CN201056828Y - Liftable worktable for building construction - Google Patents

Liftable worktable for building construction Download PDF

Info

Publication number
CN201056828Y
CN201056828Y CNU2007200908407U CN200720090840U CN201056828Y CN 201056828 Y CN201056828 Y CN 201056828Y CN U2007200908407 U CNU2007200908407 U CN U2007200908407U CN 200720090840 U CN200720090840 U CN 200720090840U CN 201056828 Y CN201056828 Y CN 201056828Y
Authority
CN
China
Prior art keywords
guardrail
working platform
movable rail
adjacent
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200908407U
Other languages
Chinese (zh)
Inventor
焦安亮
黄延铮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CNU2007200908407U priority Critical patent/CN201056828Y/en
Application granted granted Critical
Publication of CN201056828Y publication Critical patent/CN201056828Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forklifts And Lifting Vehicles (AREA)

Abstract

A lifting working platform for building operation comprises a pedestal. Wheels are arranged below the pedestal, a lifting canister having internal screw thread is fixed at the central position of the pedestal, a lifting rod having external screw thread is arranged in the lifting canister, the upper end surface of the lifting rod is fixed at the center of the lower bottom surface of the working platform, a protection fence is arranged at the periphery of the working platform, one of the protection fence is movable, one end of the movable protection fence is hinged with one lateral surface of the working platform, the other end of the movable protection fence is movably connected with the adjacent protection fence, 1 to 4 transverse baffles are arranged on the movable protection fence, and the height of the protection hence is lower than that of the lifting canister. The working platform can not only travel freely, but also adjust the height of the working platform. In addition, one end of one of the protection fences at the periphery of the working platform is hinged with the working platform, and the other end is movably connected with the adjacent protection fence. The utility model has simple and compact appearance, thus being particularly suitable for indoor construction.

Description

The liftable workbench that a kind of building operations is used
Technical field
The utility model belongs to auxiliary equipment used in the building operations.
Background technology
In the building construction process, after with brick the house having been built, also has very big workload, as to interior wall and roof with the mud powder with coat etc., when carrying out these work, the operator need construct in the scope of 0-3 rice, the operator may stand on the ground and constructs in the scope of 0-2 rice, but be higher than the construction of 2 meters parts, must use shelf, adopt scaffold at present mostly.Scaffold not only loads and unloads trouble, and need shift from one place to another in the house, increased workman's workload, reduced operating efficiency, for fear of present this situation, the patent No. is to have disclosed a kind of building finishing dolly in 01251626.0 the patent documentation, this dolly is that lifting motor is housed below workbench, and lifting motor is connected with elevating mechanism, and elevating mechanism comprises reduction box and lifting screw rod, cuts the fork member, movable motor also is housed on car, and wheel is equipped with in the base below of car.This building finishing dolly can arbitrarily move according to the finishing place, and oscilaltion as required, uses easily.But this dolly is except that having one set of lifting mechanism, and two motors also need be arranged; Therefore not only weight is big for dolly, and the cost height.
Summary of the invention
The purpose of this utility model provides a kind of simple in structure, and is easy to use, is applicable to the working a kind of liftable workbench of building in the house.
The purpose of this utility model is achieved through the following technical solutions: the liftable workbench that this building operations is used, comprise base, wheel is equipped with in base bottom, be fixed with tapped lifting tube on the center of base, be equipped with in the lifting tube and be with externally threaded elevating lever, the upper surface of elevating lever is fixed on the center of working plate bottom surface, the periphery of working plate is equipped with guardrail, wherein one is movable rail, a side of its end and working plate is hinged, the other end and adjacent guardrail flexible connection are fixed with 1-4 bar transverse baffle on the movable rail, the height of guardrail is less than the height of lifting tube.
The height of lifting tube is 50-60cm, and the length of elevating lever is 65-75cm.
Be equipped with the hole on the sidewall of the other end of movable rail, be fixed with the pin-fin tube concentric on the sidewall of the guardrail that is adjacent, when movable rail and adjacent guardrail snap together, in pin-fin tube and hole, be inserted with same bearing pin with the hole.
Wherein on the sidewall of the other end of a guardrail hook is housed, on the sidewall of the guardrail that is adjacent fixing hole is arranged, when movable rail and adjacent guardrail snap together, hook in the fixing hole.
Because wheel is arranged at this workbench bottom, be fixed with tapped lifting tube on the center of base, be equipped with in the lifting tube and be with externally threaded elevating lever, therefore not only arbitrarily walking of workbench, and can regulate the height of workbench with rotatablely moving between lifting tube and the elevating lever, an end and the working plate of a guardrail is hinged in the guardrail of working plate periphery in addition, the other end and adjacent guardrail flexible connection, and be fixed with 1-3 bar transverse baffle on this piece guardrail, after overturning, the guardrail direction can use it as ladder, therefore after the constructor is raised to certain altitude to workbench, and he is need go up lower table the time, only need to get final product up and down along ladder, therefore this workbench is very easy to use; Owing in whole construction course, avoided the number of times of unnecessary self-powered platform, the wearing and tearing of lifting tube and elevating lever in the utility model have been reduced, increased its application life, and when workbench does not use, ladder can snap together with guardrail again, and this utility model is seemed, and outward appearance is simply compact.Because indoor height is generally in 3 meters scopes, so it is highly suitable for indoor building operations.
Description of drawings
Fig. 1 looks schematic diagram for master of the present utility model;
Fig. 2 is the partial enlarged drawing at M position among Fig. 1.
Fig. 3 is the upward view of Fig. 1.
The specific embodiment
Embodiment: the liftable workbench that a kind of building operations is used, comprise base 2, wheel is equipped with in base 2 bottoms, wheel is preferably three, one of them is universal wheel 1a, other two is that 1, three line of taking turns subcenter of road wheel is a triangle, and the center of universal wheel 1a equates with the centre distance of other two road wheels 1; Be fixed with tapped lifting tube 3 on the center of base 2, be equipped with in the lifting tube 3 and be with externally threaded elevating lever 4, the height that falls tube is 55-60cm, and the length of elevating lever is 70-75cm.The upper surface of elevating lever 4 is fixed on the center of working plate 6 bottom surfaces, the periphery of working plate 6 is equipped with guardrail 6a, wherein a guardrail is a movable rail 5, a side of its end and working plate 6 is hinged, the other end and adjacent guardrail flexible connection, be fixed with 2-4 bar transverse baffle on this movable rail 5, the height of this movable rail 5 is less than the height of lifting tube 3, promptly less than 55cm.After turning, movable rail 5 still can not touch ground like this.The form of structure that the other end of movable rail 5 and adjacent guardrail flexibly connect is in the present embodiment: two sidewalls of this movable rail 5 are angle bar, on two sidewalls of its other end, be equipped with hole 5a, with be fixed with the pin-fin tube 7 concentric on the sidewall of these movable rail 5 adjacent both sides guardrails with the hole, when movable rail 5 and adjacent guardrail snap together, in pin-fin tube 7 and hole 5a, be inserted with same bearing pin 8, so that movable rail 5 combines with adjacent guardrail.Movable rail 5 also can be with the form of structure that adjacent guardrail flexibly connects: on the sidewall of the other end of movable rail 5 hook is housed, on the sidewall of its adjacent guardrail, fixing hole is arranged, when movable rail 5 and adjacent guardrail snap together, hook in the fixing hole.
According to the height of construction needs, in the utility model, the height of lifting tube also can be 50cm, and the length of elevating lever is 65-70cm; When the height of lifting tube hanged down, the transverse baffle that installs on the movable rail 5 can be the 1-2 bar.

Claims (4)

1. liftable workbench that building operations is used, comprise base, wheel is equipped with in base bottom, it is characterized in that: be fixed with tapped lifting tube on the center of base, be equipped with in the lifting tube and be with externally threaded elevating lever, the upper surface of elevating lever is fixed on the center of working plate bottom surface, the periphery of working plate is equipped with guardrail, wherein one is movable rail, a side of its end and working plate is hinged, the other end and adjacent guardrail flexible connection are fixed with 1-4 bar transverse baffle on the movable rail, the height of guardrail is less than the height of lifting tube.
2. workbench according to claim 1 is characterized in that: the height of lifting tube is 50-60cm, and the length of elevating lever is 65-75cm.
3. workbench according to claim 2, it is characterized in that: be equipped with the hole on the sidewall of the other end of movable rail, be fixed with the pin-fin tube concentric on the sidewall of the guardrail that is adjacent with the hole, when movable rail and adjacent guardrail snap together, in pin-fin tube and hole, be inserted with same bearing pin.
4. workbench according to claim 2, it is characterized in that: wherein on the sidewall of the other end of a guardrail hook is housed, on the sidewall of the guardrail that is adjacent fixing hole is arranged, when movable rail and adjacent guardrail snap together, hook in the fixing hole.
CNU2007200908407U 2007-06-26 2007-06-26 Liftable worktable for building construction Expired - Fee Related CN201056828Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200908407U CN201056828Y (en) 2007-06-26 2007-06-26 Liftable worktable for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200908407U CN201056828Y (en) 2007-06-26 2007-06-26 Liftable worktable for building construction

Publications (1)

Publication Number Publication Date
CN201056828Y true CN201056828Y (en) 2008-05-07

Family

ID=39425669

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200908407U Expired - Fee Related CN201056828Y (en) 2007-06-26 2007-06-26 Liftable worktable for building construction

Country Status (1)

Country Link
CN (1) CN201056828Y (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103075095A (en) * 2011-10-25 2013-05-01 温永林 Lifting platform for working at heights
CN103498549A (en) * 2013-09-23 2014-01-08 河南天工建设集团有限公司 Aerial work platform for decoration in industrial factory building
CN105544951A (en) * 2016-01-22 2016-05-04 成都迅德科技有限公司 Supporting device for building
CN106121210A (en) * 2016-08-16 2016-11-16 中建三局第建设工程有限责任公司佛山市分公司 A kind of spiral automatic jacking device of push rod and building external scaffolding building method
CN106381997A (en) * 2016-10-31 2017-02-08 深圳前海特辰科技有限公司 Top protection shed structure of climbing scaffold
CN106381993A (en) * 2016-09-22 2017-02-08 无锡市龙海杰机械制造有限公司 Scaffold pedal provided with hoisting lifter
CN106894621A (en) * 2017-03-21 2017-06-27 无锡市龙海杰机械制造有限公司 Lift consolidates scaffold
CN107905515A (en) * 2017-11-15 2018-04-13 魏超军 A kind of construction worker's protective device
CN108396957A (en) * 2016-08-15 2018-08-14 吴红平 Ensure the working method of the construction safe frame of construction safety
CN108425488A (en) * 2016-08-15 2018-08-21 吴小再 The construction techniques of the safe frame and application of construction the scaffold safe frame
CN108979105A (en) * 2018-07-23 2018-12-11 绿山高科建设科技有限公司 A kind of climbing type CONSTRUCTION OPERATIONS platform

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103075095A (en) * 2011-10-25 2013-05-01 温永林 Lifting platform for working at heights
CN103498549A (en) * 2013-09-23 2014-01-08 河南天工建设集团有限公司 Aerial work platform for decoration in industrial factory building
CN105544951A (en) * 2016-01-22 2016-05-04 成都迅德科技有限公司 Supporting device for building
CN108396957A (en) * 2016-08-15 2018-08-14 吴红平 Ensure the working method of the construction safe frame of construction safety
CN108547437A (en) * 2016-08-15 2018-09-18 朱保生 The construction techniques of construction scaffold and the application scaffold
CN108442679A (en) * 2016-08-15 2018-08-24 蒋春花 Construction safe frame and gripping mechanism
CN108425488A (en) * 2016-08-15 2018-08-21 吴小再 The construction techniques of the safe frame and application of construction the scaffold safe frame
CN106121210A (en) * 2016-08-16 2016-11-16 中建三局第建设工程有限责任公司佛山市分公司 A kind of spiral automatic jacking device of push rod and building external scaffolding building method
CN106381993A (en) * 2016-09-22 2017-02-08 无锡市龙海杰机械制造有限公司 Scaffold pedal provided with hoisting lifter
CN106381997B (en) * 2016-10-31 2018-08-28 深圳前海特辰科技有限公司 A kind of top protection booth structure of climbing scaffold
CN106381997A (en) * 2016-10-31 2017-02-08 深圳前海特辰科技有限公司 Top protection shed structure of climbing scaffold
CN106894621A (en) * 2017-03-21 2017-06-27 无锡市龙海杰机械制造有限公司 Lift consolidates scaffold
CN107905515A (en) * 2017-11-15 2018-04-13 魏超军 A kind of construction worker's protective device
CN108979105A (en) * 2018-07-23 2018-12-11 绿山高科建设科技有限公司 A kind of climbing type CONSTRUCTION OPERATIONS platform

Similar Documents

Publication Publication Date Title
CN201056828Y (en) Liftable worktable for building construction
CN202925866U (en) Movable lifting work platform
CN108661300A (en) A kind of adjustable architectural engineering supporting rack
CN204434086U (en) A kind of Portable liftable portal frame
CN201753244U (en) Multipurpose micro-elevator for decoration
CN110304562A (en) Multifunctional sunlight room installs elevator
CN106428927A (en) Multifunctional and movable ash pan
CN215631458U (en) Scaffold for building engineering
CN215291292U (en) Lifting device for housing construction
CN209037615U (en) A kind of house decoration multifunctional handcar
CN205398003U (en) Multistage combination formula hoist mechanism
CN210213809U (en) Overhead ladder ferry turning alignment system
CN209702149U (en) The full landform gantry crane of modular
CN214696722U (en) Convenient building site scaffold frame of adjusting
CN219158343U (en) Building wall construction platform
CN207522577U (en) One kind is used for power equipment maintaining lift
CN206336288U (en) It is a kind of to be used to extend the Extension support that re-railing block bottom bridge uses length
CN207526077U (en) Portable scaffold
CN2651912Y (en) Rack for assembling transformer coils
CN215167784U (en) Bearing frame for building construction
CN110965753A (en) Multifunctional high stool
CN216577708U (en) Electric tool extension auxiliary assembly of regularization
CN205709737U (en) A kind of high-lift operation hanging cradle
CN220928620U (en) Scaffold for building engineering
CN205555747U (en) Liftable power maintenance equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080507

Termination date: 20120626