CN108984858A - A kind of Construction of Rolled Concrete Dam intelligent management system - Google Patents

A kind of Construction of Rolled Concrete Dam intelligent management system Download PDF

Info

Publication number
CN108984858A
CN108984858A CN201810671771.1A CN201810671771A CN108984858A CN 108984858 A CN108984858 A CN 108984858A CN 201810671771 A CN201810671771 A CN 201810671771A CN 108984858 A CN108984858 A CN 108984858A
Authority
CN
China
Prior art keywords
construction
module
concrete
information
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810671771.1A
Other languages
Chinese (zh)
Inventor
李成
江涛
李钧
邓瑞振
秦谢
丁访涛
吴东林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Survey and Design Research Institute for Water Resources and Hydropower
Original Assignee
Guizhou Survey and Design Research Institute for Water Resources and Hydropower
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Survey and Design Research Institute for Water Resources and Hydropower filed Critical Guizhou Survey and Design Research Institute for Water Resources and Hydropower
Priority to CN201810671771.1A priority Critical patent/CN108984858A/en
Publication of CN108984858A publication Critical patent/CN108984858A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Abstract

The invention discloses a kind of Construction of Rolled Concrete Dam intelligent management system, including site construction management area, Construction simulation simulation regions.The site construction management area includes that management platform, concrete mixing-vehicle rinsing management platform, concrete construction management platform are stacked in aggregate production screening.The Construction simulation simulation region includes actual progress logging modle, construction simulation emulation module.This system combines the regulatory requirement of over contract side under EPC Project management mode, for big scene, the grinding concrete construction management that process is more, technical requirements are high, management difficulty is big, over contract side can use this system, originally scattered information is collected into and carries out intellectual analysis together, improve the degree of association and transmission efficiency of the information such as construction worker, mechanical equipment, material, be conducive to each unit of taking part in building to cooperate, supervise, to reach the raising efficiency of management, project risk is reduced, realizes the purpose for each side's win-win of taking part in building.

Description

A kind of Construction of Rolled Concrete Dam intelligent management system
Technical field
The present invention relates to hydraulic and hydroelectric engineering EPC Project management domains, and in particular to a kind of Construction of Rolled Concrete Dam Intelligent management system is used in the management domain of Construction of Rolled Concrete Dam.
Background technique
With the high speed development of water conservancy, more and more RCC dam project kickoff construction are mixed due to rolling Solidifying earth dam technical requirements are high, and construction management difficulty is big, under traditional Contract Model, from the exploitation of stock ground early period to later period grinding coagulation soil Dam construction, has the following problems:
(1) stock ground area: 1. the project amount of the daily actual production in stock ground cannot be recorded and analyzed effectively, can only rough estimate; 2. dumper driver's working time, vehicle hour cannot be recorded effectively, there are the case where haul tired driver driving to be obtained The problem of less than supervision.
(2) mixing building: 1. the running parameters such as mixing building feeding sequence, duration of mixing, which can only arrive at mixing building, checks, management Person cannot Information whenever and wherever possible;2. intelligent record analysis cannot be carried out to the daily production practical capacity of mixing building, especially Rough estimate can only be carried out to the daily output of subregion concrete;3. the timeliness of machine outlet concrete test detection cannot supervise It superintends and directs, and testing result cannot be real-time transmitted on project manager/project management side/management mobile phone and analyze, and can not refer in real time Construction is led, the result made needs to sign, and can not dock in time with corresponding unit;4. mixing building blanking finishes, transport department Machine does not know the information having been filled with, and mixing building personnel to be leaned on to go to cry out;5. grinding coagulation soil has subregion to roll requirement, there are haul departments Machine does not know the concrete information of transported train number, causes later period transport driver that cannot shift to an earlier date and cooperates with storehouse surface technical staff;6. former Expect service condition, daily personnel is needed largely to go statistical data, record and analysis raw material that can not be intelligent store and use feelings Condition.
(3) rinsing area: 1. the haul vehicle of front and back two reaches flushing region and cannot determine, may cause and rinses vehicle crew To run to the problem of opening and closing water tap back and forth, cause the waste at water source.2. it is necessary to entrance dam storehouse after haulage vehicle flushing Face, storehouse surface technical staff can not know the material source information for carrying out vehicle in advance, and it is improper to command sometimes, cause discharging not in specified area The waste of concrete is caused in domain.
(4) construction storehouse surface: 1. storehouse surface concrete rolls the timeliness of the testing inspections data results such as quality testing, the detection of VC value The result that property cannot be supervised, and be made cannot be real-time transmitted to construction party project manager, over contract side, carry out on management mobile phone Analysis, can not real-time instruction construction;2. number of rolling cannot control well.
(5) management mode: under traditional Contract Model, to linking require stringent process construction operation when, cannot with it is corresponding Responsible person timely and effectively link up, cause managerial confusion.
It summarizes: for big scene, the grinding concrete construction project management that process is more, technical requirements are high, management difficulty is big, Originally scattered information effectively cannot be collected into intellectual analysis together by traditional Contract Model, and construction worker, machinery are set The degree of association of the information such as standby, material is poor, matches between each unit of taking part in building and closes not in time, and lacks effective supervision.
Summary of the invention
The purpose of the present invention is to solve the Railway Projects mentioned in background technique, and a kind of grinding coagulation soil proposed Dam construction intelligent management system.
To achieve the goals above, present invention employs following technical solutions:
A kind of Construction of Rolled Concrete Dam intelligent management system, including site construction management area, Construction simulation simulation region;Institute The site construction management area stated, including management platform is stacked in aggregate production screening, concrete mixing-vehicle rinsing manages platform, Concrete construction manages platform;Management platform is stacked in the aggregate production screening, including aggregate produces-be crushed module, aggregate sieve Stacking amplification module;The concrete mixing-flushing pipe platform includes mix area module, rinsing area module;The construction is imitative True simulation region, including construction simulation emulation module, actual progress logging modle.
Further, the aggregate produces-is crushed module and receives for realizing information, information record analysis, starts report Alert program, the function of transmitting signal.
Further, the aggregate produces-is crushed module and is such building and implements: disposing and feels in crusher region Scanner GL is answered, the personal working information two dimensional code of placement on vehicle, when sensitive scanning device GL senses that dumper reaches specified discharging Behind region, sensitive scanning device GL will include car number, vehicle arrived specified region, the information of driver's working time is sent out automatically It send to aggregate and produces-be crushed module, one side aggregate, which produces-be crushed module, will send voice reminder, inform that vehicle arrived finger Determine discharge region;On the other hand, cumulative operation time is more than limit value on the day of driver, and aggregate produces-be crushed module starting intelligence It can alert program.
Further, the mix area module is such building and implements: disposing and incudes in mixing building blanking region Scanner BH, the personal working information two dimensional code of placement on vehicle, when sensitive scanning device BH senses that dumper reaches mixing building blanking Behind region, sensitive scanning device BH will arrived the information of the information in specified region, driver's working time including car number, vehicle It is automatically sent to mix block module, one side mix area module will send voice reminder, inform that vehicle arrived specified blanking Region;On the other hand, cumulative operation time is more than limit value on the day of driver, and mix area module starts intelligent alarm program.
Further, the building and implementation method of the mix area module further include: it is finished when secondary concrete discharges, when Secondary charging, bin stock, ingredient, mix, discharging whole process information are collected by mixing building console automatically, are sent to mix area mould Block, when there is non-standard operation, mix area module will start alert program.
Further, the building and implementation method of the mix area module further include: machine outlet sample detection is once opened Begin, it is more than limit value when the sample detection time that mix block module, which will record the lower sample detection time, and mix area module will start Alert program sends warning message to testing crew in time;After equal tests are finished, testing crew presses the instruction hair for terminating detection Mix area module is given, mix area module sends the order for waiting signature audit to related side, if test data relevant parameter is each Side has identical ideas, and mix area module sends the order for agreeing to construction;If at sixes and sevens, mix area module will start journey of alarming Sequence.
Further, the rinsing area module is such building and implements: rinsing region placement sensitive scanning device CX, the personal working information two dimensional code of placement on vehicle, when sensitive scanning device CX sense dumper reach rinse region after, induction is swept It retouches device CX vehicle be arrived into the information such as specified region and be automatically sent to rinsing area module, one side rinsing area module sends voice It reminds vehicle to reach and rinses area information;On the other hand, rinsing area module transmits a signal to flushing inductor, starts intelligent wash The function of vehicle;Limit value is arranged in washing time, and after washing time arrives, tap is closed, and rinsing area module is mobile to related side Terminal sends information and carries out voice broadcast.
Further, concrete construction management platform is such building and implements: testing crew starts to do the same day Before the detection of storehouse surface concrete test, the signal for starting sample detection is sent to concrete construction management console module, storehouse surface test takes Sample detection is once it is more than limit value, storehouse when the sample detection time that concrete construction management platform, which records the sample detection time, Surface construction manages platform and starts alert program, sends warning message to testing crew in time, supervises and makes the best use of time to complete test;Deng After test is finished, testing crew presses the instruction for terminating to detect and is sent to concrete construction management platform, and concrete construction manages platform The order for waiting signature audit is sent to related side, if test data relevant parameter each side has identical ideas, concrete construction management is flat Platform sends the order for agreeing to construction;If at sixes and sevens, concrete construction manages platform and starts alert program.
Further, the building and implementation method of concrete construction management platform further include: number of rolling passes through pressure Road machine sensor is recorded, and real-time data transmission to concrete construction manages platform, if number of rolling reaches, concrete construction management Platform rolls to compactor operator, concrete construction manager, management voice broadcast and completes information.
Further, construction simulation emulation module is learnt according to real-time progress record module, realizes prediction progress function Can, and BIM threedimensional model is combined to carry out simulative calculation of construction;Construction simulation emulation module and hydrologic monitoring, meteorological department link Realize warning function of passing the flood period of controlling flood.
The beneficial effects of the present invention are: site construction management area is by utilizing sensitive scanning device, personal working information two dimension Code, system alarm program, mobile terminal, mixing building console, can time set automatic flushing device etc., obtain transport in real time Vehicle driver's working time reaches specified area information, travels Bus Schedules, stock ground mining information, mixing building relevant parameter information, Transport vehicle material source information, by voice broadcast function to take part in building constituent parts related personnel remind and it is to be solved and pay attention to matters, It especially reminds storehouse surface technical staff, mixing building manager effectively to cooperate with transport vehicle driver, testing inspection personnel is reminded to mention in time Hand over test result, prompting each side's quality inspection personnel of taking part in building judges the reasonability of test data in time, and can make information go directly design side, The functions such as expert, owner.Originally scattered information can be collected into and carry out intellectual analysis together by site construction management area, and raising is applied The degree of association and transmission efficiency of the information such as work operating personnel, mechanical equipment, material are conducive to each unit of taking part in building and cooperate, supervise It superintends and directs, to reach the raising efficiency of management, reduces project risk, realize the purpose for each side's win-win of taking part in building.
By the way that construction simulation emulation platform, actual progress logging modle are arranged in system, collect live progress and believe in real time Breath, and BIM is combined to carry out three-dimensional construction simulation emulation, for reporting real-time progress and progress point to owner, higher authority Prediction case is analysed, and realizes three-dimensional display function, allows inspection to be more clear clear.It passes the flood period simultaneously for controlling flood, with locality The departments such as immigration office, flood prevention office realize linkage, instruct emergency evacuation.
Detailed description of the invention
A kind of Construction of Rolled Concrete Dam intelligent management system structure chart Fig. 1 of the invention;
The stock ground Fig. 2 area job engineering schematic diagram;
Fig. 3 mix area job engineering schematic diagram;
The rinsing area Fig. 4 job engineering schematic diagram;
Fig. 5 concrete mixing is to unloading work flow chart;
The stock ground Fig. 6 area, mix-rinsing area division of duty schematic diagram;
Fig. 7 storehouse surface area, Construction simulation simulation region division of duty schematic diagram.
Specific embodiment
Present invention will be further explained below with reference to the attached drawings and examples, but not as any limitation of the invention.
Please refer to Fig. 1-Fig. 7: a kind of Construction of Rolled Concrete Dam intelligent management system of the invention, including site operation pipe Manage area, Construction simulation simulation region.Wherein site construction management area includes that management platform is stacked in aggregate production screening, concrete is mixed Conjunction-vehicle rinsing management platform, concrete construction manage platform;Construction simulation simulation region includes construction simulation emulation module, reality Progress record module.Further, management platform is stacked in aggregate production screening, including aggregate produces-be crushed module, aggregate screening Heap amplification module.Concrete mixing-vehicle rinsing manages platform, including mix area module, rinsing area module.As shown in Figure 1.
Wherein, aggregate produces-is crushed module and is implemented: construction party stock ground manager periodically and irregularly checks stock ground Situation is exploited, whether analysis raw material is qualified, and actual conditions are entered into mobile terminal by stock ground manager, then clicks and is sent to always Turn-key projects manager, if raw material is undesirable, EPC Project manager will receive mobile terminal sound prompting, in time after review Information is conveyed at geology responsible person, provides decision by geology responsible person;Aggregate produces-is crushed module and plays information reception, letter The function that breath records and analyzes, starts alert program, transmitting signal.
Specifically, disposing sensitive scanning device GL in crusher region, the personal working information two dimensional code of placement, works as induction on vehicle After scanner GL senses that dumper reaches specified discharge region, sensitive scanning device GL arrived car number, vehicle specified The information such as region, driver's working time are automatically sent to aggregate and produce-be crushed module, and one side aggregate produces-be crushed module will Voice reminder is sent to mix area manager, haul driver, informs that vehicle arrived specified discharge region;On the other hand, work as driver Same day cumulative operation time is more than limit value, and aggregate produces-is crushed module starting intelligent alarm program, passes through to EPC Project Reason, construction party sole duty security official, haul driver send voice reminder, reach supervisory role, guarantee that driver safety drives.
In addition, it is also necessary to dispose sensitive scanning device BH in mixing building blanking region, the personal working information two dimension of placement on vehicle Code, after sensitive scanning device BH senses that dumper reaches mixing building blanking region, sensitive scanning device BH is by car number, vehicle It arrived the information such as information, driver's working time in specified region and be automatically sent to mix block module, one side mix area mould Block will be handled to mix area, haul driver sends voice reminder, inform that vehicle arrived specified blanking region;On the other hand, when Cumulative operation time is more than limit value on the day of driver, and mix area module starts intelligent alarm program, to EPC Project manager, is applied Work side's sole duty security official, haul driver send voice reminder, reach supervisory role, guarantee that driver safety drives.
When the discharging of secondary concrete finishes, when secondary charging, bin stock, ingredient, mix, discharging whole process information are mixed automatically It closes building console to collect, is sent to mix area module, when there is non-standard operation, mix area module will start alert program, to Management, EPC Project manager, mix area manager send warning message, reach supervisory role.
When the discharging of secondary concrete finishes, if having machine outlet testing inspection, testing crew is under the supervision of management, to mix Area's module sends the signal for starting sample detection, and mix area module is after receiving testing inspection information, in time to transport driver's language Sound broadcasts the information of " please wait testing inspection ";If same day machine outlet testing inspection has been done, mix area module is directly to transport department The information of machine voice broadcast " blanking finishes, and please set out ".
Machine outlet sample detection is once mix block module will record the lower sample detection time, when sample detection Between be more than limit value, mix area module will start alert program, send warning message to testing crew in time, supervise and make the best use of time Complete test;After equal tests are finished, testing crew, which is pressed, to be terminated the instruction of detection and is sent to mix area module, mix area module to Construction party quality inspection manager, EPC Project manager, management send the order for waiting signature audit, if test data relevant parameter four Side has identical ideas, and mix area module sends the order for agreeing to construction;If at sixes and sevens, mix area module will start journey of alarming Sequence will send the instruction that cannot be used for construction to construction party quality inspection manager, EPC Project manager, management, by management, over contract Shared Decision Making is handled in project manager, construction party quality inspection, in favor of solving the problems, such as concrete mixing amount of substance in time.
Rinsing area module is implemented: disposing sensitive scanning device CX rinsing region, the personal working letter of placement on vehicle Two dimensional code is ceased, after sensitive scanning device CX senses that dumper reaches flushing region, vehicle arrived finger by sensitive scanning device CX Determine the information such as region and be automatically sent to rinsing area module, one side rinsing area module will send voice reminder to haul driver and " arrive Up to flushing region " information;On the other hand, rinsing area module transmits a signal to flushing inductor, starts the function of intelligent wash vehicle Energy;Limit value is arranged in washing time, and after washing time arrives, tap is closed, and rinsing area module is sent out to transport driver's mobile terminal 3 Deliver letters breath, 3 voice broadcast of mobile terminal " flushing finishes, and starts to set out, vehicle transport be × grading concrete, × area please be arrive Discharging ", while information is sent to storehouse surface person in charge of the technology aspect mobile terminal 4, " × vehicle drives towards storehouse surface × area to voice broadcast, please carry out Storehouse surface discharging commander prepares ".
Concrete construction management platform is implemented: testing crew starts before doing same day storehouse surface concrete test detection, Under the supervision of management, the signal for starting sample detection, storehouse surface test sampling detection are sent to concrete construction management console module Once it is more than limit value when the sample detection time, storehouse surface is applied that concrete construction management platform, which will record the lower sample detection time, Work manages platform and starts alert program, sends warning message to testing crew in time, supervises and makes the best use of time to complete test;Deng test After finishing, testing crew, which is pressed, to be terminated the instruction of detection and is sent to concrete construction management platform, and concrete construction manages platform to applying Work side's quality inspection manager, EPC Project manager, management send the order for waiting signature audit, if test data relevant parameter four directions It has identical ideas, concrete construction manages platform and sends the order for agreeing to construction;If at sixes and sevens, concrete construction manages platform starting Alert program sends the instruction that cannot be used for construction to construction party quality inspection manager, EPC Project manager, management, by management, always Shared Decision Making is handled in turn-key projects manager, construction party quality inspection, in favor of solving the problems, such as grinding coagulation soil correlated quality in time.
Concrete construction manages in platform, and number of rolling is recorded by road roller sensor, real-time data transmission to storehouse Surface construction manages platform, if number of rolling reaches, concrete construction manages platform to compactor operator, concrete construction manager, management Voice broadcast, which rolls, completes information.
Actual progress logging modle, the submodule in inside connection site construction management area, collects all real-time progress datas, Progress data can be shown by different time unit (day, the moon, year etc.).
Construction simulation emulation module is learnt according to real-time progress record module, has the function of prediction progress, and combine BIM threedimensional model carries out simulative calculation of construction.It can link with hydrologic monitoring, meteorological department, there is warning function of passing the flood period of controlling flood.
It is above specific application example of the invention, there are other embodiments of the invention, all to use equivalent replacement Or the technical solution that equivalent transformation is formed, it all falls within protection scope of the presently claimed invention.

Claims (10)

1. a kind of Construction of Rolled Concrete Dam intelligent management system, it is characterised in that: including site construction management area, Construction simulation Simulation region;Management platform, concrete mixing-vehicle rinsing are stacked in the site construction management area, including aggregate production screening Manage platform, concrete construction manages platform;Management platform is stacked in the described aggregate production screening, including aggregate produce-be crushed mould Block, aggregate screening heap amplification module;The concrete mixing-flushing pipe platform includes mix area module, rinsing area module;Institute State Construction simulation simulation region, including construction simulation emulation module, actual progress logging modle.
2. Construction of Rolled Concrete Dam intelligent management system according to claim 1, it is characterised in that: the aggregate is raw Produce-be crushed the function that module receives for realizing information, information records and analyzes, starts alert program, transmits signal.
3. Construction of Rolled Concrete Dam intelligent management system according to claim 2, it is characterised in that: the aggregate is raw Producing-be crushed module is such building and implements: disposing sensitive scanning device GL in crusher region, personal working letter is disposed on vehicle Two dimensional code is ceased, after sensitive scanning device GL senses that dumper reaches specified discharge region, sensitive scanning device GL will include vehicle Number, vehicle arrived specified region, the information of driver's working time is automatically sent to aggregate and produces-be crushed module, on the one hand Aggregate, which produces-be crushed module, will send voice reminder, inform that vehicle arrived specified discharge region;On the other hand, when driver works as Its cumulative operation time is more than limit value, and aggregate produces-be crushed module starting intelligent alarm program.
4. Construction of Rolled Concrete Dam intelligent management system according to claim 1, it is characterised in that: the mix area Module is such building and implements: disposing sensitive scanning device BH in mixing building blanking region, the personal working information of placement on vehicle Two dimensional code, after sensitive scanning device BH senses that dumper reaches mixing building blanking region, sensitive scanning device BH will include vehicle Number, vehicle arrived the information in specified region, the information of driver's working time is automatically sent to mix block module, on the one hand Mix area module will send voice reminder, inform that vehicle arrived specified blanking region;On the other hand, add up work on the day of driver Make the time more than limit value, mix area module starts intelligent alarm program.
5. Construction of Rolled Concrete Dam intelligent management system according to claim 4, it is characterised in that: the mix area The building and implementation method of module further include: when the discharging of secondary concrete finishes, when secondary charging, bin stock, ingredient, mix, discharging Whole process information is collected by mixing building console automatically, is sent to mix area module, when there is non-standard operation, mix area mould Block will start alert program.
6. Construction of Rolled Concrete Dam intelligent management system according to claim 4, it is characterised in that: the mix area The building and implementation method of module further include: machine outlet sample detection is once mix block module will record lower sampling inspection The time is surveyed, is more than limit value when the sample detection time, mix area module will start alert program, send report to testing crew in time Alert information;After equal tests are finished, testing crew, which is pressed, to be terminated the instruction of detection and is sent to mix area module, and mix area module is to phase Guan Fang sends the order for waiting signature audit, if test data relevant parameter each side has identical ideas, mix area module, which is sent, to be agreed to The order of construction;If at sixes and sevens, mix area module will start alert program.
7. Construction of Rolled Concrete Dam intelligent management system according to claim 1, it is characterised in that: the rinsing area Module is such building and implements: region placement sensitive scanning device CX is being rinsed, the personal working information two dimensional code of placement on vehicle, After sensitive scanning device CX senses that dumper reaches flushing region, vehicle arrived specified region etc. by sensitive scanning device CX to be believed Breath is automatically sent to rinsing area module, and one side rinsing area module sends voice reminder vehicle and reaches flushing area information;It is another Aspect, rinsing area module transmit a signal to flushing inductor, start the function of intelligent wash vehicle;Washing time setting limits Value, after washing time arrives, tap is closed, and rinsing area module sends information to related side's mobile terminal and carries out voice broadcast.
8. Construction of Rolled Concrete Dam intelligent management system according to claim 1, it is characterised in that: the storehouse surface is applied Work management platform is such building and implements: testing crew starts before doing same day storehouse surface concrete test detection, applies to storehouse surface Work manages console module and sends the signal for starting sample detection, and storehouse surface test sampling detection is once concrete construction management is flat Platform records the sample detection time, is more than limit value when the sample detection time, and concrete construction manages platform and starts alert program, and When to testing crew send warning message, supervise make the best use of time complete test;
After equal tests are finished, testing crew presses the instruction for terminating to detect and is sent to concrete construction management platform, concrete construction pipe Platform sends the order for waiting signature audit to related side, if test data relevant parameter each side has identical ideas, concrete construction It manages platform and sends the order for agreeing to construction;If at sixes and sevens, concrete construction manages platform and starts alert program.
9. Construction of Rolled Concrete Dam intelligent management system according to claim 8, it is characterised in that: the storehouse surface is applied The building and implementation method of work management platform further include: number of rolling is recorded by road roller sensor, and data pass in real time Defeated to manage platform to concrete construction, if number of rolling reaches, concrete construction manages platform and passes through to compactor operator, concrete construction Reason, management voice broadcast roll and complete information.
10. Construction of Rolled Concrete Dam intelligent management system according to claim 1, it is characterised in that: construction simulation is imitative True module is learnt according to real-time progress record module, realizes prediction progress function, and construct in conjunction with BIM threedimensional model Simulation calculation;Warning function of passing the flood period of controlling flood is realized in construction simulation emulation module and hydrologic monitoring, meteorological department's linkage.
CN201810671771.1A 2018-06-26 2018-06-26 A kind of Construction of Rolled Concrete Dam intelligent management system Pending CN108984858A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810671771.1A CN108984858A (en) 2018-06-26 2018-06-26 A kind of Construction of Rolled Concrete Dam intelligent management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810671771.1A CN108984858A (en) 2018-06-26 2018-06-26 A kind of Construction of Rolled Concrete Dam intelligent management system

Publications (1)

Publication Number Publication Date
CN108984858A true CN108984858A (en) 2018-12-11

Family

ID=64538908

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810671771.1A Pending CN108984858A (en) 2018-06-26 2018-06-26 A kind of Construction of Rolled Concrete Dam intelligent management system

Country Status (1)

Country Link
CN (1) CN108984858A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110488782A (en) * 2019-08-26 2019-11-22 中电建路桥集团有限公司 Cement concrete batching plant back court intelligent monitor system based on BIM platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110488782A (en) * 2019-08-26 2019-11-22 中电建路桥集团有限公司 Cement concrete batching plant back court intelligent monitor system based on BIM platform

Similar Documents

Publication Publication Date Title
CN102139700B (en) Vehicle working condition online monitoring system for rail transit
CN108805441A (en) power emergency command system
CN101582198B (en) Real-time monitoring method for construction quality of core rockfill dam
CN106375027A (en) Intelligent cloud monitoring system and method for radio
CN110262355A (en) Intelligent mine management system and method based on intelligent mine control platform
CN110703709A (en) Smart environmental sanitation cloud platform integrated management system
CN103116825A (en) Intelligent city management system
CN101445122A (en) System of urban track traffic for passenger flow monitor and emergency evacuation
CN103116917B (en) A kind of public transport intelligent parking field control method based on GPS
CN105564465A (en) System and method for controlling maintenance operation of railway electrical service signal equipment
CN202720264U (en) Remote monitoring system for electricity consumption
CN111860960A (en) Prediction pre-control cloud smart supervision sharing platform based on big data internet and block chain
CN112488667A (en) Industrial solid waste overall process real-time monitoring system and method
CN206077596U (en) A kind of urban flooding monitors scheduling system on-line
CN110284503B (en) Construction control method for preventing cold joint in large-volume concrete pouring
CN102147604A (en) Integrated system and method for monitoring mix proportion
CN106774322A (en) A kind of photovoltaic plant cruising inspection system and its operation method
CN110782214A (en) Intelligent supervision system applied to construction waste recovery treatment
CN106302758A (en) Supervision department's management informationalized to demolition site system and using method thereof
CN210466599U (en) Electric power construction site recognition alarm system violating regulations
CN206584222U (en) A kind of supercentral station's centralized monitoring system
CN106527328A (en) Sanitation vehicle and operation equipment intelligent management system
CN108984858A (en) A kind of Construction of Rolled Concrete Dam intelligent management system
CN112230617A (en) Integrated industrial intelligent management and control system
CN106483919A (en) A kind of Domestic Waste Collection fortune compression control method and control system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination