CN108880617A
CN108880617A CN201810822283.6A CN201810822283A CN108880617A CN 108880617 A CN108880617 A CN 108880617A CN 201810822283 A CN201810822283 A CN 201810822283A CN 108880617 A CN108880617 A CN 108880617A
Authority
CN
China
Prior art keywords
signal
voltage
cycle
point
setting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810822283.6A
Other languages
Chinese (zh)
Inventor
张金木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou Alignment Mdt Infotech Ltd
Original Assignee
Fuzhou Alignment Mdt Infotech Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou Alignment Mdt Infotech Ltd filed Critical Fuzhou Alignment Mdt Infotech Ltd
Publication of CN108880617A publication Critical patent/CN108880617A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B3/00Line transmission systems
    • H04B3/54Systems for transmission via power distribution lines
    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C19/00Electric signal transmission systems
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09FDISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
    • G09F9/00Indicating arrangements for variable information in which the information is built-up on a support by selection or combination of individual elements
    • G09F9/30Indicating arrangements for variable information in which the information is built-up on a support by selection or combination of individual elements in which the desired character or characters are formed by combining individual elements
    • G09F9/33Indicating arrangements for variable information in which the information is built-up on a support by selection or combination of individual elements in which the desired character or characters are formed by combining individual elements being semiconductor devices, e.g. diodes
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B1/00Details of transmission systems, not covered by a single one of groups H04B3/00 - H04B13/00; Details of transmission systems not characterised by the medium used for transmission
    • H04B1/38Transceivers, i.e. devices in which transmitter and receiver form a structural unit and in which at least one part is used for functions of transmitting and receiving
    • H04B1/40Circuits

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Power Engineering (AREA)
  • Theoretical Computer Science (AREA)
  • Cable Transmission Systems, Equalization Of Radio And Reduction Of Echo (AREA)

Abstract

The present invention relates to a kind of city LED light box advertisement tele-control systems, every 1 is expressed to multiple LED light box advertisements by the effect that a billboard controller controls its ad content, a piece area controller is arranged in multiple billboard controllers in one region, billboard controller and piece area controller pass through power line communication, piece area controller accesses internet by Network Interface Module, so as to use computer and handheld mobile device to understand and control each section LED light box advertisement.

Description

A kind of city LED light box advertisement tele-control system
(1) technical field:
The present invention relates to a kind of city LED light box advertisement tele-control systems, include piece area controller and each billboard control Device processed is crossed 0 area's specified point to grid cyclic wave voltage and is sent wide pulse signal generation mutation current using power line communication method, Grid cyclic wave is set to carry information.Piece area controller receives the data of each billboard controller acquisition, and by being integrated with TCP/IP The Network Interface Module of hardware protocol stacks accesses internet, so as to use computer and handheld mobile device to access remote computation Machine management system.
(2) background technique:
Current power line communication refers mainly to power line carrier communication and bi-directional Glenn shunt.Power line carrier communication PLC benefit Signal is transmitted by carrier system with existing power line.But distribution transformer has barrier action to power carrier signal, simultaneously Transmission has the very big loss of signal again between three-phase power line, so power carrier signal can only be in a distribution transformer platform area Transmission, and can only be transmitted in single-phase electricity line.In practical application, when power line zero load, point-to-point carrier signal can be transferred to Several kilometers, but when load is very heavy on power line, tens meters can only be transmitted, therefore power line carrier communication is only applied remote at present In journey meter reading, also need to cooperate other means of communication.
Bi-directional Glenn shunt TWACS, which is utilized, is added modulated signal in power-frequency voltage fundamental wave zero passage area, with the electricity in this region The distorted signal of pressure or current waveform carries information.TWACS system equipment exists only in substation and user terminal.Wherein by power transformation Standing to the channel of user terminal transmission is output channel, carries information using the modulation of voltage waveform, is passed from user terminal to substation Defeated channel is input channel, transmits information using the variation of current waveform.Its receiving and transmitting signal passes through coupling transformer and electricity The crosslinking of power net.
The detection of TW A CS signal is mainly based upon time-domain difference technology, these methods mostly data processing complex, in real time Property it is poor, equipment cost is high, needs to acquire a large amount of signal of multiple cycles relatively and carries out A/D conversion respectively, then carries out complicated meter It calculates, just can determine that the signal position is " 1 " or " 0 ", due to the preciseness of calculating, interference signal can seriously affect detected signal Judgement as a result, therefore original method be difficult China apply.
Clock timer and synchrotimer is arranged in the present invention, and the true and false judgement of synchrotimer and cycle signal is screened With reference to my 2016 yearly correlation patents.
(3) summary of the invention:
Power line bi-directional Glenn shunt be when silicon-controlled 30 ° of triggering and conductings before zero crossing of modulation circuit, by every Modulated signal is generated from transformer, makes grid cyclic wave that short circuit distortion occur, exports the frequency of modulated signal in 200~600Hz Range, receiving end demodulate useful letter by acquisition, A/D conversion and the series of computation to multiple groups cycle distorted signal Breath.But China's power network uses isolated neutral or small current neutral grounding system, electricity consumption situation is complicated, the two-way power frequency of power line Communication can hardly find practical applications in China.
The present invention relates to a kind of city LED light box advertisement tele-control system, an advertising company is maintain in city A large amount of LED light box advertising equipments, city LED light box advertisement includes the LED light box advertisement being installed in roof and road on both sides of the road, riverbank Side LED light box advertisement and the LED light box advertisement at each sight spot etc., every 1 to multiple LED light box advertisements is controlled by a billboard Device controls the effect expression of its ad content, and a piece area controller, advertisement is arranged in multiple billboard controllers in a region Board controller and piece area controller reduce wiring installation using power line communication by power line communication.By piece area controller control The LED display pattern of billboard controller processed selects, and piece area controller is connect by being integrated with the network of TCP/IP hardware protocol stacks Mouth mold block accesses internet, can so as to use computer and handheld mobile device to understand and control each section LED light box advertisement Remote computation machine management system is accessed at any time.
The power line communication of use is the signal sending point and signal receiving point by the setting to grid cyclic wave voltage It is accurately positioned, sends a rectangle broad pulse of communication positive or negative pole in the signal sending point of setting to generate mutation electricity Stream, which causes a voltage drop to be superimposed on grid voltage waveform on the short-circuit impedance of distribution transformer, to complete Signal modulation process, signal receiving point demodulated signal of the receiving end in the setting of grid cyclic wave voltage;One anode Broad pulse refers to that the high level part of pulse returns 0 from 0 to height.Because only sending single rectangular wave broad pulse to power grid shadow Very little is rung, and structure simple signal recall rate is high.The microcontroller STC15F2K60S of system, using external crystal-controlled oscillation, frequency 35MHz, signal procedure are write with assembler language, to reduce communication instruction holding time.Or use other model high speed microcontrollers Device.
The setting of signal transmitting and receiving position:It is crossed at 0 in the voltage of grid cyclic wave positive half cycle and 0 voltage comparator was set, in electricity A setting cycle voltage location setting signal voltage comparator between voltage 21V -40V of net week wave positive half cycle.In this way, The output of signal voltage comparator realizes overturning in two positions of all wave voltages of setting of a cycle positive half cycle.Cycle just The position of the setting week wave voltage of half cycle ascent stage is as the first signal location, all wave voltages of setting signal transmitting-receiving point Position is known as the first signal set point, cycle positive half cycle descending branch the setting week wave voltage position as second signal The cycle voltage location of position, setting signal transmitting-receiving point is known as second signal set point.Microcontroller STC15F2K60S can be with It is that rising edge triggers or failing edge triggers that external interrupt, which is arranged, has served as 0 voltage comparator and signal voltage comparator in power grid week The ascent stage of wave positive half cycle or descending branch, which generate after overturning triggering is interrupted, changes down trigger mode, or and by different interruptions Source generates interruption.
The condition that signal transmitting and receiving has:0 voltage comparator of mistake and signal voltage comparator are all made of ns grades of height Fast voltage comparator.The time mistake that overturning and triggering are interrupted can reduce using High Speed Microcontroller and high speed voltage comparator Difference, and have the resolution ratio of sufficiently high detection overturning triggering break period, cooperate the position of signal to wipe the skill with synchrotimer Art means improve the recall rate that grid cyclic wave carries information.It needs to transmit by ns grades of high-speed power control switch basis signal Distance it is tests determined by transmitted positive 35V to a setting rectangular wave broad pulse voltage-drop loading between 60V in power grid Signal sending point on cycle, the rectangular wave broad pulse voltage are higher than the voltage for the grid cyclic wave position being loaded.Basis signal The width of the tests determined rectangular wave broad pulse voltage of the distance that need to be transmitted is 0.3ms~0.5ms, can provide signal code 1A- 20A.It is displaced all wave voltages in the time of the signal location, so that the high speed voltage comparator of receiving end be made to connect in signal Sink is not overturn, is taken " 1 " to send as the position (BIT) in signal, is otherwise taken " 0 " to send for the position (BIT) in signal.Therefore only When the position value in signal overturn signal voltage comparator should in signal receiving point, due to interference be not flipped just have by Interference effect.
Signal receiving end setting:Signal receiving end is by twin voltage comparator, High-speed Control switch and signal voltage comparator It constitutes, grid cyclic wave connects after electric resistance partial pressure with twin voltage comparator input terminal, and the setting of twin voltage comparator is rationed the power supply by wealthy family The low-voltage window region that the threshold range of pressure and low threshold voltage is constituted.Under microcontroller control, when all wave voltages of input When falling in the low-voltage window region of twin voltage comparator setting, make High-speed Control switch in an ON state, signal voltage compares Device directly receives position in the signal of all wave voltages and receives signal and measurement cycle time parameter, whether determines received signal In the signal receiving point error range of setting, make High-speed Control switch in an off state other than low-voltage window region.Cause This, grid cyclic wave voltage is only directly conditioned in two low-voltage window regions of cycle positive half cycle through High-speed Control switch control Filtering is followed by signal voltage comparator input terminal, is filtered out High-frequency Interference and is passed through fundamental frequency signal re-demodulation signal of communication, every From grid cyclic wave high voltage, the error as caused by bleeder circuit is reduced.Low-voltage window region is arranged in twin voltage comparator When, it need to guarantee that the first signal location and second signal position are fallen in always in the low-voltage window region.
The erasing and repeating transmission of position value in signal:During transmitting terminal sends signal, when high-speed power control switch is opened Afterwards, signal transmitted by transmitting terminal simultaneously receiving end signal voltage comparator receive, if received position value information with The position value information of transmission is different, then then sends the erasing signal of this.Each data bit is erasable in each frame signal It retransmits, erasing signal, if erasing is unsuccessful, that is, the erasing signal value information sent and received not phase is received and dispatched using control bit Together, continue to send this erasing signal until sending successfully, then retransmit the position signal being wiped free of, other position signals that do not wipe are still So effectively, to improve signal recall rate.Only when be wiped free of position quantity be more than setting value when, just wipe and retransmission of information Frame.
Information frame generates:System is the communication of two machines or principal and subordinate's multi-computer communication, is allocated in advance when for principal and subordinate's multi-computer communication Synchronization time is used in the communication of each machine, and setting section synchronization time can communicate one or many, communicates multiple information frames every time, synchronization Period timing terminates, and synchrotimer resets and restarts timing.
Institute's rheme is binary digit.Each information frame is made of start bit, data bit, stop bits.Start bit and end The every bit occupancy a cycle in position, data bit totally 8, two periods of every bit occupancy.Position value is with signal voltage comparator in signal Receiving point does not overturn to send position signal " 1 ", overturns to send position signal " 0 ".Microcontroller records effectively during transmitting-receiving Data bits and the occupied digit of erase process show that data bit passes when wherein valid data digit reaches 8 digit of setting Send end.When first signal set point of each data bit sends position signal " 1 " or " 0 ", position signal " 1 " that second round sends or " 0 " is with the period 1 on the contrary, its two kinds are combined " 1 ", " 0 " and " 0 ", " 1 " as position signal two different values.Second round Second signal set point is confirmation or the data that the first signal set point of erasing is sent, and sending " 0 " is confirmation, and sending " 1 " is to wipe It removes.It is to start to send that signal voltage comparator, which sends " 1 " in the first signal set point, in start bit, and stop bits is set in the first signal Fixed point is terminated with sending " 0 ", and the second signal set point of start bit and stop bits does not have to.
The compensation of signal transmitting and receiving location error:China's sinusoidal ac mains frequency be 50Hz, voltage effective value 220V, Its instantaneous voltage u is calculated by following formula:
U=Umsin100 π t;……………………….………….1
In formula:Um is China's network voltage peak value
As shown in Figure 1, system is crossed at 0 using the voltage of cycle positive half cycle ascent stage as start time to the first signal set point Time interval be nominal value Tm1;The voltage of cycle positive half cycle ascent stage is crossed at 0 as start time to second signal set point Time interval is nominal value Tm2.The Tm1 and Tm2 is calculated by 1 formula, and u is to set all wave voltages in formula.
Simultaneously measured 0 voltage comparator the cycle positive half cycle ascent stage mistake 0 overturn when time arrived for start time The real-time measurement values Tc1 of time interval of the signal voltage comparator when the first signal location is overturn;This spent for 0 flip-flop transition when being Between starting point to signal voltage comparator second signal position overturn when time interval real-time measurement values Tc2;Signal voltage Comparator arrived time of 0 voltage comparator when the mistake 0 of cycle positive half cycle descending branch is overturn when second signal position is overturn The real-time measurement values Tc3 at interval;0 voltage comparator is crossed when the mistake 0 of the cycle positive half cycle ascent stage of two adjacent cycles is overturn Time interval be cycle period real-time measurement values Tzu.
Since power grid crosses the left and right shake that 0 error showed as at 0 point, but sending and receiving end synchronized 0 and to cross 0 overturning as base Locating tab assembly cycle time parameter, crossing 0 shake influences very little to measurement cycle time parameter, therefore ignores 0 voltage comparator and cross 0 Overturning and timing error.When the cycle and its two adjacent cycles that detect are cycle period reality that is true, being detected simultaneously by When measured value Tzu in 20ms and its error range, measure the cycle to cross 0 voltage comparator in the cycle positive half cycle ascent stage The a reference value Tc01 of time interval when crossing 0 overturning for start time to signal voltage comparator when the first signal location is overturn The a reference value that 0 overturning is time interval of the start time to signal voltage comparator when second signal position is overturn is crossed with this Tc02 saves the continuous T c01 and Tc02 of a setting number in 30 to 50 and calculates saved Tc01Average value Tp1With The T savedc02Average value Tp2, by Tp1And Tp2It is stored in corresponding storage unit.
The then error compensation value T of signal voltage comparator flip-flop transitionbIt is determined by following formula:
Tb={ (Tm2-Tm1)-(Tp2-Tp1)}÷2;………………2
Tb is saved.Tb is that timing illustrates that the position of actual signal transmitting-receiving point is higher.
Measurement described above, wherein Tc1 or Tc01 be with cross 0 voltage comparator and signal voltage comparator cycle just Half cycle was crossed on the basis of the flip-flop transition of 0 position and signal location, but actual measurement is after overturning triggering interruption with voltage comparator Timer timing time on the basis of, in this way, served as 0 voltage comparator the cycle positive half cycle ascent stage mistake 0 overturn after touch Hair interrupts and starts the process of timer, and there are time for each instructions, it need to be added in the timing time of the measurement;Meanwhile The instruction of the process of timer is interrupted and is read in the triggering that the timing time of the measurement need to subtract after the overturning of the first signal location Execute the time.When the execution for also needing an instruction being carrying out comprising microcontroller after overturning is interrupted in triggering after wherein overturning Between, it can postpone interruption, and microcontroller STC15F2K60S is the single-chip microcontroller of 1T, this is easy to obtain the instruction time.? Binary signal position measures Tc2 or Tc02Similarly, T is measuredc3When be also similar to above.
The judgement of the cycle true and false:By Tc1With Tp1;Tc2 and Tp2;Tzu makes comparisons respectively with 20ms, if respectively at it In the cycle error range of permission, then the cycle signal detected is very, otherwise to there is more overproof a, week detected Wave signal is false.Not in communication period and in the Tc1 and Tp1 of communication period;It is set respectively when Tc2 makes comparisons respectively with Tp2 Different cycle error ranges is set, since the first signal location of communication period and second signal position are shifted, and is taken biggish Cycle error range.
Clock timer and synchrotimer is arranged in system, and wherein synchrotimer saves each cycle period and counted with 20ms The cycle period aggregate-value of calculation is as synchronization time.When above-mentioned judgement cycle signal is true, saves Tzu and take 20ms and synchronometer When device timing time be added, the value that will add up restores in synchrotimer, if the cycle signal detected be it is false, will be all Wave signal is timing time during the vacation compared with 20ms is multiplied by the product for cycle during the vacation, if in error range, 20ms is taken to be added multiplied by the product for cycle during the vacation with synchrotimer timing time, when detecting that cycle signal is again The time synchronisation time is accurately corrected when true, and otherwise using cycle signal is timing time and synchrotimer timing during the vacation Time is added.It is ± 0.1Hz when generally running, when the relative error since power system frequency deviation allowable value is 0.2Hz When more than 6ms, illustrate that power grid has occurred compared with major break down.
The synchronization of signal transmitting and receiving:Communication is realized under control synchronization time.Communication transmits multiple information frames each time, often At the beginning of secondary communication use synchronization time, be it is preset or by piece area controller instruct arrange, according to power grid quality and letter Number structure needs the data bit occupancy in each frame information 1 to multiple setting byte numbers, and power grid quality takes well biggish set Determine byte number.The clock timer time there are two cycle period is stayed after each frame traffic, for updating Tc1、Tc2And Tc3。 The communication of next frame since next cycle retransmits the information frame if detecting that cycle signal is vacation in a frame traffic.
Realize that the cycle in communication sequentially synchronizes by the start bit of each frame information, stop bits in the sending and receiving end of the communication information It connects.Piece area controller or billboard controller measure respectively and store T in the call duration time gap of described two framesc1、Tc2 And Tc3, and the average value Tk3 of the average value Tk2 and Tc3 of average value Tk1, Tc2 of two real-time measurement values Tc1 are calculated separately, And it is stored in two groups of storage units, the i.e. storage unit of Tc1, Tc2 and Tc3 and Tk1, Tk2 and Tk3 storage unit respectively, when from depositing Storage unit resets two groups of storage units after taking out Tk1, Tk2 and Tk3.The storage unit can store 16 real-time measurement values Tc1, Tc2 and Tc3.Not in communication period, continuous 16 real-time measurement values Tc1, Tc2 and Tc3 are measured respectively, arrive cycle if screened Signal is vacation, then resets the respective storage unit of described Tc1, Tc2 and Tc3, continues to measure when it is true for screening to cycle signal And storage, one Tc1, Tc2 and Tc3 of every deposit, first remove Tc1, Tc2 and Tc3 being stored at first, press simultaneously when being filled with Number is taken out in a setting in 2 to 15, takes out Tc1, Tc2 and Tc3 of last one group of deposit, and when power grid quality difference, choosing is smaller sets Surely number is taken out, calculates the average value Tk3 of the average value Tk2 and Tc3 of average value Tk1, Tc2 of each group of the Tc1 taken out simultaneously Tk1, Tk2 and the Tk3 originally saved is replaced, the shadow of network voltage and frequency fluctuation is reduced using average value Tk1, Tk2 and Tk3 It rings.
Send the determination of signal time:Communication is implemented in the single-phase phase line in a transformer platform area of power grid, And it makes an appointment by the synchrotimer time and starts call duration time.Holding with address information is first broadcasted by piece area controller when communication Hand signal, when piece area controller requires some billboard controller to piece area controller feedback information, the billboard controller Just information is sent to piece area controller.Piece area controller or billboard controller are in the communication synchronization time transmitting-receiving letter made an appointment Before breath, it is necessary to screen out continuous no less than 16 grid cyclic waves, i.e., have no less than 16 in real-time measurement storage unit A Tc1, Tc2 and Tc3 is sequentially delayed if continuous 16 Tc1, Tc2 and Tc3 is not detected until detecting 16 Until.The value that transmitting terminal takes out Tk1, Tk2 and Tk3 from storage unit adds Tb respectively, obtains the first letter with error compensation Number practical transmitting-receiving point Td1 and practical sending point Td2 of second signal:
Td1=Tk1-Tb;…………………………………………3
Td2=Tk2+Tb;…………………………………………4
The practical receiving point Td3 of second signal with error compensation:
Td3=Tk3-Tb;…………………………………………5
Td1, Td2 and Td3 are saved in respective storage unit.Tk1, Tk2 and Tk3 are by more after sending each frame information Newly.
Send signal when, microcontroller use respectively Td1 and Td2 as the timing midpoint of switching signal timer and according to Used rectangular wave broad pulse voltage levels take certain offset, then using the spaced time of rectangular wave broad pulse as switch The timing length of signal timing device is easy to calculate high-speed power control switch turn-on time point, i.e., sends rectangle for Td1 point The setting sending time Tf2 of the rectangular wave broad pulse of setting sending time Tf1 and the Td2 point of wave broad pulse:
Tf1=Td1- (Tm/2)-Tan;……………………………6
Tf2=Td2- (Tm/2)-Tan;……………………………7
Tm is signal rectangular wave broad pulse width in formula, and Tan is the offset.
In the cycle positive half cycle ascent stage, since rectangular wave broad pulse loads on the initial stage of cycle positive half cycle, the wide arteries and veins of rectangular wave Rush that the voltage more therefore transmitted rectangular wave broad pulses high relative to all wave voltages are more powerful, the signal of generation receives Point displacement is more, sets turnover voltage in the other time segment signal voltage comparator of loading procedure, has been moved off signal reception The voltage location of point;Cycle positive half cycle descending branch is then the signal generated in the latter stage for loading on cycle process in rectangular wave broad pulse Receiving point displacement is more, in this way, the switching signal according to the tests determined transmitting terminal of rectangular wave broad pulse voltage actually used Offset Tan between the midpoint and Td1 or Td2 of timer time receives signal more reliable.
Signal transmission process:Transmitting terminal is crossed the overturning of 0 voltage comparator in cycle positive half cycle ascent stage cycle and was generated in 0 Disconnected, after the Ti1 or Ti2 that is delayed, firing switch signal timing device simultaneously connects high-speed power control switch, and single rectangular wave is wide Pulse voltage is superimposed on grid cyclic wave, and fundamental frequency is made to generate small displacement on a timeline in the voltage of Td1 or Td2, And certain harmonic wave can be injected to system.
If cross 0 interruption after interrupt handling routine, start measurement Tc1 timer with connects switching signal timer instruct The execution time is Tin
When sending signal to Td1:
Ti=Tf1-Tin;…………………………………………8
When sending signal to Td2:
Ti2=Tf2-Tin.…………………………………………9
Signaling point displacement how many in real time adjustings of the value of Ti and Ti2 also according to receiving end.
Closing high-speed power control switch in the interrupt service program when interrupting is overflowed in switching signal timer timing, thus Complete a signal modulation process.
In view of the decaying of signals transmission, and demodulation is using cycle voltage over zero as time reference, in this way In Long Distant Transmit, the cycle voltage phase difference of sending and receiving end will cause setting and receives signal time position and actual signal signal Occur deviation between time location and shadow communication performance, therefore when not taking the method for eliminating deviation, communication distance is limited System is in same transformer platform area.
The demodulation of signal:Signal voltage comparator of the receiving end when receiving signal is in the first signal location real-time measurement Tc1 subtract the value after Tb with from the previous Tc1 that the Tc1 being finally stored in is taken out in memory subtract Tb after value whether make comparisons Within the scope of the signal errors of permission, determine that the first signal location receives position value in signal;Signal voltage comparator is The Tc3 of binary signal position real-time measurement subtracts the value after Tb and subtracts with the previous Tc3 for taking out the Tc3 being finally stored in from memory Whether the value after removing Tb makes comparisons within the scope of the signal errors of permission, determines that second signal position receives position in signal and takes Value.
The control of signal transmitting power:When transmitting terminal switching signal timer fires and connect high-speed power control switch Afterwards, the external interrupt mouth of microcontroller opening signal receiving end immediately detects signal voltage comparator in cycle positive half cycle first The flip-flop transition of signal location and second signal position, whether shifted compared with Td1 and Td3 and its shift amount, if signal Voltage comparator flip-flop transition closer to Td1, illustrates that the rectangular wave broad pulse energy sent is relatively smaller or electric network impedance is opposite It is lower.If signal voltage comparator flip-flop transition closer to Td1, increases the Ti time, if rectangular wave broad pulse voltage ratio The Ti2 time is then reduced closer to Td2 compared with device flip-flop transition.
(4) Detailed description of the invention:
Fig. 1 is grid cyclic wave receiving and transmitting signal position data relation schematic diagram;
Fig. 2 is a kind of circuit structure block diagram of city LED light box advertisement tele-control system.
(5) specific embodiment:
A kind of circuit structure block diagram of city LED light box advertisement tele-control system is as shown in Figure 2.It is controlled including section Device and multiple billboard controllers.Piece area controller is shown by signal sending end A, signal receiving end B, Network Interface Module 2, keyboard Show that module 10 and micro controller module 1 are constituted.Billboard controller is by signal sending end A, signal receiving end B, LED light box advertisement 11 and micro controller module 1 constitute.Piece area controller and billboard controller use the power line communication.Master station is to be located at most The computer management system on upper layer is made of router and computer.
Signal sending end A, the signal receiving end B of power line communication described in piece area controller and billboard controller and micro- Controller module 1 is identical with the hardware configuration of power module 4.
The signal sending end A of the power line communication is made of high-speed power control switch 5, switching signal timer 3, electricity Net voltage is connected to high-speed power control switch output end.
The signal receiving end B of the power line communication is compared by twin voltage comparator 7, High-speed Control switch 6,0 voltage excessively Device 8 and signal voltage comparator 9 are constituted.Grid cyclic wave connects after electric resistance partial pressure with 7 input terminal of twin voltage comparator, crosses 0 electricity Pressure comparator 8 and signal voltage comparator 9 are all made of ns grades of high speed voltage comparator MAX319.
Micro controller module 1 uses High Speed Microcontroller STC15F2K60S, this is a kind of single clock/machine cycle (1T) Single-chip microcontroller, speed ratio STC12 also fast 20% is high speed/low-power consumption/superpower jamproof 8051 single-chip microcontroller of new generation, no AD Conversion.
The single-phase firewire and zero curve of power grid connect the output port of signal sending end and the input port of receiving end, wherein power grid Zero line grounding end.The window region network voltage control is in 55V voltage range, machine shell protective grounding, and has high electricity The security warning of pressure area, it is 1 that trouble hunting, which should install no-load voltage ratio additional,:1 isolating transformer is avoided because of failure accidental shock.
Network Interface Module 2 in piece area controller, which uses, is integrated with the W5100 Ethernet mould of TCP/IP hardware protocol stacks Block, or use other network interface chips.High Speed Microcontroller STC15F2K60S and Network Interface Module 2 in micro controller module 1 Between use SPI serial bus communication mode, data to be sent are reached into W5100, are then passed through data by W5100 subpackage Internet is dealt into master station.

Claims (10)

1. a kind of implementation method of city LED light box advertisement tele-control system, billboard controller pass through with piece area controller Power line communication, piece area controller access internet by Network Interface Module, it is characterised in that:
The power line communication of use is by the accurate of the signal sending point of the setting to grid cyclic wave voltage and signal receiving point Positioning sends a rectangle broad pulse of communication positive or negative pole in the signal sending point of setting to generating mutation current, The electric current causes a voltage drop to be superimposed on grid voltage waveform on the short-circuit impedance of distribution transformer, to complete primary Signal modulation process, signal receiving point demodulated signal of the receiving end in the setting of grid cyclic wave voltage;One wide arteries and veins of anode Punching refers to that the high level part of pulse returns 0 from 0 to height.
2. the method according to claim 1, wherein the signal sending point of the setting in grid cyclic wave voltage Modulating and demodulating signal step with the signal receiving point of setting includes:
It sends:The overturning of 0 voltage comparator is crossed when the cycle that the cycle positive half cycle ascent stage is arranged in and generated 0 interruption, after being delayed Its sending time falls in the signal sending point of the setting of all wave voltages, and firing switch signal timing device simultaneously connects high-speed power control Switch, by single positive pulse voltage Signal averaging on grid cyclic wave;
It receives:The low-voltage window being made of the threshold range of high threshold voltage and low threshold voltage being arranged by twin voltage comparator Mouth region, when all wave voltages of input fall in the low-voltage window region of twin voltage comparator setting, makes under microcontroller control High-speed Control switch in an ON state, signal voltage comparator directly all wave voltages signal receive position receive signal and Cycle time parameter is measured, received signal is determined whether in the signal receiving point error range of setting, in low-voltage window Make High-speed Control switch in an off state other than mouth region.
3. according to the method described in claim 2, it is characterized in that, the signal sending point and signal receiving point of setting are in power grid The voltage of cycle positive half cycle, which is crossed at 0, was arranged 0 voltage comparator, in a setting cycle voltage location of grid cyclic wave positive half cycle Setting signal voltage comparator, the output of signal voltage comparator is in two positions for setting all wave voltages of a cycle positive half cycle Set realization overturning;The cycle positive half cycle ascent stage the setting week wave voltage position as the first signal location, setting The cycle voltage location of signal transmitting and receiving point is known as the first signal set point, in the setting cycle electricity of cycle positive half cycle descending branch The position of pressure is known as second signal set point as second signal position, the cycle voltage location of setting signal transmitting-receiving point;
The signal voltage comparator is a setting cycle being arranged between voltage 21V -40V of grid cyclic wave positive half cycle Voltage location.
4. the method according to claim 1, wherein the distance that basis signal need to transmit when sending signal is through testing It determines:
Rectangular wave broad pulse voltage-drop loading is set in the positive 35V of the signal sending point on grid cyclic wave to the voltage value between 60V; The rectangular wave broad pulse voltage is higher by value than the voltage for the grid cyclic wave position being loaded;The width value of rectangular wave broad pulse voltage For 0.3ms~0.5ms;Signal code value 1A -20A can be provided.
5. the method according to claim 1, wherein the signal receiving point demodulated signal in setting, includes The signal that confirmation or erasing are sent from the signal sending point of setting, during transmitting terminal sends signal, letter transmitted by transmitting terminal Number simultaneously receiving end receive, if received position value information is different from the position value information of transmission, then send the position Erasing signal, each data bit is erasable in each frame information and retransmits.
6. according to the method described in claim 5, it is characterized in that, position value with signal voltage comparator signal receiving point not Overturning overturns to send position signal " 1 " to send position signal " 0 ", the first signal set point of each data bit sends position signal " 1 " Or when " 0 ", second round send position signal " 1 " or " 0 " with the period 1 on the contrary, its two kinds are combined " 1 ", " 0 " and " 0 ", " 1 " As position signal two different values, the second signal set point of second round is to confirm or wipe the first signal set point to send Data, sending " 0 " is confirmation, and sending " 1 " is erasing, and signal voltage comparator is sent in the first signal set point in start bit " 1 " is to start to send, and stop bits is terminated in the first signal set point with sending " 0 ", and the second signal of start bit and stop bits is set Fixed point does not have to.
7. the method according to claim 1, wherein the signal sending point of setting and the accurate of signal receiving point are determined Position includes the error compensation of set signal sending point and signal receiving point, while crossing 0 voltage comparator and signal voltage ratio Ns grades of high speed voltage comparators and High Speed Microcontroller are all made of compared with device.
8. according to claim 1 and method of claim 7, which is characterized in that signal sending point and signal receiving point It is accurately positioned and its compensation method of error, to be first computing system crossed at 0 using the voltage of cycle positive half cycle ascent stage as the time O'clock to the first signal set point time interval be nominal value Tm1;The voltage of cycle positive half cycle ascent stage is crossed at 0 as start time Time interval to second signal set point is nominal value Tm2
And time of 0 voltage comparator when the mistake 0 of cycle positive half cycle ascent stage overturns was measured as start time to signal electricity Press the real-time measurement values T of time interval of the comparator when the first signal location is overturnc1;This spent for 0 flip-flop transition as start time To the real-time measurement values T of time interval of the signal voltage comparator when second signal position is overturnc2;Signal voltage comparator exists The reality of time interval of 0 voltage comparator when the mistake 0 of cycle positive half cycle descending branch is overturn was arrived in second signal position when overturning When measured value Tc3;Cross time interval of 0 voltage comparator when the mistake 0 of the cycle positive half cycle ascent stage of two adjacent cycles is overturn For cycle period real-time measurement values Tzu;
When the cycle and its two adjacent cycles that detect are true, the cycle period real-time measurement values Tzu being detected simultaneously by In 20ms and its error range, the cycle is measured to cross 0 voltage comparator when the mistake 0 of cycle positive half cycle ascent stage is overturn and be The a reference value T of time interval of the start time to signal voltage comparator when the first signal location is overturnc010 overturning is crossed with this For a reference value T of time interval of the start time to signal voltage comparator when second signal position is overturnc02, save 30 to The continuous T of a setting number in 50c01And Tc02And calculate saved Tc01Average value Tp1With the T savedc02It is flat Mean value Tp2, by Tp1And Tp2It is stored in corresponding storage unit;
The then error compensation value T of signal voltage comparator flip-flop transitionbIt is determined by following formula:
Tb={ (Tm2-Tm1)-(Tp2-Tp1)}÷2;
By TbIt saves, TbIllustrate that the position of actual signal transmitting-receiving point is higher for timing;
The extremely multiple setting byte number of the data bit occupancy in each frame information 1 is needed according to power grid quality and signal structure, The clock timer time there are two cycle period is stayed after each frame traffic, for updating Tc1、Tc2And Tc3, from next week Wave starts the communication of next frame, if detecting that cycle signal is vacation in a frame traffic, retransmits the information frame;
It realizes that the cycle in communication sequentially synchronizes by the start bit of each frame information, stop bits and connects in the sending and receiving end of the communication information Continuous, piece area controller or billboard controller measure respectively and store T in the call duration time gap of described two framesc1、Tc2With Tc3, and calculate separately two real-time measurement values Tc1Average value Tk1、Tc2Average value Tk2And Tc3Average value Tk3, and deposit respectively Enter two groups of storage units, i.e. Tc1、Tc2And Tc3Storage unit and Tk1、Tk2And Tk3Storage unit, when from storage unit take out Tk1、 Tk2And Tk3After reset two groups of storage units, the storage unit can store 16 real-time measurement values Tc1、Tc2And Tc3, do not communicating Period measures continuous 16 real-time measurement values T respectivelyc1、Tc2And Tc3If screen to cycle signal be it is false, described in clearing Tc1、Tc2And Tc3Respective storage unit, continue to measure when screening to cycle signal is true and store, it is every when being filled with to be stored in one A Tc1、Tc2And Tc3, first remove a T being stored at firstc1、Tc2And Tc3, while number is taken out by a setting in 2 to 15, Take out the T of last one group of depositc1、Tc2And Tc3, when power grid quality difference, number is taken out in the smaller setting of choosing, and calculating is taken out each The T of groupc1Average value Tk1、Tc2Average value Tk2And Tc3Average value Tk3And replace the T originally savedk1、Tk2And Tk3
Send the determination of signal time:Continuous no less than 16 grid cyclic waves must be screened out before receiving and sending messages, i.e., in fact When measurement storage unit in have no less than 16 Tc1、Tc2And Tc3If continuous 16 T are not detectedc1、Tc2And Tc3 It is then sequentially delayed until detecting 16, transmitting terminal takes out T from storage unitk1、Tk2And Tk3Value add T respectivelyb, Obtain the practical transmitting-receiving point T of the first signal with error compensationd1With the practical sending point T of second signald2
Td1=Tk1-Tb
Td2=Tk2+Tb
The practical receiving point T of second signal with error compensationd3
Td3=Tk3-Tb
Save Td1、Td2And Td3In respective storage unit, T after each frame information is sentk1、Tk2And Tk3All it is updated;
When sending signal, microcontroller uses T respectivelyd1And Td2As switching signal timer timing midpoint and according to being used Rectangular wave broad pulse voltage levels take certain offset, then using the spaced time of rectangular wave broad pulse as switching signal determine When device timing length, be easy to calculate high-speed power control switch turn-on time point, that is, be used for Td1Point sends the wide arteries and veins of rectangular wave The setting sending time T of punchingf1And Td2The setting sending time T of the rectangular wave broad pulse of pointf2
Tf1=Td1-(Tm/2)-Tan
Tf2=Td2-(Tm/2)-Tan
T in formulamFor signal rectangular wave broad pulse width, TanFor the offset;
Rectangular wave broad pulse loads on the initial stage of cycle positive half cycle, and rectangular wave broad pulse voltage is high more relative to all wave voltages More, the signal receiving point displacement of generation is more, and cycle positive half cycle descending branch is then to load on cycle process in rectangular wave broad pulse The signal receiving point displacement that generates of latter stage it is more, the midpoint of the switching signal timer time of tests determined transmitting terminal With Td1Or Td2Between offset Tan
Signal transmission process:Grid cyclic wave voltage is connected to high-speed power control switch output port, when the cycle positive half cycle ascent stage Cycle cross 0 voltage comparator overturning generated 0 interruption, through be delayed Ti1Or Ti2Afterwards, firing switch signal timing device and height is connected Fast power control switch makes fundamental frequency in T by single positive pulse voltage Signal averaging on grid cyclic waved1Or Td2Electricity Pressure generates small displacement on a timeline;
If crossing interrupt handling routine after 0 interruption, starting measurement Tc1Timer with connect switching signal timer instruction execution Time is Tin
When to Td1When sending signal:
Ti=Tf1-Tin;
When to Td2When sending signal:
Ti2=Tf2-Tin;
TiAnd Ti2Signaling point displacement of the value also according to receiving end how many adjust in real time;
Closing high-speed power control switch in the interrupt service program when interrupting is overflowed in switching signal timer timing, to complete Signal modulation process;
Above-mentioned Ti2Value also according to receiving end signaling point displacement it is how many adjust in real time, methods are:If signal voltage compares Device flip-flop transition is closer to Td1, then microcontroller control high-speed power control switch increases rectangular wave broad pulse voltage, if letter Number voltage comparator flip-flop transition is closer to Td2Then reduce Ti2Time.
9. a kind of device of city LED light box advertisement tele-control system, it is characterised in that including,
Signal sending end, signal receiving end and the microcontroller of power line communication described in piece area controller and billboard controller The hardware configuration of module is identical;
The signal sending end of the power line communication is made of high-speed power control switch, switching signal timer;
The signal receiving end of the power line communication is switched by twin voltage comparator, High-speed Control, crosses 0 voltage comparator and signal Voltage comparator is constituted.
10. device according to claim 9, it is characterised in that the signal receiving end of the power line communication is by power grid All wave voltages through High-speed Control switch control, cycle positive half cycle two low-voltage window regions directly after conditioning filtering be followed by Signal voltage comparator input terminal, High-speed Control switch only open by the low-voltage window region around signal transmitting and receiving point, isolation Grid cyclic wave high voltage, signal voltage comparator is directly when the signal of all wave voltages receives position and receives signal and measurement cycle Between parameter;
The signal sending end of the power line communication, network voltage are connected to high-speed power control switch output end, in cycle just half All ascent stage cycles cross the overturning of 0 voltage comparator and generated 0 interruption, through the T that is delayedi1Or Ti2Afterwards, firing switch signal timing device is simultaneously High-speed power control switch is connected, by single rectangular wave broad pulse voltage superposition on grid cyclic wave.
CN201810822283.6A 2018-06-10 2018-07-24 A kind of city LED light box advertisement tele-control system Withdrawn CN108880617A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2018105913334 2018-06-10
CN201810591333 2018-06-10

Publications (1)

Publication Number Publication Date
CN108880617A true CN108880617A (en) 2018-11-23

Family

ID=64305095

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810822283.6A Withdrawn CN108880617A (en) 2018-06-10 2018-07-24 A kind of city LED light box advertisement tele-control system

Country Status (1)

Country Link
CN (1) CN108880617A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112770447A (en) * 2019-10-21 2021-05-07 软核株式会社 Power line-based communication device and LED lighting system adopting same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112770447A (en) * 2019-10-21 2021-05-07 软核株式会社 Power line-based communication device and LED lighting system adopting same

Similar Documents

Publication Publication Date Title
CN108898783A (en) A kind of Warehouse Fire alarm control system
CN108919718A (en) A kind of analog quantity remote collection alarm system
CN108880617A (en) A kind of city LED light box advertisement tele-control system
CN109921831A (en) A kind of factory and enterprise electric energy detection management system
CN108877192A (en) A kind of residential block Auto-recording System of Electrical Power Calculation
CN108831136A (en) A kind of Automatic meter reading system of tap water supply pipe network
CN108990650A (en) A kind of agricultural greenhouse artificial climate Experimental Control System
CN108897297A (en) A kind of household electric appliances tele-control system
CN108961705A (en) A kind of fire alarm control system
CN108958121A (en) A kind of agricultural greenhouse atmosphere control system
CN108897295A (en) A kind of tele-control system of household electric appliances
CN108877191A (en) A kind of residential area Water-flowmeter auto-recording
CN108964709A (en) A kind of residential block tap water meter Automatic meter reading system
CN108923824A (en) A kind of bus arrival intelligent display system
CN108717799A (en) A kind of radio communication station board system of bus station
CN109001998A (en) A kind of poultry purchase wholesale market data collection system
CN108880618A (en) A kind of city LED advertising control system
CN108873999A (en) A kind of green house of vegetables temperature and humidity control system
CN108958120A (en) A kind of hotel intelligence control system
CN108961730A (en) A kind of flow data collector system
CN108717777A (en) A kind of eating and drinking establishment's fire alarm control system
CN108961806A (en) A kind of bus station's intelligence station board display system
CN108964707A (en) A kind of chain store's customer queries system
CN108873784A (en) A kind of hotel electric appliance remote control system
CN108961729A (en) A kind of Factory Electric Power data acquisition management system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20181123