- CN109019257A CN109019257A CN201810816417.3A CN201810816417A CN109019257A CN 109019257 A CN109019257 A CN 109019257A CN 201810816417 A CN201810816417 A CN 201810816417A CN 109019257 A CN109019257 A CN 109019257A
- Authority
- CN
- China
- Prior art keywords
- climbing
- power transmission
- steel pipe
- pair
- support platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B9/00—Kinds or types of lifts in, or associated with, buildings or other structures
- B66B9/02—Kinds or types of lifts in, or associated with, buildings or other structures actuated mechanically otherwise than by rope or cable
- B66B9/022—Kinds or types of lifts in, or associated with, buildings or other structures actuated mechanically otherwise than by rope or cable by rack and pinion drives
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B11/00—Main component parts of lifts in, or associated with, buildings or other structures
- B66B11/02—Cages, i.e. cars
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B11/00—Main component parts of lifts in, or associated with, buildings or other structures
- B66B11/04—Driving gear ; Details thereof, e.g. seals
- B66B11/043—Driving gear ; Details thereof, e.g. seals actuated by rotating motor; Details, e.g. ventilation
- B66B11/0461—Driving gear ; Details thereof, e.g. seals actuated by rotating motor; Details, e.g. ventilation with rack and pinion gear
Abstract
The steel pipe power transmission rod maintenance support platform based on climbing type that the invention discloses a kind of is related to tower bar maintenance prevention field of transmitting electricity.In the present invention: offering longitudinal a pair the first guide wheel stroke groove and a pair of of first gear stroke groove on power transmission tower steel pipe;Fixation is installed with built-in lifting rack in first gear stroke groove;A pair of of support platform plate and a pair of supporting substrate that climbs are installed in the periphery of power transmission tower steel pipe;Positioning guide wheel is installed with by pivot structure between a pair of of locating wheel substrate;Power device card connects fixation on substrate and is installed with driving power device of climbing;A pair supports and is installed with climbing gear between fixed deckle board.The present invention passes through in the driving power device of climbing that installing driving support platform plate is gone up and down on supporting substrate of climbing, by climbing, driving power device drives climbing gear to be acted on the built-in lifting rack of power transmission tower steel pipe, to which convenient and efficient is supported the descending operation of platform board, so that the power transmission tower attended operation of technical staff is more convenient.
Description
Technical field
The present invention relates to transmission of electricity tower bar maintenance prevention field more particularly to a kind of steel pipe power transmission rod maintenances based on climbing type
Use support platform.
Background technique
Transmission tower is bearing overhead transmission line conductor and aerial earth wire and makes to protect between them and between the earth
Hold the rod or tower of certain distance.There is many electric power facility equipment, such as conducting wire, insulation on transmission tower
Son, fitting, shaft tower and its basis, lightning conducter and earthing or grounding means etc..It is repaired to the facilities and equipment on these transmission towers
When maintenance, personnel is needed to carry out corresponding high altitude operation, traditional mode of ascending a height needs to be climbed with climbers, such high-altitude
Operation mode makes technical staff that can not comprehensively put the attended operation of electric power facility equipment to good use;How to make that technical staff's is defeated
Pylon attended operation is more convenient, convenient for many high-altitude complex operations of technical staff, becomes problem to be solved.
Summary of the invention
The steel pipe power transmission rod maintenance support platform based on climbing type that the technical problem to be solved in the present invention is to provide a kind of,
By climbing, driving power device drives climbing gear to be acted on the built-in lifting rack of power transmission tower steel pipe, thus convenient
The descending operation for being efficiently supported platform board is conducive to technology so that the power transmission tower attended operation of technical staff is more convenient
Many high-altitude complex operations of personnel.
In order to solve the above technical problems, the present invention is achieved by the following technical solutions:
The present invention provides a kind of steel pipe power transmission rod maintenance support platform based on climbing type, including power transmission tower steel pipe, defeated
Longitudinal a pair the first guide wheel stroke groove and a pair of of first gear stroke groove are offered on pylon steel pipe;In first gear stroke groove
Fixation is installed with built-in lifting rack.
It climbs supporting substrate including a pair of of support platform plate and a pair;A pair of of support platform plate and a pair are climbed supporting substrate
It is installed in the periphery of power transmission tower steel pipe;The edge placement of support platform plate is fixedly connected with the first support fixed link plate;First
The side of support fixed link plate is fixedly connected with a pair of of locating wheel substrate;It is installed between a pair of of locating wheel substrate by pivot structure
Positioning guide wheel.
The console that climbs is fixed on support platform plate;The climb side of supporting substrate is fixedly connected with power device card
Even substrate;Power device card connects fixation on substrate and is installed with driving power device of climbing;The climb other side of supporting substrate is fixed
It is connected with a pair of support and fixes deckle board;A pair supports and is installed with climbing gear between fixed deckle board;Driving power device of climbing is logical
Axis mechanism of overdriving is connected with climbing gear;The climb both ends of supporting substrate are all fixedly connected with avris fixed link plate.
Wherein, 90 ° are divided between the angle between the first guide wheel stroke groove and first gear stroke groove.
Wherein, the both ends of the first support fixed link plate all offer the first support fixed hole;It is opened in avris fixed link plate
If with avris fixed hole;Position, structure size and the avris of the first support fixed hole in first support fixed link plate are solid
Determine the position of the avris fixed hole on connecting plate, structure size matches.
Wherein, the first guide wheel row on the position of the positioning guide wheel on support platform plate, structure size and power transmission tower steel pipe
The groove body position of journey slot, structure size match;On the position power transmission tower steel pipe of the climbing gear to climb on supporting substrate
The groove body position of one gear stroke groove matches;The structure size of climbing gear and the structure size of built-in lifting rack match
It closes.
Wherein, the console that climbs controls route by electrical communications and is connected with driving power device driving of climbing.
Compared with prior art, the beneficial effects of the present invention are:
1, the present invention by around power transmission tower steel pipe install be used to support maintenance personnel support platform plate and climb
Supporting substrate is risen, by passing through in the driving power device of climbing that installing driving support platform plate is gone up and down on supporting substrate of climbing
Driving power device of climbing driving climbing gear is acted on the built-in lifting rack of power transmission tower steel pipe, thus convenient and efficient
It is supported the descending operation of platform board, so that the power transmission tower attended operation of technical staff is more convenient, is conducive to technical staff
Many high-altitude complex operations;
2, the present invention on support platform plate by installing positioning guide wheel, and corresponding first is opened up on power transmission tower steel pipe
Guide wheel stroke groove so that the lifting resistance of support platform plate reduces, while also playing the effect of detent, the liter of support platform plate
Drop more steady and smooth.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the steel pipe power transmission rod maintenance support platform of the invention based on climbing type;
Fig. 2 is the structural schematic diagram that the component of apparatus of the present invention separates;
Fig. 3 is the partial structural diagram of power transmission tower steel pipe in the present invention;
Fig. 4 is the structural schematic diagram of support platform plate in the present invention;
Fig. 5 is the structural schematic diagram of supporting substrate of climbing in the present invention;
Wherein: 1- power transmission tower steel pipe;2- support platform plate;3- climbs supporting substrate;4- climbs driving power device;101-
First guide wheel stroke groove;102- first gear stroke groove;Lifting rack built in 103-;201- first supports fixed link plate;202-
Locating wheel substrate;203- positioning guide wheel;204- climbs console;205- first supports fixed hole;301- power device card connects
Substrate;302- avris fixed link plate;303- supports fixed deckle board;304- climbing gear;305- drive shaft mechanism;306- avris is solid
Determine through-hole.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right
The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and
It is not used in the restriction present invention.
The present invention is a kind of steel pipe power transmission rod maintenance support platform based on climbing type, including power transmission tower steel pipe 1, transmission of electricity
Longitudinal the first guide wheel of a pair stroke groove 101 and a pair of of first gear stroke groove 102 are offered on tower steel pipe 1;First gear row
It is fixed in journey slot 102 to be installed with built-in lifting rack 103.
It climbs supporting substrate 3 including a pair of of support platform plate 2 and a pair;A pair of of support platform plate 2 and a pair are climbed support
Substrate 3 is installed in the periphery of power transmission tower steel pipe 1;The edge placement of support platform plate 2 is fixedly connected with the first support fixed link plate
201;The side of first support fixed link plate 201 is fixedly connected with a pair of of locating wheel substrate 202;A pair of of locating wheel substrate 202 it
Between positioning guide wheel 203 is installed with by pivot structure.
The console 204 that climbs is fixed on support platform plate 2;Climb supporting substrate 3 side be fixedly connected it is dynamic
Device card connects substrate 301;Power device card connects fixation on substrate 301 and is installed with driving power device 4 of climbing;Climb supporting substrate
3 other side is fixedly connected with a pair of support and fixes deckle board 303;A pair supports and is installed with climbing gear between fixed deckle board 303
304;Driving power device of climbing 4 is connected by drive shaft mechanism with climbing gear 304;Climb supporting substrate 3 both ends it is all solid
Surely it is connected with avris fixed link plate 302.
Further, 90 ° are divided between the angle between the first guide wheel stroke groove 101 and first gear stroke groove 102.
Further, the both ends of the first support fixed link plate 201 all offer the first support fixed hole 205;Avris is solid
Determine to open up on connecting plate 302 and avris fixed hole 306;First in first support fixed link plate 201 supports fixed hole 205
Position, structure size are matched with the position of the avris fixed hole 306 in avris fixed link plate 302, structure size.
Further, on the position of the positioning guide wheel 203 on support platform plate 2, structure size and power transmission tower steel pipe 1
The groove body position of one guide wheel stroke groove 101, structure size match;The position of the climbing gear 304 to climb on supporting substrate 3 is defeated
The groove body position of first gear stroke groove 102 on pylon steel pipe 1 matches;The structure size of climbing gear 304 is climbed with built-in
The structure size for rising rack gear 103 matches.
Further, the console 204 that climbs controls route by electrical communications and drives phase with driving power device 4 of climbing
Even.
Explaination explanation further is carried out to the present invention:
In the present invention, the supporting substrate 3 that climbs is stuck in the side of power transmission tower steel pipe 1, climbing gear 304 is directed at the first tooth
Take turns in stroke groove 102 built-in lifting rack 103;Support platform plate 2 is stuck in the side of power transmission tower steel pipe 1 simultaneously, positioning is led
203 the first guide wheel stroke groove 101 of alignment of wheel;It by the avris fixed link plate 302 climbed on supporting substrate 3 and is propped up by bolt mechanism
The first support fixed link plate 201 on support platform board 2 carries out cooperation fixation;Driving power device of climbing 4 drives climbing gear 304
Carry out climbing/declining on built-in lifting rack 103 on power transmission tower steel pipe 1 operating out so that support platform plate 2 with
Rise/fall, consequently facilitating technical staff carries out convenient maintenance to power transmission tower.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention
Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.
Claims (5)
1. a kind of steel pipe power transmission rod maintenance support platform based on climbing type, it is characterised in that:
Including power transmission tower steel pipe (1), longitudinal a pair the first guide wheel stroke groove (101) is offered on the power transmission tower steel pipe (1)
With a pair of of first gear stroke groove (102);
Fixation is installed with built-in lifting rack (103) in the first gear stroke groove (102);
Supporting substrate (3) are climbed including a pair of of support platform plate (2) and a pair;
A pair of of support platform plate (2) and a pair supporting substrate (3) that climbs are installed in the periphery of power transmission tower steel pipe (1);
The edge placement of the support platform plate (2) is fixedly connected with the first support fixed link plate (201);
The side of first support fixed link plate (201) is fixedly connected with a pair of of locating wheel substrate (202);
Positioning guide wheel (203) are installed with by pivot structure between a pair of of locating wheel substrate (202);
The console that climbs (204) are fixed on the support platform plate (2);
The side of the supporting substrate that climbs (3) is fixedly connected with power device card and connects substrate (301);
The power device card connects fixation on substrate (301) and is installed with driving power device of climbing (4);
The other side of the supporting substrate that climbs (3) is fixedly connected with a pair of support and fixes deckle board (303);
A pair supports and is installed with climbing gear (304) between fixed deckle board (303);
The driving power device of climbing (4) is connected by drive shaft mechanism with climbing gear (304);
The both ends of the supporting substrate that climbs (3) are all fixedly connected with avris fixed link plate (302).
2. a kind of steel pipe power transmission rod maintenance support platform based on climbing type according to claim 1, it is characterised in that:
90 ° are divided between angle between the first guide wheel stroke groove (101) and first gear stroke groove (102).
3. a kind of steel pipe power transmission rod maintenance support platform based on climbing type according to claim 1, it is characterised in that:
The both ends of first support fixed link plate (201) all offer the first support fixed hole (205);
It is opened up on the avris fixed link plate (302) and avris fixed hole (306);
Position, structure size and the avris of the first support fixed hole (205) in first support fixed link plate (201) are solid
Determine the position of the avris fixed hole (306) on connecting plate (302), structure size matches.
4. a kind of steel pipe power transmission rod maintenance support platform based on climbing type according to claim 1, it is characterised in that:
First on the position of positioning guide wheel (203) on the support platform plate (2), structure size and power transmission tower steel pipe (1)
The groove body position of guide wheel stroke groove (101), structure size match;
First gear stroke groove on the position power transmission tower steel pipe (1) of climbing gear (304) on the supporting substrate that climbs (3)
(102) groove body position matches;
The structure size of the climbing gear (304) is matched with the structure size of built-in lifting rack (103).
5. a kind of steel pipe power transmission rod maintenance support platform based on climbing type according to claim 1, it is characterised in that:
The console that climbs (204) controls route by electrical communications and is connected with driving power device of climbing (4) driving.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810816417.3A CN109019257A (en) | 2018-07-24 | 2018-07-24 | A kind of steel pipe power transmission rod maintenance support platform based on climbing type |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810816417.3A CN109019257A (en) | 2018-07-24 | 2018-07-24 | A kind of steel pipe power transmission rod maintenance support platform based on climbing type |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109019257A true CN109019257A (en) | 2018-12-18 |
Family
ID=64644527
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810816417.3A Pending CN109019257A (en) | 2018-07-24 | 2018-07-24 | A kind of steel pipe power transmission rod maintenance support platform based on climbing type |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109019257A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112141852A (en) * | 2019-09-29 | 2020-12-29 | 广东博智林机器人有限公司 | Vertical conveyor |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2356355B (en) * | 1999-11-22 | 2003-07-09 | Nicholas Woodmansey | A portable mast climbing device |
CN1485266A (en) * | 2002-09-24 | 2004-03-31 | 建 温 | Spring-type pole climbing machine |
CN2727308Y (en) * | 2004-05-12 | 2005-09-21 | 三一重工股份有限公司 | Fully automatic stepless lifting device |
CN203129678U (en) * | 2012-12-13 | 2013-08-14 | 张淮 | Combination of charging type lifter and tooth space type electric pole |
CN205626921U (en) * | 2016-05-03 | 2016-10-12 | 张一鹤 | Novel trees climbing device |
-
2018
- 2018-07-24 CN CN201810816417.3A patent/CN109019257A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2356355B (en) * | 1999-11-22 | 2003-07-09 | Nicholas Woodmansey | A portable mast climbing device |
CN1485266A (en) * | 2002-09-24 | 2004-03-31 | 建 温 | Spring-type pole climbing machine |
CN2727308Y (en) * | 2004-05-12 | 2005-09-21 | 三一重工股份有限公司 | Fully automatic stepless lifting device |
CN203129678U (en) * | 2012-12-13 | 2013-08-14 | 张淮 | Combination of charging type lifter and tooth space type electric pole |
CN205626921U (en) * | 2016-05-03 | 2016-10-12 | 张一鹤 | Novel trees climbing device |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112141852A (en) * | 2019-09-29 | 2020-12-29 | 广东博智林机器人有限公司 | Vertical conveyor |
CN112141852B (en) * | 2019-09-29 | 2021-10-01 | 广东博智林机器人有限公司 | Vertical conveyor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2458207A3 (en) | Lightning conduction system for wind turbine blades with carbon fibre laminates | |
CN102820628A (en) | Special tool for replacing split conductor spacer rod | |
CN109019257A (en) | A kind of steel pipe power transmission rod maintenance support platform based on climbing type | |
CN109254243A (en) | A kind of high-voltage circuitbreaker test short jumper device | |
CN202330562U (en) | Ground resistance test wire clamp | |
CN104901255A (en) | High-voltage overhead line crossing method and safe distance separating device | |
CN204304021U (en) | A kind of Novel high-level bus bridge Special grounding wire clip | |
CN202721387U (en) | Special tool for changing split conductor spacer | |
CN110429510B (en) | Anti-vibration hammer reset mechanism and operation method thereof | |
CN107762737A (en) | The inspection system and method for wind generator set blade lightning-protection system | |
CN200973929Y (en) | Guide rail steering connector | |
CN209148844U (en) | A kind of high-voltage circuitbreaker test short jumper device | |
CN106771878B (en) | A kind of monitoring method of wind power plant shaft tower lightning stroke drop point | |
CN212478731U (en) | Three-loop cable terminal iron tower with high-altitude area maintenance platform | |
CN106410727B (en) | Conducting wire fixed platform stent | |
CN208169926U (en) | A kind of environment monitoring auxiliary device | |
CN206364448U (en) | Portable rope ladder | |
CN203166320U (en) | Wall bushing tap grounding device | |
CN203288363U (en) | Reflective strain insulator for power transmission line | |
CN204588388U (en) | One is exempted to climb device pair and is opened device with pedal | |
CN103342139A (en) | Mechanical device capable of being adapted to external contour of wind power tower automatically | |
CN204732831U (en) | A kind of high-tension overhead line intersection bores safe distance escapement more | |
KR102606521B1 (en) | Earth leakage prevention device for transmission lines and steel towers and its installation method | |
CN204703736U (en) | The two-tube band of a kind of steel pipe pole protects the cat ladder of cage | |
CN201415627Y (en) | Rigid contact line ground clamp |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20181218 |
|
WD01 | Invention patent application deemed withdrawn after publication |