CN108985551A CN201810549911.8A CN201810549911A CN108985551A CN 108985551 A CN108985551 A CN 108985551A CN 201810549911 A CN201810549911 A CN 201810549911A CN 108985551 A CN108985551 A CN 108985551A
Authority
CN
China
Prior art keywords
materials
goods
data
technology
repairing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810549911.8A
Other languages
Chinese (zh)
Inventor
洪松琛
李勇
郑海彬
程凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fang Lishuang
Lin Qijian
Lin Shali
Shanghai Zhougu Power Technology Co Ltd
Zheng Kaizeng
State Grid Information and Telecommunication Co Ltd
State Grid Fujian Electric Power Co Ltd
Great Power Science and Technology Co of State Grid Information and Telecommunication Co Ltd
Original Assignee
Fang Lishuang
Lin Qijian
Lin Shali
Shanghai Zhougu Power Technology Co Ltd
Zheng Kaizeng
State Grid Information and Telecommunication Co Ltd
State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fang Lishuang, Lin Qijian, Lin Shali, Shanghai Zhougu Power Technology Co Ltd, Zheng Kaizeng, State Grid Information and Telecommunication Co Ltd, State Grid Fujian Electric Power Co Ltd filed Critical Fang Lishuang
Priority to CN201810549911.8A priority Critical patent/CN108985551A/en
Publication of CN108985551A publication Critical patent/CN108985551A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The invention discloses a kind of Power Material declaration methods based on VR technology, the following steps are included: breakdown gang 5 carries out the data acquisition at scene using mobile terminal respectively and demand is declared, the data of acquisition are first stored in each mobile terminal its drip irrigation device;The data of repairing are declared platform by mobile terminal typing unification respectively by repair personnel;The server being connected with mobile terminal generates repairing materials needed scheme, and is shown corresponding goods and materials in mobile terminal by VR technology;Repair personnel selects for the corresponding goods and materials that mobile terminal is shown, by information back to server;Control centre carries out demand to the declaration data of each breakdown gang 5 and summarizes, and forms unified goods and materials data;Stock clerk is compared using the goods and materials data passed back with storehouse raw material, and carries out stock delivery to goods and materials;Cargo is distributed unitedly and dispatched by delivery system and is dispensed into repairing place;Carry out maintenance work, has achieved the effect that realize and repairing goods and materials are uniformly declared and distributed.

Description

A kind of Power Material declaration method based on VR technology
Technical field
The present invention relates to electric power material management fields, and in particular to a kind of Power Material declaration method based on VR technology.
Background technique
In the electric power first-aid stage, usually from scene to warehouse initiate demand, warehouse by searching for whether there is the goods and materials, then Goods and materials delivery is carried out, there are deviations for description of the Field Force to the description and warehouse personnel of goods and materials to goods and materials, and both sides is caused to link up It is at high cost, it is also possible to occur that warehouse is practical the model goods and materials, but due to describe it is unclear cause it is non-shipment, increase repairing when Between, and in the electric power first-aid stage, it is necessary to race against time, waste of time be more likely to produce serious consequence, cause it is biggish Economic loss.
And large-scale power grid damage can be generated under the influence of large-scale natural calamity (such as typhoon), necessarily give people Life, work make troubles, cause biggish economic loss, common Power Material is declared there are inefficiency, is influenced complete The speed of face repairing, it is therefore desirable to which the method that more Power Material is declared can be quickly uniformly processed in one kind.
Summary of the invention
The purpose of the present invention is to provide a kind of Power Material declaration methods based on VR technology, to solve material on hand The at high cost and Power Material that scene carries out goods and materials communication with warehouse during repairing declares more dispersed problem.
To achieve the above object, the technical scheme is that a kind of Power Material declaration method based on VR technology, packet Include following steps:
S1: repairing point data situation is collected: each breakdown gang 5 is equipped with multiple mobile terminals, and breakdown gang 5 is whole using movement End carries out the data acquisition at scene and demand is declared, and the data of acquisition are first stored in each mobile terminal;
S2: repairing data inputting: repair personnel is flat by declaring for mobile terminal typing unification by the data of repairing respectively Platform;
S3: generate repairing materials needed scheme: the server being connected with mobile terminal generates repairing materials needed scheme, and Corresponding goods and materials are shown in mobile terminal by VR technology;
S4: goods and materials selection: repair personnel selects for the corresponding goods and materials that mobile terminal is shown, by information back to clothes Business device;
S5: material requirements summarize: control centre carries out demand to the declaration data of each breakdown gang 5 and summarizes, and forms unification Goods and materials data.
S6: goods and materials compare: stock clerk is compared using the goods and materials data passed back with storehouse raw material, and VR skill is used Art checks whether goods and materials with scene need goods and materials to be consistent, and then carries out stock delivery to goods and materials;
S7: goods and materials delivery: being distributed unitedly cargo and dispatched by delivery system and is dispensed into repairing place;
S8: carry out maintenance work.
As advanced optimizing, data collection includes the receipts of position of failure point, required personnel, facility information in step S1 Collection.
As advanced optimizing, information transmission is carried out by the way of breakpoint transmission in step S2 and/or step S4.
As advanced optimizing, the repairing materials needed scheme that system generates in step S3 includes the shape of goods and materials, model.
As advanced optimizing, the repairing materials needed scheme that system generates in step S3 further includes mating with materials needed Ironware, fitting.
As advanced optimizing, step S5 specifically includes the following steps:
Step S6.1: warehouse end is established to the simulated scenario in warehouse by VR technology using real time data;
Step S6.2: the simulated scenario of the goods and materials data and warehouse passed back is compared, and determines materials needed, is carried out standby Material delivery.
As advanced optimizing, field condition is back to server by terminal when carrying out maintenance work in step S8; Other staff check scene rush to repair progress situation by VR technology.
The present invention has the advantage that
1, repair personnel directly carries out data acquisition to repairing scene using mobile terminal and is uploaded to server, server Three-dimensional modeling is carried out using VR technology and generates Rush Repair Scheme selecting for repair personnel, keep repair personnel intuitive, convenient and fast The goods and materials needed for oneself are selected, the difficulty being described is reduced.
2, emergency declares the entrance of declaring that platform has unified emergency materials demand, and specification requirements are declared, and each department are conducive to The statistics of demand and the scheduling of goods and materials can avoid declaring generation confusion in repairing operation on a large scale, goods and materials caused to distribute Existing mistake, influences the efficiency of repairing.
3, the mode of design requirement breakpoint transmission, the requirements of support accurately send back dispatching point, avoid due to external environment etc. Reason causes demand Transmission that can not be sent to, and control centre causes goods and materials delivery not in time or scarce hair leakage is sent out.
4, the Rush Repair Scheme selected through repair personnel, which is back to server, can also check phase after warehouse termination receives demand Rapid matching relevant supplies are prompted storage position, to promote electricity by threedimensional model, picture, the text answered, warehouse management system The efficiency of power repairing, it is convenient intuitive, it is easy to discriminate whether as materials needed, while can avoid wrong sending, omission sending goods and materials.
5, the simulated scenario in warehouse is established at warehouse end by VR technology using real time data, passes through the simulation at scene and warehouse Scene compares the lookup and delivery of progress goods and materials that can be more convenient.
6, when repairing process, field condition is showed by VR technology in real time, convenient for understanding scene rush to repair progress, carried out Remote assistance, while can also carry out carrying out goods and materials stock supplement in advance according to field condition, to save the time that goods and materials are declared Cost.
Detailed description of the invention
Fig. 1 is 1 flow chart of embodiment.
Fig. 2 is 2 flow chart of embodiment.
Specific embodiment
The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention..
Embodiment 1
A kind of Power Material declaration method based on VR technology, in conjunction with Fig. 1, comprising the following steps:
S1: repairing point data situation is collected: each breakdown gang 5 is equipped with multiple mobile terminals, and breakdown gang 5 is whole using movement End carries out the data acquisition at scene and demand is declared, and the data of acquisition are first stored in each mobile terminal;Collect content packet Include the information such as photo site, position of failure point, required personnel, equipment;
S2: repairing data inputting: repair personnel is flat by declaring for mobile terminal typing unification by the data of repairing respectively Platform;
S3: generate repairing materials needed scheme: the server being connected with mobile terminal generates repairing materials needed scheme, and Corresponding goods and materials are shown in mobile terminal by VR technology;Wherein, repairing materials needed scheme specifically include goods and materials shape, Model selects in order to repair personnel, further, during large size repairing, since large scale equipment often needs to be equipped with one Support of a little ironwares, fitting for equipment is fixed, and while repair personnel selects equipment, VR technology can be corresponding mating The goods and materials such as ironware, fitting be presented in terminal, repair personnel carries out the selection of goods and materials as needed.
S4: goods and materials selection: repair personnel selects for the corresponding goods and materials that mobile terminal is shown, by information back to clothes Business device;
S5: goods and materials compare: stock clerk is compared using the goods and materials data passed back with storehouse raw material, and VR skill is used Art checks whether goods and materials with scene need goods and materials to be consistent, and then carries out stock delivery to goods and materials;
S6: goods and materials compare: stock clerk is compared using the goods and materials data passed back with storehouse raw material, and VR skill is used Art checks whether goods and materials with scene need goods and materials to be consistent, and then carries out stock delivery to goods and materials;
S7: goods and materials delivery: being distributed unitedly cargo and dispatched by delivery system and is dispensed into repairing place;
S8: carrying out maintenance work, and field condition is back to server by terminal when carrying out maintenance work;Other staff Scene rush to repair progress situation is checked by VR technology in a computer.
The field condition of repair personnel's acquisition is presented in face of warehouseman by VR technology, facilitates warehouse work people Member lookups is compared, avoid description mistake caused by goods and materials provide mistake with not in time the problems such as, largely save time cost; Also, mobile terminal can also push materials needed scheme to scene rush to repair personnel, select for repair personnel, make declaring more for goods and materials It is prompt, accurate to accelerate.
It is declared in the present invention using unified platform progress goods and materials of declaring, and material requirements is summarized, distributed unitedly It provides, the allocative efficiency of adjustable height goods and materials, avoids there is a situation where goods and materials granting entanglement, for the repairing work saving quality time.
Goods and materials are caused to deliver to avoid causing demand Transmission can not be sent to control centre due to external environment etc. Not in time or hair leakage hair being lacked, information transmission is carried out using breakpoint transmission by the way of in step S2 and/or step S4, when transmission, by Transformation task is divided into several parts, each part is transmitted using a thread, can be with if encountering network failure Continue the unfinished part of transmission since the part transmitted, uploads downloading, the requirements of support from the beginning without necessary Accurately send back dispatching point.
Embodiment 2
Facilitate materials needed to compare with warehouse inventory to advanced optimize storehouse management in conjunction with Fig. 2, receives at the scene Depot data can be collected while collecting data and three-dimensional modeling is carried out to warehouse using VR technology, realize the scene in warehouse Reproduce, thus the step S6 in embodiment 1 specifically includes the following steps:
S6.1: warehouse end is established to the simulated scenario in warehouse by VR technology using real time data;
S6.2: the simulated scenario of the goods and materials data and warehouse passed back is compared, determines materials needed, carries out stock hair Goods.
It should be noted that warehouse is established using real time data by VR technology in warehouse end by step S6.1 in the present invention Sequencing is not present into S4 by simulated scenario and S1 between the collection and back delivery operations of field data, can carry out simultaneously.
Depot data can be collected while on-site collection data and three-dimensional modeling is carried out to warehouse using VR technology, It realizes that the scene in warehouse reproduces, facilitates storehouse management, meanwhile, lookup is compared in field data and depot data, can be convenient for storehouse The positioning of library goods and materials, goods and materials are provided more efficient.
Although above having used general explanation and specific embodiment, the present invention is described in detail, at this On the basis of invention, it can be made some modifications or improvements, this will be apparent to those skilled in the art.Therefore, These modifications or improvements without departing from theon the basis of the spirit of the present invention are fallen within the scope of the claimed invention.

Claims (7)

1. a kind of Power Material declaration method based on VR technology, which comprises the following steps:
S1: repairing point data situation is collected: each breakdown gang 5 is equipped with multiple mobile terminals, breakdown gang 5 using mobile terminal into The data acquisition at row scene and demand are declared, and the data of acquisition are first stored in each mobile terminal;
S2: repairing data inputting: the data of repairing are declared platform by mobile terminal typing unification respectively by repair personnel;
S3: generate repairing materials needed scheme: the server being connected with mobile terminal generates repairing materials needed scheme, and passes through VR technology shows corresponding goods and materials in mobile terminal;
S4: goods and materials selection: repair personnel selects for the corresponding goods and materials that mobile terminal is shown, by information back to service Device;
S5: material requirements summarize: control centre carries out demand to the declaration data of each breakdown gang 5 and summarizes, and forms unified goods and materials Data.
S6: goods and materials compare: stock clerk is compared using the goods and materials data passed back with storehouse raw material, is looked into using VR technology It sees whether goods and materials with scene need goods and materials to be consistent, stock delivery then is carried out to goods and materials;
S7: goods and materials delivery: being distributed unitedly cargo and dispatched by delivery system and is dispensed into repairing place;
S8: carry out maintenance work.
2. the Power Material declaration method according to claim 1 based on VR technology, which is characterized in that data in step S1 Collect the collection including position of failure point, required personnel, facility information.
3. the Power Material declaration method according to claim 1 based on VR technology, which is characterized in that step S2 and/or Information transmission is carried out by the way of breakpoint transmission in step S4.
4. the Power Material declaration method according to claim 1 based on VR technology, which is characterized in that system in step S3 The repairing materials needed scheme of generation includes the shape of goods and materials, model.
5. the Power Material declaration method according to claim 4 based on VR technology, which is characterized in that system in step S3 The repairing materials needed scheme of generation further includes ironware matched with materials needed, fitting.
6. the Power Material declaration method according to claim 1 based on VR technology, which is characterized in that step S6 is specifically wrapped Include following steps:
Step S6.1: warehouse end is established to the simulated scenario in warehouse by VR technology using real time data;
Step S6.2: the simulated scenario of the goods and materials data and warehouse passed back is compared, determines materials needed, carries out stock hair Goods.
7. the Power Material declaration method according to claim 1 based on VR technology, which is characterized in that carry out in step S8 Field condition is back to server by terminal when maintenance work;Other staff check scene rush to repair progress feelings by VR technology Condition.
CN201810549911.8A 2018-05-31 2018-05-31 A kind of Power Material declaration method based on VR technology Pending CN108985551A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810549911.8A CN108985551A (en) 2018-05-31 2018-05-31 A kind of Power Material declaration method based on VR technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810549911.8A CN108985551A (en) 2018-05-31 2018-05-31 A kind of Power Material declaration method based on VR technology

Publications (1)

Publication Number Publication Date
CN108985551A true CN108985551A (en) 2018-12-11

Family

ID=64542809

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810549911.8A Pending CN108985551A (en) 2018-05-31 2018-05-31 A kind of Power Material declaration method based on VR technology

Country Status (1)

Country Link
CN (1) CN108985551A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110543805A (en) * 2019-04-15 2019-12-06 贵州电网有限责任公司都匀供电局 Electric power emergency material demand reporting platform based on image recognition and intelligent allocation
CN111598258A (en) * 2019-02-20 2020-08-28 中国石油天然气股份有限公司 Management method and device for maintenance and first-aid repair information of oil and gas pipeline and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104572841A (en) * 2014-12-11 2015-04-29 惠州Tcl移动通信有限公司 Method and electronic equipment for presenting corresponding information of object
CN105404993A (en) * 2015-11-25 2016-03-16 国家电网公司 Intelligent material management system
CN106548268A (en) * 2016-09-26 2017-03-29 云南电网有限责任公司临沧供电局 A kind of method of intelligent allocation Power Material demand
CN206209852U (en) * 2016-12-02 2017-05-31 四川亚润科技有限公司 A kind of control system for Power Material field management

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104572841A (en) * 2014-12-11 2015-04-29 惠州Tcl移动通信有限公司 Method and electronic equipment for presenting corresponding information of object
CN105404993A (en) * 2015-11-25 2016-03-16 国家电网公司 Intelligent material management system
CN106548268A (en) * 2016-09-26 2017-03-29 云南电网有限责任公司临沧供电局 A kind of method of intelligent allocation Power Material demand
CN206209852U (en) * 2016-12-02 2017-05-31 四川亚润科技有限公司 A kind of control system for Power Material field management

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵芳主编: "《电子商务概论》", 28 February 2015 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111598258A (en) * 2019-02-20 2020-08-28 中国石油天然气股份有限公司 Management method and device for maintenance and first-aid repair information of oil and gas pipeline and storage medium
CN110543805A (en) * 2019-04-15 2019-12-06 贵州电网有限责任公司都匀供电局 Electric power emergency material demand reporting platform based on image recognition and intelligent allocation

Similar Documents

Publication Publication Date Title
CN109784508A (en) A kind of power grid panorama monitoring operation management method and system based on cloud platform
CN105809373A (en) Distribution network fault information comprehensive collection and management platform
CN106357414B (en) Information interacting method and system for base station electric generation management
CN104091034B (en) Circuit communication chart automatic mapping system and method based on Graphic Pattern Matching
CN108305008A (en) A kind of working method of online resource sharing service platform
CN109933634B (en) Power system graph drawing method based on power radiation range
CN103926891B (en) Mobile Telecommunication Equipment Room environment in mobile stations equipment monitoring system and method
CN103544652A (en) Power grid industry classification load automatic statistical method and system
CN108985551A (en) A kind of Power Material declaration method based on VR technology
CN110568310A (en) Visual online monitoring system for power transmission line
CN109713800B (en) Low-voltage distribution network data acquisition system based on intelligent cloud management
CN103488726A (en) Method for establishing unified grid data platform based on WEB-SERVICE
CN110991977A (en) Collaborative scene intelligent monitoring system based on power grid business process
US10210177B2 (en) Distribution management system
CN104253859A (en) Centralized scheduling resource distributing load balancing device and method
CN106714217A (en) IBeacon base station maintenance method, iBeacon base station maintenance system, mobile terminal and iBeacon base station
CN105048639A (en) SCD (substation configuration description) modeling-based substation power source system monitoring system
CN108919734B (en) Electric power information synchronous processing storage application system
CN108960440A (en) A kind of Power Material comparison method based on VR technology
CN111478434A (en) Power dispatching remote maintenance system
CN107145427A (en) A kind of method and system of automatic classification monitoring application service daily record
CN105512956A (en) Intelligent multimedia interactive platform system for electric power fault emergency repair process
CN103532798A (en) Data reporting method, data reporting system, M2M platform and terminal
CN102708181A (en) Distributed data instancing method of charging station monitoring system
CN101945030A (en) Communication method for monitoring inverter on basis of MODBUS protocol

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181211