CN109004955A - A kind of industrial enterprise's electricity consumption data acquisition management system - Google Patents

A kind of industrial enterprise's electricity consumption data acquisition management system Download PDF

Info

Publication number
CN109004955A
CN109004955A CN201810821711.3A CN201810821711A CN109004955A CN 109004955 A CN109004955 A CN 109004955A CN 201810821711 A CN201810821711 A CN 201810821711A CN 109004955 A CN109004955 A CN 109004955A
Authority
CN
China
Prior art keywords
signal
voltage
cycle
point
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810821711.3A
Other languages
Chinese (zh)
Inventor
张金木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou Alignment Mdt Infotech Ltd
Original Assignee
Fuzhou Alignment Mdt Infotech Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou Alignment Mdt Infotech Ltd filed Critical Fuzhou Alignment Mdt Infotech Ltd
Publication of CN109004955A publication Critical patent/CN109004955A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B3/00Line transmission systems
    • H04B3/54Systems for transmission via power distribution lines
    • H04B3/546Combination of signalling, telemetering, protection
    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C19/00Electric signal transmission systems
    • G08C19/16Electric signal transmission systems in which transmission is by pulses
    • G08C19/22Electric signal transmission systems in which transmission is by pulses by varying the duration of individual pulses
    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C19/00Electric signal transmission systems
    • G08C19/16Electric signal transmission systems in which transmission is by pulses
    • G08C19/24Electric signal transmission systems in which transmission is by pulses using time shift of pulses

Abstract

The present invention relates to a kind of industrial enterprise's electricity consumption data acquisition management system, each group of electrical equipment is arranged an electric quantity collector and acquires power information to more electrical equipments, and every electrical equipment configures voltage transformer and current transformer.Electric quantity collector is sent into A/D converter after amplifying collected electric current and voltage signal after conditioning and carries out various electric energy calculating again, and Centralized Controller is uploaded to by power line communication, internet is accessed by being integrated with the Network Interface Module of TCP/IP hardware protocol stacks after being summarized again by Centralized Controller, so as to use computer and handheld mobile device to access remote computation machine management system.

Description

A kind of industrial enterprise's electricity consumption data acquisition management system
(1) technical field:
The present invention relates to a kind of industrial enterprise's electricity consumption data acquisition management systems, include Centralized Controller and each electric quantity acquisition Device is crossed 0 area's specified point to grid cyclic wave voltage and sends wide pulse signal generation mutation current, made using power line communication method Grid cyclic wave carries information.Centralized Controller receives the data of each electric quantity collector acquisition, and by being integrated with TCP/IP hardware The Network Interface Module of protocol stack accesses internet, so as to use computer and handheld mobile device to access remote computer pipe Reason system.
(2) background technique:
Current power line communication refers mainly to power line carrier communication and bi-directional Glenn shunt.Power line carrier communication PLC benefit Signal is transmitted by carrier system with existing power line.But distribution transformer has barrier action to power carrier signal, simultaneously Transmission has the very big loss of signal again between three-phase power line, so power carrier signal can only be in a distribution transformer platform area Transmission, and can only be transmitted in single-phase electricity line.In practical application, when power line zero load, point-to-point carrier signal can be transferred to Several kilometers, but when load is very heavy on power line, tens meters can only be transmitted, therefore power line carrier communication is only applied remote at present In journey meter reading, also need to cooperate other means of communication.
Bi-directional Glenn shunt TWACS, which is utilized, is added modulated signal in power-frequency voltage fundamental wave zero passage area, with the electricity in this region The distorted signal of pressure or current waveform carries information.TWACS system equipment exists only in substation and user terminal.Wherein by power transformation Standing to the channel of user terminal transmission is output channel, carries information using the modulation of voltage waveform, is passed from user terminal to substation Defeated channel is input channel, transmits information using the variation of current waveform.Its receiving and transmitting signal passes through coupling transformer and electricity The crosslinking of power net.
The detection of TW A CS signal is mainly based upon time-domain difference technology, these methods mostly data processing complex, in real time Property it is poor, equipment cost is high, needs to acquire a large amount of signal of multiple cycles relatively and carries out A/D conversion respectively, then carries out complicated meter It calculates, just can determine that the signal position is " 1 " or " 0 ", due to the preciseness of calculating, interference signal can seriously affect detected signal Judgement as a result, therefore original method be difficult China apply.
Clock timer and synchrotimer is arranged in the present invention, and the true and false judgement of synchrotimer and cycle signal is screened With reference to my 2016 yearly correlation patents.
(3) summary of the invention:
Power line bi-directional Glenn shunt be when silicon-controlled 30 ° of triggering and conductings before zero crossing of modulation circuit, by every Modulated signal is generated from transformer, makes grid cyclic wave that short circuit distortion occur, exports the frequency of modulated signal in 200~600Hz Range, receiving end demodulate useful letter by acquisition, A/D conversion and the series of computation to multiple groups cycle distorted signal Breath.But China's power network uses isolated neutral or small current neutral grounding system, electricity consumption situation is complicated, the two-way power frequency of power line Communication can hardly find practical applications in China.
The present invention relates to a kind of industrial enterprise's electricity consumption data acquisition management system, an electricity is arranged in each group of electrical equipment Collector acquires power information to more electrical equipments, and every electrical equipment configures voltage transformer and current transformer.Electricity Amount collector is sent into A/D converter after amplifying collected electric current and voltage signal after conditioning and carries out various electric energy calculating again, And Centralized Controller is uploaded to by power line communication, then by being integrated with TCP/IP hardware protocol after being summarized by Centralized Controller The Network Interface Module of stack accesses internet, so as to use computer and handheld mobile device to access remote computer management system System.Wiring installation is reduced using power line communication.
The power line communication of use is the signal sending point and signal receiving point by the setting to grid cyclic wave voltage It is accurately positioned, sends a rectangle broad pulse of communication positive or negative pole in the signal sending point of setting to generate mutation electricity Stream, which causes a voltage drop to be superimposed on grid voltage waveform on the short-circuit impedance of distribution transformer, to complete Signal modulation process, signal receiving point demodulated signal of the receiving end in the setting of grid cyclic wave voltage;One anode Broad pulse refers to that the high level part of pulse returns 0 from 0 to height.Because only sending single rectangular wave broad pulse to power grid shadow Very little is rung, and structure simple signal recall rate is high.The microcontroller STC15F2K60S of system, using external crystal-controlled oscillation, frequency 35MHz, signal procedure are write with assembler language, to reduce communication instruction holding time.Or use other model high speed microcontrollers Device.
The setting of signal transmitting and receiving position: it is crossed at 0 in the voltage of grid cyclic wave positive half cycle and 0 voltage comparator was set, in electricity A setting cycle voltage location setting signal voltage comparator between voltage 21V -40V of net week wave positive half cycle.In this way, The output of signal voltage comparator realizes overturning in two positions of all wave voltages of setting of a cycle positive half cycle.Cycle just The position of the setting week wave voltage of half cycle ascent stage is as the first signal location, all wave voltages of setting signal transmitting-receiving point Position is known as the first signal set point, cycle positive half cycle descending branch the setting week wave voltage position as second signal The cycle voltage location of position, setting signal transmitting-receiving point is known as second signal set point.Microcontroller STC15F2K60S can be with It is that rising edge triggers or failing edge triggers that external interrupt, which is arranged, has served as 0 voltage comparator and signal voltage comparator in power grid week The ascent stage of wave positive half cycle or descending branch, which generate after overturning triggering is interrupted, changes down trigger mode, or and by different interruptions Source generates interruption.
The condition that signal transmitting and receiving has: 0 voltage comparator of mistake and signal voltage comparator are all made of ns grades of height Fast voltage comparator.The time mistake that overturning and triggering are interrupted can reduce using High Speed Microcontroller and high speed voltage comparator Difference, and have the resolution ratio of sufficiently high detection overturning triggering break period, cooperate the position of signal to wipe the skill with synchrotimer Art means improve the recall rate that grid cyclic wave carries information.It needs to transmit by ns grades of high-speed power control switch basis signal Distance it is tests determined by transmitted positive 35V to a setting rectangular wave broad pulse voltage-drop loading between 60V in power grid Signal sending point on cycle, the rectangular wave broad pulse voltage are higher than the voltage for the grid cyclic wave position being loaded.Basis signal The width of the tests determined rectangular wave broad pulse voltage of the distance that need to be transmitted is 0.3ms~0.5ms, can provide signal code 1A- 20A.It is displaced all wave voltages in the time of the signal location, so that the high speed voltage comparator of receiving end be made to connect in signal Sink is not overturn, is taken " 0 " to send as the position (BIT) in signal, is otherwise taken " 1 " to send for the position (BIT) in signal.Therefore only When the position value in signal overturn signal voltage comparator should in signal receiving point, due to interference be not flipped just have by Interference effect.
Signal receiving end setting: signal receiving end is made of High-speed Control switch and signal voltage comparator, in microcontroller Device controls lower High-speed Control switch, and only the low-voltage window region around signal transmitting and receiving point is opened.In the first signal transmitting and receiving point when week Week wave voltage positive half cycle ascent stage wave voltage cross 0 interruption after, after the 0.1ms that is delayed connect High-speed Control switch, work as signal voltage Comparator shutdown High-speed Control switch after the 0.3ms that is delayed after the overturning of the first signal transmitting and receiving point is interrupted;It is received and dispatched in second signal Point is when signal voltage comparator is after week cycle positive half cycle ascent stage, wave voltage crossed 0 interruption, through the T that is delayedicAfter connect High-speed Control Switch Tic=Ti2- 0.1ms, 0.1ms turns off High-speed Control and opens before cycle positive half cycle descending branch week, wave voltage crossed 0 interruption It closes, in this way, the low-voltage window region around the first signal transmitting and receiving point and second signal transmitting-receiving point is formd, when the cycle of input When voltage falls in low-voltage window region, High-speed Control is switched in an ON state, and signal voltage comparator is directly in all wave voltages Signal receive position receive signal and measurement cycle time parameter, determine received signal whether setting signal receive Within the scope of point tolerance, High-speed Control switch is in an off state other than low-voltage window region.Therefore, grid cyclic wave voltage is through height Fast control switch control, only in two low-voltage window regions of cycle positive half cycle, directly filtering is followed by signal voltage ratio after conditioning Compared with device input terminal, High-frequency Interference is filtered out by fundamental frequency signal re-demodulation signal of communication, grid cyclic wave high voltage has been isolated, is dropped The low error as caused by bleeder circuit.
The erasing and repeating transmission of position value in signal: during transmitting terminal sends signal, when high-speed power control switch is opened Afterwards, signal transmitted by transmitting terminal simultaneously receiving end signal voltage comparator receive, if received position value information with The position value information of transmission is different, then then sends the erasing signal of this.Each data bit is erasable in each frame information Retransmit, using control bit receive and dispatch erasing signal, if wipe twice in succession it is unsuccessful, that is, send erasing frame signal, to mention High signal recall rate.Only when the quantity for being wiped free of position is more than setting value, just wipe and retransmission of information frame.
Information frame generates: institute's rheme is binary digit.Each information frame is by start bit, address or data bit, stop bits Composition.Every bit occupancy a cycle, address or data bit totally 8.Position value with signal voltage comparator signal receiving point not Overturning overturns to send position signal " 0 " to send position signal " 1 ".Microcontroller recorded during transmitting-receiving effective address or Data bits and the occupied digit of erase process show ground when wherein effective address or data bits reach 8 digit of setting Location or data bit transmission terminate.Wherein the first signal set point of address or data bit is transmitting-receiving address or data, second signal Set point is confirmation or the information that the first signal set point of erasing is sent, and sending " 1 " is confirmation, and sending " 0 " is erasing.Start bit It is to start to send that middle signal voltage comparator, which sends " 0 " in the first signal set point, and sending " 0 " in second signal set point is hair Address frame is sent, sending " 1 " is data frame.Stop bits is in the first signal set point to send " 1 " end, and second signal set point is not With.
The compensation of signal transmitting and receiving location error: China's sinusoidal ac mains frequency be 50Hz, voltage effective value 220V, Its instantaneous voltage u is calculated by following formula:
U=Umsin100 π t;……………….………….1
In formula: UmFor China's network voltage peak value
As shown in Figure 1, system is crossed at 0 using the voltage of cycle positive half cycle ascent stage as start time to the first signal set point Time interval be nominal value Tm1;The voltage of cycle positive half cycle ascent stage is crossed at 0 as start time to second signal set point Time interval is nominal value Tm2.The Tm1And Tm2It is calculated by 1 formula, u is to set all wave voltages in formula.
Simultaneously measured 0 voltage comparator the cycle positive half cycle ascent stage mistake 0 overturn when time arrived for start time The real-time measurement values T of time interval of the signal voltage comparator when the first signal location is overturnc1;This spent for 0 flip-flop transition when being Between starting point to signal voltage comparator second signal position overturn when time interval real-time measurement values Tc2;Signal voltage ratio It was arrived when second signal position is overturn between time of 0 voltage comparator when the mistake 0 of cycle positive half cycle descending branch is overturn compared with device Every real-time measurement values Tc3;Cross 0 voltage comparator the cycle positive half cycle ascent stage of two adjacent cycles mistake 0 overturn when Between between be divided into cycle period real-time measurement values Tzu.
Since power grid crosses the left and right shake that 0 error showed as at 0 point, but sending and receiving end synchronized 0 and to cross 0 overturning as base Locating tab assembly cycle time parameter, crossing 0 shake influences very little to measurement cycle time parameter, therefore ignores 0 voltage comparator and cross 0 Overturning and timing error.When the cycle and its two adjacent cycles that detect are cycle period reality that is true, being detected simultaneously by When measured value Tzu in 20ms and its error range, measure the cycle to cross 0 voltage comparator in the cycle positive half cycle ascent stage The a reference value T of time interval when crossing 0 overturning for start time to signal voltage comparator when the first signal location is overturnc01 The a reference value that 0 overturning is time interval of the start time to signal voltage comparator when second signal position is overturn is crossed with this Tc02, save the continuous T of a setting number in 30 to 50c01And Tc02And calculate saved Tc01Average value Tp1With protected The T depositedc02Average value Tp2, by Tp1And Tp2It is stored in corresponding storage unit.
The then error compensation value T of signal voltage comparator flip-flop transitionbIt is determined by following formula:
Tb={ (Tm2- Tm1)-(Tp2- Tp1)}÷2;……………2
By TbIt saves.TbIllustrate that the position of actual signal transmitting-receiving point is higher for timing.
Measurement described above, wherein Tc1Or Tc01It is to cross 0 voltage comparator and signal voltage comparator in cycle just half Week crossed on the basis of the flip-flop transition of 0 position and signal location, but actual measurement is after overturning triggering interruption with voltage comparator On the basis of the timing time of timer, in this way, having served as triggering after mistake 0 of 0 voltage comparator in the cycle positive half cycle ascent stage is overturn The process for interrupting and starting timer, there are time for each instructions, it need to be added in the timing time of the measurement;Meanwhile institute The timing time for stating measurement, which need to subtract the triggering after the overturning of the first signal location, to interrupt and reads the instruction of process of timer and hold The row time.The execution time for also needing an instruction being carrying out comprising microcontroller after overturning is interrupted in triggering after wherein overturning, It can postpone interruption, and microcontroller STC15F2K60S is the single-chip microcontroller of 1T, this is easy to obtain the instruction time.Second Signal location measures Tc2Or Tc02Similarly, T is measuredc3When be also similar to above.
The judgement of the cycle true and false: by Tc1With Tp1;Tc2With Tp2;Tzu makes comparisons respectively with 20ms, if fair at it respectively Perhaps in cycle error range, then the cycle signal detected is very, otherwise to there is more overproof, the cycle detected Signal is false.Not in communication period and in the T of communication periodc1With Tp1;Tc2With Tp2Difference is respectively set when making comparisons respectively Cycle error range, since the first signal location of communication period and second signal position are shifted, and biggish cycle is taken to miss Poor range.
Clock timer and synchrotimer is arranged in system, and wherein synchrotimer saves each cycle period and counted with 20ms The cycle period aggregate-value of calculation is as synchronization time.When above-mentioned judgement cycle signal is true, saves Tzu and take 20ms and synchronometer When device timing time be added, the value that will add up restores in synchrotimer, if the cycle signal detected be it is false, will be all Wave signal is timing time during the vacation compared with 20ms is multiplied by the product for cycle during the vacation, if in error range, 20ms is taken to be added multiplied by the product for cycle during the vacation with synchrotimer timing time, when detecting that cycle signal is again The time synchronisation time is accurately corrected when true, and otherwise using cycle signal is timing time and synchrotimer timing during the vacation Time is added.It is ± 0.1Hz when generally running, when the relative error since power system frequency deviation allowable value is 0.2Hz When more than 6ms, illustrate that power grid has occurred compared with major break down.
The synchronization of signal transmitting and receiving: communication is realized under control synchronization time.Communication transmits multiple information frames each time, often At the beginning of secondary communication use synchronization time, be it is preset or by Centralized Controller instruct arrange, according to power grid quality and letter Number structure needs the data bit occupancy in each frame information 1 to multiple setting byte numbers, and power grid quality takes well biggish set Determine byte number.The clock timer time there are two cycle period is stayed after each frame traffic, for updating Tc1、Tc2And Tc3。 The communication of next frame since next cycle retransmits the information frame if detecting that cycle signal is vacation in a frame traffic.
Realize that the cycle in communication sequentially synchronizes by the start bit of each frame information, stop bits in the sending and receiving end of the communication information It connects.Centralized Controller or electric quantity collector measure respectively and store T in the call duration time gap of described two framesc1、Tc2With Tc3, and calculate separately two real-time measurement values Tc1Average value Tk1、Tc2Average value Tk2And Tc3Average value Tk3, and deposit respectively Enter two groups of storage units, i.e. Tc1、Tc2And Tc3Storage unit and Tk1、Tk2And Tk3Storage unit, when from storage unit take out Tk1、 Tk2And Tk3After reset two groups of storage units.The storage unit can store 16 real-time measurement values Tc1、Tc2And Tc3.It is not communicating Period measures continuous 16 real-time measurement values T respectivelyc1、Tc2And Tc3If screen to cycle signal be it is false, described in clearing Tc1、Tc2And Tc3Respective storage unit, continue to measure when screening to cycle signal is true and store, it is every when being filled with to be stored in one A Tc1、Tc2And Tc3, first remove a T being stored at firstc1、Tc2And Tc3, while number is taken out by a setting in 2 to 15, Take out the T of last one group of depositc1、Tc2And Tc3, when power grid quality difference, number is taken out in the smaller setting of choosing, and calculating is taken out each The T of groupc1Average value Tk1、Tc2Average value Tk2And Tc3Average value Tk3And replace the T originally savedk1、Tk2And Tk3, use Average value Tk1、Tk2And Tk3Reduce the influence of network voltage and frequency fluctuation.
Send the determination of signal time: communication is implemented in the single-phase phase line in a transformer platform area of power grid, And it makes an appointment by the synchrotimer time and starts call duration time.Holding with address information is first broadcasted by Centralized Controller when communication Hand signal, when Centralized Controller requires some electric quantity collector to Centralized Controller feedback information, the electric quantity collector just to Centralized Controller sends information.Centralized Controller or electric quantity collector receive and send messages it in the communication synchronization time made an appointment Before, it is necessary to it screens out continuous no less than 16 grid cyclic waves, i.e., has no less than 16 in real-time measurement storage unit Tc1、Tc2And Tc3If continuous 16 T are not detectedc1、Tc2And Tc3It is then sequentially delayed until detecting 16.Hair Sending end takes out T from storage unitk1、Tk2And Tk3Value add T respectivelyb, obtain the practical transmitting-receiving of the first signal with error compensation Point Td1With the practical sending point T of second signald2:
Td1=Tk1-Tb;………………………………………3
Td2=Tk2+Tb;……………………………………4
The practical receiving point T of second signal with error compensationd3:
Td3=Tk3-Tb;………………………………………5
Save Td1、Td2And Td3In respective storage unit.Send T after each frame informationk1、Tk2And Tk3All it is updated.
When sending signal, microcontroller uses T respectivelyd1And Td2As switching signal timer timing midpoint and according to Used rectangular wave broad pulse voltage levels take certain offset, then using the spaced time of rectangular wave broad pulse as switch The timing length of signal timing device is easy to calculate high-speed power control switch turn-on time point, that is, is used for Td1Point sends rectangle The setting sending time T of wave broad pulsef1And Td2The setting sending time T of the rectangular wave broad pulse of pointf2:
Tf1=Td1(Tm/ 2)-Tan;…………………………6
Tf2=Td2(Tm/ 2)-Tan;…………………………7
T in formulamFor signal rectangular wave broad pulse width, TanFor the offset.
In the cycle positive half cycle ascent stage, since rectangular wave broad pulse loads on the initial stage of cycle positive half cycle, the wide arteries and veins of rectangular wave Rush that the voltage more therefore transmitted rectangular wave broad pulses high relative to all wave voltages are more powerful, the signal of generation receives Point displacement is more, sets turnover voltage in the other time segment signal voltage comparator of loading procedure, has been moved off signal reception The voltage location of point;Cycle positive half cycle descending branch is then the signal generated in the latter stage for loading on cycle process in rectangular wave broad pulse Receiving point displacement is more, in this way, the switching signal according to the tests determined transmitting terminal of rectangular wave broad pulse voltage actually used The midpoint of timer time and Td1Or Td2Between offset Tan, receive signal more reliable.
Signal transmission process: transmitting terminal is crossed the overturning of 0 voltage comparator in cycle positive half cycle ascent stage cycle and was generated in 0 It is disconnected, through the T that is delayedi1Or Ti2Afterwards, firing switch signal timing device and high-speed power control switch is connected, single rectangular wave is wide Pulse voltage is superimposed on grid cyclic wave, makes fundamental frequency in Td1Or Td2Voltage generate small displacement on a timeline, and Certain harmonic wave can be injected to system.
If crossing interrupt handling routine after 0 interruption, starting measurement Tc1Timer with connect switching signal timer instruction The execution time is Tin
When to Td1When sending signal:
Ti=Tf1-Tin;……………………………………………8
When to Td2When sending signal:
Ti2=Tf2-Tin.…………………………………………9
TiAnd Ti2Signaling point displacement of the value also according to receiving end how many adjust in real time.
Closing high-speed power control switch in the interrupt service program when interrupting is overflowed in switching signal timer timing, thus Complete a signal modulation process.
In view of the decaying of signals transmission, and demodulation is using cycle voltage over zero as time reference, in this way In Long Distant Transmit, the cycle voltage phase difference of sending and receiving end will cause setting and receives signal time position and actual signal signal Occur deviation between time location and shadow communication performance, therefore when not taking the method for eliminating deviation, communication distance is limited System is in same transformer platform area.
The demodulation of signal: signal voltage comparator of the receiving end when receiving signal is in the first signal location real-time measurement Tc1Subtract TbRear value and the T being finally stored in is taken out from memoryc1Previous Tc1Subtract TbValue afterwards make comparisons whether Within the scope of the signal errors of permission, determine that the first signal location receives position value in signal;Signal voltage comparator is second The T of signal location real-time measurementc3Subtract TbRear value and the T being finally stored in is taken out from memoryc3Previous Tc3Subtract Tb Whether value afterwards makes comparisons within the scope of the signal errors of permission, determines that second signal position receives position value in signal.
The control of signal transmitting power: when transmitting terminal switching signal timer fires and high-speed power control switch is connected Afterwards, the external interrupt mouth of microcontroller opening signal receiving end immediately detects signal voltage comparator in cycle positive half cycle first The flip-flop transition of signal location and second signal position, with Td1And Td3It compares and whether shifts and its shift amount, if signal is electric Press comparator flip-flop transition closer to Td1, illustrate to send rectangular wave broad pulse energy is relatively smaller or electric network impedance relatively It is low.If signal voltage comparator flip-flop transition is closer to Td1, then increase TiTime, if rectangular wave broad pulse voltage comparator Flip-flop transition is closer to Td2Then reduce Ti2Time.
(4) Detailed description of the invention:
Fig. 1 is grid cyclic wave receiving and transmitting signal position data relation schematic diagram;
Fig. 2 is a kind of circuit structure block diagram of industrial enterprise's electricity consumption data acquisition management system.
(5) specific embodiment:
A kind of circuit structure block diagram of industrial enterprise's electricity consumption data acquisition management system is as shown in Figure 2.It is controlled including concentrating Device processed and multiple electric quantity collectors.Centralized Controller is shown by signal sending end A, signal receiving end B, Network Interface Module 2, keyboard Show that module 10 and micro controller module 1 are constituted.Electric quantity collector is mutual by signal sending end A, signal receiving end B, electric current and voltage Sensor group 7 and micro controller module 1 are constituted.Total station control is the computer management system positioned at top layer by router and electricity Brain is constituted.Centralized Controller and electric quantity collector use the power line communication.
Signal sending end A, signal receiving end B and the micro-control of power line communication described in Centralized Controller and electric quantity collector Device module 1 processed is identical with the hardware configuration of power module 4.
The signal sending end A of the power line communication is made of high-speed power control switch 5, switching signal timer 3, electricity Net voltage is connected to high-speed power control switch output end.
The signal receiving end B of the power line communication is by High-speed Control switch 6, excessively 0 voltage comparator 8 and signal voltage ratio It is constituted compared with device 9.It crosses 0 voltage comparator 8 and signal voltage comparator 9 is all made of ns grades of high speed voltage comparator MAX319.
Micro controller module 1 uses High Speed Microcontroller STC15F2K60S, this is a kind of single clock/machine cycle (1T) Single-chip microcontroller, speed ratio STC12 also fast 20% is high speed/low-power consumption/superpower jamproof 8051 single-chip microcontroller of new generation, no AD Conversion.
The single-phase firewire and zero curve of power grid connect the output port of signal sending end and the input port of receiving end, wherein power grid Zero line grounding end.The window region network voltage control is in 55V voltage range, machine shell protective grounding, and has high electricity The security warning of pressure area, trouble hunting should install the isolating transformer that no-load voltage ratio is 1:1 additional, avoid because of failure accidental shock.
Network Interface Module 2 in Centralized Controller, which uses, is integrated with the W5100 Ethernet mould of TCP/IP hardware protocol stacks Block, or use other network interface chips.High Speed Microcontroller STC15F2K60S and Network Interface Module 2 in micro controller module 1 Between use SPI serial bus communication mode, data to be sent are reached into W5100, are then passed through data by W5100 subpackage Internet is dealt into total station control.

Claims (10)

1. a kind of implementation method of industrial enterprise's electricity consumption data acquisition management system, electric quantity collector acquire the electricity consumption of each electricity consumer Data are uploaded to Centralized Controller by power line communication method, and Centralized Controller accesses internet by Network Interface Module, It is characterized by:
The power line communication of use is by the accurate of the signal sending point of the setting to grid cyclic wave voltage and signal receiving point Positioning sends a rectangle broad pulse of communication positive or negative pole in the signal sending point of setting to generating mutation current, The electric current causes a voltage drop to be superimposed on grid voltage waveform on the short-circuit impedance of distribution transformer, to complete primary Signal modulation process, signal receiving point demodulated signal of the receiving end in the setting of grid cyclic wave voltage;One wide arteries and veins of anode Punching refers to that the high level part of pulse returns 0 from 0 to height.
2. the method according to claim 1, wherein the signal sending point of the setting in grid cyclic wave voltage Modulating and demodulating signal step with the signal receiving point of setting includes:
It sends: crossing the overturning of 0 voltage comparator when the cycle that the cycle positive half cycle ascent stage is arranged in and generated 0 interruption, after being delayed Its sending time falls in the signal sending point of the setting of all wave voltages, and firing switch signal timing device simultaneously connects high-speed power control Switch, by single positive pulse voltage Signal averaging on grid cyclic wave;
Receive: High-speed Control switch only open by the low-voltage window region around signal transmitting and receiving point under microcontroller control, shape At the low-voltage window region around the first signal transmitting and receiving point and second signal transmitting-receiving point.When all wave voltages of input fall in it is low When voltage window mouth region, High-speed Control is switched in an ON state, and signal voltage comparator is directly received in the signal of all wave voltages Position receive signal and measurement cycle time parameter, determine received signal whether setting signal receiving point error range Interior, High-speed Control switch is in an off state other than low-voltage window region.
3. according to the method described in claim 2, it is characterized in that, the signal sending point and signal receiving point of setting are in power grid The voltage of cycle positive half cycle, which is crossed at 0, was arranged 0 voltage comparator, in a setting cycle voltage location of grid cyclic wave positive half cycle Setting signal voltage comparator, the output of signal voltage comparator is in two positions for setting all wave voltages of a cycle positive half cycle Set realization overturning;The cycle positive half cycle ascent stage the setting week wave voltage position as the first signal location, setting The cycle voltage location of signal transmitting and receiving point is known as the first signal set point, in the setting cycle electricity of cycle positive half cycle descending branch The position of pressure is known as second signal set point as second signal position, the cycle voltage location of setting signal transmitting-receiving point;
The signal voltage comparator is a setting cycle being arranged between voltage 21V -40V of grid cyclic wave positive half cycle Voltage location.
4. the method according to claim 1, wherein the distance that basis signal need to transmit when sending signal is through testing It determines:
Rectangular wave broad pulse voltage-drop loading is set in the positive 35V of the signal sending point on grid cyclic wave to the voltage value between 60V; The rectangular wave broad pulse voltage is higher by value than the voltage for the grid cyclic wave position being loaded;The width value of rectangular wave broad pulse voltage For 0.3ms~0.5ms;Signal code value 1A -20A can be provided.
5. the method according to claim 1, wherein the signal receiving point demodulated signal in setting, includes The signal that confirmation or erasing are sent from the signal sending point of setting, during transmitting terminal sends signal, letter transmitted by transmitting terminal Number simultaneously receiving end receive, if received position value information is different from the position value information of transmission, then send the position Erasing signal, each data bit is erasable in each frame information and retransmits.
6. according to the method described in claim 5, it is characterized in that, position value with signal voltage comparator signal receiving point not Overturning overturns to send position signal " 0 " to send position signal " 1 ", wherein the first signal set point of address or data bit is to receive Address or data are sent out, second signal set point is confirmation or the information that the first signal set point of erasing is sent, and it is true for sending " 1 " Recognize, sending " 0 " is erasing, and signal voltage comparator in the first signal set point sends " 0 " to start to send in start bit, the It is to send address frame that binary signal set point, which sends " 0 ", and sending " 1 " is data frame, and stop bits is in the first signal set point to send " 1 " terminates, and second signal set point does not have to.
7. the method according to claim 1, wherein the signal sending point of setting and the accurate of signal receiving point are determined Position includes the error compensation of set signal sending point and signal receiving point, while crossing 0 voltage comparator and signal voltage ratio Ns grades of high speed voltage comparators and High Speed Microcontroller are all made of compared with device.
8. according to claim 1 and method of claim 7, which is characterized in that signal sending point and signal receiving point It is accurately positioned and its compensation method of error is that first computing system is crossed at 0 using the voltage of cycle positive half cycle ascent stage as start time Time interval to the first signal set point is nominal value Tm1;The voltage of cycle positive half cycle ascent stage is crossed at 0 to be arrived for start time The time interval of second signal set point is nominal value Tm2
And time of 0 voltage comparator when the mistake 0 of cycle positive half cycle ascent stage overturns was measured as start time to signal electricity Press the real-time measurement values T of time interval of the comparator when the first signal location is overturnc1;This spent for 0 flip-flop transition as start time To the real-time measurement values T of time interval of the signal voltage comparator when second signal position is overturnc2;Signal voltage comparator exists The reality of time interval of 0 voltage comparator when the mistake 0 of cycle positive half cycle descending branch is overturn was arrived in second signal position when overturning When measured value Tc3;Cross time interval of 0 voltage comparator when the mistake 0 of the cycle positive half cycle ascent stage of two adjacent cycles is overturn For cycle period real-time measurement values Tzu;
When the cycle and its two adjacent cycles that detect are true, the cycle period real-time measurement values Tzu being detected simultaneously by In 20ms and its error range, the cycle is measured to cross 0 voltage comparator when the mistake 0 of cycle positive half cycle ascent stage is overturn and be The a reference value T of time interval of the start time to signal voltage comparator when the first signal location is overturnc010 overturning is crossed with this For a reference value T of time interval of the start time to signal voltage comparator when second signal position is overturnc02, save 30 to The continuous T of a setting number in 50c01And Tc02And calculate saved Tc01Average value Tp1With the T savedc02It is flat Mean value Tp2, by Tp1And Tp2It is stored in corresponding storage unit;
The then error compensation value T of signal voltage comparator flip-flop transitionbIt is determined by following formula:
Tb={ (Tm2- Tm1)-(Tp2- Tp1)}÷2;
By TbIt saves, TbIllustrate that the position of actual signal transmitting-receiving point is higher for timing;
The extremely multiple setting byte number of the data bit occupancy in each frame information 1 is needed according to power grid quality and signal structure, The clock timer time there are two cycle period is stayed after each frame traffic, for updating Tc1、Tc2And Tc3, from next week Wave starts the communication of next frame, if detecting that cycle signal is vacation in a frame traffic, retransmits the information frame;
It realizes that the cycle in communication sequentially synchronizes by the start bit of each frame information, stop bits and connects in the sending and receiving end of the communication information Continuous, Centralized Controller or electric quantity collector measure respectively and store T in the call duration time gap of described two framesc1、Tc2And Tc3, And calculate separately two real-time measurement values Tc1Average value Tk1、Tc2Average value Tk2And Tc3Average value Tk3, and be stored in respectively Two groups of storage units, i.e. Tc1、Tc2And Tc3Storage unit and Tk1、Tk2And Tk3Storage unit, when from storage unit take out Tk1、 Tk2And Tk3After reset two groups of storage units, the storage unit can store 16 real-time measurement values Tc1、Tc2And Tc3, do not communicating Period measures continuous 16 real-time measurement values T respectivelyc1、Tc2And Tc3If screen to cycle signal be it is false, described in clearing Tc1、Tc2And Tc3Respective storage unit, continue to measure when screening to cycle signal is true and store, it is every when being filled with to be stored in one A Tc1、Tc2And Tc3, first remove a T being stored at firstc1、Tc2And Tc3, while number is taken out by a setting in 2 to 15, Take out the T of last one group of depositc1、Tc2And Tc3, when power grid quality difference, number is taken out in the smaller setting of choosing, and calculating is taken out each The T of groupc1Average value Tk1、Tc2Average value Tk2And Tc3Average value Tk3And replace the T originally savedk1、Tk2And Tk3
It sends the determination of signal time: continuous no less than 16 grid cyclic waves must be screened out before receiving and sending messages, i.e., in fact When measurement storage unit in have no less than 16 Tc1、Tc2And Tc3If continuous 16 T are not detectedc1、Tc2And Tc3 It is then sequentially delayed until detecting 16, transmitting terminal takes out T from storage unitk1、Tk2And Tk3Value add T respectivelyb, Obtain the practical transmitting-receiving point T of the first signal with error compensationd1With the practical sending point T of second signald2:
Td1=Tk1- Tb
Td2=Tk2+Tb
The practical receiving point T of second signal with error compensationd3:
Td3=Tk3- Tb
Save Td1、Td2And Td3In respective storage unit, T after each frame information is sentk1、Tk2And Tk3All it is updated;
When sending signal, microcontroller uses T respectivelyd1And Td2As switching signal timer timing midpoint and according to being used Rectangular wave broad pulse voltage levels take certain offset, then using the spaced time of rectangular wave broad pulse as switching signal determine When device timing length, be easy to calculate high-speed power control switch turn-on time point, that is, be used for Td1Point sends the wide arteries and veins of rectangular wave The setting sending time T of punchingf1And Td2The setting sending time T of the rectangular wave broad pulse of pointf2:
Tf1=Td1(Tm/ 2)-Tan
Tf2=Td2(Tm/ 2)-Tan
T in formulamFor signal rectangular wave broad pulse width, TanFor the offset;
Rectangular wave broad pulse loads on the initial stage of cycle positive half cycle, and rectangular wave broad pulse voltage is high more relative to all wave voltages More, the signal receiving point displacement of generation is more, and cycle positive half cycle descending branch is then to load on cycle process in rectangular wave broad pulse The signal receiving point displacement that generates of latter stage it is more, the midpoint of the switching signal timer time of tests determined transmitting terminal With Td1Or Td2Between offsetTan
Signal transmission process: grid cyclic wave voltage is connected to high-speed power control switch output port, when the cycle positive half cycle ascent stage Cycle cross 0 voltage comparator overturning generated 0 interruption, through be delayed Ti1Or Ti2Afterwards, firing switch signal timing device and height is connected Fast power control switch makes fundamental frequency in T by single positive pulse voltage Signal averaging on grid cyclic waved1Or Td2Electricity Pressure generates small displacement on a timeline;
If crossing interrupt handling routine after 0 interruption, starting measurement Tc1Timer with connect switching signal timer instruction execution Time is Tin
When to Td1When sending signal:
Ti=Tf1- Tin;
When to Td2When sending signal:
Ti2=Tf2- Tin;
TiAnd Ti2Signaling point displacement of the value also according to receiving end how many adjust in real time;
Closing high-speed power control switch in the interrupt service program when interrupting is overflowed in switching signal timer timing, to complete Signal modulation process;
Above-mentioned Ti2Value also according to receiving end signaling point displacement it is how many adjust in real time, method are as follows: if signal voltage compares Device flip-flop transition is closer to Td1, then microcontroller control high-speed power control switch increases rectangular wave broad pulse voltage, if letter Number voltage comparator flip-flop transition is closer to Td2Then reduce Ti2Time.
9. a kind of device of industrial enterprise's electricity consumption data acquisition management system, it is characterised in that including,
Signal sending end, signal receiving end and the microcontroller mould of power line communication described in Centralized Controller and electric quantity collector The hardware configuration of block is identical;
The signal sending end of the power line communication is made of high-speed power control switch, switching signal timer;
The signal receiving end of the power line communication is switched by High-speed Control, crosses 0 voltage comparator and signal voltage comparator structure At.
10. device according to claim 9, it is characterised in that the signal receiving end of the power line communication is by power grid All wave voltages are through High-speed Control switch control, and only in two low-voltage window regions of cycle positive half cycle, directly filtering is followed by after conditioning To signal voltage comparator input terminal, High-speed Control switch only open by the low-voltage window region around signal transmitting and receiving point, isolation Grid cyclic wave high voltage, signal voltage comparator directly receive position in the signal of all wave voltages and receive signal and measurement cycle Time parameter;
The signal sending end of the power line communication, network voltage are connected to high-speed power control switch output end, in cycle just half All ascent stage cycles cross the overturning of 0 voltage comparator and generated 0 interruption, through the T that is delayedi1Or Ti2Afterwards, firing switch signal timing device is simultaneously High-speed power control switch is connected, by single rectangular wave broad pulse voltage superposition on grid cyclic wave.
CN201810821711.3A 2018-06-10 2018-07-24 A kind of industrial enterprise's electricity consumption data acquisition management system Withdrawn CN109004955A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2018105914233 2018-06-10
CN201810591423 2018-06-10

Publications (1)

Publication Number Publication Date
CN109004955A true CN109004955A (en) 2018-12-14

Family

ID=64596283

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810821711.3A Withdrawn CN109004955A (en) 2018-06-10 2018-07-24 A kind of industrial enterprise's electricity consumption data acquisition management system

Country Status (1)

Country Link
CN (1) CN109004955A (en)

Similar Documents

Publication Publication Date Title
CN108919718A (en) A kind of analog quantity remote collection alarm system
CN108898783A (en) A kind of Warehouse Fire alarm control system
CN109921831A (en) A kind of factory and enterprise electric energy detection management system
CN108897297A (en) A kind of household electric appliances tele-control system
CN108877192A (en) A kind of residential block Auto-recording System of Electrical Power Calculation
CN108958121A (en) A kind of agricultural greenhouse atmosphere control system
CN108831136A (en) A kind of Automatic meter reading system of tap water supply pipe network
CN108877191A (en) A kind of residential area Water-flowmeter auto-recording
CN108806229A (en) A kind of workshop electric appliance remote control system
CN108897295A (en) A kind of tele-control system of household electric appliances
CN109004955A (en) A kind of industrial enterprise's electricity consumption data acquisition management system
CN108897296A (en) A kind of wisdom agricultural greenhouse atmosphere control system
CN108880617A (en) A kind of city LED light box advertisement tele-control system
CN108990650A (en) A kind of agricultural greenhouse artificial climate Experimental Control System
CN108961705A (en) A kind of fire alarm control system
CN108983663A (en) A kind of intelligent domestic tele-control system
CN108983662A (en) A kind of fluid flow data acquisition alarm system
CN108964709A (en) A kind of residential block tap water meter Automatic meter reading system
CN109921830A (en) A kind of air temperature distribution data collection system
CN108961729A (en) A kind of Factory Electric Power data acquisition management system
CN109001998A (en) A kind of poultry purchase wholesale market data collection system
CN108964710A (en) A kind of supermarket's commodity customer queries system
CN108983664A (en) A kind of green house of vegetables temperature and humidity intelligent control system
CN108961730A (en) A kind of flow data collector system
CN108873999A (en) A kind of green house of vegetables temperature and humidity control system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20181214