CN108974767B - Rubber belt system migration rock discharging method - Google Patents
Rubber belt system migration rock discharging method Download PDFInfo
- Publication number
- CN108974767B CN108974767B CN201810907973.1A CN201810907973A CN108974767B CN 108974767 B CN108974767 B CN 108974767B CN 201810907973 A CN201810907973 A CN 201810907973A CN 108974767 B CN108974767 B CN 108974767B
- Authority
- CN
- China
- Prior art keywords
- machine
- rock
- rock discharging
- discharging
- tape
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G15/00—Conveyors having endless load-conveying surfaces, i.e. belts and like continuous members, to which tractive effort is transmitted by means other than endless driving elements of similar configuration
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G43/00—Control devices, e.g. for safety, warning or fault-correcting
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Factory Administration (AREA)
- Belt Conveyors (AREA)
Abstract
The invention discloses a method for moving and arranging rocks by a rubber belt system, which comprises the following steps: step A: b, arranging the rock discharging machine on the inner side of the displacement belt conveyor, performing rock discharging until the rock discharging width reaches a first preset width, and turning to the step B; and B: winding the rock discharging machine to the outer side of the displacement belt conveyor, performing rock discharging until the rock discharging reaches a second preset width, and turning to the step C; and C: and B, judging whether the tape displacing machine can move to the next station or not, if so, moving the tape displacing machine to the next station, turning to the step A, and if not, ending. The rock discharging machine discharges the soil at the inner side of the adhesive tape machine with a certain width, namely a placing platform is provided for the rock discharging machine, and at the moment, the rock discharging machine can be wound on the outer side of the adhesive tape machine for discharging the soil.
Description
Technical Field
The invention relates to the technical field of rock discharging transportation and moving, in particular to a moving and rock discharging method of a rubber belt system.
Background
At present, the rock removal of the adhesive tape system is mainly realized by a rock removal machine and a displacement adhesive tape machine, and is mainly applied to 1310m level (III soil). According to the design, the rock dumping machine is used for dumping on the outer side of a step of a soil yard, a safety platform with the width of 35m needs to be reserved on the outer side of the rock dumping machine, the dumping safety of the rock dumping machine is guaranteed, the effective rock dumping range of the rock dumping machine is 85m, and the actual rock dumping width is 50m after the safety platform is reserved. After rock discharging is completed at one position, the rock discharging machine and the adhesive tape displacing machine need to be moved outwards.
The construction period of each translation of the belt conveyor is about 15 days, the rock discharge of a belt system cannot be realized, the translation relates to construction of various engineering equipment, civil engineering and the like, the cost is high, and the cost is about 250 ten thousand yuan for 1 translation.
Therefore, it is an urgent technical problem to be solved by those skilled in the art how to reduce the moving frequency of the tape machine and reduce the cost of the tape system.
Disclosure of Invention
In view of the above, the present invention is to provide a method for moving and rock discharging a tape system, so as to reduce the moving frequency of the tape machine and reduce the cost of the tape system.
In order to achieve the above object, the present invention provides the following solutions:
a method for moving and rock discharging of a rubber belt system comprises the following steps:
step A: b, arranging the rock discharging machine on the inner side of the displacement belt conveyor, performing rock discharging until the rock discharging width reaches a first preset width, and turning to the step B;
and B: winding the rock discharging machine to the outer side of the displacement belt conveyor, performing rock discharging until the rock discharging reaches a second preset width, and turning to the step C;
and C: and B, judging whether the tape displacing machine can move to the next station or not, if so, moving the tape displacing machine to the next station, turning to the step A, and if not, ending.
In a specific embodiment, said step a is preceded by the step D of:
the pushing and translating field is arranged to form a placing platform, and the placing platform is used for installing the tape displacing machine.
In a specific embodiment, in the step D, the moving site is leveled by a bulldozer.
In a specific embodiment, in the step C, moving the tape displacing machine to the next station includes the following steps:
step C1: extending the transfer station forward a third preset distance;
step C2: arranging the tape displacing machine at an edge step of a transfer site, wherein the tape displacing machine can convey materials to the transfer station;
step C3: and connecting the displacement tape machine to the transfer station.
In a specific embodiment, said step C1 is preceded by the step C4:
and dismantling the displacing belt conveyor between the rock discharging machine and the transfer station.
In a specific embodiment, said step C4 is preceded by the step C5:
docking the rock discharger to the end of the displacement belt machine.
The various embodiments according to the invention can be combined as desired, and the embodiments obtained after these combinations are also within the scope of the invention and are part of the specific embodiments of the invention.
According to the technical scheme, the rock discharging method for the rubber belt system transfer is characterized in that the rock discharging machine is arranged on the inner side of the belt transferring machine to perform soil receiving operation (namely soil discharging operation or rock discharging operation), when the soil discharging width reaches a sufficient width, the rock discharging machine is wound on the outer side of the belt transferring machine to perform soil receiving operation, and when the discharged soil reaches a sufficient width; the tape displacement machine is moved to the next station and the above steps are repeated until the tape displacement machine can no longer move forward (i.e., the end of the length of the work). The rock discharging machine discharges the soil at the inner side of the belt conveyor by a certain width, namely a placing platform is provided for the rock discharging machine, at the moment, the rock discharging machine can be wound on the outer side of the belt conveyor to discharge the soil, and compared with the prior art that the soil can be discharged at one side of the belt conveyor, the method increases the soil discharging width of the rock discharging machine, reduces the frequency of moving and displacing the belt conveyor in the process of completing a soil discharging project, reduces the moving frequency of displacing the belt conveyor, and reduces the cost of a belt system.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
Fig. 1 is a flow chart of a rock displacement method for the adhesive tape system provided by the invention.
Detailed Description
In order to make the technical solutions of the present invention better understood, the present invention will be further described in detail with reference to the accompanying drawings and specific embodiments.
Referring to fig. 1, a flow chart of a rock discharging method for a tape system provided by the present invention is shown.
The invention discloses a method for moving and arranging rocks by a rubber belt system, which comprises the following steps:
step S1: and arranging the rock discharging machine at the inner side of the displacement belt conveyor, performing rock discharging until the rock discharging width reaches a first preset width, and turning to the step S2.
The rock discharging machine is arranged at the tail end of the displacement belt machine, and can convey materials to the rock discharging machine.
Specifically, the adhesive tape displacing machine is placed at an edge step of the soil field.
The inner side of the belt conveyor is the side of the belt conveyor which is far away from the dumping of the rock discharger.
The first preset width refers to the width of the dumping machine capable of dumping soil, which meets the requirements of the soil yard.
Step S2: and winding the rock discharging machine to the outer side of the displacement belt conveyor, performing rock discharging until the rock discharging reaches a second preset width, and turning to the step S3.
The outer side of the displacement belt machine refers to the side facing the dumping of the rock discharging machine. Because the rock dumping machine is arranged outside the soil yard step on the inner side of the displacement belt conveyor and forms a certain width, the rock dumping machine can move to the outer side of the displacement belt conveyor to dump.
The second preset width is the width of the dumping machine capable of dumping soil meeting the requirements of the soil yard.
Step S3: and judging whether the tape displacing machine can move to the next station or not, if so, moving the tape displacing machine to the next station, turning to the step S1, and if not, ending.
The distance that the adhesive tape displacing machine can move at one time can be set according to actual needs.
The invention provides a rock discharging method for transferring a rubber belt system, which comprises the steps of arranging a rock discharging machine on the inner side of a transfer rubber belt machine, discharging soil, winding the rock discharging machine on the outer side of the transfer rubber belt machine when the rock discharging width reaches a sufficient width, and discharging soil when the soil discharging width reaches the sufficient width; and moving the tape displacement machine to the next station, and repeating the steps until the tape displacement machine can not move forwards any more. The rock discharging machine discharges the soil at the inner side of the belt conveyor by a certain width, namely a placing platform is provided for the rock discharging machine, at the moment, the rock discharging machine can be wound on the outer side of the belt conveyor to discharge the soil, and compared with the prior art that the soil can be discharged at only one side of the belt conveyor, the method increases the soil discharging width of the rock discharging machine, reduces the frequency of moving and displacing the belt conveyor in the completion of a soil discharging project, reduces the moving frequency of the belt conveyor, and reduces the cost of a belt system.
Example two
In another embodiment of the present invention, the method for moving and rock-discharging the adhesive tape system in this embodiment is similar to the method for moving and rock-discharging the adhesive tape system in the first embodiment, and the same parts are not repeated and only differences are introduced.
In this example, it is disclosed that in a specific embodiment, step S1 is preceded by step S4: the pushing and translating field is formed into a placing platform, and the placing platform is used for installing and displacing the adhesive tape machine.
Pushing and flattening the rock dumping machine within 20 meters of the outer side of a step surface formed by soil operation to form a displacement adhesive tape machine placing platform with the length of 1200 meters and the width of 20 meters along the moving direction of the displacement adhesive tape machine, wherein the longitudinal gradient is required to be not more than 2%, and the transverse height difference is required to be not more than +/-0.5 meter.
Furthermore, the invention discloses that the placing platform is formed by pushing and translating the earth placing field through a bulldozer.
Further, the present invention discloses that in step S3, moving the tape dispenser to the next station specifically includes the following steps:
step S31: the transfer station is extended forward a third preset distance.
In this embodiment, the third preset distance is 80 meters, for example. The transfer is used for transferring the materials on the displacement belt conveyor to a receiving arm of the rock discharging machine, and a discharging arm of the rock discharging machine discharges the materials.
Step S32: and arranging the tape displacing machine at the edge step of the transfer field.
Specifically, the tape displacing machine is located 5 meters away from the edge of the edge step, and a safety platform 5 meters wide is reserved.
Step S33: and connecting the tape displacing machine with the transfer station.
Further, the present invention discloses before step S31, step S34: and dismantling the adhesive tape displacing machine between the rock discharging machine and the transfer station.
Here, the belt conveyor is displaced between the rock discharger and the transfer station at the previous station.
In a specific embodiment, step S34 is preceded by step S35: the rock discharger is docked to the end of the displacement belt machine.
The end of the tape machine is the end that is displaced from the end (end) of the tape machine where the material is conveyed.
The translation of the belt conveyor is long in influence on rock discharging of the earth field belt system, the construction period of each translation is about 15 days, the rock discharging of the belt system cannot be realized in the period, the translation relates to construction of various engineering equipment, civil engineering and the like, the cost is high, and the cost is about 250 ten thousand yuan for 1 translation. After the method is used, the method in the prior art can reduce 2 times by 3 times of transferring, effectively reduce the translation times of the adhesive tape machine and reduce the transferring cost of the adhesive tape machine.
The terms "first", "second", and the like in the present invention are used for descriptive distinction and have no other special meaning.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and inventive features disclosed herein.
Claims (6)
1. A method for moving and rock discharging of a rubber belt system is characterized by comprising the following steps:
step A: arranging a rock discharging machine on the inner side of a displacement belt conveyor, wherein the displacement belt conveyor is arranged at an edge step of a soil field, the inner side of the displacement belt conveyor refers to the side of the displacement belt conveyor, which deviates from the rock discharging of the rock discharging machine, performing rock discharging until the rock discharging width reaches a first preset width, so that the rock discharging machine can move to the outer side of the displacement belt conveyor to perform rock discharging, and turning to step B;
and B: winding the rock discharging machine to the outer side of the displacement belt conveyor, performing rock discharging until the rock discharging reaches a second preset width, and turning to the step C;
and C: and B, judging whether the tape displacing machine can move to the next station or not, if so, moving the tape displacing machine to the next station, turning to the step A, and if not, ending.
2. The tape system migration rock racking method of claim 1 further comprising step D prior to said step a:
the pushing and translating field is arranged to form a placing platform, and the placing platform is used for placing the tape displacing machine.
3. The tape system migration rock discharging method of claim 2, wherein in the step D, the migration site is pushed flat by a bulldozer.
4. A method for moving rock discharging by using the adhesive tape system as claimed in claim 2 or 3, wherein the step C, moving the adhesive tape moving machine to the next station comprises the following steps:
step C1: extending the transfer station a third predetermined distance forward;
step C2: arranging the tape displacing machine at an edge step of a transfer site, wherein the tape displacing machine can convey materials to the transfer station;
step C3: and connecting the displacement tape machine to the transfer station.
5. The tape system migration rock arranging method of claim 4, wherein the step C1 is preceded by the step C4:
and dismantling the displacing belt conveyor between the rock discharging machine and the transfer station.
6. The tape system migration rock arranging method of claim 5, wherein said step C4 is preceded by the step C5:
docking the rock discharger to the end of the displacement belt machine.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810907973.1A CN108974767B (en) | 2018-08-10 | 2018-08-10 | Rubber belt system migration rock discharging method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810907973.1A CN108974767B (en) | 2018-08-10 | 2018-08-10 | Rubber belt system migration rock discharging method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108974767A CN108974767A (en) | 2018-12-11 |
CN108974767B true CN108974767B (en) | 2021-01-01 |
Family
ID=64555854
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810907973.1A Active CN108974767B (en) | 2018-08-10 | 2018-08-10 | Rubber belt system migration rock discharging method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108974767B (en) |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB190822155A (en) * | 1908-10-20 | 1909-10-20 | Robert Frank Pochin | Improvements in and relating to Appliances for Elevating and Conveying Stone, Ores, Coal, and other Minerals and Materials. |
CN105735238A (en) * | 2016-03-04 | 2016-07-06 | 太原钢铁(集团)有限公司 | Dump safety control method under collapsible loess foundation condition |
CN105645119B (en) * | 2016-03-15 | 2023-12-29 | 孙润 | Belt type conveyor direct arrangement method of discharging material |
-
2018
- 2018-08-10 CN CN201810907973.1A patent/CN108974767B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN108974767A (en) | 2018-12-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10036252B2 (en) | Method for removing hydraulic support for solid filling coal mining | |
CA2883015C (en) | A system for the reduction in applied energy, improved efficiencies and reduced costs in open pit mining | |
CN104806247B (en) | Longitudinal combination bridge transportation resources is built in the middle of open-pit mine stope | |
CN108974767B (en) | Rubber belt system migration rock discharging method | |
CN101982688A (en) | Large-caliber long-distance steel jacking pipe construction system | |
RU2654884C2 (en) | Apparatus for extracting ore from block caves and method and system therefor | |
AU2015100065A4 (en) | A System for the Reduction in Applied Energy, Improved Efficiencies and Reduced Costs in Open Pit Mining | |
WO2024199389A1 (en) | Continuous and rapid filling method and device for coal gangue | |
CN106761759B (en) | A kind of coal-mining method of open coal mine | |
US5427439A (en) | Surface mining conveyor system | |
CN110939446B (en) | Steering method for mining area of ultra-thick inclined coal seam | |
CN109538218B (en) | Method for simultaneously constructing tunnel bottom filling and connecting channel of shield tunnel under-rail structure | |
CN112253121B (en) | Strip mine transportation method | |
KR101614744B1 (en) | Pc block and installing method for shield tunnel stucture | |
JP6550942B2 (en) | Segment unloading method and segment unloading device | |
CN110107299B (en) | Open pit coal mine step mining and stripping and transportation road arrangement system and method and mining method | |
CN110905519A (en) | Strip mine dumping method | |
CN110206543A (en) | Open coal mine transportation resources | |
CN110005425A (en) | The shield cyclization section of jurisdiction that simultaneous grouting slurry can be effectively prevent to leak and building method | |
ITRM20080650A1 (en) | MODULAR FINISH FOR TUNNELS. | |
CN105672186A (en) | Deepwater riprapping method and equipment | |
CN113738387A (en) | Method and device for in-situ utilization of TBM stone slag in underground cave | |
KR102341682B1 (en) | Tunneling machine for non-open cut type to install excavation device | |
CN108118607B (en) | Walking tower bridge equipment for strip mine | |
CN117027839A (en) | Rapid conveying method for ultra-large span tunnel portal slag |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |