CN108978659A - A kind of construction method for cutting pile crown for concrete precast pipe pile - Google Patents
A kind of construction method for cutting pile crown for concrete precast pipe pile Download PDFInfo
- Publication number
- CN108978659A CN108978659A CN201810749772.3A CN201810749772A CN108978659A CN 108978659 A CN108978659 A CN 108978659A CN 201810749772 A CN201810749772 A CN 201810749772A CN 108978659 A CN108978659 A CN 108978659A
- Authority
- CN
- China
- Prior art keywords
- concrete
- pile
- prefabricated tubular
- core pulling
- tubular pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D9/00—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The invention discloses a kind of construction methods that pile crown is cut for concrete precast pipe pile, and prefabricated tubular pile includes framework of steel reinforcement, outer concrete and interior layer concrete, and framework of steel reinforcement is cast between outer concrete and interior layer concrete;The construction equipment of use includes cutting machine, tube bundle extracting machine, outer layer core pulling cylinder and internal layer core pulling cylinder;Tube bundle extracting machine the following steps are included: S1, be erected above prefabricated tubular pile by construction method;S2, ring cutting carried out to prefabricated tubular pile with cutting machine, when cutting does not injure the framework of steel reinforcement in prefabricated tubular pile;S3, outer layer core pulling cylinder is installed on tube bundle extracting machine, is drilled through and removed by outer concrete of the outer layer core pulling cylinder to prefabricated tubular pile;S4, internal layer core pulling cylinder is installed on tube bundle extracting machine, is drilled through and removed by interior layer concrete of the internal layer core pulling cylinder to prefabricated tubular pile;S5, the residual concrete on prefabricated tubular pile is purged, exposes framework of steel reinforcement.In the case where internal reinforcing bar can not be hurt by this way, the concrete of ectonexine is removed.
Description
Technical field
The present invention relates to cut pile crown construction field, in particular to a kind of construction party that pile crown is cut for concrete precast pipe pile
Method.
Background technique
Pile crown construction method field is being cut at present, because the past is more conventional to the mode for cutting pile crown construction, someone is used
Sledgehammer is directly carried out with handrail-type cutting machine, this may it is careless in destroy the structure of internal reinforcing bar, after causing with
It appears on the stage and holds body welding and occur insecure, cause building lot weak, or even the hidden danger collapsed occur, even crackle, all may
The construction of impression from now on, later period discovery want to make up also bad operation,.Therefore a kind of new section pile crown construction method, operation are needed
While simple, it is most important that the structure of reinforcing bar itself can not be destroyed, guarantee that overall structure is complete.
Summary of the invention
The problem to be solved in the present invention is how to provide a kind of section of pile crown construction, this section of pile crown is primarily directed to a variety of fields
It closes and uses, defect or disadvantage complicated for operation existing for traditional section pile crown mode can either be overcome, and can enhance practical
The function of property, to meet the needs of associated scenario.
To solve the above-mentioned problems, the present invention provides it is a kind of for concrete precast pipe pile cut pile crown construction method,
Prefabricated tubular pile includes framework of steel reinforcement, outer concrete and interior layer concrete, and framework of steel reinforcement is cast in outer concrete and internal layer is mixed
Between solidifying soil;The construction equipment of use includes cutting machine, tube bundle extracting machine, outer layer core pulling cylinder and internal layer core pulling cylinder;Construction method includes
Following steps:
S1, tube bundle extracting machine is erected above prefabricated tubular pile;
S2, ring cutting carried out to prefabricated tubular pile with cutting machine, when cutting does not injure the framework of steel reinforcement in prefabricated tubular pile;
S3, outer layer core pulling cylinder is installed on tube bundle extracting machine, is drilled through by outer concrete of the outer layer core pulling cylinder to prefabricated tubular pile
And it removes;
S4, internal layer core pulling cylinder is installed on tube bundle extracting machine, is drilled through by interior layer concrete of the internal layer core pulling cylinder to prefabricated tubular pile
And it removes;
S5, the residual concrete on prefabricated tubular pile is purged, exposes framework of steel reinforcement.
Preferably, the diameter of outer layer core pulling cylinder is identical as prefabricated tubular pile outer layer diameter in step S3.Convenient for outer layer core pulling cylinder
Outer concrete can be directly corresponded to, framework of steel reinforcement is not injured, and carries out stripping operation.
Preferably, the diameter of internal layer core pulling cylinder is identical as prefabricated tubular pile internal layer diameter in step S4.Convenient for internal layer core pulling cylinder
Layer concrete in can directly corresponding to, does not injure framework of steel reinforcement, and carry out stripping operation.
Preferably, the ring cutting excision that step S2 cutting machine carries out is prefabricated tubular pile outer concrete structure.In this way
The position for setting removed concrete to prefabricated tubular pile convenient for tube bundle extracting machine operates.
Preferably, step S3 can be exchanged with the job order of step S4.Either first strip outer concrete or elder generation
Interior layer concrete is stripped, final purpose is consistent with effect.
It is a kind of for concrete precast pipe pile cut pile crown construction method have it is below the utility model has the advantages that
1. easy to operate, practical function.Only it need to switch ectonexine core pulling cylinder on tube bundle extracting machine, it can be to the ectonexine of prefabricated tubular pile
Concrete is stripped respectively, and process only separates concrete and do not injure framework of steel reinforcement, guarantees the stability of its function.
2. saving labour, fault rate is reduced.The concrete on prefabricated tubular pile can be removed by tube bundle extracting machine, no
It is abolished by force with extra manpower, and reduces artificial caused operation error, it is easy for construction.
Detailed description of the invention
Fig. 1 is that a kind of outer layer for the construction method that pile crown is cut for concrete precast pipe pile of the present invention removes figure.
Fig. 2 is that a kind of internal layer for the construction method that pile crown is cut for concrete precast pipe pile of the present invention removes figure.
Fig. 3 is a kind of cutting pile crown figure for the construction method that pile crown is cut for concrete precast pipe pile of the present invention.
Detailed description of the invention: 1 is framework of steel reinforcement, and 2 be prefabricated tubular pile, and 3 be tube bundle extracting machine, and 4 be outer layer core pulling cylinder, and 5 be internal layer core pulling
Cylinder, 6 be cutting machine, and 21 be outer concrete, and 22 be interior layer concrete.
Specific embodiment
The preferred embodiments of the present invention will be described in detail with reference to the accompanying drawing so that it is of the invention a little with feature more
It is easily readily appreciated by one skilled in the art, to make apparent define to protection scope of the present invention.
Embodiment 1
As shown in figure 1 to 3, in the present embodiment, the present invention provides a kind of construction parties that pile crown is cut for concrete precast pipe pile for ginseng
Method, prefabricated tubular pile 2 include framework of steel reinforcement 1, outer concrete 21 and interior layer concrete 22, and framework of steel reinforcement 1 is cast in outer layer coagulation
Between soil 21 and interior layer concrete 22;The construction equipment of use includes that cutting machine 6, tube bundle extracting machine 3, outer layer core pulling cylinder 4 and internal layer are taken out
Core cylinder 5;Construction method the following steps are included:
S1, tube bundle extracting machine 3 is erected to 2 top of prefabricated tubular pile;
S2, ring cutting carried out to prefabricated tubular pile 2 with cutting machine 6, when cutting does not injure the framework of steel reinforcement in prefabricated tubular pile 2
1;
S3, outer layer core pulling cylinder 4 is installed on tube bundle extracting machine 3, by the outer concretes 21 of outer layer core pulling 4 pairs of prefabricated tubular piles 2 of cylinder into
Row is drilled through and is removed;
S4, internal layer core pulling cylinder 5 is installed on tube bundle extracting machine 3, by the interior layer concrete 22 of 5 pairs of prefabricated tubular piles 2 of internal layer core pulling cylinder into
Row is drilled through and is removed;
S5, the residual concrete on prefabricated tubular pile 2 is purged, exposes framework of steel reinforcement 1.
Embodiment 2
The present embodiment is similar to embodiment 1, further, the diameter of outer layer core pulling cylinder 4 and pre- in step S3 described in the present embodiment
2 outer layer diameter of tubulation stake is identical;The diameter of internal layer core pulling cylinder 5 is identical as 2 internal layer diameter of prefabricated tubular pile in step S4;Step S2 is cut
The ring cutting excision that cutting mill 6 carries out is 2 outer concrete of prefabricated tubular pile, 21 structure.
Embodiment 3
The present embodiment is similar to embodiment 1, and further, the job order of step S3 described in the present embodiment and step S4 can be handed over
It changes;Its construction method the following steps are included:
S1, tube bundle extracting machine 3 is erected to 2 top of prefabricated tubular pile;
S2, ring cutting carried out to prefabricated tubular pile 2 with cutting machine 6, when cutting does not injure the framework of steel reinforcement in prefabricated tubular pile 2
1;
S3, internal layer core pulling cylinder 5 is installed on tube bundle extracting machine 3, by the interior layer concrete 22 of 5 pairs of prefabricated tubular piles 2 of internal layer core pulling cylinder into
Row is drilled through and is removed;
S4, outer layer core pulling cylinder 4 is installed on tube bundle extracting machine 3, by the outer concretes 21 of outer layer core pulling 4 pairs of prefabricated tubular piles 2 of cylinder into
Row is drilled through and is removed;
S5, the residual concrete on prefabricated tubular pile 2 is purged, exposes framework of steel reinforcement 1.
Embodiments of the present invention are explained in detail above in conjunction with attached drawing, but the present invention is not limited to above-mentioned implementations
Mode within the knowledge of a person skilled in the art can also be without departing from the purpose of the present invention
It makes a variety of changes.
Claims (5)
1. it is a kind of for concrete precast pipe pile cut pile crown construction method, the prefabricated tubular pile (2) include framework of steel reinforcement (1),
Outer concrete (21) and interior layer concrete (22), the framework of steel reinforcement (1) are cast in outer concrete (21) and internal layer coagulation
Between native (22);It is characterized by: the construction equipment used includes cutting machine (6), tube bundle extracting machine (3), outer layer core pulling cylinder (4) and interior
Layer core pulling cylinder (5);The construction method the following steps are included:
S1, tube bundle extracting machine (3) is erected above prefabricated tubular pile (2);
S2, ring cutting carried out to prefabricated tubular pile (2) with cutting machine (6), when cutting does not injure the steel in prefabricated tubular pile (2)
Tendons skeleton (1);
S3, outer layer core pulling cylinder (4) are installed on tube bundle extracting machine (3), it is mixed by outer layer of the outer layer core pulling cylinder (4) to prefabricated tubular pile (2)
Solidifying soil (21) is drilled through and is removed;
S4, internal layer core pulling cylinder (5) are installed on tube bundle extracting machine (3), it is mixed by internal layer of the internal layer core pulling cylinder (5) to prefabricated tubular pile (2)
Solidifying soil (22) is drilled through and is removed;
S5, the residual concrete on prefabricated tubular pile (2) is purged, exposes framework of steel reinforcement (1).
2. a kind of construction method for cutting pile crown for concrete precast pipe pile according to claim 1, which is characterized in that institute
The diameter for stating outer layer core pulling cylinder (4) in step S3 is identical as prefabricated tubular pile (2) outer layer diameter.
3. a kind of construction method for cutting pile crown for concrete precast pipe pile according to claim 1, which is characterized in that institute
The diameter for stating internal layer core pulling cylinder (5) in step S4 is identical as prefabricated tubular pile (2) internal layer diameter.
4. a kind of construction method for cutting pile crown for concrete precast pipe pile according to claim 1, which is characterized in that institute
The ring cutting excision for stating step S2 cutting machine (6) progress is prefabricated tubular pile (2) outer concrete (21) structure.
5. a kind of construction method for cutting pile crown for concrete precast pipe pile according to claim 1, which is characterized in that institute
Stating step S3 can exchange with the job order of step S4.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810749772.3A CN108978659B (en) | 2018-07-10 | 2018-07-10 | Construction method for concrete precast tubular pile cutting head |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810749772.3A CN108978659B (en) | 2018-07-10 | 2018-07-10 | Construction method for concrete precast tubular pile cutting head |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108978659A true CN108978659A (en) | 2018-12-11 |
CN108978659B CN108978659B (en) | 2021-06-01 |
Family
ID=64537538
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810749772.3A Active CN108978659B (en) | 2018-07-10 | 2018-07-10 | Construction method for concrete precast tubular pile cutting head |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108978659B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112854284A (en) * | 2021-01-15 | 2021-05-28 | 中国电建集团港航建设有限公司 | Construction method of tubular pile foundation for bottom mud treatment plant |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202787242U (en) * | 2012-09-17 | 2013-03-13 | 中国建筑第八工程局有限公司 | Concrete-grouting and model-overhanging device of pile head of cut-off prestressed concrete pipe pile |
CN103452114A (en) * | 2013-09-23 | 2013-12-18 | 甘肃路桥建设集团有限公司 | Bridge cast-in-place pile head chiseling method |
CN204241261U (en) * | 2014-11-26 | 2015-04-01 | 广东省工业贸易职业技术学校 | A kind of core drill boring core machine |
CN204728331U (en) * | 2015-04-10 | 2015-10-28 | 中铁建工集团有限公司 | The ultrashort pile crown pile cut device of multifunctional precast pile tube |
CN107034887A (en) * | 2017-03-30 | 2017-08-11 | 河南大建桥梁钢构股份有限公司 | Bored piles headring cuts construction method |
CN107268627A (en) * | 2017-07-14 | 2017-10-20 | 中国冶集团有限公司 | One kind is applied to large-scale cast-in-situ bored pile pile crown restructuring bankrupt |
CN207260148U (en) * | 2017-08-21 | 2018-04-20 | 中交二公局第三工程有限公司 | Service sleeve pile crown integrally abolishes device |
-
2018
- 2018-07-10 CN CN201810749772.3A patent/CN108978659B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202787242U (en) * | 2012-09-17 | 2013-03-13 | 中国建筑第八工程局有限公司 | Concrete-grouting and model-overhanging device of pile head of cut-off prestressed concrete pipe pile |
CN103452114A (en) * | 2013-09-23 | 2013-12-18 | 甘肃路桥建设集团有限公司 | Bridge cast-in-place pile head chiseling method |
CN204241261U (en) * | 2014-11-26 | 2015-04-01 | 广东省工业贸易职业技术学校 | A kind of core drill boring core machine |
CN204728331U (en) * | 2015-04-10 | 2015-10-28 | 中铁建工集团有限公司 | The ultrashort pile crown pile cut device of multifunctional precast pile tube |
CN107034887A (en) * | 2017-03-30 | 2017-08-11 | 河南大建桥梁钢构股份有限公司 | Bored piles headring cuts construction method |
CN107268627A (en) * | 2017-07-14 | 2017-10-20 | 中国冶集团有限公司 | One kind is applied to large-scale cast-in-situ bored pile pile crown restructuring bankrupt |
CN207260148U (en) * | 2017-08-21 | 2018-04-20 | 中交二公局第三工程有限公司 | Service sleeve pile crown integrally abolishes device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112854284A (en) * | 2021-01-15 | 2021-05-28 | 中国电建集团港航建设有限公司 | Construction method of tubular pile foundation for bottom mud treatment plant |
Also Published As
Publication number | Publication date |
---|---|
CN108978659B (en) | 2021-06-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105970993B (en) | The construction method of the underwater connection structure of prefabricated pile and prefabricated cushion cap | |
CN109853566A (en) | A kind of filling pile head restructuring bankrupt and device using high compression swelling | |
CN102733385B (en) | Fully-recycled body expanding anchor rod and construction method for anchoring ground using same | |
CN101736739B (en) | Multisection double-protection casing pile pore-forming device and pile forming method thereof | |
CN108978659A (en) | A kind of construction method for cutting pile crown for concrete precast pipe pile | |
CN105421445A (en) | Construction method for non-prestressed centrifugal high-strength concrete pile planted pile | |
CN103741673B (en) | A kind of self-anchoring type steel strand pre-tensioning system centrifugal concrete pile and manufacture method thereof | |
CN205857219U (en) | Prefabricated pile and the attachment structure under water of prefabricated cushion cap | |
CN107762135A (en) | The construction method of skin scaffold wall connecting piece | |
CN105239571B (en) | Tree root shape electric pole lateral conductor fixator | |
CN103741674B (en) | A kind of manufacture method with the pre-tensioning system centrifugal concrete pile of steel strand | |
CN103882856B (en) | A kind of pre-tensioning system centrifugal concrete pile and manufacture method with steel strand | |
CN104453235B (en) | Current conversion station fire wall construction technology | |
CN205976447U (en) | Scaffold frame of connecting with straight screw sleeve links wall spare | |
CN108560539A (en) | A kind of filling pile head device for excising and its construction method | |
CN209308283U (en) | A kind of non-post bar planting formula constructional column reinforcing steel bar connecting device and structure | |
CN210140839U (en) | Device for pulling out dewatering well | |
CN107587723A (en) | Top plate spool protection device and its construction method | |
CN206509452U (en) | Modern assembled architecture engineering steel reinforcement cage circular stirrups coiling cylinder | |
CN208267393U (en) | Electrical wire tube one-time reserved pre-buried finished product protection device | |
CN203821379U (en) | Self-anchored steel strand pretensioned centrifugal concrete pile and steel strand locking structure | |
CN207143924U (en) | A kind of diaphram wall | |
CN208379575U (en) | A kind of filling pile head device for excising | |
CN108995049B (en) | Method for cutting concrete precast tubular pile head to reserve steel bars | |
CN207846534U (en) | A kind of rainwater-collecting recovery system constructing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |