CN108995049A - One kind cutting concrete precast pipe pile pile crown and retains reinforcing bar method - Google Patents

One kind cutting concrete precast pipe pile pile crown and retains reinforcing bar method Download PDF

Info

Publication number
CN108995049A
CN108995049A CN201810749657.6A CN201810749657A CN108995049A CN 108995049 A CN108995049 A CN 108995049A CN 201810749657 A CN201810749657 A CN 201810749657A CN 108995049 A CN108995049 A CN 108995049A
Authority
CN
China
Prior art keywords
concrete
pile
prefabricated tubular
cutting
framework
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810749657.6A
Other languages
Chinese (zh)
Other versions
CN108995049B (en
Inventor
谢海鹏
朱勃海
江国明
吴振江
李强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd
Original Assignee
Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd filed Critical Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd
Priority to CN201810749657.6A priority Critical patent/CN108995049B/en
Publication of CN108995049A publication Critical patent/CN108995049A/en
Application granted granted Critical
Publication of CN108995049B publication Critical patent/CN108995049B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D1/00Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor
    • B28D1/02Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by sawing
    • B28D1/04Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by sawing with circular or cylindrical saw-blades or saw-discs

Abstract

Concrete precast pipe pile pile crown is cut the invention discloses one kind and retains reinforcing bar method, and prefabricated tubular pile includes framework of steel reinforcement, outer concrete and interior layer concrete, and framework of steel reinforcement is cast between outer concrete and interior layer concrete;The construction equipment of use includes cutting machine, veneer sawing machine and small saw blade;Veneer sawing machine is located at the top of prefabricated tubular pile;Pile crown retains reinforcing bar method the following steps are included: S1, veneer sawing machine to be mounted on to the top of prefabricated tubular pile;S2, ring cutting is carried out to prefabricated tubular pile with cutting machine, framework of steel reinforcement is not injured in cutting process;S3, small saw blade is installed on veneer sawing machine, ring cutting is carried out by interior layer concrete of the small saw blade to prefabricated tubular pile, and do not injure framework of steel reinforcement;S4, the outer concrete of well cutting and interior layer concrete are pulled out or is knocked out, and do not damage the framework of steel reinforcement in prefabricated tubular pile;S5, residual concrete on prefabricated tubular pile is purged.

Description

One kind cutting concrete precast pipe pile pile crown and retains reinforcing bar method
Technical field
The present invention relates to cutting prefabricated tubular pile method field, in particular to one kind cuts the reservation of concrete precast pipe pile pile crown Reinforcing bar method.
Background technique
At present in cutting prefabricated tubular pile method field, because the mode of any excess concrete of excision prefabricated tubular pile is mostly now Manpower sledgehammer is abolished or hand-held cutting machine, although reducing human cost etc., all exists and destroys internal bar construction Risk, this effect of risk is changeable, seriously may cause that building structure is unstable, influences the peace of people's lives and properties Entirely, in order to avoid there is such case, a kind of new cutting prefabricated tubular pile method is needed, while being easy to use, and is not destroyed Internal bar construction makes monolithic architecture secure, reduces unnecessary hidden danger.
Summary of the invention
The problem to be solved in the present invention is how to provide a kind of cutting prefabricated tubular pile method, which is mainly needle A variety of occasions are used, deficiency existing for traditional cutting mode or disadvantage complicated for operation can either be overcome, and can Enhance the function of practicability, to meet the needs of associated scenario.
To solve the above-mentioned problems, concrete precast pipe pile pile crown is cut the present invention provides one kind retain reinforcing bar method, Prefabricated tubular pile includes framework of steel reinforcement, outer concrete and interior layer concrete, and framework of steel reinforcement is cast in outer concrete and internal layer is mixed Between solidifying soil;The construction equipment of use includes cutting machine, veneer sawing machine and small saw blade;Veneer sawing machine is located at the top of prefabricated tubular pile;Stake Head retain reinforcing bar method the following steps are included:
S1, the top that veneer sawing machine is mounted on to prefabricated tubular pile;
S2, ring cutting is carried out to prefabricated tubular pile with cutting machine, framework of steel reinforcement is not injured in cutting process;
S3, small saw blade is installed on veneer sawing machine, ring cutting is carried out by interior layer concrete of the small saw blade to prefabricated tubular pile, and not Injure framework of steel reinforcement;
S4, the outer concrete of well cutting and interior layer concrete are pulled out or is knocked out, and do not damaged in prefabricated tubular pile Framework of steel reinforcement;
S5, residual concrete on prefabricated tubular pile is purged.
Preferably, framework of steel reinforcement can be to top cushion cap or lightning-protection system progress is corresponding welds.Design can guarantee structure in this way Globality, reduction there is error in architectural design.
Preferably, in step S3 small saw blade diameter be less than prefabricated tubular pile in layer concrete diameter.Convenient for small saw blade into Enter the boring part of prefabricated tubular pile, and adjust angle and position, carries out cutting operation.
Preferably, the 2 outer concrete structure of prefabricated tubular pile for being for the ring cutting excision that step S2 cutting machine carries out.Only Outer concrete is cut, while avoiding damage to framework of steel reinforcement, is convenient for breaking concrete.
Preferably, outer concrete is cut in step S2 ~ S3 and the position of interior layer concrete is corresponding.It avoids because of cleavage Difference is set, the case where stripping appearance is led to not.
Preferably, step S2 can be exchanged with the job order of step S3.The two exchange job order has no effect on finally Purpose, therefore layer concrete in no matter first cutting outer concrete or first cutting, effect is all consistent.
One kind cut concrete precast pipe pile pile crown retain reinforcing bar method have it is below the utility model has the advantages that
1. it is easy to operate, avoid reinforcing bar from destroying.Only need veneer sawing machine and cutting machine respectively to the inside and outside layer concrete of prefabricated tubular pile It is cut, then is pulled out, and internal framework of steel reinforcement is not destroyed, guarantee the integrality of framework of steel reinforcement.
2. manpower is saved, it is easy for construction.The coagulation of prefabricated tubular pile can be removed by the operation of veneer sawing machine and cutting machine Soil is abolished without excessive manpower, greatlys save human cost and time cost, and easy for construction, reduces manual operation Fault influences engineering.
Detailed description of the invention
Fig. 1 is a kind of inside cutting drawing for cutting concrete precast pipe pile pile crown and retaining reinforcing bar method of the present invention.
Fig. 2 is a kind of external cutting drawing for cutting concrete precast pipe pile pile crown and retaining reinforcing bar method of the present invention.
Detailed description of the invention: 1 is framework of steel reinforcement, and 2 be prepackage tubular pole, and 3 be small saw blade, and 4 be veneer sawing machine, and 5 be cutting machine, and 21 be outer Layer concrete, 22 be interior layer concrete.
Specific embodiment
The preferred embodiments of the present invention will be described in detail with reference to the accompanying drawing so that it is of the invention a little with feature more It is easily readily appreciated by one skilled in the art, to make apparent define to protection scope of the present invention.
Embodiment 1
Referring to shown in Fig. 1-2, in the present embodiment, concrete precast pipe pile pile crown is cut the present invention provides one kind and retains reinforcing bar side Method, prefabricated tubular pile 2 include framework of steel reinforcement 1, outer concrete 21 and interior layer concrete 22, and framework of steel reinforcement 1 is cast in outer layer coagulation Between soil 21 and interior layer concrete 22;The construction equipment of use includes cutting machine 5, veneer sawing machine 4 and small saw blade 3;Veneer sawing machine 4 is located at The top of prefabricated tubular pile 2;Pile crown retain reinforcing bar method the following steps are included:
S1, the top that veneer sawing machine 4 is mounted on to prefabricated tubular pile 2;
S2, ring cutting is carried out to prefabricated tubular pile 2 with cutting machine 5, does not injure framework of steel reinforcement 1 in cutting process;
S3, small saw blade 3 is installed on veneer sawing machine 4, ring is carried out by interior layer concrete 22 of the small saw blade 3 to prefabricated tubular pile 2 and is cut It cuts, and does not injure framework of steel reinforcement 1;
S4, the outer concrete 21 of well cutting and interior layer concrete 22 are pulled out or is knocked out, and do not damage prefabricated tubular pile 2 Interior framework of steel reinforcement 1;
S5, residual concrete on prefabricated tubular pile 2 is purged.
Embodiment 2
The present embodiment is similar to embodiment 1, and further, framework of steel reinforcement 1 described in the present embodiment can be with top cushion cap or lightning protection system System is accordingly welded.;The diameter of small saw blade 3 is less than the diameter of layer concrete 22 in prefabricated tubular pile 2 in step S3;Step S2 is cut 2 outer concrete of prefabricated tubular pile, 21 structure for being for the ring cutting excision that cutting mill 5 carries out;It is mixed that outer layer is cut in step S2 ~ S3 The position of solidifying soil 21 and interior layer concrete 22 is corresponding.
Embodiment 3
The present embodiment is similar to embodiment 1, and further, the job order of step S2 described in the present embodiment and step S3 can be handed over It changes;Its pile crown retain reinforcing bar method the following steps are included:
S1, the top that veneer sawing machine 4 is mounted on to prefabricated tubular pile 2;
S2, small saw blade 3 is installed on veneer sawing machine 4, ring is carried out by interior layer concrete 22 of the small saw blade 3 to prefabricated tubular pile 2 and is cut It cuts, and does not injure framework of steel reinforcement 1;
S3, ring cutting is carried out to prefabricated tubular pile 2 with cutting machine 5, does not injure framework of steel reinforcement 1 in cutting process;
S4, the outer concrete 21 of well cutting and interior layer concrete 22 are pulled out or is knocked out, and do not damage prefabricated tubular pile 2 Interior framework of steel reinforcement 1;
S5, residual concrete on prefabricated tubular pile 2 is purged.
Embodiments of the present invention are explained in detail above in conjunction with attached drawing, but the present invention is not limited to above-mentioned implementations Mode within the knowledge of a person skilled in the art can also be without departing from the purpose of the present invention It makes a variety of changes.

Claims (6)

1. one kind cut concrete precast pipe pile pile crown retain reinforcing bar method, the prefabricated tubular pile (2) include framework of steel reinforcement (1), Outer concrete (21) and interior layer concrete (22), the framework of steel reinforcement (1) are cast in outer concrete (21) and internal layer coagulation Between native (22);It is characterized by: the construction equipment used includes cutting machine (5), veneer sawing machine (4) and small saw blade (3);Described Veneer sawing machine (4) is located at the top of prefabricated tubular pile (2);The pile crown retain reinforcing bar method the following steps are included:
S1, the top that veneer sawing machine (4) is mounted on to prefabricated tubular pile (2);
S2, ring cutting is carried out to prefabricated tubular pile (2) with cutting machine (5), does not injure framework of steel reinforcement (1) in cutting process;
S3, small saw blade (3) are installed on veneer sawing machine (4), by small saw blade (3) to the interior layer concrete (22) of prefabricated tubular pile (2) Ring cutting is carried out, and does not injure framework of steel reinforcement (1);
S4, the outer concrete (21) of well cutting and interior layer concrete (22) are pulled out or is knocked out, and do not damaged prefabricated Framework of steel reinforcement (1) in tubular pole (2);
S5, residual concrete on prefabricated tubular pile (2) is purged.
2. one kind according to claim 1, which cuts concrete precast pipe pile pile crown, retains reinforcing bar method, which is characterized in that institute Stating framework of steel reinforcement (1) can be to top cushion cap or lightning-protection system progress is corresponding welds.
3. one kind according to claim 1, which cuts concrete precast pipe pile pile crown, retains reinforcing bar method, which is characterized in that institute The diameter for stating small saw blade (3) in step S3 is less than the diameter of prefabricated tubular pile (2) interior layer concrete (22).
4. one kind according to claim 1, which cuts concrete precast pipe pile pile crown, retains reinforcing bar method, which is characterized in that institute State prefabricated tubular pile (2) outer concrete (21) structure for being of the ring cutting excision of step S2 cutting machine (5) progress.
5. one kind according to claim 1, which cuts concrete precast pipe pile pile crown, retains reinforcing bar method, which is characterized in that institute It is corresponding with the position of interior layer concrete (22) to state cutting outer concrete (21) in step S2 ~ S3.
6. one kind according to claim 1, which cuts concrete precast pipe pile pile crown, retains reinforcing bar method, which is characterized in that institute Stating step S2 can exchange with the job order of step S3.
CN201810749657.6A 2018-07-10 2018-07-10 Method for cutting concrete precast tubular pile head to reserve steel bars Active CN108995049B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810749657.6A CN108995049B (en) 2018-07-10 2018-07-10 Method for cutting concrete precast tubular pile head to reserve steel bars

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810749657.6A CN108995049B (en) 2018-07-10 2018-07-10 Method for cutting concrete precast tubular pile head to reserve steel bars

Publications (2)

Publication Number Publication Date
CN108995049A true CN108995049A (en) 2018-12-14
CN108995049B CN108995049B (en) 2021-03-02

Family

ID=64599960

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810749657.6A Active CN108995049B (en) 2018-07-10 2018-07-10 Method for cutting concrete precast tubular pile head to reserve steel bars

Country Status (1)

Country Link
CN (1) CN108995049B (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3727599A (en) * 1971-07-27 1973-04-17 Nippon Concrete Ind Co Ltd Method of and apparatus for cutting hollow precast concrete piles or the like
CN2405696Y (en) * 2000-01-18 2000-11-15 上海宝钢冶金建设公司 Underground cutting device for steel-tube pile
CN101603313A (en) * 2009-07-01 2009-12-16 中铁十三局集团第三工程有限公司 A kind of method for chiseling pile head of filling pile
CN102127913A (en) * 2011-05-04 2011-07-20 江苏建华管桩有限公司 Method for connecting concrete pile and bearing platform
CN102312429A (en) * 2011-07-12 2012-01-11 中铁西北科学研究院有限公司 Rapid separation and integral hoisting method for pile head of cast-in-place concrete pile
CN104727306A (en) * 2015-03-19 2015-06-24 中交二航局第三工程有限公司 Cast-in place pile pouring and pile head cutting-off method
CN204728331U (en) * 2015-04-10 2015-10-28 中铁建工集团有限公司 The ultrashort pile crown pile cut device of multifunctional precast pile tube
CN105350524A (en) * 2015-12-04 2016-02-24 中交隧道工程局有限公司 Steel reinforcement cage structure, concrete filling pile structure and construction method of concrete filling pile structure
CN106996107A (en) * 2017-05-26 2017-08-01 中交第二航务工程局有限公司 A kind of filling pile head abolishes device and its construction method
CN107023009A (en) * 2017-04-28 2017-08-08 中国化学工程第三建设有限公司 A kind of prefabricated tubular pile blocks construction method
CN207092073U (en) * 2017-08-07 2018-03-13 中国建筑西南勘察设计研究院有限公司 A kind of protection sleeve pipe of pile crown steel reinforcement cage cage bar

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3727599A (en) * 1971-07-27 1973-04-17 Nippon Concrete Ind Co Ltd Method of and apparatus for cutting hollow precast concrete piles or the like
CN2405696Y (en) * 2000-01-18 2000-11-15 上海宝钢冶金建设公司 Underground cutting device for steel-tube pile
CN101603313A (en) * 2009-07-01 2009-12-16 中铁十三局集团第三工程有限公司 A kind of method for chiseling pile head of filling pile
CN102127913A (en) * 2011-05-04 2011-07-20 江苏建华管桩有限公司 Method for connecting concrete pile and bearing platform
CN102312429A (en) * 2011-07-12 2012-01-11 中铁西北科学研究院有限公司 Rapid separation and integral hoisting method for pile head of cast-in-place concrete pile
CN104727306A (en) * 2015-03-19 2015-06-24 中交二航局第三工程有限公司 Cast-in place pile pouring and pile head cutting-off method
CN204728331U (en) * 2015-04-10 2015-10-28 中铁建工集团有限公司 The ultrashort pile crown pile cut device of multifunctional precast pile tube
CN105350524A (en) * 2015-12-04 2016-02-24 中交隧道工程局有限公司 Steel reinforcement cage structure, concrete filling pile structure and construction method of concrete filling pile structure
CN107023009A (en) * 2017-04-28 2017-08-08 中国化学工程第三建设有限公司 A kind of prefabricated tubular pile blocks construction method
CN106996107A (en) * 2017-05-26 2017-08-01 中交第二航务工程局有限公司 A kind of filling pile head abolishes device and its construction method
CN207092073U (en) * 2017-08-07 2018-03-13 中国建筑西南勘察设计研究院有限公司 A kind of protection sleeve pipe of pile crown steel reinforcement cage cage bar

Also Published As

Publication number Publication date
CN108995049B (en) 2021-03-02

Similar Documents

Publication Publication Date Title
CN106400802B (en) A kind of drilled pile pile crown is pre-buried to exempt from the whole quickly lifting method of ring cutting that drills
CN106958208A (en) A kind of novel reinforced method of double curvature arched bridge
CN109853566A (en) A kind of filling pile head restructuring bankrupt and device using high compression swelling
CN104727306A (en) Cast-in place pile pouring and pile head cutting-off method
CN108612109A (en) The carrierless method for dismounting of concrete support beam
CN209279343U (en) A kind of reusable built-in type stand column pile
CN209114619U (en) A kind of fastener inserts
CN108995049A (en) One kind cutting concrete precast pipe pile pile crown and retains reinforcing bar method
CN106049503B (en) The preprocess method of reinforced concrete brace demolition blasting in a kind of foundation ditch
CN209260722U (en) A kind of foundation pit concrete breast beam fast dismounting device
CN216240663U (en) Composite lining segment for tunnel portal of connecting passage
CN107762135A (en) The construction method of skin scaffold wall connecting piece
CN206386078U (en) Precast T-Beam uses packaged type safety climbing ladder
CN101153488A (en) Bottom-expanding and piling method for immersed tube bottom-expanding pile
CN206769106U (en) A kind of assembled steel fiber high strength concrete steel plate combination Antiknock wall body
CN109944246A (en) A kind of construction method of broken pile head
CN212896351U (en) Bridge pile foundation pile head breaking protection preprocessing device
CN211947968U (en) Integral assembling type construction platform for high-altitude pier column construction
CN209025474U (en) Move embedded steel pile casting protective device
CN106825323B (en) Modern assembled architecture engineering reinforcing cage stirrup coiling hold-down mechanism
CN108978659A (en) A kind of construction method for cutting pile crown for concrete precast pipe pile
CN106734765B (en) Modern assembled architecture engineering steel reinforcement cage tie hoop cutting system
CN106734753B (en) Modern assembled architecture engineering steel reinforcement cage tie hoop coiling device
CN109989394A (en) A kind of cast-in-place concrete pile section stake partition and its construction method
CN201627203U (en) Revolvable ground anchor device for single-side support form

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant