CN109013015A - Solid waste tailing and building waste comprehensively utilize workshop - Google Patents

Solid waste tailing and building waste comprehensively utilize workshop Download PDF

Info

Publication number
CN109013015A
CN109013015A CN201810975929.4A CN201810975929A CN109013015A CN 109013015 A CN109013015 A CN 109013015A CN 201810975929 A CN201810975929 A CN 201810975929A CN 109013015 A CN109013015 A CN 109013015A
Authority
CN
China
Prior art keywords
production line
tailing
raw material
building stones
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810975929.4A
Other languages
Chinese (zh)
Inventor
郭幸福
张真弟
赵建强
乔斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Linfen City China Building Materials Science And Technology Ltd Co
Original Assignee
Linfen City China Building Materials Science And Technology Ltd Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Linfen City China Building Materials Science And Technology Ltd Co filed Critical Linfen City China Building Materials Science And Technology Ltd Co
Priority to CN201810975929.4A priority Critical patent/CN109013015A/en
Publication of CN109013015A publication Critical patent/CN109013015A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C21/00Disintegrating plant with or without drying of the material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C23/00Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
    • B02C23/08Separating or sorting of material, associated with crushing or disintegrating
    • B02C23/14Separating or sorting of material, associated with crushing or disintegrating with more than one separator
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09BDISPOSAL OF SOLID WASTE NOT OTHERWISE PROVIDED FOR
    • B09B3/00Destroying solid waste or transforming solid waste into something useful or harmless
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C2201/00Codes relating to disintegrating devices adapted for specific materials
    • B02C2201/02Codes relating to disintegrating devices adapted for specific materials for reinforced concrete
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/58Construction or demolition [C&D] waste

Landscapes

  • Engineering & Computer Science (AREA)
  • Food Science & Technology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Disintegrating Or Milling (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

Tailings construction rubbish of the present invention comprehensively utilizes production line, belongs to construction machinery equipment field;The invention proposes a kind of solid waste tailings and building waste to comprehensively utilize workshop, and production line arrangement is compact in the workshop, and occupied area is small, high production efficiency;There is provided technical solution are as follows: solid waste tailing and building waste comprehensively utilize workshop, tailings construction rubbish comprehensive utilization production line is provided in the comprehensive utilization workshop, the comprehensive utilization production line includes: the tailing production line and stone production line being arranged in the same direction, is set to the integrated production line of tailing production line and stone production line side;The tailing production line, stone production line discharge port docked respectively with integrated production line feed inlet by feed belt;The material that the present invention handles different material according to customer requirement, produces variable grain size, can effectively reduce production cost, increases economic efficiency.

Description

Solid waste tailing and building waste comprehensively utilize workshop
Technical field
Tailings construction rubbish of the present invention comprehensively utilizes production line, belongs to construction machinery equipment field, and in particular to one kind is mixed Solidifying soil aggregate production line.
Background technique
Construction industry is grown rapidly in recent two decades as one of mainstay of the national economy industry, with urban construction Flourishing progress, remove become each city theme.Removal can generate a large amount of building waste.
These rubbish are mainly common brick, armored concrete and its mixture.Currently, the quantity of China's building waste has accounted for The 30%~40% of municipal refuse total amount.Oneself is more than 400,000,000 t to building waste annual emissions, wherein the big cities such as Beijing, Shanghai year discharge Amount is in 30,000,000 t or more.The unprocessed countryside or rural area just directly transported to of these building wastes overwhelming majority is using outdoor It stacks or the mode of landfill is handled, and stacking and filling then needs to consume the construction investments such as a large amount of expropriation of land, refuse collection, together When, it clears and has aggravated environmental pollution again with fugitive dust with dropping in stacking process.Add in modern metropolitan cities towards industrialization, urbanization The today developed fastly, the rubbish that a large amount of engineering constructions generate just are threaten the natural environment of human survival.Developed country is more already A series of fruitful researchs and practice have been carried out for this problem, it was demonstrated that the recycling for realizing building waste is to solve conscientiously The good recipe of this social concern.But so far, the related work of China's construction refuse resource relatively lags behind, and thus gives society Meeting, environment and resource bring various detrimental effects.
It is main trend in recent years using building waste and industrial tailings production aggregate etc. other industrial products, but It is the production and processing that General Production Lines cannot be considered in terms of traditional raw material (cobblestone etc.) and building waste and industrial tailings, is arranged two Production line significantly improves cost of investment, reduces production efficiency.
Production line arrangement is at random in traditional mode of production workshop, and occupied area is wide, and production is extensive, and efficiency is extremely low, and in workshop Only it is suitble to a kind of production line of processing method, production efficiency is lower, and economic cost further increases, and enterprise competitiveness is low, effect Benefit is poor.
Summary of the invention
To overcome above-mentioned technical problem, the invention proposes a kind of solid waste tailing and building waste comprehensive utilization production vehicles Between, which can produce and process building waste and industrial tailings, also it is capable of handling traditional raw material, such as cobblestone Working process, while production line arrangement is compact, occupied area is small, high production efficiency.
In order to solve the above technical problems, the present invention provides technical solution are as follows: solid waste tailing and building waste comprehensive utilization life Is produced from workshop, tailings construction rubbish comprehensive utilization production line, the comprehensive utilization life are provided in the comprehensive utilization workshop Producing line includes: tailing production line, stone production line and integrated production line;The discharge port of the tailing production line, stone production line It is docked respectively with integrated production line by feed belt;
The tailing production line is set to inside workshop, and the stone production line is arranged in the same direction with tailing production line, and institute Stone production line discharge port is stated to be disposed adjacent with tailing production line discharge port, the integrated production line be set to stone production line and The side of tailing production line, and integrated production line feed inlet is set to below stone production line and tailing production line discharge port.
The tailing production line include: raw material cabin, raw material batcher, jaw crusher, material transfer belt, dregs storehouse, Dregs feed belt, raw material intermediate bin and impact crusher;The raw material cabin upper end opening flushes setting, raw material cabin bottom with ground Portion exit is equipped with raw material batcher, and the raw material batcher discharge port is docked with jaw crushing machine inlet, the jaw Material transfer belt is installed, side is also equipped with dregs storehouse and dregs among the material transfer belt under discharge hole of crusher Feed belt, the dregs feed belt are docked with material transfer belt, and the other end of material transfer belt is set in raw material Between above storehouse, be provided with impact crusher below the raw material intermediate bin.
The stone production line includes: building stones storehouse, building stones batcher, building stones feed belt, building stones intermediate bin and multi-cylinder circle Conic crusher;The building stones storehouse is set to ground, and stone bin outlet is equipped with building stones batcher, the building stones intermediate bin with it is above-mentioned Raw material intermediate bin is disposed adjacent in earth's surface, and building stones feed belt, institute are provided between the building stones batcher and building stones intermediate bin It states building stones intermediate bin outlet lower section and is provided with multi-cylinder cone crusher.
The integrated production line includes being set to ground: circular shale shaker, material intermediate bin, impact crusher, sorting It sieves, mix wet machine and material storage storage;Pass through biography between the circular shale shaker and above-mentioned impact crusher and multi-cylinder cone crusher It send belt to connect, sets gradually material intermediate bin, impact crusher, separating sieve after the circular shale shaker and mix wet machine, institute It states and is connected between circular shale shaker, material intermediate bin, impact crusher and separating sieve by feed belt, it is described to mix wet machine setting Below separating sieve, the material storage storage includes several warehouses, and the warehouse of the material storage storage passes through several feed belts It is connect with separating sieve, and discharge port height layering setting below separating sieve, the transmission of several the material storage storage and separating sieve Belt is arranged according to separating sieve discharge port level.
The raw material intermediate bin and building stones intermediate bin lower end are provided with oscillating feeder.
The raw material batcher uses grizzly feeder TSW1345.
Be provided with the feed belt for being connected to dregs storehouse below the raw material batcher, and dregs storehouse and raw material batcher it Between be provided with except soil sieve.
Iron remover is also equipped between the material intermediate bin and impact crusher.
Discharge port is additionally provided with the feed belt of connection impact crusher feed inlet below the separating sieve.
Deduster is mounted at the dregs storehouse, building stones storehouse and separating sieve.
The jaw crusher uses PEW860.
The impact crusher uses PFW1318 III.
The multi-cylinder cone crusher uses HPT300.
The oscillating feeder uses ZG400 type.
The circular shale shaker uses 3Y2460 formula vibrating screen.
The deduster in the dregs storehouse and building stones storehouse uses the box deduster of PPCS.
The separating sieve uses VUT120 dust pelletizing system.
Compared with the prior art, the invention has the beneficial effects that:
One, the present invention improves production line in such a way that tailing production line, stone production line are matched with integrated production line Utilization efficiency reduces cost of investment, improves economic benefit.
Two, tailing production line, the discharge port of stone production line and integrated production line feed inlet are set at one by the present invention, It cooperates convenient for three production lines, while improving workshop utilization rate.
Three, tailing production line, stone production line are oppositely arranged by the present invention, and integrated production line is set to side, convenient for not Same raw material enter workshop from different directions, while material outlet is distinguished with raw material import, convenient for management.
Four, raw material batcher of the present invention uses grizzly feeder, is convenient for bulk materials uniform feeding, is conducive to jaw crushing Machine continually and steadily works.
Five, the present invention is in such a way that jaw crusher is matched with impact breaker, convenient for bulk building waste It directly handles, effectively improves working efficiency.
Six, the present invention is mutual using jaw crusher, impact breaker, multi-cylinder cone crusher and impact crusher The mode of cooperation, convenient for producing various hardness, quality and the material of granular size according to demand.
Seven, the present invention uses separating sieve and feed belt, different material can be stored to corresponding storage bin.
Detailed description of the invention
Fig. 1 is production line schematic diagram of the present invention;
Fig. 2 is production line E of the present invention to schematic diagram;
Fig. 3 is production line G of the present invention to schematic diagram;
Fig. 4 is production line F of the present invention to schematic diagram;
In figure: 1 is tailing production line, and 2 be stone production line, and 3 be integrated production line, and 11 be raw material cabin, and 12 be raw material batcher, 13 be jaw crusher, and 14 be material transfer belt, and 15 be dregs storehouse, and 16 be dregs feed belt, and 17 be raw material intermediate bin, 18 For impact crusher, 19 is sieve except soil, and 21 be building stones storehouse, and 22 be building stones batcher, and 23 be building stones feed belt, and 24 is in building stones Between storehouse, 25 be multi-cylinder cone crusher, and 31 be circular shale shaker, and 32 be material intermediate bin, and 33 be impact crusher, and 34 be sorting Sieve, 35 is mix wet machine, and 36 be material storage storage, and 37 be iron remover.
Specific embodiment
It should be noted that structure, ratio, size etc. that Figure of description is drawn, only to cooperate specification to be taken off The content shown is not intended to limit the invention enforceable range, therefore does not have so that those skilled in the art understands and reads Technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size are not influencing institute's energy of the present invention Under the effect of generation and the purpose that can reach, the range that disclosed technology contents can be covered should all be still fallen in It is interior.
It is described further combined with specific embodiments below.
As shown in figures 1-4: solid waste tailing and building waste comprehensively utilize workshop, the comprehensive utilization workshop It is inside provided with tailings construction rubbish comprehensive utilization production line, the comprehensive utilization production line includes: tailing production line 1, building stones life Producing line 2 and integrated production line 3;The tailing production line 1, stone production line 2 discharge port pass through biography with integrated production line 3 respectively Belt is sent to dock;
The tailing production line 1 is set to inside workshop, and the stone production line 2 is arranged in the same direction with tailing production line 1, and 2 discharge port of stone production line is disposed adjacent with 1 discharge port of tailing production line, and it is raw that the integrated production line 3 is set to building stones The side of producing line 2 and tailing production line 1, and 3 feed inlet of integrated production line is set to stone production line 2 and tailing production line 1 goes out Below material mouth.
The tailing production line 1 includes: raw material cabin 11, raw material batcher 12, jaw crusher 13, material transfer belt 14, dregs storehouse 15, dregs feed belt 16, raw material intermediate bin 17 and impact crusher 18;11 upper end opening of raw material cabin with Ground flushes setting, and raw material batcher 12,12 discharge port of raw material batcher and jaw are equipped at 11 outlet at bottom of raw material cabin 13 feed inlet of formula crusher docks, and material transfer belt 14 is equipped under 13 discharge port of jaw crusher, and the material passes The intermediate side of belt 14 is sent to be also equipped with dregs storehouse 15 and dregs feed belt 16, the dregs feed belt 16 and material transmission Belt 14 docks, and the other end of material transfer belt 14 is set to 17 top of raw material intermediate bin, 17 lower section of raw material intermediate bin It is provided with impact crusher 18.
The stone production line 2 includes: building stones storehouse 21, building stones batcher 22, building stones feed belt 23, building stones intermediate bin 24 With multi-cylinder cone crusher 25;The building stones storehouse 21 is set to ground, and the outlet of building stones storehouse 21 is equipped with building stones batcher 22, described Building stones intermediate bin 24 is disposed adjacent with above-mentioned raw materials intermediate bin 17 in earth's surface, the building stones batcher 22 and building stones intermediate bin 24 it Between be provided with building stones feed belt 23, the outlet of building stones intermediate bin 24 lower section is provided with multi-cylinder cone crusher 25.
The integrated production line 3 includes being set to ground: circular shale shaker 31, material intermediate bin 32, impact crusher 33, separating sieve 34, mix wet machine 35 and material storage storage 36;The circular shale shaker 31 and above-mentioned impact crusher 18 and multi-cylinder circular cone It is connected between crusher 25 by feed belt, it is broken to set gradually material intermediate bin 32, impact type after the circular shale shaker 31 Broken machine 33, separating sieve 34 and wet machine 35 is mixed, the circular shale shaker 31, material intermediate bin 32, impact crusher 33 and separating sieve It is connected between 34 by feed belt, it is described to mix wet machine 35 and be set to the lower section of separating sieve 34, if the material storage storage 36 includes The warehouse of dry warehouse, the material storage storage 36 is connect by several feed belts with separating sieve 34, and is gone out below separating sieve 34 The feed belt of material mouth height layering setting, several material storage storage 36 and separating sieve 34 is according to 34 discharge port level of separating sieve Setting.
The raw material intermediate bin 17 and 24 lower end of building stones intermediate bin are provided with oscillating feeder.
The raw material batcher 12 uses grizzly feeder TSW1345.
The feed belt for being connected to dregs storehouse 15 is provided with below the raw material batcher 12, and dregs storehouse 15 is given with raw material It is provided between material machine 12 except soil sieve 19.
Iron remover 37 is also equipped between the material intermediate bin 32 and impact crusher 33.
The 34 lower section discharge port of separating sieve is additionally provided with the feed belt of connection 33 feed inlet of impact crusher.
Deduster is mounted at the dregs storehouse 15, building stones storehouse 21 and separating sieve 34.
The tailing production line 1 mainly handles bulk building waste and other industrial tailings, by taking building waste as an example: lorry After building waste is transported to raw material cabin 11, by grizzly feeder uniformly by bulk building waste feeding to jaw crusher 13, warp Raw material bulk particle is formed after processing, while after fritter building waste falls off from grizzly feeder, having feed belt to be transported to slag Native Cang15Chu mixes again with raw material bulk particle with ingredient dregs after except soil processing, is then transported to raw material intermediate bin 17, raw material fritter particle is formed after being further processed using impact crusher 18, it then will after the screening of circular shale shaker 31 The biggish raw material fritter particulate transportation of particle to raw material intermediate bin 17 is handled again, qualified raw material fritter particle delivery to impact Formula crusher 33 is further processed into raw material molecule, then passes through separating sieve 34, is transported to different material storage storage 36 It is interior.
Similarly, the stone production line 2 mainly handles traditional raw material, such as cobblestone, lorry transport cobblestone to stone In feed bin 21, then building stones feed belt 23 transports cobblestone to building stones intermediate bin 24, by 25 powder of multi-cylinder cone crusher The step of forming granule stone after broken, granule stone be then transported to circular shale shaker 31 and is handled, next handling granule stone It is consistent with the method for above-mentioned processing building waste with method.
The material that different material is handled according to customer requirement, produces variable grain size may be implemented in this way, With multiple combinations mode, production requirement can satisfy, while reducing cost of investment, product competitiveness is greatly improved.
It is removed it should be understood that being additionally provided between material intermediate bin 32 and impact crusher 33 in integrated production line 3 Ironware, can effectively remove the iron in abrasive grit in raw material, especially building waste, the injury of abrasive grit impingement crusher 33 compared with Greatly, removal abrasive grit can effectively improve 33 service life of impact crusher.

Claims (10)

1. solid waste tailing and building waste comprehensively utilize workshop, it is characterised in that: set in the comprehensive utilization workshop It is equipped with tailings construction rubbish comprehensive utilization production line, the comprehensive utilization production line includes: tailing production line (1), building stones production Line (2) and integrated production line (3);The tailing production line (1), stone production line (2) discharge port respectively with integrated production line (3) it is docked by feed belt;
The tailing production line (1) is set to inside workshop, and the stone production line (2) and tailing production line (1) are in the same direction Setting, and the stone production line (2) discharge port is disposed adjacent with tailing production line (1) discharge port, the integrated production line (3) It is set to the side of stone production line (2) and tailing production line (1), and integrated production line (3) feed inlet is set to building stones production Below line (2) and tailing production line (1) discharge port.
2. solid waste tailing and building waste comprehensively utilize workshop according to claim 1, it is characterised in that: the tailing Production line (1) includes: raw material cabin (11), raw material batcher (12), jaw crusher (13), material transfer belt (14), dregs Storehouse (15), dregs feed belt (16), raw material intermediate bin (17) and impact crusher (18);Raw material cabin (11) upper end opening Setting is flushed with ground, is equipped with raw material batcher (12) at raw material cabin (11) outlet at bottom, and the raw material batcher (12) goes out Material mouth is docked with jaw crusher (13) feed inlet, is equipped with material transfer belt under jaw crusher (13) discharge port (14), the intermediate side of the material transfer belt (14) is also equipped with dregs storehouse (15) and dregs feed belt (16), the slag Native feed belt (16) is docked with material transfer belt (14), and the other end of material transfer belt (14) is set to raw material intermediate bin (17) top, raw material intermediate bin (17) lower section are provided with impact crusher (18).
3. solid waste tailing and building waste comprehensively utilize workshop according to claim 1, it is characterised in that: the building stones Production line (2) includes: building stones storehouse (21), building stones batcher (22), building stones feed belt (23), building stones intermediate bin (24) and multi-cylinder Gyratory crusher (25);The building stones storehouse (21) is set to ground, and building stones storehouse (21) outlet is equipped with building stones batcher (22), institute It states building stones intermediate bin (24) to be disposed adjacent with above-mentioned raw materials intermediate bin (17) in earth's surface, in the building stones batcher (22) and building stones Between be provided with building stones feed belt (23) between storehouse (24), it is broken that building stones intermediate bin (24) outlet lower section is provided with multi-cylinder circular cone Broken machine (25).
4. according to claim 1, solid waste tailing described in 2 or 3 any claims and building waste comprehensively utilize workshop, Be characterized in that: the integrated production line (3) includes being set to ground: circular shale shaker (31), material intermediate bin (32), impact type Crusher (33), mixes wet machine (35) and material storage storage (36) at separating sieve (34);The circular shale shaker (31) and above-mentioned counterattack are broken It is connected between broken machine (18) and multi-cylinder cone crusher (25) by feed belt, is set gradually after the circular shale shaker (31) It material intermediate bin (32), impact crusher (33), separating sieve (34) and mixes wet machine (35), the circular shale shaker (31), material It is connected between intermediate bin (32), impact crusher (33) and separating sieve (34) by feed belt, the wet machine (35) of mixing is set It is placed in below separating sieve (34), the material storage storage (36) includes several warehouses, and the warehouse of the material storage storage (36) is logical It crosses several feed belts to connect with separating sieve (34), and discharge port height layering setting below separating sieve (34), several objects Expect that the feed belt of storage warehouse (36) and separating sieve (34) is arranged according to separating sieve (34) discharge port level.
5. solid waste tailing according to claim 1 or claim 2 and building waste comprehensively utilize workshop, it is characterised in that: described Raw material intermediate bin (17) and building stones intermediate bin (24) lower end are provided with oscillating feeder.
6. solid waste tailing according to claim 1 or claim 2 and building waste comprehensively utilize workshop, it is characterised in that: described Raw material batcher (12) uses grizzly feeder TSW1345.
7. solid waste tailing according to claim 1 or claim 2 and building waste comprehensively utilize workshop, it is characterised in that: described The feed belt for being connected to dregs storehouse (15), and dregs storehouse (15) and raw material batcher are provided with below raw material batcher (12) (12) it is provided between except soil sieve (19).
8. according to claim 1, solid waste tailing described in 2 or 3 any claims and building waste comprehensively utilize workshop, It is characterized in that: being also equipped with iron remover (37) between the material intermediate bin (32) and impact crusher (33).
9. according to claim 1, solid waste tailing described in 2 or 3 any claims and building waste comprehensively utilize workshop, Be characterized in that: discharge port is additionally provided with the transmission skin of connection impact crusher (33) feed inlet below the separating sieve (34) Band.
10. according to claim 1, solid waste tailing described in 2 or 3 any claims and building waste comprehensively utilize workshop, It is characterized by: being mounted on deduster at the dregs storehouse (15), building stones storehouse (21) and separating sieve (34).
CN201810975929.4A 2018-08-24 2018-08-24 Solid waste tailing and building waste comprehensively utilize workshop Pending CN109013015A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810975929.4A CN109013015A (en) 2018-08-24 2018-08-24 Solid waste tailing and building waste comprehensively utilize workshop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810975929.4A CN109013015A (en) 2018-08-24 2018-08-24 Solid waste tailing and building waste comprehensively utilize workshop

Publications (1)

Publication Number Publication Date
CN109013015A true CN109013015A (en) 2018-12-18

Family

ID=64627527

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810975929.4A Pending CN109013015A (en) 2018-08-24 2018-08-24 Solid waste tailing and building waste comprehensively utilize workshop

Country Status (1)

Country Link
CN (1) CN109013015A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114713596A (en) * 2022-04-12 2022-07-08 武汉建筑材料工业设计研究院有限公司 Production method for co-processing of construction waste and mine waste rock

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101229660A (en) * 2008-02-11 2008-07-30 苏峰 Method of preparing regenerative concrete products
CN201596527U (en) * 2010-02-05 2010-10-06 宝钢集团新疆八一钢铁有限公司 Mineral ore crushing and dressing device
CN202055143U (en) * 2011-01-31 2011-11-30 上海寰保渣业处置有限公司 Production device of road base material produced by brick-concrete type building rubbish
CN102603236A (en) * 2012-03-06 2012-07-25 刘子振 Waste brick recycled concrete building material and manufacturing method thereof
WO2015092734A1 (en) * 2013-12-20 2015-06-25 La Mia Energia Scarl De-assembling system for a photovoltaic panel enabling salvage of original materials
CN205347248U (en) * 2015-12-01 2016-06-29 重庆福丹环保建材有限公司 Building waste retrieves and recycles production line
CN206008948U (en) * 2016-08-31 2017-03-15 成都大宏立机器股份有限公司 A kind of sandstone, mine crushing production line
CN107445543A (en) * 2017-08-03 2017-12-08 河北建筑工程学院 A kind of iron tailings regeneration concrete and preparation method thereof
CN108237135A (en) * 2016-12-27 2018-07-03 越艳 A kind of equipment of building waste pretreatment system
CN209393314U (en) * 2018-08-24 2019-09-17 临汾市华基建材科技有限公司 A kind of solid waste tailing and building waste comprehensively utilize workshop

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101229660A (en) * 2008-02-11 2008-07-30 苏峰 Method of preparing regenerative concrete products
CN201596527U (en) * 2010-02-05 2010-10-06 宝钢集团新疆八一钢铁有限公司 Mineral ore crushing and dressing device
CN202055143U (en) * 2011-01-31 2011-11-30 上海寰保渣业处置有限公司 Production device of road base material produced by brick-concrete type building rubbish
CN102603236A (en) * 2012-03-06 2012-07-25 刘子振 Waste brick recycled concrete building material and manufacturing method thereof
WO2015092734A1 (en) * 2013-12-20 2015-06-25 La Mia Energia Scarl De-assembling system for a photovoltaic panel enabling salvage of original materials
CN205347248U (en) * 2015-12-01 2016-06-29 重庆福丹环保建材有限公司 Building waste retrieves and recycles production line
CN206008948U (en) * 2016-08-31 2017-03-15 成都大宏立机器股份有限公司 A kind of sandstone, mine crushing production line
CN108237135A (en) * 2016-12-27 2018-07-03 越艳 A kind of equipment of building waste pretreatment system
CN107445543A (en) * 2017-08-03 2017-12-08 河北建筑工程学院 A kind of iron tailings regeneration concrete and preparation method thereof
CN209393314U (en) * 2018-08-24 2019-09-17 临汾市华基建材科技有限公司 A kind of solid waste tailing and building waste comprehensively utilize workshop

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114713596A (en) * 2022-04-12 2022-07-08 武汉建筑材料工业设计研究院有限公司 Production method for co-processing of construction waste and mine waste rock

Similar Documents

Publication Publication Date Title
CN101549351B (en) Building refuse treatment regeneration system
CN201511034U (en) Construction waste treatment regeneration system
CN102838307A (en) Method and system for treating construction waste
CN201442005U (en) Construction waste comprehensive treatment equipment
CN206535848U (en) Building waste processing system
CN101544483A (en) Method for producing renewable aggregate by using construction waste
CN104971816A (en) Fine processing process for heavy calcium carbonate raw materials
CN108816483A (en) A kind of Machine-made Sand production system
CN113019648A (en) High-efficient preparation system of abandonment concrete regeneration sand powder
CN112439530A (en) Fine granite machine-made sandstone aggregate production line and process flow thereof
CN207643427U (en) Spoil slag dry powder and mortar production system
CN207238203U (en) A kind of Machine-made Sand production system
CN113618929A (en) Green intelligent integrated mill
CN104446071A (en) Dry sand making process
CN209576975U (en) A kind of high-quality sandstone aggregate impacts dry milling production line entirely
CN216125816U (en) Waste ceramic tile system sand powder process all-in-one
CN209393314U (en) A kind of solid waste tailing and building waste comprehensively utilize workshop
CN206526918U (en) Building rubbish treatment device
CN209393717U (en) A kind of solid waste tailing and tailings construction rubbish comprehensively utilize production line
CN106116196A (en) A kind of vertical mill grinding slag, lithium slag composite powder production method
CN209968608U (en) Limestone processing system
CN203173995U (en) Device for building waste residue associated grinding resource processing system
CN109013015A (en) Solid waste tailing and building waste comprehensively utilize workshop
CN220195096U (en) Building type sand and stone aggregate integrated equipment capable of producing coarse and fine aggregate
CN206066689U (en) A kind of joint use type dry-mixed mortar production line

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181218