CN204558970U - 10kV, 35kV switch gear room crane span structure lifting device - Google Patents

10kV, 35kV switch gear room crane span structure lifting device Download PDF

Info

Publication number
CN204558970U
CN204558970U CN201520265050.2U CN201520265050U CN204558970U CN 204558970 U CN204558970 U CN 204558970U CN 201520265050 U CN201520265050 U CN 201520265050U CN 204558970 U CN204558970 U CN 204558970U
Authority
CN
China
Prior art keywords
bar
crane span
span structure
lifting device
switch gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520265050.2U
Other languages
Chinese (zh)
Inventor
赖良发
刘伟闽
施纬
刘澎
邓有铿
汪正玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Longyan Power Supply Co of State Grid Fujian Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Longyan Power Supply Co of State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Fujian Electric Power Co Ltd, Longyan Power Supply Co of State Grid Fujian Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201520265050.2U priority Critical patent/CN204558970U/en
Application granted granted Critical
Publication of CN204558970U publication Critical patent/CN204558970U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model provides a kind of 10kV, 35kV switch gear room crane span structure lifting device, comprising: pulling part, support portion and sliding part; Described pulling part comprises back(ing) bar and pulling apparatus, and described pulling apparatus is connected by U-shaped suspension ring with the center of back(ing) bar; Described support portion comprises the vertical support bar be connected with the two ends of described back(ing) bar, and is connected to the horizontal brace rod of described vertical support bar end; Described horizontal brace rod is provided with height-adjustable support chassis and sliding part; When the height of described support chassis is adjusted to earth surface, described sliding part is in surface separation; When the height of described support chassis is adjusted to surface separation, described sliding part is in earth surface.The utility model provides a kind of 10kV, 35kV switch gear room crane span structure lifting device to improve overhaul efficiency, shortens the repair time, reduces costs, eliminate safe hidden trouble, and accomplishes controlled in control.

Description

10kV, 35kV switch gear room crane span structure lifting device
Technical field
The utility model and maintenance field, 10kV, 35kV switch gear room of transformer station, be specifically related to the instrument used when 10kV, 35kV switch gear room crane span structure is removed or installed.
Background technology
In recent years, along with power grid construction paces are constantly accelerated, transformer station's quantity is increasing.In present transformer station, 10kV, 35kV switch gap major part is all installed on indoor, and incoming line cabinet and feeder cabinet majority use crane span structure, and part transformer station also exists bus contact crane span structure with section bus.So far, Guo Wang Longyan electric company existing 10kV and 35kV main transformer inlet wire crane span structure, bus contact crane span structure and 35kV switch cubicle feeder line crane span structure nearly 450.
Because high-altitude operation vehicle cannot enter 10kV, 35kV switch gear room, the dismounting of crane span structure routine in the past, mounting means are: many people stand on scaffold or ladder, lift crane span structure with manpower, have coordinated dismounting, installment work.Scaffold is stood 4-5 people, and stand in ground 4-5 people, and during installation, by the people on ground crane span structure passed to the people on scaffold, then 2, ground personnel climb up scaffold, hang up properly safety belt, have assisted crane span structure to dock steady job; Disassembly sequence is contrary with erection sequence.The dismounting of this crane span structure, mounting means have following shortcoming: (1) high-rise working, and personnel and the easy falling from high altitude of crane span structure, cause personnel, equipment damage; (2) crane span structure weight, needs a large amount of manpower during installation; (3) there is potential safety hazard: require installation personnel good teamwork, coordinate bad if any a people, just have the possibility of causing danger; (4) mounting points narrow space, not easily finds station placement of foot when number is many; (5) inefficiency, longevity of service.This usual manner can not meet modern overhaul efficiency and often bring long loss of outage to user.How while can ensureing crane span structure dismounting, installation reliability, can reduce again the interruption duration of Electricity customers, ensureing electric power enterprise economic benefit, is a problem urgently to be resolved hurrily at present.
Therefore manufacture a kind of new tool to carry out the dismounting of auxiliary crane span structure, install imperative, new method, new technology, new tool will improve overhaul efficiency, shorten the repair time, reduce costs, eliminate safe hidden trouble, and accomplish controlled control.
Utility model content
Technical problem underlying to be solved in the utility model is to provide a kind of 10kV, 35kV switch gear room crane span structure lifting device and improves overhaul efficiency, shortens the repair time, reduces costs, eliminate safe hidden trouble, and accomplishes controlled in control.
In order to solve above-mentioned technical problem, the utility model provides a kind of 10kV, 35kV switch gear room crane span structure lifting device, comprising: pulling part, support portion and sliding part;
Described pulling part comprises back(ing) bar and pulling apparatus, and described pulling apparatus is connected by U-shaped suspension ring with the center of back(ing) bar;
Described support portion comprises the vertical support bar be connected with the two ends of described back(ing) bar, and is connected to the horizontal brace rod of described vertical support bar end; Described horizontal brace rod is provided with height-adjustable support chassis and sliding part; When the height of described support chassis is adjusted to earth surface, described sliding part is in surface separation; When the height of described support chassis is adjusted to surface separation, described sliding part is in earth surface.
In a preferred embodiment: described support chassis is connected with described horizontal brace rod by a screw rod, rotates described screw rod, i.e. the height of support chassis described in adjustable.
In a preferred embodiment: between described back(ing) bar and vertical support bar, be provided with inclined support bar; Gusseted bar is provided with between described vertical support bar and horizontal brace rod.
In a preferred embodiment: described back(ing) bar is bolted by multistage suspension rod and forms; Described vertical support bar is bolted by multistage support bar and forms.
In a preferred embodiment: described multistage suspension rod and multistage support bar are respectively equipped with multiple bolt hole, are bolted different bolts hole, regulate the entire length of described back(ing) bar and vertical support bar.
In a preferred embodiment: described pulling apparatus is zipper calabash, and its one end connects a suspension hook.
In a preferred embodiment: described sliding part is pulley.
In a preferred embodiment: described support chassis is arranged at two ends and the centre of described horizontal brace rod.
Compared to prior art, the technical solution of the utility model possesses following beneficial effect:
1. improve job security.Lifting device uses manual or electronic zipper calabash, and crane span structure rising, decline, location are all easily realized by lifting device, overcome the dangerous point only lifting fortune crane span structure by manpower.
2. save personnel, save manpower.Conventional crane span structure rises, declines is all lift fortune by manpower, whole need of work 9-10 people; After using lifting device, personnel reduce to 6 people, and whole crane span structure is dismantled, installation process is light, simple, time saving and energy saving.
3. carrying portable, flexible for installation.In lifting device, each parts are designed to independent individual, and during use, connecting portion is screwed, and the used time is not detachable, conveniently carries and enters 10kV or 35kV switch gear room.
4. applied widely.Wherein back(ing) bar and vertical support pole length in lifting device, whole tool level are adjustable, and instrument is also by pulley easily movement, and whole instrument is flexible and changeable, and occasion installed by the different crane span structure of applicable 10kV and 35kV.
5. economic benefit.Change engineering for electric company 110kV western suburb, Guo Wang Longyan Substation No.1 main transformer 10kV inlet wire crane span structure, after using lifting device, the operating time decreases 2 hours 30 minutes.Be 1063A by the electric current of inlet wire bridge, within 2 hours 30 minutes, electricity √ 3 × 1063 × 10 × 103 × 0.8 × 2.5=3.68 × 104kWh can be carried, by the 0.5 yuan of calculating of 1 degree of electricity, then can retrieve the electric quantity loss of 1.84 ten thousand yuan.With regard to total nearly 10 bus bridge frames annual in the transformer station that Guo Wang Longyan our department of electric company administers (for 2013 06 month to 2014 06 month, western suburb, Longyan become 1, Longyan Huang Xi become 2, Shanghai-Hangzhou Gutian become 2, Yongding put down to become 2 in change 2, area just outside a city gate, Wuping, Longyan heavenly steed becomes 2) need to carry out dismantling and installing, then the company that can be every year creates indirectly 18.4 ten thousand yuan of economic benefits.Have 100 crane span structures every year by the whole province need dismounting and install, then can create the benefit of 1,840,000 yuan.As long as the whole province carries out 6 years, economic benefit just can break through 1,000 ten thousand yuan.
Accompanying drawing explanation
Fig. 1 is the front view of the utility model preferred embodiment breaker in middle room crane span structure lifting device;
Fig. 2 is the end view of the utility model preferred embodiment breaker in middle room crane span structure lifting device.
Embodiment
Hereafter in conjunction with the accompanying drawings and embodiments the utility model is described further.
With reference to Fig. 1-2, a kind of 10kV, 35kV switch gear room crane span structure lifting device, comprising: pulling part, support portion and sliding part;
Described pulling part comprises back(ing) bar 11 and pulling apparatus 12, and described pulling apparatus 12 is connected by U-shaped suspension ring 13 with the center of back(ing) bar 11;
Described support portion comprises the vertical support bar 21 be connected with the two ends of described back(ing) bar 11, and is connected to the horizontal brace rod 22 of described vertical support bar 21 end; Described horizontal brace rod 22 is provided with height-adjustable support chassis 23 and sliding part; Described support chassis 23 is connected with described horizontal brace rod 22 by a screw rod 24, rotates described screw rod 24, i.e. the height of support chassis 23 described in adjustable.When the height of described support chassis 23 is adjusted to earth surface, described sliding part is in surface separation; When the height of described support chassis 23 is adjusted to surface separation, described sliding part is in earth surface.In the present embodiment, described sliding part is pulley 27.Described support chassis 23 is arranged at two ends and the centre of described horizontal brace rod 22.
Inclined support bar 25 is provided with between described back(ing) bar 11 and vertical support bar 21; Gusseted bar 26 is provided with between described vertical support bar 21 and horizontal brace rod 22.
Described back(ing) bar 11 is bolted by three sections of suspension rods and forms; Described vertical support bar 21 is bolted by three sections of support bars and forms.Described three sections of suspension rods and three sections of support bars are respectively equipped with multiple bolt hole, are bolted different bolts hole, regulate the entire length of described back(ing) bar 11 and vertical support bar 21.Described pulling apparatus 12 is zipper calabash, and its one end connects a suspension hook 121.
During use, the height installed is needed according to crane span structure, back(ing) bar 11 and vertical support bar 21 are set to suitable length, first adjusting screw(rod) 24, make support chassis 23 and surface separation, after lifting device being moved to installation site by pulley 27, adjusting screw(rod) 24 makes support chassis 23 and earth surface, and whole device completes location.Be connected with crane span structure by the suspension hook 121 of zipper calabash, because slinger has 2, therefore the two ends of crane span structure are all by suspension hook 121 hook lock.Pulled by staff or electronicly pull zipper calabash, crane span structure can be promoted to the height of needs.
Therefore efficiency and the job security of work is substantially increased.Lifting device uses manual or electronic zipper calabash, and crane span structure rising, decline, location are all easily realized by lifting device, overcome the dangerous point only lifting fortune crane span structure by manpower.Conventional crane span structure rises, declines is all lift fortune by manpower, whole need of work 9-10 people; After using lifting device, personnel reduce to 6 people, and whole crane span structure is dismantled, installation process is light, simple, time saving and energy saving.In lifting device, each parts are designed to independent individual, and during use, connecting portion is screwed, and the used time is not detachable, conveniently carries and enters 10kV or 35kV switch gear room.Wherein back(ing) bar and vertical support pole length in lifting device, whole tool level are adjustable, and instrument is also by pulley easily movement, and whole instrument is flexible and changeable, and occasion installed by the different crane span structure of applicable 10kV and 35kV.
Change engineering for electric company 110kV western suburb, Guo Wang Longyan Substation No.1 main transformer 10kV inlet wire crane span structure, after using lifting device, the operating time decreases 2 hours 30 minutes.Be 1063A by the electric current of inlet wire bridge, within 2 hours 30 minutes, electricity √ 3 × 1063 × 10 × 103 × 0.8 × 2.5=3.68 × 104kWh can be carried, by the 0.5 yuan of calculating of 1 degree of electricity, then can retrieve the electric quantity loss of 1.84 ten thousand yuan.With regard to total nearly 10 bus bridge frames annual in the transformer station that Guo Wang Longyan our department of electric company administers (for 2013 06 month to 2014 06 month, western suburb, Longyan become 1, Longyan Huang Xi become 2, Shanghai-Hangzhou Gutian become 2, Yongding put down to become 2 in change 2, area just outside a city gate, Wuping, Longyan heavenly steed becomes 2) need to carry out dismantling and installing, then the company that can be every year creates indirectly 18.4 ten thousand yuan of economic benefits.Have 100 crane span structures every year by the whole province need dismounting and install, then can create the benefit of 1,840,000 yuan.As long as the whole province carries out 6 years, economic benefit just can break through 1,000 ten thousand yuan.
The above; be only the utility model preferably embodiment; but protection range of the present utility model is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the utility model discloses; the change that can expect easily or replacement, all should be encompassed within protection range of the present utility model.Therefore, protection range of the present utility model should be as the criterion with the protection range of claim.

Claims (8)

1. 10kV, 35kV switch gear room crane span structure lifting device, is characterized in that comprising: pulling part, support portion and sliding part;
Described pulling part comprises back(ing) bar and pulling apparatus, and described pulling apparatus is connected by U-shaped suspension ring with the center of back(ing) bar;
Described support portion comprises the vertical support bar be connected with the two ends of described back(ing) bar, and is connected to the horizontal brace rod of described vertical support bar end; Described horizontal brace rod is provided with height-adjustable support chassis and sliding part; When the height of described support chassis is adjusted to earth surface, described sliding part is in surface separation; When the height of described support chassis is adjusted to surface separation, described sliding part is in earth surface.
2. a kind of 10kV, 35kV switch gear room according to claim 1 crane span structure lifting device, is characterized in that: described support chassis is connected with described horizontal brace rod by a screw rod, rotates described screw rod, i.e. the height of support chassis described in adjustable.
3. a kind of 10kV, 35kV switch gear room according to claim 1 crane span structure lifting device, is characterized in that: be provided with inclined support bar between described back(ing) bar and vertical support bar; Gusseted bar is provided with between described vertical support bar and horizontal brace rod.
4. a kind of 10kV, 35kV switch gear room according to claim 1 crane span structure lifting device, is characterized in that: described back(ing) bar is bolted by multistage suspension rod and forms; Described vertical support bar is bolted by multistage support bar and forms.
5. a kind of 10kV, 35kV switch gear room according to claim 4 crane span structure lifting device, it is characterized in that: described multistage suspension rod and multistage support bar are respectively equipped with multiple bolt hole, be bolted different bolts hole, regulate the entire length of described back(ing) bar and vertical support bar.
6. a kind of 10kV, 35kV switch gear room crane span structure lifting device according to any one of claim 1-5, is characterized in that: described pulling apparatus is zipper calabash, and its one end connects a suspension hook.
7. a kind of 10kV, 35kV switch gear room according to claim 6 crane span structure lifting device, is characterized in that: described sliding part is pulley.
8. a kind of 10kV, 35kV switch gear room according to claim 6 crane span structure lifting device, is characterized in that: described support chassis is arranged at two ends and the centre of described horizontal brace rod.
CN201520265050.2U 2015-04-28 2015-04-28 10kV, 35kV switch gear room crane span structure lifting device Expired - Fee Related CN204558970U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520265050.2U CN204558970U (en) 2015-04-28 2015-04-28 10kV, 35kV switch gear room crane span structure lifting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520265050.2U CN204558970U (en) 2015-04-28 2015-04-28 10kV, 35kV switch gear room crane span structure lifting device

Publications (1)

Publication Number Publication Date
CN204558970U true CN204558970U (en) 2015-08-12

Family

ID=53834041

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520265050.2U Expired - Fee Related CN204558970U (en) 2015-04-28 2015-04-28 10kV, 35kV switch gear room crane span structure lifting device

Country Status (1)

Country Link
CN (1) CN204558970U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104779545A (en) * 2015-04-28 2015-07-15 国家电网公司 10 kV and 35 kV switch room bridge hoisting tool
CN108767671A (en) * 2018-05-29 2018-11-06 吴远 A kind of mined flame-proof switch cabinet case support adjustment mechanism

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104779545A (en) * 2015-04-28 2015-07-15 国家电网公司 10 kV and 35 kV switch room bridge hoisting tool
CN108767671A (en) * 2018-05-29 2018-11-06 吴远 A kind of mined flame-proof switch cabinet case support adjustment mechanism

Similar Documents

Publication Publication Date Title
CN105281174B (en) Aerial high-voltage equipment ground bar aids in assembly and disassembly system
CN204558970U (en) 10kV, 35kV switch gear room crane span structure lifting device
CN105932601B (en) Disconnected strand of overhead grounding wire method for repairing and mending
CN104779545A (en) 10 kV and 35 kV switch room bridge hoisting tool
CN204364712U (en) Safety belt suspension device
CN205791238U (en) A kind of 10kV distribution line charged lifter of straightway three-phase conducting wire
CN208280706U (en) A kind of electric pole facilitating climbing
CN103031966B (en) Main shaft maintenance platform for water turbine and electric generator
CN104158123B (en) Overhead line phase sequence plate hot-line assembly and disassembly method and assembling device
CN217794178U (en) Safety belt hanger for high-voltage switch cabinet
CN206712336U (en) Shaft tower cable platform work protective cradle
CN103332608A (en) Special suspender for replacing GW6 disconnector knob insulator
CN105226541B (en) The electronic inspection platform of disconnecting switch
CN116161587A (en) Ascending device for electric power detection and maintenance
CN204038917U (en) Dismountable external hanging service platform
CN201883932U (en) Hoop-type vertical insulating single ladder
CN108336703A (en) A kind of distribution low-voltage circuit junction box's support device
CN103326264B (en) Single-column vertical-telescopic-type outdoor high-voltage alternating replacing options
CN215009300U (en) Insulating platform is used in power equipment installation
CN204840723U (en) Safety belt linkage is used in transformer maintenance
CN215760356U (en) Aerial work platform ladder capable of being quickly assembled and disassembled
CN204992369U (en) Fixed frame that overhauls of GW4 type isolator
CN206257427U (en) Supervising device mounting and fixing support
CN214658637U (en) Scaffold for building installation
CN214412015U (en) Alternating-current low-voltage JP cabinet maintenance platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150812