-proofing composition layer Operating space is provided;On the other hand, it will not influence applying for water-proofing composition layer after being flipped up due to 3 opposing fixed plate 2 of movable plate Work, therefore, fixed plate 2 can be welded in the outside of steel column 1 in factory, without having constructed until live water-proofing composition layer Fixed plate 2 is welded on steel column 1 by Bi Houzai, is welded in factory, can not only guarantee welding quality, and can be to avoid solid Fixed board 2 and the welding procedure of steel column 1 are to the fireproof coating layer 4 of 1 outer surface of steel column and combine waterproof layer and damage.
Preferably, going out in layer Steel Structure waterproof construction in the present embodiment, the movable plate 3 and the fixed plate 2 are logical Cross the connection of hinge 5.Hinge 5 is also known as hinge and is for connection to two solids, and the mechanical device for allowing to rotate between the two.It is logical The setting hinge 5 between fixed plate 2 and movable plate 3 is crossed, the rotation of 3 opposing fixed plate 2 of movable plate may be implemented.
Preferably, going out in layer Steel Structure waterproof construction in the present embodiment, the movable plate 3 and the fixed plate 2 are equal For steel plate.Movable plate 3 made of steel plate and fixed plate 2, it is durable, it will not get rusty.
Please continue to refer to Fig. 1, the construction method for going out layer Steel Structure waterproof construction of the present embodiment includes the following steps:
Step 1, fixed plate 2 is perpendicularly fixed on steel column 1 by welding manner in factory.Since welding procedure is in work Factory carries out, it is ensured that welding quality, and can to avoid fixed plate 2 and steel column 1 welding procedure to 1 outer surface of steel column Fireproof coating layer 4 and combination waterproof layer damage.
Step 2, Construction of Steel Structure, the steel construction include the steel column 1 for stretching out roofing.
Step 3, fireproof coating layer 4 is arranged in the outer surface of steel column 1.
Step 4, movable plate 3 is rotated up, the laying for subsequent water-proofing composition layer provides operating space.
Step 5, roofing be laid with water-proofing composition layer, and the water-proofing composition layer along roofing in the steel column 1 and roofing Intersection turn over a preset distance, the preset distance is 800~1000mm.
Step 6, movable plate 3 is rotated down, so that movable plate 3 is perpendicular with fixed plate 2 and is located under fixed plate 2 Side, forms L-type structure, and movable plate 3, fixed plate 2 and fireproof coating are protruded into turning over for the water-proofing composition layer at the top of part In the space that layer 4 is formed.
Step 7, the movable plate 3 and the active connection place of fixed plate 2 are fully welded closing, not only can by movable plate 3 and Fixed relative position is fixed, and can be to avoid rainwater under the inflow of the gap of movable plate 3 Yu the junction of fixed plate 2 On Fang Zuhe waterproof layer, so that the double wings component that movable plate 3 and fixed plate 2 form plays the role of drip, rainwater is avoided to fall It pours into waterproof roll layer 7, realizes the receipts head processing of waterproof construction.
Preferably, go out in the construction method of layer Steel Structure waterproof construction in above-mentioned, the step 5 includes:
Step 51, cement mortar is set in roofing and with the outside of the fireproof coating layer 4 of the steel column 1 of the boundary of roofing Base 6.By cement mortar base 6, close laying water-proof coiled material layer 7 can be convenient.
Step 52, one waterproof roll is set in the outside of the lateral cement mortar base 6 and vertical cement mortar base 6 Layer 7.
Step 53, sealing compound 8 is set between the top and fireproof coating layer 4 of vertical cement mortar base 6.Pass through setting Sealing compound 8 can flow into room to avoid gap of the rainwater between vertical cement mortar base 6 and the fireproof coating floor 4 of steel column 1 It is interior.
Step 54, pea gravel concreten layer 9 is poured, so that pea gravel concreten layer 9 is covered in the top of sealing compound 8, waterproof roll Above the end of the material layer 7 and outside of waterproof roll layer 7.Pea gravel concreten layer 9 can play the work of protection waterproof roll layer 7 With.
Foregoing description is only the description to the utility model preferred embodiment, not to any limit of the scope of the utility model Fixed, any change, the modification that the those of ordinary skill in the utility model field does according to the disclosure above content belong to right and want Seek the protection scope of book.

Claims (4)

1. one kind goes out layer Steel Structure waterproof construction, which is characterized in that described including a Double-wing-plate component and water-proofing composition layer Double-vane board member includes fixed plate and movable plate, is flexibly connected between fixed plate and movable plate, and the fixed plate is perpendicularly fixed at On steel column, fireproof coating layer is equipped on the outside of the steel column, the water-proofing composition layer is laid with along roofing and in the steel column A preset distance is turned over the intersection of roofing, the fixed plate is located at the top for turning over part of water-proofing composition layer, the work Movable plate before the construction of water-proofing composition layer is completed can opposing fixed plate rotation, the movable plate is in being flexibly connected for fixed plate Water-proofing composition layer is fully welded closing after constructing, so that movable plate is perpendicular with fixed plate and is located at the lower section of fixed plate, it is described Turning over for water-proofing composition layer is protruded at the top of part in the space that movable plate, fixed plate and fireproof coating layer are formed.
2. as described in claim 1 go out layer Steel Structure waterproof construction, which is characterized in that the preset distance be 800~ 1000mm。
3. going out layer Steel Structure waterproof construction as described in claim 1, which is characterized in that the movable plate and the fixed plate It is connected by a hinge.
4. going out layer Steel Structure waterproof construction as described in claim 1, which is characterized in that the movable plate and the fixed plate It is steel plate.
CN201821325934.2U 2018-08-16 2018-08-16 One kind going out layer Steel Structure waterproof construction Active CN209211660U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821325934.2U CN209211660U (en) 2018-08-16 2018-08-16 One kind going out layer Steel Structure waterproof construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821325934.2U CN209211660U (en) 2018-08-16 2018-08-16 One kind going out layer Steel Structure waterproof construction

Publications (1)

Publication Number Publication Date
CN209211660U true CN209211660U (en) 2019-08-06

Family

ID=67452864

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821325934.2U Active CN209211660U (en) 2018-08-16 2018-08-16 One kind going out layer Steel Structure waterproof construction

Country Status (1)

Country Link
CN (1) CN209211660U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024928A (en) * 2018-08-16 2018-12-18 上海建工七建集团有限公司 One kind going out layer Steel Structure waterproof construction and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024928A (en) * 2018-08-16 2018-12-18 上海建工七建集团有限公司 One kind going out layer Steel Structure waterproof construction and its construction method

Similar Documents

Publication Publication Date Title
DE202020106398U1 (en) Waterproof side wall structure for subway stations
CN206352400U (en) Positively fixed type parapet of roofing position waterproof modular repair structure
CN209211660U (en) One kind going out layer Steel Structure waterproof construction
CN105113646A (en) Outer window structure suitable for passive-type low-energy-consumption buildings and installation method thereof
KR20160107402A (en) Swimming pool
CN2929033Y (en) External wall heat insulation structure of building water-proof and anti-cracks
CN107605107A (en) A kind of method for controlling pitched roof concrete construction quality
CN213626105U (en) Waterproof structure of roof deformation joint
CN109024928A (en) One kind going out layer Steel Structure waterproof construction and its construction method
CN112376848A (en) Bearing connecting tool for flue and using method thereof
CN109577565B (en) Slope roof construction method adopting large-span hyperbolic high-wave profiled steel sheet
CN207296121U (en) A kind of Roof system and low-rise building
CN103343577A (en) Shear wall water stopping method of detachable butted screw rods
CN209457199U (en) Precast concrete shear wall Side fascia seam crossing connecting node
CN212562218U (en) Roof deformation joint leakage-proof structure
CN213268014U (en) Corrugated cover plate mounting structure for advanced construction of roof post-cast strip
CN108894490A (en) Edge banding apparatus and its method for fabricated construction overlapping layers concrete construction
CN108589793A (en) A kind of poured band of outer wall of basement postposition assembled advance water stop construction method
CN105239732B (en) A kind of construction method of the stretching roofing pipe of rainwater leakage prevention
CN212000596U (en) Connection structure of assembled bent cap and pier
CN209760313U (en) Underground totally-enclosed pile head waterproof structure
CN107965059A (en) A kind of installation method of wall groove-type built-in fitting
CN111236321A (en) Pre-closed waterproof post-cast strip structure
CN207331980U (en) A kind of masonry set aside pre-embedded constructing structure
CN205976148U (en) Side fascia installation node

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant