CN108979105A - A kind of climbing type CONSTRUCTION OPERATIONS platform - Google Patents

A kind of climbing type CONSTRUCTION OPERATIONS platform Download PDF

Info

Publication number
CN108979105A
CN108979105A CN201810813421.4A CN201810813421A CN108979105A CN 108979105 A CN108979105 A CN 108979105A CN 201810813421 A CN201810813421 A CN 201810813421A CN 108979105 A CN108979105 A CN 108979105A
Authority
CN
China
Prior art keywords
welded
motor
type construction
fixed block
operations platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810813421.4A
Other languages
Chinese (zh)
Inventor
孙军
杨泓斌
张亮亮
黄万禧
刘博�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Bozhilin Robot Co Ltd
Original Assignee
Green Mountain High Tech Construction Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Green Mountain High Tech Construction Technology Co Ltd filed Critical Green Mountain High Tech Construction Technology Co Ltd
Priority to CN201810813421.4A priority Critical patent/CN108979105A/en
Publication of CN108979105A publication Critical patent/CN108979105A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/18Scaffolds primarily resting on the ground adjustable in height

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention proposes a kind of climbing type CONSTRUCTION OPERATIONS platform, including pedestal, the base top surface is welded with the first fixed plate, first fixed plate, one side surface offers sliding slot, third fixed block is welded at the top of the base inner wall, third motor has been bolted to connection at the top of the third fixed block, the third motor output end has been connected by key rotating disc, the first screw rod is welded at the rotating disc top center axis, first screw rod one end passes through pedestal, first screw rod has been connected through a screw thread casing, described sleeve pipe side is welded with the first fixed block, first fixed plate side offers sliding slot, it can be taken the article on ground by this device, save the time, improve working efficiency, job schedule will not be interrupted.

Description

A kind of climbing type CONSTRUCTION OPERATIONS platform
Technical field
The present invention relates to Architectural Equipment technical fields, and in particular to a kind of climbing type CONSTRUCTION OPERATIONS platform.
Background technique
As the improvement of people's living standards, more and more buildings are built out, in order to supervise construction and be Management construction, so there is a kind of climbing type CONSTRUCTION OPERATIONS platform.
But existing climbing type CONSTRUCTION OPERATIONS platform, when operator moves high-altitude, discovery also some works Tool is forgotten on ground or needs replacing article, and people need to reduce climbing type CONSTRUCTION OPERATIONS platform, it is done so that, wave It is time-consuming, reduce working efficiency.
Summary of the invention
In view of the above-mentioned problems, the present invention proposes a kind of climbing type CONSTRUCTION OPERATIONS platform, pass through third motor, rotation The components composed structures such as disk, lifting frame, the first fixed plate, the first screw rod, the first fixed block, this structure can make to go up and down frame certainly By moving up and down, in addition this device passes through the components groups such as first gear, second gear, the first placement plate, rubber block, spur rack At structure, this structure can make operator when operating on going up and down frame, can be taken by this device in the air high The article on ground saves the time, improves working efficiency, will not interrupt job schedule.
The present invention proposes a kind of climbing type CONSTRUCTION OPERATIONS platform, including pedestal, and the base top surface is welded with First fixed plate, one side surface of the first fixed plate offers sliding slot, is welded with third fixed block at the top of the base inner wall, described It is bolted to connection third motor at the top of third fixed block, the third motor output end has been connected by key rotation Disk, the first screw rod is welded at the rotating disc top center axis, and first screw rod one end passes through pedestal, first screw rod It is connected through a screw thread casing, described sleeve pipe side is welded with the first fixed block, and first fixed plate side offers sliding slot.
Further improvement lies in that: first fixed block side is welded with lifting frame, and first fixed plate side opens up There is sliding slot, sliding slot inside is by slidably connecting lifting frame.
Further improvement lies in that: the second fixed block, the second fixed block top are welded at the top of the lifting frame inner wall It is bolted to connection first motor, the first motor output end has been connected by key connecting rod, the connecting rod one End is welded with second gear, and lifting frame inner wall bottom has been bolted to connection the second battery, and first motor passes through Electric wire is connected with the second battery.
Further improvement lies in that: the lifting frame two sides are welded with kelly, and described kelly one end is provided with sliding Plate, the sliding panel side are welded with the second placement plate, and the first electricity has been bolted to connection at the top of second placement plate Machine and the first battery, the first motor output end have been connected by key first gear, and the first motor is connected by electric wire It is connected to the first battery.
Further improvement lies in that: the sliding panel side is opened up there are two notch, and one of notch inner wall is carved with tooth, institute It states second gear and sliding panel notch inner wall is intermeshed.
Further improvement lies in that: the sliding panel side offers sliding slot, and sliding slot is interior by slidably connecting the first placement Plate, the first placement plate top are welded with spur rack, and spur rack and first gear are intermeshed.
Further improvement lies in that: the sliding panel side offers sliding slot, and sliding slot is interior by slidably connecting the first placement Plate.
Further improvement lies in that: it is welded with spur rack at the top of first placement plate, spur rack is mutually nibbled with first gear It closes.
Further improvement lies in that: first fixed block two sides are welded with the first depending post, and first depending post one end extends To one side chute of the first fixed plate.
Beneficial effects of the present invention: the present invention passes through third motor, rotating disc, lifting frame, the first fixed plate, the first spiral shell The components composed structures such as bar, the first fixed block, this structure, which can make to go up and down frame, freely to move up and down, and in addition this device passes through the The components composed structures such as one gear, second gear, the first placement plate, rubber block, spur rack, this structure can make operator When being operated on going up and down frame, it can be taken the article on ground by this device in the air high, save the time, improve work Efficiency will not interrupt job schedule.
Detailed description of the invention
Fig. 1 is whole structural schematic diagram of the invention;
Fig. 2 is the structural schematic diagram of sliding panel of the invention;
Fig. 3 be casing of the invention, the first fixed block, the first fixed plate overlooking structure diagram.
In figure: 1 pedestal, 2 first fixed plates, 3 rubber blocks, 4 first placement plates, 5 sliding panels, 6 second placement plates, 7 first Motor, 8 first gears, 9 first batteries, 10 first fixed blocks, 11 first motors, 12 connecting rods, 13 second fixed blocks, 14 Two batteries, 15 first screw rods, 16 rotating discs, 17 third motors, 18 third fixed blocks, 19 lifting frames, 20 casings, 21 straight-tooth Item, 22 second gears.
Specific embodiment
In order to deepen the understanding of the present invention, the present invention is further described below in conjunction with embodiment, the present embodiment For explaining only the invention, it is not intended to limit the scope of the present invention..
A kind of climbing type CONSTRUCTION OPERATIONS platform according to shown in Fig. 1-3, including pedestal 1,1 top surface of pedestal It is welded with the first fixed plate 2,2 one side surface of the first fixed plate offers sliding slot, it is solid that third is welded at the top of 1 inner wall of pedestal Determine block 18, third motor 17,17 output end of third motor have been bolted to connection at the top of the third fixed block 18 It has been connected by key rotating disc 16, has been welded with the first screw rod 15, first screw rod 15 at the 16 top center axis of rotating disc One end passes through pedestal 1, and first screw rod 15 has been connected through a screw thread casing 20, and it is fixed that 20 side of described sleeve pipe is welded with first Block 10,2 side of the first fixed plate offer sliding slot, and 10 two sides of the first fixed block are welded with the first depending post, and first Depending post one end extends to inside 2 one side chute of the first fixed plate.
In the present embodiment: 10 side of the first fixed block is welded with lifting frame 19, and 2 side of the first fixed plate offers Sliding slot, sliding slot inside guarantee that lifting frame 19 is moved along orbital direction, guarantee lifting frame 19 by slidably connecting lifting frame 19 Motion profile be straight line.
In the present embodiment: the second fixed block 13,13 top of the second fixed block are welded at the top of lifting 19 inner wall of frame It is bolted to connection first motor 11,11 output end of first motor has been connected by key connecting rod 12, the company 12 one end of extension bar is welded with second gear 22, and the 19 inner wall bottom of lifting frame has been bolted to connection the second battery 14, first motor 11 is connected with the second battery 14 by electric wire.
In the present embodiment: lifting 19 two sides of frame are welded with kelly, and described kelly one end is provided with sliding panel 5, described 5 side of sliding panel is welded with the second placement plate 6, be bolted to connection at the top of second placement plate 6 first motor 7 and First battery 9,7 output end of first motor have been connected by key first gear 8, and the first motor 7 is connected by electric wire It is connected to the first battery 9.
In the present embodiment: 5 side of sliding panel is opened up there are two notch, and one of notch inner wall is carved with tooth, and described the Two gears 22 are intermeshed with 5 notch inner wall of sliding panel, drive sliding panel 5 to move downward by second gear 22.
In the present embodiment: 5 side of sliding panel offers sliding slot, and sliding slot is interior by slidably connecting the first placement plate 4.
In the present embodiment: spur rack 21 is welded at the top of the first placement plate 4, spur rack 21 is mutually nibbled with first gear 8 It closes.
In the present embodiment: 10 two sides of the first fixed block are welded with the first depending post, and first depending post one end extends to Inside one fixed plate, 2 one side chute.
Beneficial effects of the present invention: the present invention by third motor 17, rotating disc 16, lifting frame 19, the first fixed plate 2, The components composed structures such as the first screw rod 15, the first fixed block 10, this structure can make lifting frame 19 freely move up and down, in addition This device passes through the components composed structures such as first gear 8, second gear 22, the first placement plate 4, rubber block 3, spur rack 21, This structure can make operator when operating on going up and down frame 19, can be taken ground by this device in the air high Article saves the time, improves working efficiency, will not interrupt job schedule.
Working principle: connection power supply starts third motor 17, and third motor 17 drives rotating disc 16 to rotate, rotating disc 16 The first screw rod 15 is driven to rotate, the first screw rod 15 drives the first fixed block 10 to move upwards, and the first fixed block 10 drives lifting frame 19 move upwards, and lifting frame 19 is moved along 2 one side chute direction of the first fixed plate, when going up and down the arrival suitable position of frame 19, Stop third motor 17 rotate, when need to take ground instrument when, in order to save time, improve working efficiency, keep work into Degree starts first motor 11 by remote controler, and first motor 11 drives second gear 22 to rotate, and second gear 22 drives sliding Plate 5 moves downward, and when rubber block 3 touches ground, stops first motor 11 by remote controler and rotates, by remote controler, open Dynamic first motor 7, first motor 7 drive first gear 8 to rotate, and first gear drives spur rack 21 to move upwards, spur rack 21 Movement in 4 flying formation of geese sliding panel of the first placement plate, 5 one side chute is driven, when the first placement plate 4 reaches lifting 19 side through hole of frame When, operator is by 4 one side through hole of placement plate, the article taken in the first placement plate 4, this device can save the time, mention High working efficiency keeps job schedule, and the tool for being placed on ground can be taken by greatly facilitating staff.
In the description of the present invention, it is to be understood that, term " center ", " longitudinal direction ", " transverse direction ", " length ", " width ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside", " up time The orientation or positional relationship of the instructions such as needle ", " counterclockwise " is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of The description present invention and simplified description, rather than the equipment of indication or suggestion meaning or element must have a particular orientation, with spy Fixed orientation construction and operation, therefore be not considered as limiting the invention.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include one or more of the features.In the description of the present invention, the meaning of " plurality " is two or more, Unless otherwise specifically defined.
The basic principles, main features and advantages of the invention have been shown and described above.The technical staff of the industry should Understand, the present invention is not limited to the above embodiments, and the above embodiments and description only describe originals of the invention Reason, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes and improvements It all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appended claims and its equivalent circle It is fixed.

Claims (8)

1. a kind of climbing type CONSTRUCTION OPERATIONS platform, it is characterised in that: including pedestal (1), pedestal (1) the top surface weldering It is connected to the first fixed plate (2), (2) one side surface of the first fixed plate offers sliding slot, and the is welded at the top of pedestal (1) inner wall Three fixed blocks (18), third fixed block (18) top have been bolted to connection third motor (17), the third electricity Machine (17) output end has been connected by key rotating disc (16), is welded with the first screw rod at rotating disc (16) the top center axis (15), described first screw rod (15) one end passes through pedestal (1), and first screw rod (15) has been connected through a screw thread casing (20), Described sleeve pipe (20) side is welded with the first fixed block (10), and the first fixed plate (2) side offers sliding slot.
2. a kind of climbing type CONSTRUCTION OPERATIONS platform according to claim 1, it is characterised in that: first fixed block (10) side is welded with lifting frame (19), and the first fixed plate (2) side offers sliding slot, passes through inside sliding slot and be slidably connected There are lifting frame (19).
3. a kind of climbing type CONSTRUCTION OPERATIONS platform according to claim 2, it is characterised in that: the lifting frame (19) It is welded with the second fixed block (13) at the top of inner wall, has been bolted to connection first motor at the top of second fixed block (13) (11), first motor (11) output end has been connected by key connecting rod (12), and described connecting rod (12) one end is welded with Two gears (22), lifting frame (19) the inner wall bottom have been bolted to connection the second battery (14), first motor (11) the second battery (14) are connected with by electric wire.
4. a kind of climbing type CONSTRUCTION OPERATIONS platform according to claim 2, it is characterised in that: the lifting frame (19) Two sides are welded with kelly, and described kelly one end is provided with sliding panel (5), and sliding panel (5) side is welded with the second placement Plate (6), the second placement plate (6) top has been bolted to connection first motor (7) and the first battery (9), described First motor (7) output end has been connected by key first gear (8), and the first motor (7) is connected with the first storage by electric wire Battery (9).
5. a kind of climbing type CONSTRUCTION OPERATIONS platform according to claim 4, it is characterised in that: the sliding panel (5) Side is opened up there are two notch, and one of notch inner wall is carved with tooth, the second gear (22) and sliding panel (5) notch inner wall Intermeshing.
6. a kind of climbing type CONSTRUCTION OPERATIONS platform according to claim 4, it is characterised in that: the sliding panel (5) Side offers sliding slot, and sliding slot is interior by slidably connecting the first placement plate (4).
7. a kind of climbing type CONSTRUCTION OPERATIONS platform according to claim 6, it is characterised in that: first placement plate (4) top is welded with spur rack (21), and spur rack (21) and first gear (8) are intermeshed.
8. a kind of climbing type CONSTRUCTION OPERATIONS platform according to claim 4, it is characterised in that: first fixed block (10) two sides are welded with the first depending post, and first depending post one end extends to inside (2) one side chute of the first fixed plate.
CN201810813421.4A 2018-07-23 2018-07-23 A kind of climbing type CONSTRUCTION OPERATIONS platform Pending CN108979105A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810813421.4A CN108979105A (en) 2018-07-23 2018-07-23 A kind of climbing type CONSTRUCTION OPERATIONS platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810813421.4A CN108979105A (en) 2018-07-23 2018-07-23 A kind of climbing type CONSTRUCTION OPERATIONS platform

Publications (1)

Publication Number Publication Date
CN108979105A true CN108979105A (en) 2018-12-11

Family

ID=64549667

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810813421.4A Pending CN108979105A (en) 2018-07-23 2018-07-23 A kind of climbing type CONSTRUCTION OPERATIONS platform

Country Status (1)

Country Link
CN (1) CN108979105A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201056828Y (en) * 2007-06-26 2008-05-07 中国建筑第七工程局有限公司 Liftable worktable for building construction
CN206599976U (en) * 2017-03-03 2017-10-31 衢州伟仕工业产品设计有限公司 A kind of lifting platform for building
CN206707233U (en) * 2017-05-19 2017-12-05 国家电网公司 A kind of movable building construction support
CN107762129A (en) * 2017-10-18 2018-03-06 北京城建长城建筑装饰工程有限公司 Furred ceiling hoisting frame
CN207122115U (en) * 2017-06-21 2018-03-20 温州市林鸥工程建设监理有限公司 A kind of construction site scaffold easy to use

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201056828Y (en) * 2007-06-26 2008-05-07 中国建筑第七工程局有限公司 Liftable worktable for building construction
CN206599976U (en) * 2017-03-03 2017-10-31 衢州伟仕工业产品设计有限公司 A kind of lifting platform for building
CN206707233U (en) * 2017-05-19 2017-12-05 国家电网公司 A kind of movable building construction support
CN207122115U (en) * 2017-06-21 2018-03-20 温州市林鸥工程建设监理有限公司 A kind of construction site scaffold easy to use
CN107762129A (en) * 2017-10-18 2018-03-06 北京城建长城建筑装饰工程有限公司 Furred ceiling hoisting frame

Similar Documents

Publication Publication Date Title
CN212095745U (en) Building wood processing device
CN207016289U (en) A kind of height-adjustable twisted and released of the cable frame
CN108581612A (en) A kind of lathe cuts retracting device with iron
CN208977989U (en) A kind of cutter device of construction material processing
CN113070282A (en) Milling machine is clean with dust extraction that can go up and down to stretch
CN209045005U (en) A kind of urban planning layout displaying device
CN213856235U (en) Hubei province brokenly machine with dust removal mechanism
CN108979105A (en) A kind of climbing type CONSTRUCTION OPERATIONS platform
CN216785114U (en) Vertical screw car unloader with dust fall function
CN211827872U (en) Model display device for architectural design
CN215029531U (en) Prevent partition panel of stifled type cement mill
CN208467898U (en) A kind of lathe cuts recyclable device with iron
CN116717303B (en) Tunnel construction equipment
CN218624205U (en) Survey and use drilling equipment
CN218361133U (en) Feed inlet clearance instrument
CN108748417A (en) A kind of Furniture manufacturing plank drilling equipment
CN204522565U (en) The air outlet structure of air purifier and air purifier
CN219491645U (en) Construction engineering support convenient to operate
CN207656978U (en) A kind of rectilinear cutter device of aerated bricks
CN220477971U (en) Lifting rigid smoke-blocking vertical wall
CN213290903U (en) A workstation for granite processing equipment
CN213159814U (en) But angle regulation's dust collector for construction
CN216246894U (en) Position adjustable factory environment protection monitoring device uses operating mode machine
CN220639864U (en) A remove bracket for aerated concrete block
CN218671448U (en) Visual management and control integration mechanism for electric power engineering field supervision

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190930

Address after: 528300 East Office Building 201-11, No. 11 Junye East Road, Beijiao Town, Shunde District, Foshan City, Guangdong Province

Applicant after: Guangdong Bozhilin Robot Co., Ltd.

Address before: 519000 -46218, 105 room 6, Baohua Road, Hengqin New District, Zhuhai, Guangdong (centralized office area)

Applicant before: Green mountain high tech Construction Technology Co., Ltd.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20181211

RJ01 Rejection of invention patent application after publication