CN108985656A - pipeline inspection monitoring method and device - Google Patents
pipeline inspection monitoring method and device Download PDFInfo
- Publication number
- CN108985656A CN108985656A CN201810886963.4A CN201810886963A CN108985656A CN 108985656 A CN108985656 A CN 108985656A CN 201810886963 A CN201810886963 A CN 201810886963A CN 108985656 A CN108985656 A CN 108985656A
- Authority
- CN
- China
- Prior art keywords
- inspection
- pipeline
- maintenance
- detection data
- inspector
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/083—Shipping
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
Abstract
The embodiment of the present invention provides a kind of pipeline inspection monitoring method and device, and the pipeline inspection monitoring method includes: the detection data for receiving inspector and sending, and the detection data includes the condition information of inspection position and the inspection position;The pipeline location for needing to safeguard is determined according to the detection data, and scheduled maintenance personnel safeguard the pipeline location for needing to safeguard.It can receive the detection data from inspector during inspection, when finding that pipeline needs to be serviced during inspection, scheduled maintenance personnel can carry out pipe-line maintenance in a short time, working efficiency can be improved with this, reduce security risk.
Description
Technical field
The present invention relates to Long-distance Transmission Pipeline monitoring field, in particular to a kind of pipeline inspection monitoring method and
Device.
Background technique
For inflammable, explosive natural gas, pipeline transportation freight volume, transportation cost, in terms of
It is transported with traditional extra large land transportation, highway transportation, the incomparable advantage of means of transportation such as railway transportation and air transportation.But
It is to be leaked once pipeline is damaged, not only will affect natural gas upstream exploitation, middle reaches natural gas processing and downstream user
Supply etc. work normal operation, can also welding even cause the serious accidents such as fire, explosion, cause personal injury
And property loss.Therefore, it is necessary to daily maintenance be carried out to it, wherein carrying out inspection for Long-distance Transmission Pipeline is maintenance pipe
Highly important work during line normal operation.Traditional routine inspection mode is manual inspection, hand-kept, i.e. inspector's inspection
After, route, situation, hidden danger information of hand-kept inspection etc..This mode low efficiency, at high cost, normative difference, it is difficult to
Adapt to the needs of modernization Long-distance Transmission Pipeline production and development.
Summary of the invention
To overcome problems of the prior art, the embodiment of the present invention is designed to provide a kind of pipeline inspection monitoring
Method and device.
To achieve the above object, the invention provides the following technical scheme:
In a first aspect, the embodiment of the present invention provides a kind of pipeline inspection monitoring method, the pipeline inspection monitoring method packet
It includes:
The detection data that inspector sends is received, the detection data includes the shape of inspection position and the inspection position
Condition information;
It is determined according to the detection data and needs the pipeline location safeguarded, and scheduled maintenance personnel maintenance is described needs to safeguard
Pipeline location.
With reference to first aspect, in alternative embodiment of the invention, the condition information of the inspection position includes described patrols
The step of risk class of inspection position, the scheduled maintenance personnel safeguard the pipeline location for needing to safeguard, comprising:
Maintenance personnel's scheduling scheme is determined according to the risk class of the inspection position;
The pipeline location for needing to safeguard is safeguarded according to maintenance personnel's scheduling scheme schedules maintenance personnel.
With reference to first aspect, it in alternative embodiment of the invention, described needs to tie up in scheduled maintenance personnel maintenance
After the step of pipeline location of shield, the method also includes:
Status information after receiving the inspection position maintenance that maintenance personnel reports;
Maintenance effects are assessed according to the status information after the maintenance.
With reference to first aspect, it in alternative embodiment of the invention, is commented in the status information according to after the maintenance
After the step of estimating maintenance effects, the method also includes:
The inspection cycle to the inspection position is determined according to maintenance effects.
With reference to first aspect, it in alternative embodiment of the invention, is commented in the status information according to after the maintenance
After the step of estimating maintenance effects, the method also includes:
The patrol plan path of inspector is updated according to maintenance effects.
With reference to first aspect, in alternative embodiment of the invention, in the detection data that the reception inspector sends
After step, the method also includes:
The dynamic map of inspection is generated according to the detection data.
With reference to first aspect, in alternative embodiment of the invention, in the detection data that the reception inspector sends
After step, the method also includes:
It is assessed according to inspection quality of the detection data to inspector.
Second aspect, the embodiment of the present invention provide a kind of pipeline inspection monitoring device, the pipeline inspection monitoring device packet
It includes:
Receiving module, for receiving the detection data of inspector's transmission, the detection data includes inspection position and institute
State the condition information of inspection position;
Scheduler module, for determining the pipeline location for needing to safeguard according to the detection data, and scheduled maintenance personnel tie up
Protect the pipeline location for needing to safeguard.
In conjunction with second aspect, in alternative embodiment of the invention, the scheduler module is also used to:
Maintenance personnel's scheduling scheme is determined according to the risk class of the inspection position.
In conjunction with second aspect, in alternative embodiment of the invention, the pipeline inspection monitoring device further include:
Monitoring module, for generating the dynamic map of inspection according to the detection data.
Compared with prior art, the pipeline inspection monitoring method and device of the embodiment of the present invention, can be with during inspection
The detection data from inspector is received, it, can be in a short time when finding that pipeline needs to be serviced during inspection
It is maintained the scheduling scheme of personnel, maintenance personnel may further be arranged to carry out pipe-line maintenance, work effect can be improved with this
Rate reduces security risk.
To enable the above objects, features and advantages of the present invention to be clearer and more comprehensible, special embodiment below, and appended by cooperation
Attached drawing is described in detail below.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached
Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair
The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this
A little attached drawings obtain other relevant attached drawings.
Fig. 1 is the schematic diagram of pipeline inspection monitoring system provided in an embodiment of the present invention.
Fig. 2 is the block diagram of pipeline inspection monitor terminal provided in an embodiment of the present invention.
Fig. 3 is a kind of flow chart of pipeline inspection monitoring method provided in an embodiment of the present invention.
Fig. 4 is the partial process view of pipeline inspection monitoring method provided in an embodiment of the present invention.
Fig. 5 is the functional block diagram of pipeline inspection monitoring device provided in an embodiment of the present invention.
Icon: 10- server;The first user terminal of 20-;21- second user terminal;200- pipeline inspection monitor terminal;
210- pipeline inspection monitoring device;211- monitoring module;212- scheduler module;213- receiving module;220- processor;230- is deposited
Reservoir;240- storage control;250- Peripheral Interface;260- input-output unit;270- display unit.
Specific embodiment
Below in conjunction with attached drawing in the embodiment of the present invention, technical solution in the embodiment of the present invention carries out clear, complete
Ground description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Usually exist
The component of the embodiment of the present invention described and illustrated in attached drawing can be arranged and be designed with a variety of different configurations herein.Cause
This, is not intended to limit claimed invention to the detailed description of the embodiment of the present invention provided in the accompanying drawings below
Range, but it is merely representative of selected embodiment of the invention.Based on the embodiment of the present invention, those skilled in the art are not doing
Every other embodiment obtained under the premise of creative work out, shall fall within the protection scope of the present invention.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi
It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.Meanwhile of the invention
In description, term " first ", " second " etc. are only used for distinguishing description, are not understood to indicate or imply relative importance.
The embodiment of the invention provides a kind of pipeline inspection monitoring method and devices.The pipeline inspection monitoring method and dress
Set the inspection monitoring that can be used for Long-distance Transmission Pipeline, wherein the implementation of the pipeline inspection monitoring device 210 is patrolled by pipeline
Monitoring system is examined to realize.
As shown in Figure 1, being the schematic diagram of pipeline inspection monitoring system provided in an embodiment of the present invention.The pipeline inspection prison
Control system includes server 10, the first user terminal 20, second user terminal 21, the server 10 by network and one or
Multiple first user terminals 20 are communicatively coupled, and the server 10 also passes through network and one or more second user terminals
21 are communicatively coupled, and communicate to connect between first user terminal 20 and the second user terminal 21, to carry out data
Communication or interaction.In the present embodiment, the server 10 includes service server, Web (World Wide Web, WWW) clothes
Business device, GPS (Global Positioning System, global positioning system) terminal location receive server.Described first uses
Family terminal 20 can be PC (personal computer, PC), tablet computer, smart phone, personal digital assistant
(personal digital assistant, PDA), the second user terminal 21 is also possible to PC (personal
Computer, PC), tablet computer, smart phone, personal digital assistant (personal digital assistant, PDA).
Wherein, the service server, Web server, GPS terminal position receive that data can be carried out between server is logical
Letter or interaction, the server 10 can carry out data by protecting wall, Ethernet, router and first user terminal 20
Communication or interaction.The server 10 can be counted by protecting wall, Ethernet, router and the second user terminal 21
According to communication or interaction.
Wherein, first user terminal 20 can be the computer of control centre, Regional Representative, subdistrict office, institute
Request can be issued to the server 10 to obtain the data in the server 10 by stating the first user terminal 20.
The second user terminal 21 can be the inspection terminal that outgoing inspector holds, in inspection collection in worksite number
According to.In the present embodiment, the differentiation of first user terminal 20 and the second user terminal 21 can by Account Registration or
Identity binding is realized, is also possible to through priority assignation to realize.
As a kind of operation embodiment of pipeline inspection monitoring system, the operation of the system can pass through data
The basic environments such as library, NET are built.The system can use B/S framework, and the server 10 can use C# language
It is developed in .net framework4.5 environment, the service server can use 8 (Internet of IIS
Information Services, Internet Information Service) server management system.In an example, the server
10 operating system can be Windows Server 2012R2, and the database can be PostgreSQL 9.5.
In the present embodiment, after completing the building of the system, the deployment of software installation packet can be carried out.Deployment process packet
Include: business datum initialization imports data.Wherein, it is being installed the database and is initializing the tables of data of the system
Afterwards, need to import the relevant basic data of business.The relevant basic data of the business includes pipe line, yard, valve chamber, valve
The data such as well, high consequence area, test pile, the villages and small towns unit information along pipeline, medium-long term planning.
In the present embodiment, the relevant basic data of the business can be issued as to service figure layer, so as to described first
When user terminal 20 or the second user terminal 21 issue request, can by shown with map the software APP of function into
Row data are shown.
Wherein, the service server is developed using .net framework4.5, is issued using IIS.In a reality
In example, directly catalogue can be issued by decompression system installation kit RsGasPipe.rar to IIS.If being disposed in the manner described,
The access address of system is http://localhost/RsGasPipe/.
After completing the deployment of the system and software package, it can be entered by first administrator's account of system initialization
System.After entering system, multiple subordinate manager's accounts can be created by the first administrator account.Wherein, multiple
The permission of first administrator's account be higher than subordinate manager's account permission, the first administrator account can with it is each
The responsible person of department is associated, and subordinate manager's account can be closed with the subordinate staff of each department
Connection, wherein the department can be subdistrict office, control centre, inspection enforcement division.
In whole system operational process, as an implementation, the system is that outgoing inspector distributes slave tube
Reason person's account, and subordinate manager's account and the GPS positioning device in the inspection terminal are bound one by one, so that inspection
For member when the carrying inspection terminal goes out inspection, the location information for the inspector that goes out can be by the system senses, further
It can know the patrolled and examined track of outgoing inspector.Once arranging patrol task, the system can be detected in place automatically,
To judge the plan schedule of the patrol task.
Fig. 2 shows a kind of structural block diagrams of pipeline inspection monitor terminal 200 that can be applied in the embodiment of the present invention.Institute
Stating pipeline inspection monitor terminal 200 can be service server shown in FIG. 1.As shown in Fig. 2, the pipeline inspection monitor terminal
200 include processor 220, memory 230, storage control 240, Peripheral Interface 250, input-output unit 260, display unit
270.The memory 230, processor 220, storage control 240, Peripheral Interface 250, input-output unit 260, display are single
Member 270 is directly or indirectly electrically connected between each other, to realize the transmission or interaction of data.For example, these components mutually it
Between can pass through one or more communication bus or signal wire and realize and be electrically connected.
Memory 230 can be used for storing software program and module, such as the pipeline inspection monitoring side in the embodiment of the present invention
Method and the corresponding program instruction/module of device, processor 220 by the software program that is stored in memory 230 of operation and
Module, to realize pipeline inspection monitoring method provided in an embodiment of the present invention and device.
Wherein, the memory 230 may be, but not limited to, (the Random Access of random access memory 230
Memory, RAM), read-only memory 230 (Read Only Memory, ROM), programmable read only memory 230
(Programmable Read-Only Memory, PROM), 230 (Erasable of erasable read-only memory
Programmable Read-Only Memory, EPROM), (the Electric Erasable of electricallyerasable ROM (EEROM) 230
Programmable Read-Only Memory, EEPROM) etc..Wherein, memory 230 is for storing program, the processor
220 after receiving and executing instruction, and executes described program.The processor 220 may be a kind of IC chip, have letter
Number processing capacity.Above-mentioned processor 220 can be general processor 220, including 220 (Central of central processing unit
Processing Unit, abbreviation CPU), network processing unit 220 (Network Processor, abbreviation NP) etc.;It can also be several
Word signal processor 220 (DSP), specific integrated circuit (ASIC), field programmable gate array (FPGA) or other are programmable
Logical device, discrete gate or transistor logic, discrete hardware components.It may be implemented or execute in the embodiment of the present invention
Disclosed each method, step and logic diagram.General processor 220 can be microprocessor 220 or the processor 220
It can be any conventional processor 220 etc..Processor 220 and other possible components can be to the access of memory 230
It is carried out under the control of storage control 240.The Peripheral Interface 250 by various input/output devices be coupled to processor 220 with
And memory 230.In some embodiments, Peripheral Interface 250, processor 220 and storage control 240 can be in single cores
It is realized in piece.In some other example, they can be realized by independent chip respectively.
The input-output unit 260 is for being supplied to user input data.The input-output unit 260 can be,
But it is not limited to, mouse and keyboard etc..In an example, user can be inputted or be exported by the input-output unit 260 and tieed up
Protect personal scheduling scheme.
Display unit 270 provided between the pipeline inspection monitor terminal 200 and user an interactive interface (such as with
Family operation interface) or for display image data give user reference.The display unit 270 can be liquid crystal display or touch-control
Display.
In one embodiment, the pipeline inspection monitor terminal 200 can not also include the display unit 270, but
It is an external display.
The display can be connect with the server 10, can also be connect with first user terminal 20.It is described
Display can be used for displaying data when first user terminal 20 is issued and requested.
It is appreciated that structure shown in Fig. 2 is only to illustrate, the pipeline inspection monitor terminal 200 may also include than in Fig. 2
Shown more perhaps less component or with the configuration different from shown in Fig. 1.Each component shown in Fig. 2 can use
Hardware, software, or its combination is realized.In the embodiment of the present invention, pipeline inspection monitor terminal 200 can be personal computer, move
Dynamic equipment etc. can connect network and the equipment with calculation processing power.In some embodiments, pipeline inspection monitoring is whole
End 200 can also be not limited to physical equipment, for example, it is also possible to be virtual machine, virtual server etc..
In the present embodiment, referring to Fig. 3, being provided in an embodiment of the present invention applied to pipeline inspection shown in Fig. 2 monitoring
The flow chart of the pipeline inspection monitoring method of terminal 200.Detailed process shown in Fig. 3 will be described in detail below.
Step S110 receives the detection data that inspector sends.
Wherein, the detection data includes the condition information of inspection position and the inspection position.
In one embodiment, inspector can send the detection data by inspection terminal.Wherein, the inspection
Data collector and GPS locator can be set in terminal.
When in the detection data including sonic data, the data collector can be sonic test instrument, loudspeaker
Or microphone;When in the detection data including video data, the data collector can be camera;When the detection
When including epidemic disaster data in data, the data collector can be temperature sensor, humidity sensor.Further, institute
Stating data collector may include sonic test instrument, loudspeaker, microphone, camera, temperature sensor, appointing in humidity sensor
It anticipates one or more.
Wherein, routine information can be carried in the detection data, risk information, the routine information packet can also be carried
Include pipeline, yard, valve pit, valve chamber, test pile, the road information along pipeline, the risk information include historical risk information,
Current risk class information and current risk.
The pipeline inspection monitor terminal 200 can be with detection data described in real-time reception, can also be according between certain time
Every receiving the detection data, the time interval can be 3 hours, can be half a day, be also possible to 1 day, can also be 3
It.The time interval for receiving the detection data that inspector sends can be arbitrarily arranged in those skilled in the art according to actual needs.
In an example, the pipeline inspection monitor terminal 200 every other day receives the detection of the primary inspector
Data.
Step S120 determines the pipeline location for needing to safeguard according to the detection data, and scheduled maintenance personnel safeguard institute
State the pipeline location for needing to safeguard.
When carrying risk information and location information in the detection data, the inspection position quilt of inspector's transmission
It is determined as risk position, maintenance personnel may further be scheduled so that the maintenance personnel safeguards.Wherein, described
Maintenance personnel can be pipe-line maintenance worker, be also possible to the manager or cooperation and communication person for needing to participate in maintenance process.
Wherein, when the detection data carry risk information when, can according to the risk position in the detection data come
The pipeline location for needing to safeguard is determined, further according to the risk class in the risk information, the wind in the risk information
Dangerous classification safeguards the pipeline location for needing to safeguard with scheduled maintenance personnel.Risk letter is carried when no in the detection data
When breath, inspector can carry out inspection according to script patrol plan.
Entire pipeline inspection process and maintenance process can be made to obtain standard operation by the above method, in inspection process
In can receive the detection data from inspector, find that pipeline, can be short when needing to be serviced during inspection
Scheduled maintenance personnel carry out pipe-line maintenance in time, and working efficiency can be improved with this, reduce security risk.
In the present embodiment, after step S120, as shown in figure 4, the method also includes:
Step S121 determines maintenance personnel's scheduling scheme according to the risk class of the inspection position.
Step S122 safeguards the pipeline position for needing to safeguard according to maintenance personnel's scheduling scheme schedules maintenance personnel
It sets.
Wherein, the risk class carries out after being assessed by outgoing inspector according to the actual conditions at inspection scene
It uploads.Outgoing inspector can be manually entered the risk class and upload, after also can choose preset risk class option
It uploads, can also be that the detection data selected according to inspector carries out automatic identification with the determination risk class.The risk
Classification uploads after being selected by inspector according to preset risk option, and inspector can also be in the testing number
According to middle remarks specific Risk Content relevant to the risk, for example, when risk is pipeline oneself factor, in remarks
It is abnormal that appearance can be temperature, humidity;When risk is environmental factor, remarks content be can be in 200 meters of risk position periphery
There is project under construction;When risk is other factors, remarks content can combine actual conditions to fill in by inspector.
In an example, receive inspector transmission risk class and risk position, to the risk class into
Determine that levels of maintenance is second level after row identification.The risk and remarks content sent according to inspector determines tube circumference 100
There is project under construction in rice, the risk position sent in conjunction with inspector determines that needing the position safeguarded is 300 meters of risk position periphery
Interior risk zones.According to levels of maintenance and it is described need the available Second Echelon Maintenance personal scheduling scheme in position safeguarded, into
One step scheduling maintenance personnel safeguards.Wherein, maintenance personnel includes the inspector of the risk zones, the risk zones
Neighbourhood committee responsible person, externally links up personnel at pipeline maintenance worker.The inspector of the risk zones can be according to the Second Echelon Maintenance
Personal scheduling scheme carries out secondary inspection;The neighbourhood committee responsible person of the risk zones and the external communication personnel can be according to institutes
Second Echelon Maintenance personal scheduling scheme is stated externally to be linked up so as to reach an agreement with the responsible person of the project under construction;It is described
Pipeline maintenance worker can carry out repairing pipe or maintenance according to the Second Echelon Maintenance personal scheduling scheme.
In other embodiments, the maintenance personnel can be the subordinate staff in each department, for example, it may be
The inspector of the risk zones, pipeline maintenance worker, externally links up personnel's at the subdistrict office personnel of the risk zones
Any one or more.
When the rank for determining that needs are safeguarded is preset highest, the maintenance personnel may include the first administrator and institute
Subordinate staff is stated, first administrator has permission the subordinate staff dispatched in its affiliated function.
It can be the binding to the maintenance personnel according to the mode of maintenance personnel's scheduling scheme schedules maintenance personnel
Account sends notice, is also possible to issue to the working equipment of the maintenance personnel and reminds instruction to remind the maintenance personnel to look into
Read maintenance personnel's scheduling scheme.
It, can be direct when not having the risk class in risk information or risk information in the detection data is zero level
Zero level maintenance personnel scheduling scheme is obtained so that entire inspection maintenance work is gone on smoothly.
Wherein, the content in maintenance personnel's scheduling scheme may include risk class, according to risk class knowledge
Not Chu maintenance echelon, the division task of maintenance personnel's scheduling scheme, risk process limited, with this can remind with it is described
It binds the matched related personnel of account and carries out subsequent processing, when the risk process limited includes feedback time section, suggests verifying
Between.
In the present embodiment, maintenance personnel's scheduling scheme can be labeled as history scheduling scheme after implementation each time.
History scheduling scheme can be for maintenance personnel's scheduling scheme that current risk class information inquires, be also possible to pre-
The scheduling scheme deposited can also be the scheme temporarily uploaded.Inquire each time maintenance personnel's scheduling scheme obtain it is described
Maintenance personnel may be the same or different.
The beneficial effect is that finding risk with or without during inspection, it can guarantee that everything goes well with your work for inspection
It carries out, when finding that pipeline needs to be serviced during inspection, the maintenance of corresponding maintenance echelon can be obtained in a short time
Personal scheduling scheme can carry out pipe-line maintenance according to maintenance personnel's scheduling scheme with scheduled maintenance personnel, realize maintenance workers with this
The effective division of labor made avoids going out current task intersection in maintenance work, further increases working efficiency, reduce security risk.
In the present embodiment, after step S120, as shown in figure 3, the method also includes:
Step S130, the status information after receiving the inspection position maintenance that maintenance personnel reports.
Step S140 assesses maintenance effects according to the status information after the maintenance.
After maintenance personnel carries out maintenance work according to maintenance personnel's scheduling scheme, in the feedback time section of setting
Status information after feedback maintenance.It include maintenance personnel's scheduling scheme, this maintenance work, maintenance in the status information
Time suggests the reinspection time.
In an example, in the status information there are loss of learning or maintenance work content are unknown, can tentatively judge
Do not reach maintenance effects.
In an example, maintenance personnel can obtain feedback time section from maintenance personnel's scheduling scheme, maintenance
Personnel can carry out feedback to maintenance work at the appointed time according to the feedback time section and report.The feedback time section can be with
It is 3 hours, is also possible to 1 day, can also be 3 days.Those skilled in the art can arbitrarily set the feedback according to actual needs
Period.
If being not received by the execution of maintenance personnel's scheduling scheme of feedback within the time limit of the feedback time section
As a result, then determining that maintenance effects are unknown state, and notify the higher level of the maintenance personnel.Such as it can be to the maintenance personnel
Supervisory binding account send notice, to supervise the maintenance personnel to accelerate maintenance progress.
Wherein, the maintenance effects can be preset maintenance effects, be also possible to by maintenance personnel according to reality
The reference maintenance effects that maintenance condition uploads.The maintenance effects can be unknown state, be also possible to excellent effect, can be with
It is moderate effect, can also be low effect.The beneficial effect is that being conducive to handle work to risk according to the maintenance effects
It follows up.
In the present embodiment, after step s 140, the method also includes being determined according to maintenance effects to the inspection position
The inspection cycle set.
Wherein, the inspection cycle can according to the suggestion in the maintenance effects and the status information recheck the time with
It determines.In one embodiment, the maintenance effects are excellent effect, and the inspection cycle can be in the status information
Suggestion recheck the time.In another embodiment, the maintenance effects are unknown state, and the inspection cycle can be according to institute
It states the suggestion in maintenance personnel's scheduling scheme and verifies the time to determine.
Wherein, the inspection cycle can be half a day, can be 1 day, be also possible to 3 days, can also be 1 week, can be with
It is 15 days.The length of the inspection cycle can be arbitrarily arranged in those skilled in the art according to actual needs.
Wherein, inspection feedback, risk class identification can be repeated with processing to carry out for the risk of same position
Risk degrades, until risk is eliminated.It can repeatedly be pacified according to the inspection cycle in the risk position range for finding risk
It arranges inspector and carries out inspection, further confirm that pipe-line maintenance effect, in inspection cycle, inspector can upload current detection again
Data further reacquire maintenance personnel's scheduling scheme so that the risk information of risk position is updated.
If the risk in the risk position range is not eliminated, inspector can retransmit risk class information, if the risk
Risk class in class information is at or above the historical risk grade of the risk position, then shows former maintenance personnel's scheduling
Scheme does not make progress, and urgent content can be transmitted in inspector.The pipeline inspection monitor terminal 200 receive it is described it is urgent in
Rong Hou, the available urgent scheduling scheme of maintenance personnel, further decreases security risk.
Be conducive to carry out lifecycle management to risk the beneficial effect is that setting the inspection cycle, to supervise
Risk processing is carried out with maintenance personnel, until risk is eliminated.
In the present embodiment, after step s 140, the method also includes the inspection of inspector is updated according to maintenance effects
Intended path.
Wherein, patrol plan can be formulated according to the pipe parameter prestored before inspector carries out inspection work.It is described to patrol
Inspection includes the location information of inspection key point in the works, includes exact position, periphery in the location information of the inspection key point
There are a restriction range in position and polling path, the exact position to the peripheral position.The restriction range can be 1
Rice, 10 meters, 50 meters, 100 meters, 200 meters, 500 meters.Those skilled in the art can arbitrarily set the restriction model according to actual needs
It encloses.
Further, the polling path in the patrol plan can be updated according to the maintenance effects of maintenance personnel.
For example, former risk position can be included in the inspection key point of patrol plan, show inspection when the maintenance effects are unknown state
Member needs the inspection key point to patrol plan to carry out multiple inspection;When the maintenance effects is excellent conditions but risk is not eliminated
When, former risk position can be included in conventional inspection position, it is conventional multiple to show that inspector needs to carry out the conventional inspection position
Inspection.
Wherein, the inspection number to the conventional inspection position is higher than for the inspection number of the inspection key point.
During entire inspection, it can also be assessed according to inspection quality of the detection data to inspector.?
In one example, the current location of inspector is obtained during inspection, judges whether inspector arrives according to the current location
Up to the position of the inspection key point, if not having, prompting instruction is issued, to realize the supervision to inspector.
Wherein, the current location of the inspector may be the position of the inspection key point, it is also possible to the inspection
Position other than plan.It, can be to institute when detecting the current location not within the scope of the restriction of the inspection key point
The inspection terminal for stating inspector, which issues, reminds instruction, and is rudimentary by this inspection quality evaluation.If detecting the present bit
It sets and falls within the scope of the restriction of the inspection key point, but detect and do not arrived within according to the period as defined in patrol plan
Up to the exact position of the inspection key point, it can also be issued to inspector and remind instruction, while by this inspection quality evaluation
For middle rank.
In an example, the outgoing inspector for carrying inspection terminal can be positioned by the GPS locator,
The detection in place and effectively supervision that may be implemented externally to go out inspector with this, are further commented for the inspection quality of inspector
Estimate.
In the present embodiment, punching operation can be provided so that inspector is arriving at the inspection pass according to the patrol plan
It can actively check card when key point to show inspection progress.
In the present embodiment, can also provide complaint channel so that inspector be able to carry out inspection quality evaluation complaint, it is described
The complaint of maintenance effects can also be carried out for maintenance personnel by appealing channel.
In the present embodiment, after step silo, the method also includes generating the dynamic of inspection according to the detection data
State map.
In one embodiment, the available pipeline historical information prestored includes going through in the pipeline historical information
History safeguards data, initial tract data, road reconstruction data, then the pipeline historical information is issued as service figure layer, may be used also
Current duct size information is issued as service figure layer, dynamic map is generated according to the service figure layer.Wherein, described to work as preceding pipeline
Information includes the risk information of the risk position and the risk position.
Further, it can store the relevant basic data of above-mentioned business in the dynamic map, including pipe line, stand
The data such as field, valve chamber, valve pit, high consequence area, test pile, the villages and small towns unit information along pipeline, medium-long term planning.
In another embodiment, the inspection position of inspector is obtained, it can be in the designated time period to described
The current inspection position data of inspector is updated, then is overlapped with historical position data and patrolled and examined track can be generated, root
It is superimposed according to the inspection position and generates patrolled and examined track, then the patrolled and examined track is shown in the dynamic map.
Wherein, the designated time period can be 10 minutes, 30 minutes, 1 hour, 3 hours, 5 hours, 1 day, 3 days.It is described
Designated time period can be shorter or longer, and different specified times can be used arbitrarily in those skilled in the art according to actual needs
Section is to realize that data update.When the designated time period is less than certain value, may be implemented for the real-time of the inspection terminal
Monitoring.
In an example, the dynamic map can be shown in some software APP of the first user terminal 20.It is described
Service server, which is constantly updated and issues the service figure layer, can be used family by checking inspection situation in the dynamic map.
When user wants to check high consequence area data, it is only necessary to be issued to server 10 and request that the correlation about high consequence area can be obtained
Data, and the data in the high consequence area can be checked by the dynamic map.When user wants to check the state of inspector,
It only needs to issue the patrolled and examined track for requesting that the inspector can be obtained to server 10.
The beneficial effect is that the reduction to inspection scene can be realized by the dynamic map to a certain extent,
It can also show that the patrolled and examined track of inspector further realizes the monitoring to inspector by the dynamic map, be inspection quality
Assessment provides evidence.
It, can also be fast once the inspection terminal reports risk information by the dynamic map and the patrolled and examined track
Speed obtains the information near risk position, can be provided safeguard with this for the quick processing of risk.
In the present embodiment, pipe-line maintenance log, the pipe-line maintenance log packet can also be generated according to the detection data
Include the detection data of inspector's transmission, the maintenance personnel's scheduling scheme obtained according to the detection data, the maintenance people
Status information, inspector after the maintenance of member's feedback is to the reinspection feedback content of risk position.The beneficial effect is that passing through institute
History pipeline risk processing record can be consulted at any time by stating pipe-line maintenance log.
Referring to Fig. 5, being the functional module of pipeline inspection monitoring device 210 shown in Fig. 2 provided in an embodiment of the present invention
Schematic diagram.The pipeline inspection monitoring device 210 includes monitoring module 211, scheduler module 212, receiving module 213.The prison
Control module 211, scheduler module 212 intercouple between receiving module 213 to realize that data are transmitted.
Wherein, the receiving module 213 is used to execute the step S110 in the above method;The scheduler module 212 is used for
Execute step S120, S121, S122 in the above method.
The monitoring module 211 is used to generate the dynamic map of the inspection.
In the present embodiment, the receiving module 213 and the scheduler module 212 are also respectively used to execute in the above method
Step S130, S140.
Wherein, the scheduler module 212 is also used to determine the inspection cycle to the inspection position and updates inspector
Patrol plan path.
In one embodiment, the detection data received is sent to the scheduling by the receiving module 213
Module 212 and the monitoring module 211.The monitoring module 211 according to the detection data to inspector and inspection process into
Row monitoring, can assess during monitoring according to inspection quality of the detection data to inspector.The scheduler module
212 positions safeguarded according to the determining needs of the detection data are simultaneously maintained personal scheduling scheme, further according to the dispatching party
Case scheduled maintenance personal scheduling needs the position safeguarded.The receiving module 213 receives the maintenance personnel again or described patrols
Status information after the maintenance of inspection person's feedback, and feedback information is sent to the scheduler module 212, the scheduler module 212
It according to feedback information evaluation maintenance effects, determines inspection cycle, and updates patrol plan path.
Pipeline inspection monitoring device 210 provided in this embodiment may be implemented for Long-distance Transmission Pipeline risk information
Efficiently management, the available effective control of work quality for the inspector that goes out are that the trouble free service of Long-distance Transmission Pipeline is established
One quick response platform.
In embodiment provided herein, it should be understood that disclosed device and method, it can also be by other
Mode realize.The apparatus embodiments described above are merely exemplary, for example, the flow chart and block diagram in attached drawing are shown
Device, the architectural framework in the cards of method and computer program product, function of multiple embodiments according to the present invention
And operation.In this regard, each box in flowchart or block diagram can represent one of a module, section or code
Point, a part of the module, section or code includes one or more for implementing the specified logical function executable
Instruction.It should also be noted that function marked in the box can also be attached to be different from some implementations as replacement
The sequence marked in figure occurs.For example, two continuous boxes can actually be basically executed in parallel, they sometimes may be used
To execute in the opposite order, this depends on the function involved.It is also noted that each of block diagram and or flow chart
The combination of box in box and block diagram and or flow chart can be based on the defined function of execution or the dedicated of movement
The system of hardware is realized, or can be realized using a combination of dedicated hardware and computer instructions.
In addition, each functional module in each embodiment of the present invention can integrate one independent portion of formation together
Point, it is also possible to modules individualism, an independent part can also be integrated to form with two or more modules.
It, can be with if the function is realized and when sold or used as an independent product in the form of software function module
It is stored in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially in other words
The part of the part that contributes to existing technology or the technical solution can be embodied in the form of software products, the meter
Calculation machine software product is stored in a storage medium, including some instructions are used so that a computer equipment (can be a
People's computer, server or network equipment etc.) it performs all or part of the steps of the method described in the various embodiments of the present invention.
And storage medium above-mentioned includes: USB flash disk, mobile hard disk, read-only memory 230 (ROM, Read-Only Memory), deposits at random
Various Jie that can store program code such as access to memory 230 (RAM, Random Access Memory), magnetic or disk
Matter.It should be noted that, in this document, relational terms such as first and second and the like be used merely to an entity or
Operation is distinguished with another entity or operation, and without necessarily requiring or implying between these entities or operation, there are any
This actual relationship or sequence.Moreover, the terms "include", "comprise" or its any other variant be intended to it is non-exclusive
Property include so that include a series of elements process, method, article or equipment not only include those elements, but also
Further include other elements that are not explicitly listed, or further include for this process, method, article or equipment it is intrinsic
Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including described
There is also other identical elements in the process, method, article or equipment of element.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field
For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair
Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.It should also be noted that similar label and letter exist
Similar terms are indicated in following attached drawing, therefore, once being defined in a certain Xiang Yi attached drawing, are then not required in subsequent attached drawing
It is further defined and explained.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any
Those familiar with the art in the technical scope disclosed by the present invention, can easily think of the change or the replacement, and should all contain
Lid is within protection scope of the present invention.Therefore, protection scope of the present invention should be subject to the protection scope in claims.
Claims (10)
1. a kind of pipeline inspection monitoring method, which is characterized in that the pipeline inspection monitoring method includes:
The detection data that inspector sends is received, the detection data includes the situation letter of inspection position and the inspection position
Breath;
The pipeline location for needing to safeguard is determined according to the detection data, and scheduled maintenance personnel safeguard the pipe for needing to safeguard
Road position.
2. pipeline inspection monitoring method as described in claim 1, which is characterized in that the condition information of the inspection position includes
The step of risk class of the inspection position, the scheduled maintenance personnel safeguard the pipeline location for needing to safeguard, comprising:
Maintenance personnel's scheduling scheme is determined according to the risk class of the inspection position;
The pipeline location for needing to safeguard is safeguarded according to maintenance personnel's scheduling scheme schedules maintenance personnel.
3. pipeline inspection monitoring method as claimed in claim 2, which is characterized in that described in scheduled maintenance personnel maintenance
After the step of pipeline location for needing to safeguard, the method also includes:
Status information after receiving the inspection position maintenance that maintenance personnel reports;
Maintenance effects are assessed according to the status information after the maintenance.
4. pipeline inspection monitoring method as claimed in claim 3, which is characterized in that in the state according to after the maintenance
After the step of information evaluation maintenance effects, the method also includes:
The inspection cycle to the inspection position is determined according to maintenance effects.
5. pipeline inspection monitoring method as claimed in claim 3, which is characterized in that in the state according to after the maintenance
After the step of information evaluation maintenance effects, the method also includes:
The patrol plan path of inspector is updated according to maintenance effects.
6. pipeline inspection monitoring method as described in any one in claim 1-5, which is characterized in that sent out in the reception inspector
After the step of detection data sent, the method also includes:
The dynamic map of inspection is generated according to the detection data.
7. pipeline inspection monitoring method as described in any one in claim 1-5, which is characterized in that sent out in the reception inspector
After the step of detection data sent, the method also includes:
It is assessed according to inspection quality of the detection data to inspector.
8. a kind of pipeline inspection monitoring device characterized by comprising
Receiving module, for receiving the detection data of inspector's transmission, the detection data includes inspection position and described patrols
Examine the condition information of position;
Scheduler module, for determining the pipeline location for needing to safeguard according to the detection data, and scheduled maintenance personnel safeguard institute
State the pipeline location for needing to safeguard.
9. pipeline inspection monitoring device as claimed in claim 8, which is characterized in that the scheduler module is also used to:
Maintenance personnel's scheduling scheme is determined according to the risk class of the inspection position.
10. pipeline inspection monitoring device as claimed in claim 8, which is characterized in that the pipeline inspection monitoring device also wraps
It includes:
Monitoring module, for generating the dynamic map of inspection according to the detection data.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810886963.4A CN108985656A (en) | 2018-08-06 | 2018-08-06 | pipeline inspection monitoring method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810886963.4A CN108985656A (en) | 2018-08-06 | 2018-08-06 | pipeline inspection monitoring method and device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108985656A true CN108985656A (en) | 2018-12-11 |
Family
ID=64554995
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810886963.4A Pending CN108985656A (en) | 2018-08-06 | 2018-08-06 | pipeline inspection monitoring method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108985656A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110175945A (en) * | 2019-04-26 | 2019-08-27 | 深圳源创环保科技有限公司 | Supervisory practice, system and the computer readable storage medium of garbage classification |
CN112598343A (en) * | 2021-03-08 | 2021-04-02 | 上海有孚智数云创数字科技有限公司 | Risk inspection method, device, equipment and storage medium for data center |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103887794A (en) * | 2014-04-14 | 2014-06-25 | 杭州昊美科技有限公司 | Power distribution network production urgent repair system and method based on Internet of Things |
CN104392507A (en) * | 2014-12-12 | 2015-03-04 | 重庆市荣冠科技有限公司 | Intelligent line patrol monitoring system for urban gas pipe network |
CN105868934A (en) * | 2016-05-09 | 2016-08-17 | 国网浙江东阳市供电公司 | Tour-inspection remote management method |
-
2018
- 2018-08-06 CN CN201810886963.4A patent/CN108985656A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103887794A (en) * | 2014-04-14 | 2014-06-25 | 杭州昊美科技有限公司 | Power distribution network production urgent repair system and method based on Internet of Things |
CN104392507A (en) * | 2014-12-12 | 2015-03-04 | 重庆市荣冠科技有限公司 | Intelligent line patrol monitoring system for urban gas pipe network |
CN105868934A (en) * | 2016-05-09 | 2016-08-17 | 国网浙江东阳市供电公司 | Tour-inspection remote management method |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110175945A (en) * | 2019-04-26 | 2019-08-27 | 深圳源创环保科技有限公司 | Supervisory practice, system and the computer readable storage medium of garbage classification |
CN112598343A (en) * | 2021-03-08 | 2021-04-02 | 上海有孚智数云创数字科技有限公司 | Risk inspection method, device, equipment and storage medium for data center |
CN112598343B (en) * | 2021-03-08 | 2021-05-25 | 上海有孚智数云创数字科技有限公司 | Risk inspection method, device, equipment and storage medium for data center |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11741105B2 (en) | Intelligent remote monitoring method for fire-fighting | |
SA516371432B1 (en) | A method of generating data in an oil and gas supply chain for compatibility with external systems | |
US20170115151A1 (en) | Water meter and water supply management system using same | |
KR102131656B1 (en) | Cloud service platform system to manage for fire-fighting facilities | |
US20220276116A1 (en) | Non-intrusive integral system for pipelines monitoring in real time | |
KR20200074135A (en) | Systems and methods for tracking greenhouse gas emissions associated with an entity | |
CN104421620A (en) | Leakage signal analysis method | |
CN105319461B (en) | System for identifying potential grid faults by combining vibration and power quality analysis | |
US10386261B2 (en) | High repetition rate thermometry system and method | |
CN108830503A (en) | A kind of whole process engineering consulting method of servicing and system | |
CN103714702B (en) | Method for conducting vehicle overspeed warming through vehicle overspeed warming device | |
CN106249707B (en) | Information collection system and information collection method | |
US11906112B2 (en) | Methods for safety management of compressors in smart gas pipeline network and internet of things systems thereof | |
CN108985656A (en) | pipeline inspection monitoring method and device | |
Yang et al. | Development of online scalable approach for identifying secondary crashes | |
CN107563673A (en) | A kind of inspection management method, operation management platform and system | |
CN109029573A (en) | A kind of pipeline method for inspecting and system | |
KR20170024975A (en) | Monitering System of Risk Factor of Industrial Complex and Industry and Method thereof | |
CN107480957B (en) | Special line project management platform | |
CN109064051A (en) | Transmission of electricity tower bar on-line monitoring method and device | |
CN112598559A (en) | Intelligent park comprehensive management method and device, storage medium and electronic equipment | |
KR101096593B1 (en) | Sensor network middleware system for managing tele-metering system | |
CN115170993A (en) | AR acquisition and analysis-based on-site inspection method and system for waste gas treatment equipment | |
CN104407604A (en) | D5000 debugging protocol testing device and method | |
Nonnecke et al. | IoT & sustainability: Practice, policy and promise |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181211 |