CN108978659A - A kind of construction method for cutting pile crown for concrete precast pipe pile - Google Patents

A kind of construction method for cutting pile crown for concrete precast pipe pile Download PDF

Info

Publication number
CN108978659A
CN108978659A CN201810749772.3A CN201810749772A CN108978659A CN 108978659 A CN108978659 A CN 108978659A CN 201810749772 A CN201810749772 A CN 201810749772A CN 108978659 A CN108978659 A CN 108978659A
Authority
CN
China
Prior art keywords
concrete
pile
prefabricated tubular
core pulling
tubular pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810749772.3A
Other languages
Chinese (zh)
Other versions
CN108978659B (en
Inventor
谢海鹏
付梦求
方建华
黄文龙
史历
林欣
杨墅杭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd
Original Assignee
Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd filed Critical Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd
Priority to CN201810749772.3A priority Critical patent/CN108978659B/en
Publication of CN108978659A publication Critical patent/CN108978659A/en
Application granted granted Critical
Publication of CN108978659B publication Critical patent/CN108978659B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of construction methods that pile crown is cut for concrete precast pipe pile, and prefabricated tubular pile includes framework of steel reinforcement, outer concrete and interior layer concrete, and framework of steel reinforcement is cast between outer concrete and interior layer concrete;The construction equipment of use includes cutting machine, tube bundle extracting machine, outer layer core pulling cylinder and internal layer core pulling cylinder;Tube bundle extracting machine the following steps are included: S1, be erected above prefabricated tubular pile by construction method;S2, ring cutting carried out to prefabricated tubular pile with cutting machine, when cutting does not injure the framework of steel reinforcement in prefabricated tubular pile;S3, outer layer core pulling cylinder is installed on tube bundle extracting machine, is drilled through and removed by outer concrete of the outer layer core pulling cylinder to prefabricated tubular pile;S4, internal layer core pulling cylinder is installed on tube bundle extracting machine, is drilled through and removed by interior layer concrete of the internal layer core pulling cylinder to prefabricated tubular pile;S5, the residual concrete on prefabricated tubular pile is purged, exposes framework of steel reinforcement.In the case where internal reinforcing bar can not be hurt by this way, the concrete of ectonexine is removed.

