CN108999301A - A kind of side wall construction joint structure and construction method - Google Patents

A kind of side wall construction joint structure and construction method Download PDF

Info

Publication number
CN108999301A
CN108999301A CN201811166597.1A CN201811166597A CN108999301A CN 108999301 A CN108999301 A CN 108999301A CN 201811166597 A CN201811166597 A CN 201811166597A CN 108999301 A CN108999301 A CN 108999301A
Authority
CN
China
Prior art keywords
side wall
armpit angle
concrete
bottom plate
armpit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811166597.1A
Other languages
Chinese (zh)
Inventor
闫建龙
秦林
周自强
李昊炎
李刚
张新明
吴熊熊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Third Construction Co Ltd of CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Third Construction Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group, Third Construction Co Ltd of CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201811166597.1A priority Critical patent/CN108999301A/en
Publication of CN108999301A publication Critical patent/CN108999301A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Abstract

The present invention relates to a kind of side wall construction joint structure and construction methods, including bottom plate, side wall and fender member, the side of the bottom plate is cast with side wall vertically, the lateral surface of the side wall is provided with fender member, the armpit angle of rectangular structure is provided between the bottom plate and side wall, the upper end at the armpit angle is inlaid in the lower end of side wall.The armpit angle is made of trapezoidal sections and rectangular section, and the upper surface of the trapezoidal sections is inclined-plane, and the side wall and the connecting sewing at armpit angle are located on the inclined-plane at armpit angle.Construction joint is designed as right-angle structure by the present invention, and new, the visual boundary line of old concrete is made to drop to armpit angle and side wall intersection, to avoid the occurrence of new, old concrete interface obviously or bad root phenomenon.One section of armpit angle portion in the present invention is entirely embedded in side wall bottom end, the effective stress improved between side wall and bottom plate, so that bottom plate and side wall junction is avoided crack, and good appearance occur, the value with wide popularization and application.

Description

A kind of side wall construction joint structure and construction method
Technical field
The invention belongs to engineering construction fields, are related to the construction of side wall, especially a kind of side wall construction joint structure and construction Method.
Background technique
In concreting process, being segmented the concrete poured will form seam in the junction being poured twice.Construction Seam is not a kind of " seam " of necessary being, it for no other reason than that the concrete of after-pouring is more than the presetting period, and with first pour There are a faying face between concrete, which is known as construction joint.
Currently, in the construction of underground structure side wall, Normal practice are as follows: after the completion of bottom plate and the construction of bottom plate armpit angle, with " short abutment wall " is " old wall " (newly pouring on the outside of side wall and on the basis of " old wall "), and supporting module pours side wall concrete.
Since general side wall is higher, reinforcing bar is closeer, and " short abutment wall " pours side wall junction with after and be easy running pulp, deformation, causes Keep appearance after molding poor, Minimum Concrete Protective Coating Thickness cannot control, and cause unfavorable shadow to the durability of underground structure It rings.The appearance and quality for how handling concrete herein well become the emphasis of Underground Construction.
Summary of the invention
It is an object of the invention to overcome the deficiencies of the prior art and provide a kind of can be effectively relieved at construction joint to occur rotten Situation and guarantee concrete wall surface appearance, to reinforce the side wall construction joint structure and construction method of intensity at construction joint.
The scheme of the invention is be achieved:
A kind of side wall construction joint structure, including bottom plate, side wall and fender member, the side of the bottom plate are cast with vertically Side wall, the lateral surface of the side wall are provided with fender member, and the armpit angle of rectangular structure is provided between the bottom plate and side wall, should One end face at armpit angle is contacted with side wall, other end and contacts baseplate, and the upper end at the armpit angle is inlaid in the lower end of side wall It is interior.
Moreover, the armpit angle is made of trapezoidal sections and rectangular section, the upper surface of the trapezoidal sections is inclined-plane, the rectangular section it is upper End face is higher than trapezoidal sections, and the side wall and the connecting sewing at armpit angle are located on the inclined-plane at armpit angle.
Moreover, the armpit angle is that concrete is poured, and is integrally produced with bottom plate.
A kind of construction method of side wall construction joint, includes the following steps:
Step 1: bottom slab concreting
Reinforcing bar required for bottom plate is bound first, and armpit Angle formwork is fixed, and armpit angle and bottom plate are poured;
Step 2: armpit angle end face is cleared up
Top surface on the armpit angle of forming is cleared up, bleeding cement, loose sandstone, the weak concrete layer of pine and oil are removed Dirt guarantees the later period when pouring to side wall, the effect docked between side wall and armpit angle;
Step 3: reinforcing bar is handled
The reinforcing bar for exposing armpit angle is cleared up, the rust staining and laitance on reinforcing bar are removed;
Step 4: dabbing is handled
Upper surface and side to armpit angle carry out dabbing, are subject to and expose fresh concrete face;
Step 5: rinsing cleaning
Using clear water to after dabbing upper top surface and side clear up, guarantee and to guarantee it in side without residue on armpit angle Wall keeps wet before being poured;
Step 6: binding side wall reinforcing bar, installing side wall template
Side wall reinforcing bar is bound above the rectangular section of molding armpit angle, and side wall mould is installed on the inclined surface of armpit angle trapezoidal sections Plate keeps side wall template relatively parallel with building enclosure;Side wall template is fixedly linked by split bolt and building enclosure;It is installing When side wall template, make spaced between side wall template and the side of armpit angle rectangular section, the width at interval is side wall concrete Protective layer thickness;
Step 7: pouring pea gravel concreten
Before pouring to side wall, pea gravel concreten is poured in interval, and using vibration board to spacer portion It vibrates;
Step 8: side wall concrete pours
Side wall concrete is poured between opposite side wall form and building enclosure;
Step 9: concrete curing
After the completion of concrete side wall pours, follow up water seasoning in time, and irrigation times are to guarantee concrete side wall always Subject to moisture state;
Step 10: side wall form removable
After side wall molding, side wall template is removed, the close of concrete side wall metope is checked after side wall form removable Solidity, flatness, it is ensured that construction quality is qualified.
Moreover, checking at the interconnecting piece at side wall template and armpit angle whether pulp occur when pouring to side wall Phenomenon is vibrated to the concrete near construction joint using vibrating spear, so that concrete be made uniformly to spread apart, is finished to jolt ramming Afterwards, receipts face is smoothed out to side wall mould concrete.
The advantages and positive effects of the present invention are:
1, construction joint is designed as right-angle structure by the present invention, and new, the visual boundary line of old concrete is made to drop to armpit angle and side Wall intersection, to avoid the occurrence of, new, old concrete interface is obvious or bad root phenomenon.
2, the present invention at construction joint by vibrating, to guarantee that the concrete for being located at construction joint can uniformly be spread out The phenomenon that opening, avoiding the occurrence of rotten.
3, the present invention keeps the docking effect at construction joint more preferable by filling pea gravel concreten in gap.
4, the armpit angle in the present invention is entirely embedded in side wall bottom end, it is effective improve between side wall and bottom plate by Power, so that bottom plate and side wall junction is avoided crack, and good appearance occur, it is practical, with wide popularization and application Value.
Detailed description of the invention
Fig. 1 is the structural schematic diagram after side wall casting of the present invention;
Fig. 2 is the structural schematic diagram at armpit angle in Fig. 1;
Fig. 3 is the structural schematic diagram after the completion of armpit angle of the present invention pours;
Fig. 4 is that side wall of the present invention pours front template structural schematic diagram.
Specific embodiment
The invention will be further described with reference to the accompanying drawing and by specific embodiment.
A kind of side wall construction joint structure, as shown in Figure 1, including bottom plate 4, side wall 2 and fender member 1, the bottom plate Side is cast with side wall vertically, and the lateral surface of the side wall is provided with fender member.
The innovation of the invention consists in that:
The armpit angle 3 of rectangular structure is provided between the bottom plate and side wall, an end face at the armpit angle is contacted with side wall, separately One end face and contacts baseplate.The structure at the armpit angle as shown in Fig. 2, be made of trapezoidal sections 3B and rectangular section 3A, the trapezoidal sections it is upper Surface is inclined-plane, and the upper surface of the rectangular section is higher than trapezoidal sections.The armpit angle be concrete be poured, and with one system of bottom plate Out, easy for construction, at low cost.The rectangular section upper end at the armpit angle is inlaid in the lower end of side wall, the side position of the side wall At the trapezoidal sections inclined-plane at armpit angle, i.e. the connecting sewing of side wall and armpit angle is located on the inclined-plane at armpit angle.
Be entirely embedded in side wall bottom face at the top of armpit angle rectangular section in the present invention, it is effective improve side wall and bottom plate it Between stress, to avoid bottom plate and crack occurs in side wall junction.
A kind of construction method of side wall construction joint, includes the following steps:
Step 1: bottom slab concreting
Reinforcing bar required for bottom plate is bound first, and armpit Angle formwork 5 is fixed, to pour armpit angle and bottom plate It builds, as shown in Figure 3;
The side thickness of concrete cover that wherein meets water is 45mm, and land side thickness of protection tier is 35mm, pours bottom plate And armpit angle concrete.
Step 2: armpit angle end face is cleared up
Top surface on the armpit angle of forming is cleared up, bleeding cement, loose sandstone, the weak concrete layer of pine and oil are removed Dirt, thus when guaranteeing that the later period pours side wall, the effect docked between side wall and armpit angle;
Step 3: reinforcing bar is handled
The reinforcing bar for exposing armpit angle is cleared up, the rust staining and laitance on reinforcing bar are removed;
By clearing up rebar surface, so that the connection effect for making reinforcing bar between the concrete that pours is more preferable, protect The side wall for demonstrate,proving casting is stronger.
Step 4: dabbing is handled
Upper surface and side to armpit angle carry out dabbing, are subject to and expose fresh concrete face;
Reach 2.5Mpa to concrete strength, the top end surface and side to armpit angle carry out dabbing, and top end surface is to expose Subject to fresh concrete face, side dabbing depth is 15mm, leaks out side wall reinforcing bar.
Step 5: rinsing cleaning
Using clear water to after dabbing upper top surface and side clear up, guarantee there is not residue on armpit angle, and guarantee it It is kept before side wall is poured wet;
Step 6: binding side wall reinforcing bar, installing side wall template
As shown in figure 4, binding side wall reinforcing bar above the rectangular section of molding armpit angle, and on the inclined surface of armpit angle trapezoidal sections Side wall template 6 is installed, keeps side wall template relatively parallel with building enclosure;Side wall template is fixed by split bolt and building enclosure It is connected;When installing side wall template, makes spaced C between side wall template and the side of armpit angle rectangular section, be spaced the width of C Degree is side wall concrete protective layer thickness;
By using the technical program, it is located at the construction joint to be formed at the inclined-plane of armpit angle interconnecting piece, improves at construction joint Appearance.
Step 7: pouring pea gravel concreten
Before pouring to side wall, pea gravel concreten is poured in interval, and using vibration board to spacer portion It vibrates;Filling by pea gravel concreten to reserved position makes construction joint concrete appearance meet perception requirement.
Step 8: side wall concrete pours
Side wall concrete is poured between opposite side wall form and building enclosure, when being poured to side wall, is checked Whether there is pulp phenomenon at the interconnecting piece at side wall template and armpit angle, is shaken using vibrating spear to the concrete near construction joint Smash, so that concrete be made uniformly to spread apart, to jolt ramming after, receipts face is smoothed out to side wall mould concrete;
Step 9: concrete curing
After the completion of concrete side wall pours, follow up water seasoning in time, and irrigation times are to guarantee concrete side wall always Subject to moisture state;
Step 10: side wall form removable
After side wall molding, side wall template is removed, the close of concrete side wall metope is checked after side wall form removable Solidity, flatness, it is ensured that construction quality is qualified.
It is emphasized that embodiment of the present invention be it is illustrative, without being restrictive, therefore packet of the present invention Include and be not limited to embodiment described in specific embodiment, it is all by those skilled in the art according to the technique and scheme of the present invention The other embodiments obtained, also belong to the scope of protection of the invention.

Claims (5)

1. a kind of side wall construction joint structure, including bottom plate, side wall and fender member, the side of the bottom plate are cast with side vertically The lateral surface of wall, the side wall is provided with fender member, it is characterised in that: rectangular structure is provided between the bottom plate and side wall Armpit angle, an end face at the armpit angle is in contact with side wall, and other end is in contact with bottom plate, and the upper end at the armpit angle is inlaid in In the lower end of side wall.
2. side wall construction joint structure according to claim 1, it is characterised in that: the armpit angle is by trapezoidal sections and rectangular section structure At the upper surface of the trapezoidal sections is inclined-plane, and the upper surface of the rectangular section is higher than trapezoidal sections, the connecting sewing position of the side wall and armpit angle In on the trapezoidal sections inclined-plane at armpit angle.
3. side wall construction joint structure according to claim 1 or 2, it is characterised in that: the armpit angle be concrete be poured and At, and integrally produced with bottom plate.
4. a kind of construction method of side wall construction joint as described in any one of claims 1 to 3, it is characterised in that: including as follows Step:
Step 1: bottom slab concreting
Reinforcing bar required for bottom plate is bound first, and armpit Angle formwork is fixed, and armpit angle and bottom plate are poured;
Step 2: armpit angle end face is cleared up
Top surface on the armpit angle of forming is cleared up, bleeding cement, loose sandstone, the weak concrete layer of pine and sundries are removed, Guarantee the later period when pouring to side wall, the effect docked between side wall and armpit angle;
Step 3: reinforcing bar is handled
The reinforcing bar for exposing armpit angle is cleared up, the rust staining and laitance on reinforcing bar are removed;
Step 4: dabbing is handled
Dabbing is carried out to the rectangular section upper surface at armpit angle and side, is subject to and exposes fresh concrete face;
Step 5: rinsing cleaning
Using clear water to after dabbing upper surface and side clear up, guarantee armpit angle on without residue, and guarantee its side wall into Row keeps wet before pouring;
Step 6: binding side wall reinforcing bar, installing side wall template
Side wall reinforcing bar is bound above the rectangular section of molding armpit angle, and side wall template is installed on the inclined surface of armpit angle trapezoidal sections, Keep side wall template relatively parallel with building enclosure;Side wall template is fixedly linked by split bolt and building enclosure;Installing side When wall form, make it is spaced between side wall template and the side of armpit angle rectangular section, the width at interval be side wall concrete protect Covering thickness;
Step 7: pouring pea gravel concreten
Before pouring to side wall, pea gravel concreten is poured in interval, and carry out to spacer portion using vibration board It vibrates;
Step 8: side wall concrete pours
Side wall concrete is poured between opposite side wall form and building enclosure;
Step 9: concrete curing
After the completion of concrete side wall pours, follow up water seasoning in time, and irrigation times are to guarantee that concrete side wall is in always Subject to moisture state;
Step 10: side wall form removable
After side wall molding after, side wall template is removed, after side wall form removable check concrete side wall metope compactness, Flatness, it is ensured that construction quality is qualified.
5. the construction method of side wall construction joint according to claim 4, it is characterised in that: in the step 8, in opposite side When wall is poured, check at the interconnecting piece at side wall template and armpit angle pulp phenomenon whether occur, using vibrating spear to mixed Solidifying soil vibrates, so that concrete be made uniformly to spread apart, to jolt ramming after, receipts face is smoothed out to side wall mould concrete.
CN201811166597.1A 2018-10-08 2018-10-08 A kind of side wall construction joint structure and construction method Pending CN108999301A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811166597.1A CN108999301A (en) 2018-10-08 2018-10-08 A kind of side wall construction joint structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811166597.1A CN108999301A (en) 2018-10-08 2018-10-08 A kind of side wall construction joint structure and construction method

Publications (1)

Publication Number Publication Date
CN108999301A true CN108999301A (en) 2018-12-14

Family

ID=64589112

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811166597.1A Pending CN108999301A (en) 2018-10-08 2018-10-08 A kind of side wall construction joint structure and construction method

Country Status (1)

Country Link
CN (1) CN108999301A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109653247A (en) * 2019-01-31 2019-04-19 武汉市市政建设集团有限公司 A kind of cracking resistance formula underground pipe gallery structure and its construction method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH094077A (en) * 1995-06-15 1997-01-07 Daiken Trade & Ind Co Ltd Joint treatment method of exterior wall material
CN205259233U (en) * 2015-11-26 2016-05-25 中国建筑股份有限公司 Ensure that prefabricated coincide wall in underground and cast -in -place bottom plate connect node construction of thickness
CN108130889A (en) * 2017-12-25 2018-06-08 上海市水利工程集团有限公司 Pump lock main body bottom plate and flow channel layer side wall step construction joint method for production

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH094077A (en) * 1995-06-15 1997-01-07 Daiken Trade & Ind Co Ltd Joint treatment method of exterior wall material
CN205259233U (en) * 2015-11-26 2016-05-25 中国建筑股份有限公司 Ensure that prefabricated coincide wall in underground and cast -in -place bottom plate connect node construction of thickness
CN108130889A (en) * 2017-12-25 2018-06-08 上海市水利工程集团有限公司 Pump lock main body bottom plate and flow channel layer side wall step construction joint method for production

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109653247A (en) * 2019-01-31 2019-04-19 武汉市市政建设集团有限公司 A kind of cracking resistance formula underground pipe gallery structure and its construction method

Similar Documents

Publication Publication Date Title
CN104631513A (en) Construction method for closing basement exterior wall post-cast strip
CN106812219A (en) Filling wall top stuff up a crack construction method
CN111764522A (en) Anti-leakage building floor post-cast strip structure and pouring method
CN108005255A (en) A kind of construction method of wall
CN106996190A (en) Alter-pouring strips mould plate and post-cast strip casting method
CN106884436B (en) A kind of construction method of the waterproof connecting structure of foundation pit uplift pile and structure base slab
CN108638322B (en) Prefabricated post concreting method in a kind of assembled architecture
CN108999301A (en) A kind of side wall construction joint structure and construction method
CN208685933U (en) A kind of post-cast strip template free of demolition
CN109676748A (en) A kind of production method of the concrete prefabricated frame of distribution box
CN208072390U (en) A kind of connection structure of the stake of bridge support and underwater binder
CN102660956B (en) Concrete moulding bed structure and pouring method
CN108544655A (en) The curved beam prefabricated construction method of curved bridge
CN106284789A (en) For controlling the construction technology of cast-in-situ floor Forming Quality
CN105064500A (en) Balcony beam slab inner side filling wall body and main body structure integral casting construction method
CN103410172A (en) Construction method for post pouring belt plugging of underground structural roof plate
KR200436652Y1 (en) Mat with top?base
CN104911999A (en) Construction method for deeply burying anchor
CN213979911U (en) Basement outer wall post-cast strip template structure
CN104264714A (en) Waterproof construction joint structure of basement exterior wall
CN207659914U (en) The narrow body wave wall template of L-type
CN209244008U (en) A kind of water-tight exterior wall structure
CN107119726B (en) Equipment, method is stayed in a kind of post-cast strip
CN219638470U (en) Precast concrete plugging device
CN106760487A (en) A kind of cast-in-place concrete exterior wall crack resistence Slate hanging construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181214

RJ01 Rejection of invention patent application after publication