CN108978718A - A kind of inspection shaft gang form - Google Patents

A kind of inspection shaft gang form Download PDF

Info

Publication number
CN108978718A
CN108978718A CN201810811728.0A CN201810811728A CN108978718A CN 108978718 A CN108978718 A CN 108978718A CN 201810811728 A CN201810811728 A CN 201810811728A CN 108978718 A CN108978718 A CN 108978718A
Authority
CN
China
Prior art keywords
inspection shaft
circle tube
steel plate
tube template
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810811728.0A
Other languages
Chinese (zh)
Other versions
CN108978718B (en
Inventor
董伟
孙伟
刚永才
董伟斌
胡志刚
刘敬伟
刘丽
李佳
邓健
唐凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 5 Co Ltd
Original Assignee
Sinohydro Bureau 5 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 5 Co Ltd filed Critical Sinohydro Bureau 5 Co Ltd
Priority to CN201810811728.0A priority Critical patent/CN108978718B/en
Publication of CN108978718A publication Critical patent/CN108978718A/en
Application granted granted Critical
Publication of CN108978718B publication Critical patent/CN108978718B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/125Manhole shafts; Other inspection or access chambers; Accessories therefor characterised by the lining of the shaft
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0007Production methods using a mold

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a kind of inspection shaft gang forms, and including the vertical upright bar being set at inspection shaft center, vertical upright bar is equipped at least two circular support pedestals;It further include the outer circle tube template and inner circle tube template for having concentric setting;Circular support pedestal is supported in the inner surface of inner circle tube template;It is sequentially connected between outer circle tube template, inner circle tube template and circular support pedestal by multiple pull rods.The present invention is reliable and stable using line traffic control in pre-embedded bolt progress;Installation is simple, and stability is good, easy to operate, and construction efficiency is high;Adjustment is synchronized by flower basket bolt with a scale, measurement module is not needed and checks and position;Personnel and device configuration can be effectively reduced, construction period is shortened, reduce cost input;Size adjusting can be carried out according to the inspection shaft of different model, meet the inspection well construction of various models, size.

Description

A kind of inspection shaft gang form
Technical field
The present invention relates to a kind of inspection shaft concrete pouring construction templates, and in particular to arrives a kind of inspection shaft gang form.
Background technique
Now current urban road construction engineering is advanced by leaps and bounds, especially the bases such as urban renewal, reconstruction of rain sewage network It builds in full flourish.Inspection shaft majority is formed using concreting in work progress, such as carries out template according to former construction technology It reinforces, support, check, the number of turnover is frequent, sets up and spends the time long, and it is costly, while needing to increase more personnel, equipment And material.
Summary of the invention
The present invention provides a kind of inspection shaft gang forms, for improving the efficiency of inspection shaft concrete construction.
In order to solve the above technical problems, the technical scheme adopted by the invention is as follows:
A kind of inspection shaft gang form, including the vertical upright bar being set at inspection shaft center, vertical upright bar is equipped at least Two circular support pedestals;It further include the outer circle tube template and inner circle tube template for having concentric setting;The support of circular support pedestal In the inner surface of inner circle tube template;Between outer circle tube template, inner circle tube template and circular support pedestal successively by multiple pull rods Connection.
According to above scheme, the circular support pedestal includes fixation steel plate and flower basket bolt;Fixation steel plate is set to circle The center point of support foundation;One end of flower basket bolt is connected to fixation steel plate, and the other end is connected with T-type link block;Multiple gailys decorated basket Bolt is connected to the surrounding of fixation steel plate evenly dispersedly;Arc-shaped support bar is hinged between two adjacent T-type link blocks.
It further, further include having the sleeve being nested in vertical upright bar, the bottom of sleeve is fixedly connected on fixation steel plate Top;Sleeve is equipped with fastening bolt.
Further, sleeve is equipped with laterally protruding handle.
It further, further include having the pre-embedded bolt being embedded in inspection shaft underplate concrete, pre-embedded bolt, which is located at, to be checked At the center of shaft bottom plate;Fixation steel plate positioned at the circular support pedestal of the bottom is connect with pre-embedded bolt, and vertical upright bar Bottom end is fixed on the fixation steel plate of bottom circular support pedestal.
Further, the flower basket bolt is equipped with scale.
According to above scheme, the outer surface of the outer circle tube template is equipped with stirrup, is blocked by butterfly stirrup being fixed on drawing On bar.
Compared with prior art, the beneficial effects of the present invention are: using pre-embedded bolt carry out in line traffic control, it is reliable and stable; Installation is simple, and stability is good, easy to operate, and construction efficiency is high;Adjustment is synchronized by flower basket bolt with a scale, is not needed Measurement module is checked and positioning;Personnel and device configuration can be effectively reduced, construction period is shortened, reduce cost input;It can basis The inspection shaft of different model carries out size adjusting, meets the inspection well construction of various models, size.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the structural schematic diagram of circular support pedestal in the present invention;
Attachment structure schematic diagram of the Fig. 3 between middle sleeve of the present invention and fixation steel plate;
Fig. 4 is use state diagram of the invention.
Specific embodiment
Specific embodiments of the present invention will be further explained with reference to the accompanying drawing, the paraphrase of each label in figure are as follows: circle Shape support foundation 1, inner circle tube template 2, outer circle tube template 3, pull rod 4, stirrup 5, pre-embedded bolt 6, inspection shaft concrete to be poured 7, vertical upright bar 8, fixation steel plate 9, flower basket bolt 10, T-type link block 11, arc-shaped support bar 12, sleeve 13, fastening bolt 14, handle 15.
The present invention includes the vertical upright bar 8 at inspection shaft center, is successively arranged three from top to bottom in vertical upright bar 8 Circular support pedestal 1.It further include the outer circle tube template 3 and inner circle tube template 2 for having concentric setting.Circular support pedestal 1 supports In the inner surface of inner circle tube template 2.Pass through multiple pull rods 4 between outer circle tube template 3, inner circle tube template 2 and circular support pedestal 1 It is sequentially connected.
Circular support pedestal 1 includes fixation steel plate 9 and flower basket bolt 10.Fixation steel plate 9 is set to the circle of circular support pedestal 1 At the heart.One end of flower basket bolt 10 is connected to fixation steel plate 9, and the other end is connected with T-type link block 11.Four flower basket bolts 10 are equal The even surrounding for being dispersedly connected to fixation steel plate 9.Arc-shaped support bar 12 is hinged between two adjacent T-type link blocks 11.
It further include having the sleeve 13 being nested in vertical upright bar 8, the bottom of sleeve 13 is fixedly connected on the top of fixation steel plate 9 Portion.Sleeve 13 is equipped with fastening bolt 14 and laterally protruding handle 15.
It further include having the pre-embedded bolt 6 being embedded in inspection shaft underplate concrete, pre-embedded bolt 6 is located at inspection shaft bottom plate At center.Fixation steel plate 9 positioned at the circular support pedestal 1 of the bottom is connect with pre-embedded bolt 6, and the bottom end of vertical upright bar 8 It is fixed on the fixation steel plate 9 of bottom circular support pedestal 1.
The outer surface of outer circle tube template 3 is equipped with stirrup 5, is blocked by butterfly and stirrup 5 is fixed on pull rod 4.
Outer circle tube template 3 and inner circle tube template 2 are all made of steel plate and the lumps of wood is constituted.Add using with a thickness of the steel plate of 1.5mm Work is connected and fixed at inner or outer side template with lumps of wood rib, is removed simultaneously convenient for the lumps of wood and steel plate, is removed construction scene.It adopts With the lumps of wood of 5 × 10cm, reinforced as the reinforcing on the outside of steel plate, while convenient for inside I-steel and outer pull ring to stirrup 5.
Vertical upright bar 8 is made using Φ 48mm steel pipe, is welded on the fixation steel plate 9 of bottom, to determine inspection shaft Center line and be arranged.
Fixation steel plate 9, having a size of 300 × 300mm, is offered above using cutting with a thickness of the general steel plate of 10mm Multiple through-holes meet passing through and fixing for pre-embedded bolt 6, while being also convenient for connection flower basket bolt 10.
Pre-embedded bolt 6, when pouring inspection shaft bottom plate, is positioned pre-buried in underplate concrete using M20 bolt, it is ensured that after The fixation of continuous vertical upright bar 8.
Flower basket bolt 10 uses molding M20 flower basket bolt, and scale is engraved above, so as in operating process accurately Adjust size.Flower basket bolt 10 is used to adjust the position of each arc-shaped support bar 12, is allowed to agree with the interior table of inner circle tube template 2 Face.One end of flower basket bolt 10 is welded with junction steel plate, offers through-hole on junction steel plate, convenient for passing through spiral shell with fixation steel plate 9 It tethers and connects.The other end of flower basket bolt 10 is welded in the intermediate position of T-type link block 11, and the two sides of T-type link block 11 pass through spiral shell The end of bolt and arc-shaped support bar 12 is hinged, in order to adjust the position of arc-shaped support bar 12.T-type link block 11 and circular arc The arc degree of shape support bar 12 is set according to the constructing structure of inspection shaft.
The both ends of pull rod 4 are threaded, and attaching nut is by outer circle tube template 3, inner circle tube template 2 and circular support pedestal 1 is sequentially connected fixation.
Arc-shaped support bar 12 is formed using 14a channel steel processing and fabricating, and length is determined according to arc radius, radian according to The inspection shaft radius for needing to do determines.This secondary design is arranged according to the inspection shaft that diameter is 1.8m, within the scope of the 10cm of both ends The channel steel back side is cut off, bottom and top steel plate is only stayed, and cuts the hole for setting and passing through for bolt.
Sleeve 13 uses internal diameter to be made for the cylinder barrel of Φ 50mm, and fastening bolt 14 is arranged above, is mainly used for centre The fixation of layer and top layer circular support pedestal 1.Laterally protruding handle 15 is additionally provided on sleeve 13, convenient for pulling sleeve up and down 13, adjust the position of middle layer and top layer circular support pedestal 1.
In use, operating as follows:
1. preparing M20 bolt (pre-embedded bolt 6), Φ 48mm steel pipe (vertical upright bar 8) and bottom steel plate (fixation steel plate 9) to weld It connects securely, pre-embedded bolt 6 is welded in the 9 face hole Shang Ge of fixation steel plate;
2. surveying setting-out determines that bottom plate is normally carried out and pours, the pre-buried M20 pre-embedded bolt 6 of bottom center;
3. after the completion of bottom slab concreting, according to inspection shaft center, the interior outside of inspection shaft abutment wall being drawn with the line of ink marker, is then installed Vertical upright bar 8, the fixation steel plate 9 that vertical upright bar 8 is welded by the bottom M20 pre-embedded bolt 6 pre-buried with bottom plate are connect, it is ensured that perpendicular To the stabilization and verticality of upright bar 8;
4. flower basket bolt 10 to be retracted to most short, installation inner circle tube template 2, while arc-shaped support bar 12 being installed, and lead to Bolt is crossed to be connected firmly with T-type link block 11;According to the graduated scale rotation on flower basket bolt 10, the length of flower basket bolt 10 is adjusted Degree, it is ensured that the length that four flower basket bolts 10 adjust is unified, and inner circle tube template 2 is pushed into line of ink marker edge, meets the knot of Jing Qiang Structure position;
5. outer circle tube template 3 is installed, at the same installing bottom layer to pull rod 4 is drawn, carried out using reinforcing bar on the inside of outer circle tube template 3 Inner support meets wall body structure thickness;After outside adds stirrup 5, reinforcing stirrup 5 is blocked using butterfly and is connected into arc-shaped support bar 12 It is integrated, bottom is fixed to be completed;
6. installing circular support pedestal 1 at the middle part of vertical upright bar 8 and top;Sleeve 13 is passed through into vertical upright bar 8, is fallen To 1.5m range, rotational fastener bolt 14, fixes sleeve 13 does not allow it to be slided, then will be vertical using same method The fixation steel plate 9 at 8 top of upright bar is welded and fixed with sleeve 13, and installs arc-shaped support bar 12, four gaily decorated basket spiral shells of synchronous adjustment Bolt 10 allows its scale to show length as four flower basket bolts 10 of bottom;
7. then temperature pier inner circle tube template 2 is penetrated to pull rod 4 is drawn, outside is installed stirrup 5, is adopted between two templates With reinforcing bar inner support, the bolt of 12 inside of butterfly card and arc-shaped support bar is then fastened simultaneously, interior outboard template is tensed;
8. pouring inspection shaft concrete between interior cylinder template 2 and outer circle tube template 3;
9. after the completion of pouring, by 1.~7. inverted sequence form removal when being suitable for demoulding, after dismounting in time to the positions such as bolt into Row cleaning prepares to use next time.
The present invention is before use, first have to ensure that bottom slab concreting is completed in inspection shaft, and ensure the pre-buried pre-embedded bolt 6 of bottom plate The accuracy of position.This secondary design meets the concrete inspection well within the scope of diameter 1.9m to 2.1m, remaining size can basis Concrete condition adjusts the length of gaily decorated basket screw rod and arc-shaped support bar 12, but structure and principle are constant.

Claims (7)

1. a kind of inspection shaft gang form, it is characterised in that: vertical vertical including the vertical upright bar (8) being set at inspection shaft center Bar (8) is equipped at least two circular support pedestals (1);It further include the outer circle tube template (3) and inner cylinder for having concentric setting Template (2);Circular support pedestal (1) is supported in the inner surface of inner circle tube template (2);Outer circle tube template (3), inner circle tube template (2) it is sequentially connected between circular support pedestal (1) by multiple pull rods (4).
2. a kind of inspection shaft gang form according to claim 1, it is characterised in that: circular support pedestal (1) packet Include fixation steel plate (9) and flower basket bolt (10);Fixation steel plate (9) is set to the center point of circular support pedestal (1);Flower basket bolt (10) one end is connected to fixation steel plate (9), and the other end is connected with T-type link block (11);Multiple flower basket bolts (10) are uniformly divided It is connected to the surrounding of fixation steel plate (9) scatteredly;Arc-shaped support bar is hinged between two adjacent T-type link blocks (11) (12)。
3. a kind of inspection shaft gang form according to claim 2, it is characterised in that: further include being nested in vertical upright bar (8) bottom of the sleeve (13) on, sleeve (13) is fixedly connected on the top of fixation steel plate (9);Sleeve (13) is equipped with fastening Bolt (14).
4. a kind of inspection shaft gang form according to claim 3, it is characterised in that: sleeve (13) is equipped with laterally protruding Handle (15).
5. a kind of inspection shaft gang form according to claim 2, it is characterised in that: further include being embedded in inspection shaft bottom Pre-embedded bolt (6) in board concrete, pre-embedded bolt (6) are located at the center of inspection shaft bottom plate;Positioned at the circle branch of the bottom The fixation steel plate (9) of support group frame (1) is connect with pre-embedded bolt (6), and bottom circle branch is fixed in the bottom end of vertical upright bar (8) On the fixation steel plate (9) of support group frame (1).
6. a kind of inspection shaft gang form according to claim 2, it is characterised in that: the flower basket bolt (10) is equipped with Scale.
7. a kind of inspection shaft gang form according to claim 1, it is characterised in that: outside the outer circle tube template (3) Surface is equipped with stirrup (5), is blocked by butterfly and stirrup (5) is fixed on pull rod (4).
CN201810811728.0A 2018-07-23 2018-07-23 Inspection shaft combination template Active CN108978718B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810811728.0A CN108978718B (en) 2018-07-23 2018-07-23 Inspection shaft combination template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810811728.0A CN108978718B (en) 2018-07-23 2018-07-23 Inspection shaft combination template

Publications (2)

Publication Number Publication Date
CN108978718A true CN108978718A (en) 2018-12-11
CN108978718B CN108978718B (en) 2024-05-28

Family

ID=64550125

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810811728.0A Active CN108978718B (en) 2018-07-23 2018-07-23 Inspection shaft combination template

Country Status (1)

Country Link
CN (1) CN108978718B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110029658A (en) * 2019-04-19 2019-07-19 荆州市荆力工程设计咨询有限责任公司 A kind of steel reinforcement cage supporting member for overhead transmission line bored concrete pile
CN111456092A (en) * 2020-04-22 2020-07-28 安庆米锐智能科技有限公司 Concrete pouring enclosure mold and pouring method
CN111622572A (en) * 2020-05-30 2020-09-04 中化二建集团有限公司 Circular pool wall precision control method
CN111910684A (en) * 2020-08-18 2020-11-10 安徽铭安建设工程有限公司 Rapid construction system and method for lightweight template of reinforced concrete cast-in-place circular drainage inspection well
CN112252715A (en) * 2020-10-14 2021-01-22 陕西建工第五建设集团有限公司 Construction method for penetrating structural beam sleeve

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000198110A (en) * 1998-12-31 2000-07-18 Ryuichi Abe Manufacture of cylindrical concrete product and form for cylindrical concrete product used therefor
CN102251669A (en) * 2011-05-26 2011-11-23 葛洲坝集团第二工程有限公司 Construction method for cylindrical thin-walled concrete wall template
CN102644383A (en) * 2012-05-08 2012-08-22 广西建工集团第五建筑工程有限责任公司 Assembly type floor protecting rail
CN104343129A (en) * 2013-08-06 2015-02-11 江苏金海新能源科技有限公司 Reversing formwork for manufacturing cast-in-situ prestressed concrete cylindrical fan foundation
CN105544604A (en) * 2015-12-09 2016-05-04 华北冶建工程建设有限公司 Slipform device and construction method using same
CN205920644U (en) * 2016-05-30 2017-02-01 中国化学工程第三建设有限公司 Welder trains frame
CN208748697U (en) * 2018-07-23 2019-04-16 中国水利水电第五工程局有限公司 A kind of inspection shaft gang form

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000198110A (en) * 1998-12-31 2000-07-18 Ryuichi Abe Manufacture of cylindrical concrete product and form for cylindrical concrete product used therefor
CN102251669A (en) * 2011-05-26 2011-11-23 葛洲坝集团第二工程有限公司 Construction method for cylindrical thin-walled concrete wall template
CN102644383A (en) * 2012-05-08 2012-08-22 广西建工集团第五建筑工程有限责任公司 Assembly type floor protecting rail
CN104343129A (en) * 2013-08-06 2015-02-11 江苏金海新能源科技有限公司 Reversing formwork for manufacturing cast-in-situ prestressed concrete cylindrical fan foundation
CN105544604A (en) * 2015-12-09 2016-05-04 华北冶建工程建设有限公司 Slipform device and construction method using same
CN205920644U (en) * 2016-05-30 2017-02-01 中国化学工程第三建设有限公司 Welder trains frame
CN208748697U (en) * 2018-07-23 2019-04-16 中国水利水电第五工程局有限公司 A kind of inspection shaft gang form

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
曹军;: "18连体筒仓滑模施工技术", 山西建筑, no. 31, pages 608 - 612 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110029658A (en) * 2019-04-19 2019-07-19 荆州市荆力工程设计咨询有限责任公司 A kind of steel reinforcement cage supporting member for overhead transmission line bored concrete pile
CN111456092A (en) * 2020-04-22 2020-07-28 安庆米锐智能科技有限公司 Concrete pouring enclosure mold and pouring method
CN111622572A (en) * 2020-05-30 2020-09-04 中化二建集团有限公司 Circular pool wall precision control method
CN111910684A (en) * 2020-08-18 2020-11-10 安徽铭安建设工程有限公司 Rapid construction system and method for lightweight template of reinforced concrete cast-in-place circular drainage inspection well
CN112252715A (en) * 2020-10-14 2021-01-22 陕西建工第五建设集团有限公司 Construction method for penetrating structural beam sleeve

Also Published As

Publication number Publication date
CN108978718B (en) 2024-05-28

Similar Documents

Publication Publication Date Title
CN108978718A (en) A kind of inspection shaft gang form
CN207143755U (en) A kind of adjustable bracket for No. 0 block of bridge pier
CN202225295U (en) Integrally-forming mold base of steel reinforcement framework
CN107965065B (en) Buckling support Combined type pre-embedded member construction method
CN106592867B (en) A kind of method of construction of reinforced beam
CN103216131A (en) Reserved hole pore-forming construction method for concrete structure
CN107460889A (en) Integral movable support formwork in underground comprehensive pipe gallery construction and construction method thereof
CN109853610A (en) Steel pipe column concrete foundation pre-embedded anchoring bolts precise positioning mechanism and localization method
CN208748697U (en) A kind of inspection shaft gang form
CN104153573B (en) V-type cylinder concrete pour mould and construction method
CN201560398U (en) Inner steel mould for accurately positioning tower column cable sleeves of cable-stayed bridge
CN207959949U (en) A kind of unwrapping wire hole closure quick template supporting bracing means
CN110700319A (en) Comprehensive pipe gallery is with unilateral formwork frock
CN106245770A (en) Expanded letter variable cross-section annular stiff beam construction method
CN110046363A (en) A kind of accurate pre-buried construction method of concrete structure interior conduit group
CN209585630U (en) Building construction formwork adjustable support frame
CN104947853B (en) A kind of Inner standpipe formula cast-in-situ reinforced concrete column and construction method
CN206859076U (en) For supporting the device of one-time-concreting Inner Moulding Board in Building
CN205343431U (en) Prefabricated wall body grout sleeve strip solid matter exposes accurate positioning die of reinforcing bar
CN203440827U (en) Bay bolt positioning mold for steel pipe support of overhead contact system of electric railway
CN204899949U (en) Bow -shaped steel pipe back up support
CN206205289U (en) Rainwater hopper direct-buried reinforcing device
CN204875498U (en) Device of steel sheet installation under supplementary bridge beam supports
CN208105049U (en) A kind of carrier setting bolt hole precision positioning model
CN216765617U (en) Main girder cable guide pipe positioning device of large-span curved beam cable-stayed bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant