CN108992866A - A kind of climbing structures of power supply company 10kv distribution repairing - Google Patents
A kind of climbing structures of power supply company 10kv distribution repairing Download PDFInfo
- Publication number
- CN108992866A CN108992866A CN201811150420.2A CN201811150420A CN108992866A CN 108992866 A CN108992866 A CN 108992866A CN 201811150420 A CN201811150420 A CN 201811150420A CN 108992866 A CN108992866 A CN 108992866A
- Authority
- CN
- China
- Prior art keywords
- pedestal
- hydraulic lifting
- lifting arm
- telescopic rod
- relay
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- A—HUMAN NECESSITIES
- A63—SPORTS; GAMES; AMUSEMENTS
- A63B—APPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
- A63B27/00—Apparatus for climbing poles, trees, or the like
- A63B27/04—Climbing devices for profile poles attachable to the feet
Landscapes
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Physical Education & Sports Medicine (AREA)
- Movable Scaffolding (AREA)
Abstract
The invention discloses a kind of climbing structures of power supply company 10kv distribution repairing of technical field of power rush-repair, including right pedestal and left pedestal, the right pedestal is on the right side of left pedestal and left side and the left pedestal of right pedestal have side to contact, the front surface of the right pedestal is equipped with control cabinet, the front surface of the left pedestal is equipped with battery, it uniformly installs there are five the first hydraulic lifting arm at the top of the right pedestal, it uniformly installs there are five the second hydraulic lifting arm at the top of the left pedestal, the present invention passes through the first hydraulic lifting arm, second hydraulic lifting arm, the cooperation of third hydraulic telescopic rod and the 4th hydraulic telescopic rod, it being capable of the quickly and effectively top for being raised to electric pole that service worker is quick and safe, worker easy to repair can quickly effectively carry out 10kv distribution potent, improve the effect of repairing Rate, saves manpower, has effectively ensured the personal safety of service worker.
Description
Technical field
The present invention relates to technical field of power rush-repair, specially a kind of climbing knot of power supply company 10kv distribution repairing
Structure.
Background technique
10kv power distribution network belongs to medium voltage distribution network.Power distribution network is by overhead transmission line, cable, shaft tower, distribution transformer, isolation
The compositions such as switch, reactive compensation capacitor and some affiliated facilities, the network of important distribution electric energy effect is played in power network.
Power distribution network is classified by voltage class can be divided into high voltage distribution network (35-110KV), and medium voltage distribution network (6-10KV), low pressure is matched
Power grid (220/380V);In the biggish megapolis of load factor, 220KV power grid also has distributing function.Power distribution network refers to 35KV
And its power grid of following voltage class, effect are to power distribution station each in city and all kinds of power loads supply power supply, power distribution network
Closed loop design, open loop operation are generally used, structure is radially.The line footpath of distribution wire is smaller than power transmission line, leads to power distribution network
R/X it is larger.Since the R/X of distribution line is larger, so that trend meter of these the common algorithms in power distribution network in power transmission network
Its convergence is difficult to ensure in calculation.It needs timely to repair it when 10kv distribution is broken down, to ensure cities and towns
The normal power supply of resident needs to be repaired at the top of climbing device climbing to electric pole in maintenance 10kv distribution, existing to climb
Climbing device is mostly climbed using manpower, and due to the height of electric pole, manpower climbing is time-consuming and laborious, seriously affects the effect of repairing
Rate, and be difficult to ensure the personal safety of service worker during service worker's climbing.
Summary of the invention
The purpose of the present invention is to provide a kind of climbing structures of power supply company 10kv distribution repairing, to solve above-mentioned back
What is proposed in scape technology needs timely to repair it when 10kv distribution is broken down, to ensure town dweller just
Often power supply needs to be repaired at the top of climbing device climbing to electric pole in maintenance 10kv distribution, and existing climbing device is more
It is to be climbed using manpower, due to the height of electric pole, manpower climbing is time-consuming and laborious, seriously affects the efficiency of repairing, and tie up
It repairs worker's climbing and is difficult the problem of ensureing the personal safety of service worker in the process.
To achieve the above object, the invention provides the following technical scheme: a kind of power supply company 10kv distribution repairing is climbed
Structure, including right pedestal and left pedestal are climbed, the right pedestal is in the right side of left pedestal and the left side of right pedestal and left pedestal
Have side contact, the front surface of the right pedestal is equipped with control cabinet, and the front surface of the left pedestal is equipped with battery, institute
The top for stating right pedestal is uniformly installed there are five the first hydraulic lifting arm, the top of the left pedestal uniformly install there are five second
Hydraulic lifting arm is respectively connected with right support seat, five second hydraulic liftings at the top of five first hydraulic lifting arms
Right support seat is connected at the top of bar, two sides up and down at the left groove of the right pedestal and at the right groove of left pedestal
Upper and lower two sides are plugged with third hydraulic telescopic rod, are respectively connected with the first briquetting on the inside of four third hydraulic telescopic rods,
The top right side of the right support seat offers the first standing slot, and the top left side of the right support seat offers the second standing
Slot, upper and lower ends are plugged with the 4th liquid at upper and lower ends and right support seat right groove at the left groove of the right support seat
Telescopic rod is pressed, the second briquetting is connected on the inside of four the 4th hydraulic telescopic rods, is equipped at the top of the control cabinet red
Outside line receives head, is connected with receiving module, PLC controller and the first relay in turn from top to bottom on the left of the inner cavity of the control cabinet
The inner cavity right side of device, the control cabinet is connected with the second relay and third relay, and the battery passes through conducting wire and control
Case connection, the infrared receiving terminal are connect by conducting wire with receiving module, and the receiving module passes through conducting wire and PLC controller
Connection, the PLC controller are connect by conducting wire with the first relay, the second relay and third relay, described first after
Electric appliance is connect by conducting wire with the first hydraulic lifting arm and the second hydraulic lifting arm, and second relay passes through conducting wire and third
Hydraulic telescopic rod connection, the third relay are connect by conducting wire with the 4th hydraulic telescopic rod.
Preferably, the top of the right pedestal and left pedestal offers and the first hydraulic lifting arm and the second hydraulic liter respectively
The mounting groove that drop bar matches, and the first hydraulic lifting arm and the second hydraulic lifting arm are plugged in mounting groove and pass through weldering
The mode connect is fixed on right pedestal and left pedestal.
Preferably, the rear and front end of the right pedestal and left pedestal is respectively connected with fixed block, and two fixed blocks is interior
Side is in contact and two fixed blocks is linked together by cooperating with bolts and nuts.
Preferably, the contact surface of the inside of the right pedestal and left pedestal and third hydraulic telescopic rod offers mounting hole,
And third hydraulic telescopic rod is plugged in mounting hole, and third hydraulic telescopic rod is mounted on right pedestal by welding
On left pedestal.
Preferably, the medial surface of first briquetting and the second briquetting offers diamond shape slot.
Compared with prior art, the beneficial effects of the present invention are: the present invention passes through the first hydraulic lifting arm, the second hydraulic liter
The cooperation of bar, third hydraulic telescopic rod and the 4th hydraulic telescopic rod is dropped, and it can be quickly and effectively quickly and safe by service worker
The top for being raised to electric pole, worker easy to repair can quickly effectively to 10kv distribution carry out it is potent, improve repairing
Efficiency, save manpower, effectively ensured the personal safety of service worker.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Fig. 2 is left and right base vertical view of the present invention;
Fig. 3 is pedestal overhead sectional view in left and right of the present invention;
Fig. 4 is support base cross-sectional view in left and right of the present invention;
Fig. 5 is control cabinet cross-sectional view of the present invention.
In figure: 1 right pedestal, 2 left pedestals, 3 control cabinets, 4 batteries, 5 first hydraulic lifting arms, 6 second hydraulic lifting arms,
7 right support seats, 8 right support seats, 9 third hydraulic telescopic rods, 10 first briquettings, 11 first standing slots, 12 second standing slots, 13
Four hydraulic telescopic rods, 14 second briquettings, 15 infrared receiving terminals, 16 receiving modules, 17PLC controller, 18 first relays, 19
Second relay, 20 third relays.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Fig. 1-5 is please referred to, the present invention provides a kind of technical solution: a kind of climbing knot of power supply company 10kv distribution repairing
Structure, including right pedestal 1 and left pedestal 2, right pedestal 1 is in the right side of left pedestal 2 and the left side of right pedestal 1 and left pedestal 2
There is side contact, the front surface of right pedestal 1 is equipped with control cabinet 3, and the front surface of left pedestal 2 is equipped with battery 4, battery 4
Model 3PZS210, storing electricity 5040W, the top of right pedestal 1 is uniformly installed there are five the first hydraulic lifting arm 5, left
The top of pedestal 2 is uniformly installed there are five the second hydraulic lifting arm 6, and the top of five the first hydraulic lifting arms 5 is respectively connected with the right side
Support base 7, the top of five the second hydraulic lifting arms 6 are connected with right support seat 8, and up and down two at the left groove of right pedestal 1
Two sides up and down at the right groove of side and left pedestal 2 are plugged with third hydraulic telescopic rod 9, four third hydraulic telescopic rods 9
Inside be respectively connected with the first briquetting 10, the top right side of right support seat 7 offers the first standing slot 11, the top of right support seat 8
The second standing slot 12 is offered on the left of portion, at the left groove of right support seat 7 at 8 right groove of upper and lower ends and right support seat on
Lower both ends are plugged with the 4th hydraulic telescopic rod 13, and the inside of four the 4th hydraulic telescopic rods 13 is connected with the second briquetting 14, the
One hydraulic lifting arm 5, the second hydraulic lifting arm 6, third hydraulic telescopic rod 9, the model of the 4th hydraulic telescopic rod 13 are
NKLA22, power consumption 50W, the top of control cabinet 3 are equipped with infrared receiving terminal 15, the model of infrared receiving terminal 15
The inner cavity left side of IRM-H638T, control cabinet 3 are connected with receiving module 16, PLC controller 17 and the first relay in turn from top to bottom
Device 18, the model RFM210 of receiving module 16, the model 212-1BH23-1XA0 of PLC controller 17, power consumption 7W, control
It is connected with the second relay 19 and third relay 20 on the right side of the inner cavity of case 3 processed, the first relay 18, the second relay 19 and the
The model of three relays 20 is G3NA-240B, and battery 4 is connect by conducting wire with control cabinet 3, and infrared receiving terminal 15 passes through
Conducting wire is connect with receiving module 16, and receiving module 16 is connect by conducting wire with PLC controller 17, and PLC controller 17 passes through conducting wire
It is connect with the first relay 18, the second relay 19 and third relay 20, the first relay 18 is hydraulic by conducting wire and first
Elevating lever 5 and the connection of the second hydraulic lifting arm 6, the second relay 19 are connect by conducting wire with third hydraulic telescopic rod 9, third after
Electric appliance 20 is connect by conducting wire with the 4th hydraulic telescopic rod 13.
Wherein, the top of right pedestal 1 and left pedestal 2 offers and the first hydraulic lifting arm 5 and the second hydraulic lifting respectively
The mounting groove that bar 6 matches, and the first hydraulic lifting arm 5 and the second hydraulic lifting arm 6 are plugged in mounting groove and pass through
The mode of welding is fixed on right pedestal 1 and left pedestal 2, and the rear and front end of right pedestal 1 and left pedestal 2 is respectively connected with fixed block,
And the medial surface of two fixed blocks is in contact and two fixed blocks is linked together by cooperating with bolts and nuts, right bottom
Seat 1 and the inside of left pedestal 2 and the contact surface of third hydraulic telescopic rod 9 offer mounting hole, and third hydraulic telescopic rod 9 is inserted
It connects in mounting hole, and third hydraulic telescopic rod 9 is mounted on right pedestal 1 and left pedestal 2 by welding, the first pressure
The medial surface of block 10 and the second briquetting 14 offers diamond shape slot.
Working principle: in use, loose nut extracts bolt out, the groove part of right pedestal 1 and left pedestal 2 is connected to
On the electric pole of 10kv, right pedestal 1 and left pedestal 2 are being fixed together by nuts and bolt, by remote controler to infrared
Line receives head 15 and sends signal, and signal is passed to receiving module 16 by infrared receiving terminal 15, and receiving module 16 transmits signal
To PLC controller 17, PLC controller 17 controls the second relay 19 and third relay 20 is powered and starts, and electric current passes through second
Relay 19 and third relay 20 pass to third hydraulic telescopic rod 9 and the 4th hydraulic telescopic rod 13, third hydraulic telescopic rod 9
It is powered and starts with the 4th hydraulic telescopic rod 13, third hydraulic telescopic rod 9 and the 4th hydraulic telescopic rod 13 drive the first briquetting respectively
10 and second briquetting 14 to the direction of electric pole squeeze, the first briquetting 10 and the second briquetting 14 contact with electric pole and pass through third
First briquetting 10 and the second briquetting 14 are firmly withstood on electric wire by the pressure that hydraulic telescopic rod 9 and the 4th hydraulic telescopic rod 13 generate
On bar, right pedestal 1, left pedestal 2, right support seat 7 and right support seat 8 is fixed on utility poles, and service worker stands first
In standing slot 11 or the second standing slot 12, signal, the first hydraulic lifting arm are sent to the first hydraulic lifting arm 15 by remote controler
Signal is passed to receiving module 16 by 15, and signal is passed to PLC controller 17 by receiving module 16, and PLC controller 17 is by signal
Pass to the first relay 18 and third relay 20, the first relay 18 is powered starting, the 4th hydraulic telescopic rod 13 of control to
Recycling contracting, the 4th hydraulic telescopic rod 13 drive the second briquetting 14 to shrink away from electric pole, and the second briquetting 20 is powered starting, control the
One hydraulic lifting arm 5 and the second hydraulic lifting arm 6 upwardly extend, and right support seat 7 and right support seat 8 is driven to move up, when the
After one hydraulic lifting arm 5 and the second hydraulic lifting arm 6 are elongated to limiting altitude, service worker is by remote controler to the 4th liquid of control
Telescopic rod 13 is pressed to squeeze to the direction of electric pole, right support seat 7 and right support seat 8 is fixed on utility poles, again by distant
It controls device control third hydraulic telescopic rod 9 to bounce back, third hydraulic telescopic rod 9 drives the first briquetting 10 to leave electric pole, is again started up
First hydraulic lifting arm 5 and the second hydraulic lifting arm 6, the first hydraulic lifting arm 5 and the second hydraulic lifting arm 6 retraction drive right bottom
Seat 1 and left pedestal 2 move up, when the first hydraulic lifting arm 5 and the second hydraulic lifting arm 6 retract to limiting altitude, maintenance
Worker drives the first briquetting 10 to squeeze to the direction of electric pole by the starting of remote control control third hydraulic telescopic rod 9, by right bottom
Seat 1 and left pedestal 2 are fixed on utility poles, and so on, the top that service worker quickly can be raised to electric pole is right
10kv distribution is repaired, and the physical strength of service worker can be effectively saved, and quickly some can climb the top for arriving electric pole,
Reduce service worker in the security risk of the process of climbing electric pole, ensures the personal safety of service worker.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (5)
1. a kind of climbing structures of power supply company 10kv distribution repairing, including right pedestal (1) and left pedestal (2), the right bottom
Seat (1) is on the right side of left pedestal (2) and there are side contact in the left side of right pedestal (1) and left pedestal (2), and feature exists
In: the front surface of the right pedestal (1) is equipped with control cabinet (3), and the front surface of the left pedestal (2) is equipped with battery (4),
The top of the right pedestal (1) is uniformly installed there are five the first hydraulic lifting arm (5), and the top of the left pedestal (2) is uniformly pacified
There are five dresses the second hydraulic lifting arm (6), is respectively connected with right support seat (7) at the top of five first hydraulic lifting arms (5),
It is connected with right support seat (8) at the top of five second hydraulic lifting arms (6), at the left groove of the right pedestal (1)
Two sides up and down at the right groove of upper and lower two sides and left pedestal (2) are plugged with third hydraulic telescopic rod (9), and four described the
It is respectively connected on the inside of three hydraulic telescopic rods (9) the first briquetting (10), the top right side of the right support seat (7) offers first
Standing slot (11), the top left side of the right support seat (8) offer the second standing slot (12), a left side for the right support seat (7)
Upper and lower ends are plugged with the 4th hydraulic telescopic rod (13) at side groove upper and lower ends and right support seat (8) right groove, and four
It is connected with the second briquetting (14), is equipped at the top of the control cabinet (3) red on the inside of a 4th hydraulic telescopic rod (13)
Outside line receives head (15), is connected with receiving module (16), PLC control on the left of the inner cavity of the control cabinet (3) in turn from top to bottom
The inner cavity right side of device (17) and the first relay (18), the control cabinet (3) is connected with the second relay (19) and third relay
Device (20), the battery (4) are connect by conducting wire with control cabinet (3), and the infrared receiving terminal (15) passes through conducting wire and connects
Module (16) connection is received, the receiving module (16) is connect by conducting wire with PLC controller (17), the PLC controller (17)
It is connect by conducting wire with the first relay (18), the second relay (19) and third relay (20), first relay
(18) it is connect by conducting wire with the first hydraulic lifting arm (5) and the second hydraulic lifting arm (6), second relay (19) passes through
Conducting wire is connect with third hydraulic telescopic rod (9), and the third relay (20) is connected by conducting wire and the 4th hydraulic telescopic rod (13)
It connects.
2. a kind of climbing structures of power supply company 10kv distribution repairing according to claim 1, it is characterised in that: described
The top of right pedestal (1) and left pedestal (2) offers and the first hydraulic lifting arm (5) and the second hydraulic lifting arm (6) phase respectively
Matched mounting groove, and the first hydraulic lifting arm (5) and the second hydraulic lifting arm (6) are plugged in mounting groove and pass through weldering
The mode connect is fixed on right pedestal (1) and left pedestal (2).
3. a kind of climbing structures of power supply company 10kv distribution repairing according to claim 1, it is characterised in that: described
The rear and front end of right pedestal (1) and left pedestal (2) is respectively connected with fixed block, and the medial surface of two fixed blocks is in contact and leads to
It crosses to cooperate with bolts and nuts and two fixed blocks links together.
4. a kind of climbing structures of power supply company 10kv distribution repairing according to claim 1, it is characterised in that: described
The contact surface of the inside of right pedestal (1) and left pedestal (2) and third hydraulic telescopic rod (9) offers mounting hole, and third liquid
Pressure telescopic rod (9) is plugged in mounting hole, and third hydraulic telescopic rod (9) is mounted on right pedestal (1) by welding
On left pedestal (2).
5. a kind of climbing structures of power supply company 10kv distribution repairing according to claim 1, it is characterised in that: described
The medial surface of first briquetting (10) and the second briquetting (14) offers diamond shape slot.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811150420.2A CN108992866A (en) | 2018-09-29 | 2018-09-29 | A kind of climbing structures of power supply company 10kv distribution repairing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811150420.2A CN108992866A (en) | 2018-09-29 | 2018-09-29 | A kind of climbing structures of power supply company 10kv distribution repairing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108992866A true CN108992866A (en) | 2018-12-14 |
Family
ID=64589635
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811150420.2A Pending CN108992866A (en) | 2018-09-29 | 2018-09-29 | A kind of climbing structures of power supply company 10kv distribution repairing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108992866A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112320711A (en) * | 2020-11-25 | 2021-02-05 | 国网山西省电力公司忻州供电公司 | Climbing device for power supply company distribution network emergency maintenance |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102407004A (en) * | 2011-10-21 | 2012-04-11 | 沈阳建筑大学 | Multifunctional automatic climbing device |
CN104096338A (en) * | 2014-06-30 | 2014-10-15 | 杨浩 | Electric pole climbing device |
CN204699330U (en) * | 2015-03-31 | 2015-10-14 | 魏林 | A kind of robot capable of climbing trees |
CN206454206U (en) * | 2017-02-15 | 2017-09-01 | 厦门大学嘉庚学院 | column climbing device |
-
2018
- 2018-09-29 CN CN201811150420.2A patent/CN108992866A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102407004A (en) * | 2011-10-21 | 2012-04-11 | 沈阳建筑大学 | Multifunctional automatic climbing device |
CN104096338A (en) * | 2014-06-30 | 2014-10-15 | 杨浩 | Electric pole climbing device |
CN204699330U (en) * | 2015-03-31 | 2015-10-14 | 魏林 | A kind of robot capable of climbing trees |
CN206454206U (en) * | 2017-02-15 | 2017-09-01 | 厦门大学嘉庚学院 | column climbing device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112320711A (en) * | 2020-11-25 | 2021-02-05 | 国网山西省电力公司忻州供电公司 | Climbing device for power supply company distribution network emergency maintenance |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203850679U (en) | Elevating disassembly and assembly platform with limiting support for current transformer in high-voltage switchgear | |
CN208923713U (en) | A kind of ultra-high-tension power transmission line monoblock type line lifter | |
CN208150909U (en) | A kind of Foldable power transformation overhaul operating platform | |
CN201868761U (en) | Box-type bracket for disconnector switch mechanism | |
CN108992866A (en) | A kind of climbing structures of power supply company 10kv distribution repairing | |
CN214478817U (en) | Mobile power supply and distribution control platform for thickened oil electric heating well | |
CN203039270U (en) | Isolating switch repair protective frame | |
CN201656340U (en) | Tool for replacing supporting insulator of high-voltage tube bus | |
CN202298645U (en) | Installation support device for megawatt fan base ring | |
CN217794178U (en) | Safety belt hanger for high-voltage switch cabinet | |
CN208152679U (en) | A kind of iron tower of power transmission line | |
CN202175527U (en) | Portable manual multifunctional lifting jack | |
CN214336079U (en) | Novel distribution network low-voltage troubleshooting training device | |
CN205419576U (en) | Novel hoist and mount device | |
CN204897250U (en) | Be suitable for small -size tower crane that uses in transformer substation | |
CN201809452U (en) | Full-load groove opening device for refined aluminum groove | |
CN204577938U (en) | A kind of outdoor disconnector motor-operating mechanism Installation and Debugging platform | |
CN204558970U (en) | 10kV, 35kV switch gear room crane span structure lifting device | |
CN201512370U (en) | Switch blade hoisting frame | |
CN202231325U (en) | Transformer lifting device | |
CN204088985U (en) | A kind of integrated 10kv Zhu Shang transformer station | |
CN204720409U (en) | A kind of remote control drop switch | |
CN104851764A (en) | Remotely-controlled drop switch | |
CN204905726U (en) | Transformer substation uses simple and easy elevating gear | |
CN208508345U (en) | A kind of outdoor high-voltage switching station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181214 |