CN109017882A - A kind of city rail traffic signal system O&M failure emergency treatment device and method - Google Patents

A kind of city rail traffic signal system O&M failure emergency treatment device and method Download PDF

Info

Publication number
CN109017882A
CN109017882A CN201811067028.1A CN201811067028A CN109017882A CN 109017882 A CN109017882 A CN 109017882A CN 201811067028 A CN201811067028 A CN 201811067028A CN 109017882 A CN109017882 A CN 109017882A
Authority
CN
China
Prior art keywords
database
data
device numbering
warning information
maintenance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811067028.1A
Other languages
Chinese (zh)
Inventor
贺又林
马若声
余振强
段晨宁
辛骥
李润锦
伦敏杰
付斌
廖百睿
林伟文
许华阳
刘广泽
李中羽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Metro Group Co Ltd
Original Assignee
Guangzhou Metro Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Metro Group Co Ltd filed Critical Guangzhou Metro Group Co Ltd
Priority to CN201811067028.1A priority Critical patent/CN109017882A/en
Publication of CN109017882A publication Critical patent/CN109017882A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/50Trackside diagnosis or maintenance, e.g. software upgrades
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Biomedical Technology (AREA)
  • General Health & Medical Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The present invention provides a kind of city rail traffic signal system O&M failure emergency treatment device and methods, it include: basic database building module, for constructing the basic database of signalling arrangement in city rail traffic signal system, the basic database include the signalling arrangement device numbering and processing scheme corresponding with the device numbering;Data acquisition module, for respectively from train automatic monitoring system, Terminal Alert system or equipment state on_line monitoring system acquisition warning information, warning information to carry the device numbering and urgency level information of the signalling arrangement;Information management module, for collecting the warning information, device numbering in any one described warning information is compared with the device numbering in the basic database, to match the processing scheme consistent with the device numbering, and pushes to user client.Using apparatus and method of the present invention, emergency processing can be made according to processing scheme when signalling arrangement breaks down.

Description

A kind of city rail traffic signal system O&M failure emergency treatment device and method
Technical field
The invention of this reality belongs to city rail traffic signal system technical field, and in particular to a kind of Urban Rail Transit Signal System O&M failure emergency treatment device and method.
Background technique
City rail traffic signal system is made of as the most basic control system of urban track traffic signalling arrangement, It after signalling arrangement breaks down, cannot such as handle in time, then subway can be made to break down.Due to existing subway service mode point It dissipates, when subway breaks down, maintenance personnel is online from train automatic monitoring system, Terminal Alert system and equipment state respectively System acquisition alarm signal is monitored, to determine that position occurs for failure, poor in timeliness, the problem of causing information propagation delay, together When also need to work out specific emergency driving prediction scheme and troubleshooting scheme according to alarm signal, it is too late to cause troubleshooting When, further expansion is influenced so as to cause failure.
Summary of the invention
In order to overcome the above technical defects, the present invention provides a kind of city rail traffic signal system O&M failure emergency Processing unit and method, can be in real time from train automatic monitoring system, Terminal Alert system and equipment state on-line monitoring system The warning information of train or signalling arrangement is acquired, and corresponding processing scheme is matched according to warning information and pushes to user client End, enables signalling arrangement to be repaired in time.
To solve the above-mentioned problems, a kind of city rail traffic signal system O&M failure emergency processing of the invention dress It sets, comprising:
Basic database constructs module, for constructing the basic data of signalling arrangement in city rail traffic signal system Library, wherein the basic database include the signalling arrangement device numbering and place corresponding with the device numbering Reason scheme;
Data acquisition module, for being supervised online from train automatic monitoring system, Terminal Alert system or equipment state respectively Examining system acquires the first warning information, the second warning information or third warning information;First warning information, described second are accused Alert information and the third warning information carry the device numbering and urgency level information of the signalling arrangement, described urgent The type of degree information includes A class, B class and C class;
Information management module, for collecting first warning information, second warning information or three announcement When warning any one warning information in letter, by the device numbering and the basic database in any one described warning information In device numbering compare, to match the processing scheme consistent with the device numbering, and push to user client.
Further, the basic database include: mechanical drawing database, Maintenance plan, maintenance guide database, Database is guided in historical failure data library, station network structural database and driving;
The basic database constructs module
Data entry element guides data for the mechanical drawing of signalling arrangement described in typing, mantenance data, maintenance, goes through Data are guided in history fault data, station network structure and driving, wherein the mechanical drawing, the mantenance data, the maintenance Guiding data, the historical failure data, the station network structure, driving guide data includes the signalling arrangement Device numbering;
Data storage cell, for storing the mechanical drawing, data, described are guided in the mantenance data, the maintenance Data are guided in historical failure data, the station network structure and the driving, with respectively constitute the mechanical drawing database, The Maintenance plan, the maintenance guide database, the historical failure data library, the station network structural database and Database is guided in the driving.
Further, the information management module includes:
Comparing unit, for setting the device numbering of collected any one alarm signal with described respectively The device numbering of standby drawing data base, the device numbering of the Maintenance plan, the maintenance guide database device numbering, Number is guided in the device numbering in the historical failure data library, the device numbering of the station network structural database and the driving It compares according to the device numbering in library;
Data matching unit, in any one alarm signal device numbering and the mechanical drawing data Database, the historical failure data library, the station network structured data are guided in library, the Maintenance plan, the maintenance When the device numbering for any one database that library and the driving are guided in database matches, corresponding processing side is obtained Case;
Push unit, for when getting the corresponding processing scheme, the corresponding processing scheme to be pushed to The user client.
Further, the information management module further include:
Quantity statistics unit, when for any one warning information described in collecting, according to any one described alarm The type of urgency level information carries out A class quantity, B class quantity or C class quantity statistics in information, is also used to collecting described appoint Anticipate a kind of warning information when, according to signalling arrangement described in any one described warning information device numbering carry out quantity system Meter;
Early warning generation unit reaches default for any sort quantity in the A class quantity, B class quantity or C class quantity Amount threshold when, generate the first pre-warning signal and the user client simultaneously pushed to by the push unit, or/and be used for When the device numbering quantity of the signalling arrangement reaches preset amount threshold, generates the second pre-warning signal and pushed away by described Unit is sent to push to the user client, to warn to the signalling arrangement degradation trend.
Further, the data acquisition module includes:
Interface unit, for providing and the train automatic monitoring system, the Terminal Alert system and the equipment shape The port of state on-line monitoring system connection, the interface unit include: serial ports coffret, network transport interface, network turn string Port transmission interface;
Data sorting unit believes collected first alarm for the classification according to the urgency level information Breath, second warning information or three warning information are classified and are stored according to the urgency level information.
To solve the above-mentioned problems, the present invention also provides at a kind of city rail traffic signal system O&M failure emergency Reason method, includes the following steps:
The basic database of signalling arrangement in S1, building city rail traffic signal system, wherein the basic database Device numbering and processing scheme corresponding with the device numbering including the signalling arrangement;
S2, respectively from train automatic monitoring system, Terminal Alert system or equipment state on_line monitoring system acquisition first Warning information, the second warning information or third warning information;First warning information, second warning information and described Three warning information carry the device numbering and urgency level information of the signalling arrangement, the type of the urgency level information Including A class, B class and C class;
S3, collect first warning information, second warning information or it is described three alarm letter in it is any one When kind warning information, the device numbering in any one described warning information is done with the device numbering in the basic database It compares, to match the processing scheme consistent with the device numbering, and pushes to user client.
Further, the basic database include: mechanical drawing database, Maintenance plan, maintenance guide database, Database is guided in historical failure data library, station network structural database and driving;
The step S1 includes the following steps:
The mechanical drawing of signalling arrangement described in S11, typing, mantenance data, maintenance guide data, historical failure data, stand Data are guided in spot net structure and driving, wherein the mechanical drawing, the mantenance data, maintenance guide data, described Historical failure data, the station network structure, the driving guide data include the device numbering of the signalling arrangement;
S12, the storage mechanical drawing, the mantenance data, maintenance guide data, the historical failure data, Data are guided in the station network structure and the driving, to respectively constitute the mechanical drawing database, the mantenance data Library, the maintenance guide database, the historical failure data library, the station network structural database and the driving to guide Database.
Further, the step S3 includes the following steps:
S31, by the device numbering of collected any one alarm signal respectively with the mechanical drawing database Device numbering, the device numbering of the Maintenance plan, the maintenance guide the device numbering of database, the historical failure The equipment that database is guided in the device numbering of database, the device numbering of the station network structural database and the driving is compiled It number compares;
S32, device numbering and the mechanical drawing database, the mantenance data in any one alarm signal Library, the maintenance guide database, the historical failure data library, the station network structural database and the driving to guide When the device numbering of any one database in database matches, corresponding processing scheme is obtained;
S33, when getting the corresponding processing scheme, the corresponding processing scheme is pushed into the user client End.
Further, the step S3 further includes following steps:
When S34, any one warning information described in collecting, according to urgency level in any one described warning information The type of information carries out A class quantity, B class quantity or C class quantity statistics, when collecting any one described warning information, presses Quantity statistics are carried out according to the device numbering of signalling arrangement described in any one described warning information;;
When S35, any sort quantity in the A class quantity, B class quantity or C class quantity reach preset amount threshold, It generates the first pre-warning signal and the user client is pushed to by the push unit, or/and for being set in the signal When standby device numbering quantity reaches preset amount threshold, generates the second pre-warning signal and pushed to by the push unit The user client, to be warned to the signalling arrangement degradation trend.
Further, the step S2 includes the following steps:
S21, according to the classification of the urgency level information, collected first warning information, described second are accused Alert information or the third warning information are classified and are stored according to the urgency level information.
Compared with prior art, the beneficial effects of the present invention are: a kind of city rail traffic signal system of the invention is transported Failure emergency treatment device and method are tieed up, by constructing basic database, provides detailed technical data for treatment people, in real time The warning information of train or signalling arrangement is acquired, timeliness is strong, and fault message and processing can be matched from basic database Scheme pushes to user client, and related personnel receives all data of fault message from client, and there is no information to lose The problem of, meanwhile, associated process scheme has been refined to single devices, and accuracy rate is high, avoids leading to failure because of employee skill weakness It handles ineffective and expands failure influence, treatment people can directly receive processing scheme from client, not need manually to work out Specific prediction scheme and processing method, concentration flow path simplify failure emergency more.
Detailed description of the invention
Specific embodiments of the present invention will be described in further detail with reference to the accompanying drawing, in which:
Fig. 1 is that a kind of structure of city rail traffic signal system O&M failure emergency processing of the embodiment of the present invention 1 is shown It is intended to;
Fig. 2 is that a kind of process of city rail traffic signal system O&M failure emergency processing of the embodiment of the present invention 1 is shown It is intended to.
Specific embodiment
Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings, it should be understood that preferred reality described herein Apply example only for the purpose of illustrating and explaining the present invention and is not intended to limit the present invention.
Technical solution of the present invention is described with attached drawing combined with specific embodiments below.
Embodiment 1
As shown in Figure 1, being at one of embodiment of the present invention 1 city rail traffic signal system O&M failure emergency Reason, comprising: basic database constructs module 1, data acquisition module 2 and information management module 3;Wherein, basic database constructs Module 1, for constructing the basic database of signalling arrangement in city rail traffic signal system, wherein basic database includes The device numbering of signalling arrangement and processing scheme corresponding with device numbering;That is, being contained in basic database Processing scheme when each signalling arrangement breaks down in rail traffic signal system.Data acquisition module 2, for respectively from Train automatic monitoring system, the first warning information of Terminal Alert system or equipment state on_line monitoring system acquisition, the second alarm Information or third warning information;First warning information, the second warning information and third warning information carry signalling arrangement Device numbering and urgency level information, the type of urgency level information include A class, B class and C class, and A class is that urgency level is highest Warning information.Information management module 3, in collecting the first warning information, the second warning information or third alarm letter When any one warning information, the device numbering in the device numbering and basic database in any one warning information is done into ratio It is right, to match the processing scheme consistent with device numbering, and push to user client.
Further, basic database includes: mechanical drawing database, Maintenance plan, maintenance guide database, history Database is guided in Mishap Database, station network structural database and driving.
It includes: data entry element 11 that basic database, which constructs module, mechanical drawing, maintenance for typing signalling arrangement Data, maintenance guide data, historical failure data, station network structure and driving to guide data, wherein mechanical drawing, maintenance It includes the equipment of signalling arrangement that data, maintenance, which guide data, historical failure data, station network structure, driving guide data, Number;Data storage cell 12, for storing mechanical drawing, mantenance data, maintenance guide data, historical failure data, website Data are guided in network structure and the driving, to respectively constitute mechanical drawing database, Maintenance plan, maintenance guide data Database is guided in library, historical failure data library, station network structural database and driving.
Further, data acquisition module 2 includes: interface unit 21, for providing and train automatic monitoring system, terminal The port that warning system is connected with equipment state on-line monitoring system, interface unit 21 include: serial ports coffret, network transmission Interface, network turn serial ports coffret;Emergency treatment device is enabled to access the automatic monitoring system of different manufacturers, different routes Information on system, Terminal Alert system and equipment state on-line monitoring system;Data sorting unit 22, for according to urgency level The classification of information is classified and is stored to collected first warning information, the second warning information or third warning information.
After data acquisition module 2 collects alarm signal, the alarm signal is handled by information management module 3, In, information management module includes: comparing unit 31, for dividing the device numbering of any one collected alarm signal The device numbering of database is not guided with the device numbering of mechanical drawing database, the device numbering of Maintenance plan, maintenance, is gone through The device numbering of database is guided in the device numbering of history Mishap Database, the device numbering of station network structural database and driving It compares;Data matching unit 32, for the device numbering and mechanical drawing database, maintenance number in any one alarm signal Database, historical failure data library, station network structural database and driving is guided to guide according to library, maintenance any in database When the device numbering of one database matches, corresponding processing scheme is obtained;Push unit 33, for get it is corresponding When processing scheme, corresponding processing scheme is pushed into user client, client is mail, short message or GLINK.
In order to carry out early warning, information management module to signalling arrangement degradation trend further include: quantity statistics unit 34 is used When any one warning information described in collecting, according to the type of urgency level information in any one described warning information A class quantity, B class quantity or C class quantity statistics are carried out, are also used to when collecting any one described warning information, according to institute The device numbering for stating signalling arrangement described in any one warning information carries out quantity statistics;Early warning generation unit 35 is used for When any sort quantity in the A class quantity, B class quantity or C class quantity reaches preset amount threshold, the first early warning letter is generated Number and the user client is pushed to by the push unit, or/and for the device numbering number in the signalling arrangement When amount reaches preset amount threshold, generates the second pre-warning signal and the user client is pushed to by the push unit End, to be warned to the signalling arrangement degradation trend.
In addition to this, emergency treatment device of the invention further includes operating parameter warning module 4, settable signalling arrangement Operating parameter alarm threshold value is monitored the operating parameter for the signalling arrangement that equipment on-line detection system monitors, works as detection When the operating parameter for the signalling arrangement that system monitoring arrives is above/below operating parameter alarm threshold value, it is extremely pre- to generate operating parameter It is alert, and push to user client.
In the specific implementation process, when failure emergency treatment device from train automatic monitoring system, Terminal Alert system or When equipment state on-line monitoring system collects warning information, according to the device numbering in the warning information, from basic database In match the processing scheme consistent with the device numbering, wherein processing scheme include the equipment mechanical drawing, maintenance Data, maintenance guide data, historical failure data, station network structure and driving to guide data, meanwhile, failure emergency processing dress The urgency level for identifying warning information is set, if A class warning information, then processing scheme can pass through client push to maintenance people Member and vehicle scheduling personnel, can also be by client push to general headquarters or center leader's group, and maintenance staff are by checking processing Mechanical drawing in scheme, maintenance guide data, historical failure data, station network structure, is accurately positioned to breaking down Signalling arrangement, and maintenance work is carried out to signalling arrangement, meanwhile, vehicle scheduling personnel guide data to guide tissue row by driving Vehicle.When the device numbering quantity that failure emergency treatment device receives signalling arrangement A class quantity or/and signalling arrangement reaches When the threshold value of preset quantity, generates the first pre-warning signal and the second pre-warning signal and user client is pushed to by push unit End, according to the first pre-warning signal, it can be determined that the frequency for going out signalling arrangement generation catastrophe failure can according to the second pre-warning signal To judge frequency that signalling arrangement breaks down, maintenance staff can be reminded to carry out technological transformation or replacement to the signalling arrangement.
Compared with prior art, the invention has the following advantages:
(1) information timeliness is strong, when signalling arrangement issues alarm signal, can be acquired in real time by failure emergency treatment device And the problem of pushing in real time, information propagation delay is not present.
(2) information is complete, by constructing basic database in advance, when receiving alarm signal, then will set with the signal The problem of standby relevant data all push to related personnel, lose there is no information.
(3) troubleshooting accuracy is high, and processing scheme is obtained by the matching of failure emergency treatment device, and all data It is refined to each signalling arrangement, technical data is complete, and avoid causes troubleshooting ineffective because of employee skill weakness.And Failure is caused to influence to expand.
(4) failure emergence program simplifies, and the faulty emergency treatment device of processing scheme pushes to related personnel, do not need Specific prediction scheme and processing method are manually worked out, emergency process is simplified, keeps failure emergency more simplified.
(5) push mode diversification can push associated process scheme by mail, short message or GLINK, so that related Personnel can flexibly receive information.
Embodiment 2
As shown in Fig. 2, being the city rail traffic signal system O&M failure emergency processing of one of embodiment of the present invention 2 Method includes the following steps:
The basic database of signalling arrangement in S1, building city rail traffic signal system, wherein basic database includes The device numbering of signalling arrangement and processing scheme corresponding with device numbering;
S2, respectively from train automatic monitoring system, Terminal Alert system or equipment state on_line monitoring system acquisition first Warning information, the second warning information or third warning information;First warning information, the second warning information and third warning information are equal The device numbering and urgency level information of signalling arrangement are carried, the type of urgency level information includes A class, B class and C class;
S3, collect the first warning information, the second warning information or three alarm letter in any one warning information when, Device numbering in device numbering and basic database in any one warning information is compared, is compiled with matching with equipment Number consistent processing scheme, and push to user client.
Further, basic database includes: mechanical drawing database, Maintenance plan, maintenance guide database, history Database is guided in Mishap Database, station network structural database and driving;
Step S1 includes the following steps:
Data, historical failure data, website net are guided in S11, the mechanical drawing of typing signalling arrangement, mantenance data, maintenance Data are guided in network structure and driving, wherein data, historical failure data, website net are guided in mechanical drawing, mantenance data, maintenance It includes the device numbering of signalling arrangement that network structure, driving, which guide data, i.e., the data of each signalling arrangement are all entered into In basic database, technical support is provided for signalling arrangement O&M;
Data, historical failure data, station network structure and row are guided in S12, storage mechanical drawing, mantenance data, maintenance Vehicle guide data, with respectively constitute mechanical drawing database, Maintenance plan, maintenance guide database, historical failure data library, Database is guided in station network structural database and driving.
Basic database thens follow the steps S2 after constructing, wherein step S2 includes the following steps:
S21, according to the classification of urgency level information, to collected first warning information, the second warning information or third Warning information is classified and is stored according to urgency level information.
After data acquisition module 2 collects alarm signal, step S3 is executed, wherein step S3 includes the following steps:
S31, the device numbering of any one collected alarm signal is compiled with the equipment of mechanical drawing database respectively Number, the device numbering of Maintenance plan, maintenance guide the device numbering of database, historical failure data library device numbering, stand The device numbering of spot net structural database and driving guide the device numbering of database to compare;
S32, device numbering and mechanical drawing database in any one alarm signal, Maintenance plan, maintenance are guided Any one database in database is guided in database, historical failure data library, station network structural database and driving When device numbering matches, corresponding processing scheme is obtained;
S33, when getting corresponding processing scheme, corresponding processing scheme is pushed into user client.
In order to carry out early warning to signalling arrangement degradation trend, step S3 further includes following steps:
When S34, any one warning information described in collecting, according to urgency level in any one described warning information The type of information carries out A class quantity, B class quantity or C class quantity statistics, when collecting any one described warning information, presses Quantity statistics are carried out according to the device numbering of signalling arrangement described in any one described warning information;
When S35, any sort quantity in the A class quantity, B class quantity or C class quantity reach preset amount threshold, It generates the first pre-warning signal and the user client is pushed to by the push unit, or/and for being set in the signal When standby device numbering quantity reaches preset amount threshold, generates the second pre-warning signal and pushed to by the push unit The user client, to be warned to the signalling arrangement degradation trend.
In addition to this, emergency processing method of the invention further includes step S4: the operating parameter alarm of setting signal equipment Threshold value is monitored the operating parameter for the signalling arrangement that equipment on-line detection system monitors, monitors when detection system When the operating parameter of signalling arrangement is above/below operating parameter alarm threshold value, operating parameter abnormity early warning is generated, and push to use Family client.
In the specific implementation process, when failure emergency treatment device from train automatic monitoring system, Terminal Alert system or When equipment state on-line monitoring system collects warning information, according to the device numbering in the warning information, from basic database In match the processing scheme consistent with the device numbering, wherein processing scheme include the equipment mechanical drawing, maintenance Data, maintenance guide data, historical failure data, station network structure and driving to guide data, meanwhile, failure emergency processing dress The urgency level for identifying warning information is set, if A class warning information, then processing scheme can pass through client push to maintenance people Member and vehicle scheduling personnel, can also be by client push to general headquarters or center leader's group, and maintenance staff are by checking processing Mechanical drawing in scheme, maintenance guide data, historical failure data, station network structure, is accurately positioned to breaking down Signalling arrangement, and maintenance work is carried out to signalling arrangement, meanwhile, vehicle scheduling personnel guide data to guide tissue row by driving Vehicle.When the device numbering quantity that failure emergency treatment device receives signalling arrangement A class quantity or/and signalling arrangement reaches When the threshold value of preset quantity, generates the first pre-warning signal and the second pre-warning signal and user client is pushed to by push unit End, according to the first pre-warning signal, it can be determined that the frequency for going out signalling arrangement generation catastrophe failure can according to the second pre-warning signal To judge frequency that signalling arrangement breaks down, to remind maintenance staff to carry out technological transformation or replacement to the signalling arrangement.
Compared with prior art, the invention has the following advantages:
(1) information timeliness is strong, when signalling arrangement issues alarm signal, can be acquired in real time by failure emergency treatment device And the problem of pushing in real time, information propagation delay is not present.
(2) information is complete, by constructing basic database in advance, when receiving alarm signal, then will set with the signal The problem of standby relevant data all push to related personnel, lose there is no information.
(3) troubleshooting accuracy is high, and processing scheme is obtained by the matching of failure emergency treatment device, and all data It is refined to each signalling arrangement, technical data is complete, and avoid causes troubleshooting ineffective because of employee skill weakness.And Failure is caused to influence to expand.
(4) failure emergence program simplifies, and processing scheme pushes to related personnel by failure emergency treatment device, do not need Specific prediction scheme and processing method are manually worked out, emergency process is simplified, keeps failure emergency more simplified.
(5) push mode diversification can push associated process scheme by mail, short message or GLINK, so that related Personnel can flexibly receive information.
The above described is only a preferred embodiment of the present invention, be not intended to limit the present invention in any form, therefore Without departing from the technical solutions of the present invention, according to the technical essence of the invention it is to the above embodiments it is any modification, Equivalent variations and modification, all of which are still within the scope of the technical scheme of the invention.

Claims (10)

1. a kind of city rail traffic signal system O&M failure emergency treatment device characterized by comprising
Basic database constructs module, for constructing the basic database of signalling arrangement in city rail traffic signal system, In, the basic database include the signalling arrangement device numbering and processing side corresponding with the device numbering Case;
Data acquisition module, for respectively from train automatic monitoring system, Terminal Alert system or equipment state on_line monitoring system The first warning information of system acquisition, the second warning information or third warning information;First warning information, the second alarm letter Breath and the third warning information carry the device numbering and urgency level information of the signalling arrangement, the urgency level The type of information includes A class, B class and C class;
Information management module, for collecting first warning information, second warning information or third alarm It, will be in the device numbering and the basic database in any one described warning information when any one warning information in letter Device numbering compare, to match the processing scheme consistent with the device numbering, and push to user client.
2. failure emergency treatment device according to claim 1, which is characterized in that the basic database includes: equipment Database, historical failure data library, station network structural database and driving are guided in drawing data base, Maintenance plan, maintenance Guide database;
The basic database constructs module
Data entry element guides data, history event for the mechanical drawing of signalling arrangement described in typing, mantenance data, maintenance Hinder data, station network structure and driving and guide data, wherein the mechanical drawing, the mantenance data, the maintenance are guided Data, the historical failure data, the station network structure, driving guide data include setting for the signalling arrangement Standby number;
Data storage cell, for storing the mechanical drawing, the mantenance data, the maintenance guide data, the history Data are guided in fault data, the station network structure and the driving, to respectively constitute the mechanical drawing database, described Database, the historical failure data library, the station network structural database and described are guided in Maintenance plan, the maintenance Database is guided in driving.
3. failure emergency treatment device according to claim 2, which is characterized in that
The information management module includes:
Comparing unit, for by the device numbering of collected any one alarm signal respectively with the equipment drawing The device numbering of paper database, the device numbering of the Maintenance plan, the maintenance guide the device numbering, described of database Database is guided in the device numbering in historical failure data library, the device numbering of the station network structural database and the driving Device numbering compare;
Data matching unit, for the device numbering and the mechanical drawing database, institute in any one alarm signal State Maintenance plan, database, the historical failure data library, the station network structural database and institute are guided in the maintenance When stating the device numbering of any one database that driving is guided in database and matching, corresponding processing scheme is obtained;
Push unit, for the corresponding processing scheme being pushed to described when getting the corresponding processing scheme User client.
4. failure emergency treatment device according to claim 3, which is characterized in that the information management module further include:
Quantity statistics unit, when for any one warning information described in collecting, according to any one described warning information The type of middle urgency level information carries out A class quantity, B class quantity or C class quantity statistics, be also used to collect it is described any one When kind warning information, quantity statistics are carried out according to the device numbering of signalling arrangement described in any one described warning information;
Early warning generation unit reaches preset number for any sort quantity in the A class quantity, B class quantity or C class quantity When measuring threshold value, generates the first pre-warning signal and the user client is pushed to by the push unit, or/and in institute When stating the device numbering quantity of signalling arrangement and reaching preset amount threshold, generate the second pre-warning signal simultaneously by the push singly Member pushes to the user client, to warn to the signalling arrangement degradation trend.
5. failure emergency treatment device according to claim 1, which is characterized in that
The data acquisition module includes:
Interface unit exists for providing with the train automatic monitoring system, the Terminal Alert system and the equipment state The port of line monitoring system connection, the interface unit include: that serial ports coffret, network transport interface, network turn serial ports biography Defeated interface;
Data sorting unit, for the classification according to the urgency level information, to collected first warning information, institute The second warning information or the third warning information is stated to be classified and stored according to the urgency level information.
6. a kind of city rail traffic signal system O&M failure emergency processing method, which comprises the steps of:
The basic database of signalling arrangement in S1, building city rail traffic signal system, wherein the basic database includes The device numbering of the signalling arrangement and processing scheme corresponding with the device numbering;
S2, respectively from train automatic monitoring system, Terminal Alert system or equipment state on_line monitoring system acquisition first alert Information, the second warning information or third warning information;First warning information, second warning information and the third are accused Alert information carries the device numbering and urgency level information of the signalling arrangement, and the type of the urgency level information includes A class, B class and C class;
S3, collect first warning information, second warning information or the third alarm letter in any one When warning information, the device numbering in the device numbering and the basic database in any one described warning information is done into ratio It is right, to match the processing scheme consistent with the device numbering, and push to user client.
7. failure emergency processing method according to claim 6, which is characterized in that the basic database includes: equipment Database, historical failure data library, station network structural database and driving are guided in drawing data base, Maintenance plan, maintenance Guide database;
The step S1 includes the following steps:
Data, historical failure data, website net are guided in the mechanical drawing of signalling arrangement described in S11, typing, mantenance data, maintenance Data are guided in network structure and driving, wherein data, the history are guided in the mechanical drawing, the mantenance data, the maintenance Fault data, the station network structure, the driving guide data include the device numbering of the signalling arrangement;
It is S12, the storage mechanical drawing, the mantenance data, maintenance guide data, the historical failure data, described Data are guided in station network structure and the driving, to respectively constitute the mechanical drawing database, the Maintenance plan, institute Stating maintenance guides database, the historical failure data library, the station network structural database and the driving to guide data Library.
8. failure emergency processing method according to claim 7, which is characterized in that the step S3 includes the following steps:
S31, the device numbering of collected any one alarm signal is set with the mechanical drawing database respectively The device numbering of database, the historical failure data are guided in standby number, the device numbering of the Maintenance plan, the maintenance The device numbering in library, the device numbering of the station network structural database and the driving guide the device numbering of database to do It compares;
S32, any one alarm signal device numbering and the mechanical drawing database, the Maintenance plan, The maintenance guides database, the historical failure data library, the station network structural database and the driving to guide number When matching according to the device numbering of any one database in library, corresponding processing scheme is obtained;
S33, when getting the corresponding processing scheme, the corresponding processing scheme is pushed into the user client.
9. failure emergency processing method according to claim 8, which is characterized in that first warning information, described Two warning information and the third warning information carry;
The step S3 further includes following steps:
When S34, any one warning information described in collecting, according to urgency level information in any one described warning information Type carry out A class quantity, B class quantity or C class quantity statistics, when collecting any one described warning information, according to institute The device numbering for stating signalling arrangement described in any one warning information carries out quantity statistics;
When S35, any sort quantity in the A class quantity, B class quantity or C class quantity reach preset amount threshold, generate First pre-warning signal simultaneously pushes to the user client by the push unit, or/and in the signalling arrangement When device numbering quantity reaches preset amount threshold, generates the second pre-warning signal and pushed to by the push unit described User client, to be warned to the signalling arrangement degradation trend.
10. failure emergency processing method according to claim 6, which is characterized in that
The step S2 includes the following steps:
S21, according to the classification of the urgency level information, collected first warning information, second alarm are believed Breath or the third warning information are classified and are stored according to the urgency level information.
CN201811067028.1A 2018-09-13 2018-09-13 A kind of city rail traffic signal system O&M failure emergency treatment device and method Pending CN109017882A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811067028.1A CN109017882A (en) 2018-09-13 2018-09-13 A kind of city rail traffic signal system O&M failure emergency treatment device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811067028.1A CN109017882A (en) 2018-09-13 2018-09-13 A kind of city rail traffic signal system O&M failure emergency treatment device and method

Publications (1)

Publication Number Publication Date
CN109017882A true CN109017882A (en) 2018-12-18

Family

ID=64621374

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811067028.1A Pending CN109017882A (en) 2018-09-13 2018-09-13 A kind of city rail traffic signal system O&M failure emergency treatment device and method

Country Status (1)

Country Link
CN (1) CN109017882A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112744261A (en) * 2019-10-31 2021-05-04 株洲中车时代电气股份有限公司 Rail vehicle fault emergency processing method and system
CN114492870A (en) * 2022-01-26 2022-05-13 北京和利时系统集成有限公司 Fault processing method, device and system for rail transit signal equipment

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4220573B2 (en) * 2002-02-28 2009-02-04 株式会社京三製作所 Railway signal system database verification method
CN102452404A (en) * 2010-11-02 2012-05-16 上海直真视通科技有限公司 Subway emergency management system
CN102556125A (en) * 2011-12-26 2012-07-11 北京交控科技有限公司 Maintenance support system of automatic train control system
CN103744383A (en) * 2013-12-26 2014-04-23 北京交控科技有限公司 An early warning method and an early warning system of subway signal faults
CN106506645A (en) * 2016-11-10 2017-03-15 中车青岛四方机车车辆股份有限公司 The monitoring method and system of rail vehicle
CN106896799A (en) * 2015-12-18 2017-06-27 株洲南车时代电气股份有限公司 A kind of locomotive inspection and repair management method
CN107016057A (en) * 2017-02-28 2017-08-04 北京铁路局 Row control vehicle-mounted ATP equipment integral intelligent O&M method and system
CN107219837A (en) * 2016-03-21 2017-09-29 刘春梅 One kind is used for subway shield door failure monitoring and early warning intelligence system
CN107433962A (en) * 2016-06-18 2017-12-05 刘春梅 A kind of method and system for being used for track traffic failure monitoring and intelligent early-warning

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4220573B2 (en) * 2002-02-28 2009-02-04 株式会社京三製作所 Railway signal system database verification method
CN102452404A (en) * 2010-11-02 2012-05-16 上海直真视通科技有限公司 Subway emergency management system
CN102556125A (en) * 2011-12-26 2012-07-11 北京交控科技有限公司 Maintenance support system of automatic train control system
CN103744383A (en) * 2013-12-26 2014-04-23 北京交控科技有限公司 An early warning method and an early warning system of subway signal faults
CN106896799A (en) * 2015-12-18 2017-06-27 株洲南车时代电气股份有限公司 A kind of locomotive inspection and repair management method
CN107219837A (en) * 2016-03-21 2017-09-29 刘春梅 One kind is used for subway shield door failure monitoring and early warning intelligence system
CN107433962A (en) * 2016-06-18 2017-12-05 刘春梅 A kind of method and system for being used for track traffic failure monitoring and intelligent early-warning
CN106506645A (en) * 2016-11-10 2017-03-15 中车青岛四方机车车辆股份有限公司 The monitoring method and system of rail vehicle
CN107016057A (en) * 2017-02-28 2017-08-04 北京铁路局 Row control vehicle-mounted ATP equipment integral intelligent O&M method and system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘若南等译: "《设备诊断技术》", 31 December 1983, 北京市机械工业局技术开发研究所 *
周庭梁等: "地铁的信号维护支持系统", 《城市轨道交通研究》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112744261A (en) * 2019-10-31 2021-05-04 株洲中车时代电气股份有限公司 Rail vehicle fault emergency processing method and system
CN114492870A (en) * 2022-01-26 2022-05-13 北京和利时系统集成有限公司 Fault processing method, device and system for rail transit signal equipment

Similar Documents

Publication Publication Date Title
CN110929898B (en) Hydropower station start-stop equipment operation and maintenance and fault monitoring online evaluation system and method
CN109413614A (en) A kind of vehicle ground integrated synthesis analysis platform
CN110941918B (en) Intelligent substation fault analysis system
CN112910089A (en) Transformer substation secondary equipment fault logic visualization method and system
CN105116870B (en) The failure analysis methods of air-conditioner set, device and system
CN104574557B (en) Alarm-based site polling method, alarm-based site polling manipulation device and alarm-based site polling system
CN111290324B (en) 5T detection station safety monitoring and diagnosing system and health alarming method thereof
CN106646030A (en) Power grid fault diagnosis method and device based on multiple data sources and expert rule base
CN102140929A (en) Mine safety production inspection system
CN106559270A (en) A kind of data analysing method and device of urban rail signalling arrangement
CN110807460B (en) Transformer substation intelligent patrol system based on image recognition and application method thereof
CN105971866B (en) A kind of air compressor failure on-line detecting method and system
CN112465334B (en) Rail transit accident rapid early warning method and system
CN109017882A (en) A kind of city rail traffic signal system O&M failure emergency treatment device and method
US20200307662A1 (en) Data fusion concept
CN108909773A (en) A kind of signalling arrangement comprehensive analysis of fault system
CN110097196A (en) A kind of intelligence operation management method and system
CN110221138A (en) A kind of automatic test approach and system for protective relaying device
CN112381958A (en) ETC portal system state online monitoring method and system
CN113987001A (en) Rail transit signal system fault analysis method and device and electronic equipment
CN112562276A (en) Equipment fault alarm method and system
CN104794771B (en) One kind patrols inspection automatic planning and a device
CN115848463A (en) Intelligent operation and maintenance system and method
CN107991965A (en) Standardization electricity business failure emergency command management method based on intellectual monitoring
CN101997741A (en) Network monitoring method and system for rail transit equipment state

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181218