Description

A kind of construction method for cutting pile crown for concrete precast pipe pile
Technical field
The present invention relates to cut pile crown construction field, in particular to a kind of construction party that pile crown is cut for concrete precast pipe pile Method.
Background technique
Pile crown construction method field is being cut at present, because the past is more conventional to the mode for cutting pile crown construction, someone is used Sledgehammer is directly carried out with handrail-type cutting machine, this may it is careless in destroy the structure of internal reinforcing bar, after causing with It appears on the stage and holds body welding and occur insecure, cause building lot weak, or even the hidden danger collapsed occur, even crackle, all may The construction of impression from now on, later period discovery want to make up also bad operation,.Therefore a kind of new section pile crown construction method, operation are needed While simple, it is most important that the structure of reinforcing bar itself can not be destroyed, guarantee that overall structure is complete.
Summary of the invention
The problem to be solved in the present invention is how to provide a kind of section of pile crown construction, this section of pile crown is primarily directed to a variety of fields It closes and uses, defect or disadvantage complicated for operation existing for traditional section pile crown mode can either be overcome, and can enhance practical The function of property, to meet the needs of associated scenario.
To solve the above-mentioned problems, the present invention provides it is a kind of for concrete precast pipe pile cut pile crown construction method, Prefabricated tubular pile includes framework of steel reinforcement, outer concrete and interior layer concrete, and framework of steel reinforcement is cast in outer concrete and internal layer is mixed Between solidifying soil;The construction equipment of use includes cutting machine, tube bundle extracting machine, outer layer core pulling cylinder and internal layer core pulling cylinder;Construction method includes Following steps:
S1, tube bundle extracting machine is erected above prefabricated tubular pile;
S2, ring cutting carried out to prefabricated tubular pile with cutting machine, when cutting does not injure the framework of steel reinforcement in prefabricated tubular pile;
S3, outer layer core pulling cylinder is installed on tube bundle extracting machine, is drilled through by outer concrete of the outer layer core pulling cylinder to prefabricated tubular pile And it removes;
S4, internal layer core pulling cylinder is installed on tube bundle extracting machine, is drilled through by interior layer concrete of the internal layer core pulling cylinder to prefabricated tubular pile And it removes;
S5, the residual concrete on prefabricated tubular pile is purged, exposes framework of steel reinforcement.
Preferably, the diameter of outer layer core pulling cylinder is identical as prefabricated tubular pile outer layer diameter in step S3.Convenient for outer layer core pulling cylinder Outer concrete can be directly corresponded to, framework of steel reinforcement is not injured, and carries out stripping operation.
Preferably, the diameter of internal layer core pulling cylinder is identical as prefabricated tubular pile internal layer diameter in step S4.Convenient for internal layer core pulling cylinder Layer concrete in can directly corresponding to, does not injure framework of steel reinforcement, and carry out stripping operation.
Preferably, the ring cutting excision that step S2 cutting machine carries out is prefabricated tubular pile outer concrete structure.In this way The position for setting removed concrete to prefabricated tubular pile convenient for tube bundle extracting machine operates.
Preferably, step S3 can be exchanged with the job order of step S4.Either first strip outer concrete or elder generation Interior layer concrete is stripped, final purpose is consistent with effect.
It is a kind of for concrete precast pipe pile cut pile crown construction method have it is below the utility model has the advantages that
1. easy to operate, practical function.Only it need to switch ectonexine core pulling cylinder on tube bundle extracting machine, it can be to the ectonexine of prefabricated tubular pile Concrete is stripped respectively, and process only separates concrete and do not injure framework of steel reinforcement, guarantees the stability of its function.
2. saving labour, fault rate is reduced.The concrete on prefabricated tubular pile can be removed by tube bundle extracting machine, no It is abolished by force with extra manpower, and reduces artificial caused operation error, it is easy for construction.
Detailed description of the invention
Fig. 1 is that a kind of outer layer for the construction method that pile crown is cut for concrete precast pipe pile of the present invention removes figure.
Fig. 2 is that a kind of internal layer for the construction method that pile crown is cut for concrete precast pipe pile of the present invention removes figure.
Fig. 3 is a kind of cutting pile crown figure for the construction method that pile crown is cut for concrete precast pipe pile of the present invention.
Detailed description of the invention: 1 is framework of steel reinforcement, and 2 be prefabricated tubular pile, and 3 be tube bundle extracting machine, and 4 be outer layer core pulling cylinder, and 5 be internal layer core pulling Cylinder, 6 be cutting machine, and 21 be outer concrete, and 22 be interior layer concrete.
Specific embodiment
The preferred embodiments of the present invention will be described in detail with reference to the accompanying drawing so that it is of the invention a little with feature more It is easily readily appreciated by one skilled in the art, to make apparent define to protection scope of the present invention.
Embodiment 1
As shown in figure 1 to 3, in the present embodiment, the present invention provides a kind of construction parties that pile crown is cut for concrete precast pipe pile for ginseng Method, prefabricated tubular pile 2 include framework of steel reinforcement 1, outer concrete 21 and interior layer concrete 22, and framework of steel reinforcement 1 is cast in outer layer coagulation Between soil 21 and interior layer concrete 22;The construction equipment of use includes that cutting machine 6, tube bundle extracting machine 3, outer layer core pulling cylinder 4 and internal layer are taken out Core cylinder 5;Construction method the following steps are included:
S1, tube bundle extracting machine 3 is erected to 2 top of prefabricated tubular pile;
S2, ring cutting carried out to prefabricated tubular pile 2 with cutting machine 6, when cutting does not injure the framework of steel reinforcement in prefabricated tubular pile 2 1;
S3, outer layer core pulling cylinder 4 is installed on tube bundle extracting machine 3, by the outer concretes 21 of outer layer core pulling 4 pairs of prefabricated tubular piles 2 of cylinder into Row is drilled through and is removed;
S4, internal layer core pulling cylinder 5 is installed on tube bundle extracting machine 3, by the interior layer concrete 22 of 5 pairs of prefabricated tubular piles 2 of internal layer core pulling cylinder into Row is drilled through and is removed;
S5, the residual concrete on prefabricated tubular pile 2 is purged, exposes framework of steel reinforcement 1.
Embodiment 2
The present embodiment is similar to embodiment 1, further, the diameter of outer layer core pulling cylinder 4 and pre- in step S3 described in the present embodiment 2 outer layer diameter of tubulation stake is identical;The diameter of internal layer core pulling cylinder 5 is identical as 2 internal layer diameter of prefabricated tubular pile in step S4;Step S2 is cut The ring cutting excision that cutting mill 6 carries out is 2 outer concrete of prefabricated tubular pile, 21 structure.
Embodiment 3
The present embodiment is similar to embodiment 1, and further, the job order of step S3 described in the present embodiment and step S4 can be handed over It changes;Its construction method the following steps are included:
S1, tube bundle extracting machine 3 is erected to 2 top of prefabricated tubular pile;
S2, ring cutting carried out to prefabricated tubular pile 2 with cutting machine 6, when cutting does not injure the framework of steel reinforcement in prefabricated tubular pile 2 1;
S3, internal layer core pulling cylinder 5 is installed on tube bundle extracting machine 3, by the interior layer concrete 22 of 5 pairs of prefabricated tubular piles 2 of internal layer core pulling cylinder into Row is drilled through and is removed;
S4, outer layer core pulling cylinder 4 is installed on tube bundle extracting machine 3, by the outer concretes 21 of outer layer core pulling 4 pairs of prefabricated tubular piles 2 of cylinder into Row is drilled through and is removed;
S5, the residual concrete on prefabricated tubular pile 2 is purged, exposes framework of steel reinforcement 1.
Embodiments of the present invention are explained in detail above in conjunction with attached drawing, but the present invention is not limited to above-mentioned implementations Mode within the knowledge of a person skilled in the art can also be without departing from the purpose of the present invention It makes a variety of changes.

Claims (5)

1. it is a kind of for concrete precast pipe pile cut pile crown construction method, the prefabricated tubular pile (2) include framework of steel reinforcement (1), Outer concrete (21) and interior layer concrete (22), the framework of steel reinforcement (1) are cast in outer concrete (21) and internal layer coagulation Between native (22);It is characterized by: the construction equipment used includes cutting machine (6), tube bundle extracting machine (3), outer layer core pulling cylinder (4) and interior Layer core pulling cylinder (5);The construction method the following steps are included:
S1, tube bundle extracting machine (3) is erected above prefabricated tubular pile (2);
S2, ring cutting carried out to prefabricated tubular pile (2) with cutting machine (6), when cutting does not injure the steel in prefabricated tubular pile (2) Tendons skeleton (1);
S3, outer layer core pulling cylinder (4) are installed on tube bundle extracting machine (3), it is mixed by outer layer of the outer layer core pulling cylinder (4) to prefabricated tubular pile (2) Solidifying soil (21) is drilled through and is removed;
S4, internal layer core pulling cylinder (5) are installed on tube bundle extracting machine (3), it is mixed by internal layer of the internal layer core pulling cylinder (5) to prefabricated tubular pile (2) Solidifying soil (22) is drilled through and is removed;
S5, the residual concrete on prefabricated tubular pile (2) is purged, exposes framework of steel reinforcement (1).
2. a kind of construction method for cutting pile crown for concrete precast pipe pile according to claim 1, which is characterized in that institute The diameter for stating outer layer core pulling cylinder (4) in step S3 is identical as prefabricated tubular pile (2) outer layer diameter.
3. a kind of construction method for cutting pile crown for concrete precast pipe pile according to claim 1, which is characterized in that institute The diameter for stating internal layer core pulling cylinder (5) in step S4 is identical as prefabricated tubular pile (2) internal layer diameter.
4. a kind of construction method for cutting pile crown for concrete precast pipe pile according to claim 1, which is characterized in that institute The ring cutting excision for stating step S2 cutting machine (6) progress is prefabricated tubular pile (2) outer concrete (21) structure.
5. a kind of construction method for cutting pile crown for concrete precast pipe pile according to claim 1, which is characterized in that institute Stating step S3 can exchange with the job order of step S4.
CN201810749772.3A 2018-07-10 2018-07-10 Construction method for concrete precast tubular pile cutting head Active CN108978659B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810749772.3A CN108978659B (en) 2018-07-10 2018-07-10 Construction method for concrete precast tubular pile cutting head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810749772.3A CN108978659B (en) 2018-07-10 2018-07-10 Construction method for concrete precast tubular pile cutting head

Publications (2)

Publication Number Publication Date
CN108978659A true CN108978659A (en) 2018-12-11
CN108978659B CN108978659B (en) 2021-06-01

Family

ID=64537538

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810749772.3A Active CN108978659B (en) 2018-07-10 2018-07-10 Construction method for concrete precast tubular pile cutting head

Country Status (1)

Country Link
CN (1) CN108978659B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112854284A (en) * 2021-01-15 2021-05-28 中国电建集团港航建设有限公司 Construction method of tubular pile foundation for bottom mud treatment plant

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202787242U (en) * 2012-09-17 2013-03-13 中国建筑第八工程局有限公司 Concrete-grouting and model-overhanging device of pile head of cut-off prestressed concrete pipe pile
CN103452114A (en) * 2013-09-23 2013-12-18 甘肃路桥建设集团有限公司 Bridge cast-in-place pile head chiseling method
CN204241261U (en) * 2014-11-26 2015-04-01 广东省工业贸易职业技术学校 A kind of core drill boring core machine
CN204728331U (en) * 2015-04-10 2015-10-28 中铁建工集团有限公司 The ultrashort pile crown pile cut device of multifunctional precast pile tube
CN107034887A (en) * 2017-03-30 2017-08-11 河南大建桥梁钢构股份有限公司 Bored piles headring cuts construction method
CN107268627A (en) * 2017-07-14 2017-10-20 中国冶集团有限公司 One kind is applied to large-scale cast-in-situ bored pile pile crown restructuring bankrupt
CN207260148U (en) * 2017-08-21 2018-04-20 中交二公局第三工程有限公司 Service sleeve pile crown integrally abolishes device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202787242U (en) * 2012-09-17 2013-03-13 中国建筑第八工程局有限公司 Concrete-grouting and model-overhanging device of pile head of cut-off prestressed concrete pipe pile
CN103452114A (en) * 2013-09-23 2013-12-18 甘肃路桥建设集团有限公司 Bridge cast-in-place pile head chiseling method
CN204241261U (en) * 2014-11-26 2015-04-01 广东省工业贸易职业技术学校 A kind of core drill boring core machine
CN204728331U (en) * 2015-04-10 2015-10-28 中铁建工集团有限公司 The ultrashort pile crown pile cut device of multifunctional precast pile tube
CN107034887A (en) * 2017-03-30 2017-08-11 河南大建桥梁钢构股份有限公司 Bored piles headring cuts construction method
CN107268627A (en) * 2017-07-14 2017-10-20 中国冶集团有限公司 One kind is applied to large-scale cast-in-situ bored pile pile crown restructuring bankrupt
CN207260148U (en) * 2017-08-21 2018-04-20 中交二公局第三工程有限公司 Service sleeve pile crown integrally abolishes device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112854284A (en) * 2021-01-15 2021-05-28 中国电建集团港航建设有限公司 Construction method of tubular pile foundation for bottom mud treatment plant

Also Published As

Publication number Publication date
CN108978659B (en) 2021-06-01

Similar Documents

Publication Publication Date Title
CN105970993B (en) The construction method of the underwater connection structure of prefabricated pile and prefabricated cushion cap
CN109853566A (en) A kind of filling pile head restructuring bankrupt and device using high compression swelling
CN102733385B (en) Fully-recycled body expanding anchor rod and construction method for anchoring ground using same
CN101736739B (en) Multisection double-protection casing pile pore-forming device and pile forming method thereof
CN108978659A (en) A kind of construction method for cutting pile crown for concrete precast pipe pile
CN105421445A (en) Construction method for non-prestressed centrifugal high-strength concrete pile planted pile
CN103741673B (en) A kind of self-anchoring type steel strand pre-tensioning system centrifugal concrete pile and manufacture method thereof
CN205857219U (en) Prefabricated pile and the attachment structure under water of prefabricated cushion cap
CN107762135A (en) The construction method of skin scaffold wall connecting piece
CN105239571B (en) Tree root shape electric pole lateral conductor fixator
CN103741674B (en) A kind of manufacture method with the pre-tensioning system centrifugal concrete pile of steel strand
CN103882856B (en) A kind of pre-tensioning system centrifugal concrete pile and manufacture method with steel strand
CN104453235B (en) Current conversion station fire wall construction technology
CN205976447U (en) Scaffold frame of connecting with straight screw sleeve links wall spare
CN108560539A (en) A kind of filling pile head device for excising and its construction method
CN209308283U (en) A kind of non-post bar planting formula constructional column reinforcing steel bar connecting device and structure
CN210140839U (en) Device for pulling out dewatering well
CN107587723A (en) Top plate spool protection device and its construction method
CN206509452U (en) Modern assembled architecture engineering steel reinforcement cage circular stirrups coiling cylinder
CN208267393U (en) Electrical wire tube one-time reserved pre-buried finished product protection device
CN203821379U (en) Self-anchored steel strand pretensioned centrifugal concrete pile and steel strand locking structure
CN207143924U (en) A kind of diaphram wall
CN208379575U (en) A kind of filling pile head device for excising
CN108995049B (en) Method for cutting concrete precast tubular pile head to reserve steel bars
CN207846534U (en) A kind of rainwater-collecting recovery system constructing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant