CN108961011A - A kind of food processing materials procurement system - Google Patents
A kind of food processing materials procurement system Download PDFInfo
- Publication number
- CN108961011A CN108961011A CN201810785670.7A CN201810785670A CN108961011A CN 108961011 A CN108961011 A CN 108961011A CN 201810785670 A CN201810785670 A CN 201810785670A CN 108961011 A CN108961011 A CN 108961011A
- Authority
- CN
- China
- Prior art keywords
- module
- raw material
- order
- demand
- priority
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/06—Buying, selling or leasing transactions
- G06Q30/0601—Electronic shopping [e-shopping]
- G06Q30/0605—Supply or demand aggregation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/087—Inventory or stock management, e.g. order filling, procurement or balancing against orders
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/06—Buying, selling or leasing transactions
- G06Q30/0601—Electronic shopping [e-shopping]
- G06Q30/0633—Lists, e.g. purchase orders, compilation or processing
- G06Q30/0635—Processing of requisition or of purchase orders
Abstract
The present invention relates to food-processing industries, more particularly to a kind of food processing materials procurement system.It includes that order acquisition module, anti-module, raw material aggregation module, buying task distribution module and the supplier's priority of pushing away of order judgment module, BOM table judge module.The system effective solution various problems of artificial buying provide a set of complete intelligent procurement management system.
Description
Technical field
The present invention relates to food-processing industries, more particularly to a kind of food processing materials procurement system.
Background technique
Existing materials procurement is contacted by purchasing agent according to the amount of purchase that company requires in food-processing industry
Supplier provides raw material, wherein whole manual operation, including order collection aggregation-Raw Material Demand calculating-materials procurement
Inventory-purchasing agent contacts supplier and provides raw material.Wherein order collection aggregation, Raw Material Demand calculating, materials procurement are clear
It is single to be completed by people, it inevitably will appear mistake, will affect the processing of food when serious, lead to the promise breaking of order contract.And
Purchasing agent, which contacts to exist in supplier, brings back button, and supply raw material are successively substituted the bad for the good, and will affect food safety when serious.So
It is badly in need of a kind of whole complete intelligent procurement management system for participating in or reducing personnel's control without personnel in food-processing industry.
Summary of the invention
In view of the above technical problems, the purpose of the present invention is to provide a kind of food processing materials procurement system, this is
Effective solution of the uniting various problems of artificial buying provide a set of complete intelligent procurement management system.
To achieve the above object, the technical solution used in the present invention is:
A kind of food processing materials procurement system, it is characterised in that: it includes that order acquisition module, order judge mould
Anti- module, raw material aggregation module, buying task distribution module and the supplier's priority of pushing away of block, BOM table judges module;
All orders are sent to order and judge mould by the order acquisition module for collecting and managing all orders
Block;
The order judgment module is divided into two classes: raw material according to the type of order for classifying to all orders
Demand order and product demand order, the Raw Material Demand order are sent to raw material aggregation module, and the product demand is ordered
Single-shot gives that BOM table is counter to push away module;
The anti-module that pushes away of the BOM table includes finished product Raw Material Demand BOM table, for compare it is counter push away in product demand order at
The raw material actual demand amount of product, and raw material actual demand amount is sent to raw material aggregation module;
The raw material aggregation module obtains every for Raw Material Demand order and raw material actual demand amount to be aggregated into
The aggregate demand of kind raw material, and the aggregate demand of every kind of raw material is sent to buying task distribution module;
Supplier's priority judges module for dividing to the priority of supplier, and division result is sent
Give buying task distribution module;The condition that the priority divides includes material quality, the prices of raw materials and supplier's delivery
Speed;
The buying task distribution module is used to for the priority of the aggregate demand of raw material and corresponding supplier being sent to
Purchasing agent.
The system further includes raw materials inventory management module, and the raw materials inventory management module is for managing all former materials
The inventory information of material, and every kind of raw material are designed with inventory's early warning value;The raw materials inventory management module is also used to library
Storage is sent to buying task distribution module lower than inventory's residual quantity of the raw material of early warning value, and will by buying task distribution module
Inventory's residual quantity of the raw material is sent to corresponding purchasing agent.
The system further includes order priority management module, and the order priority management module is used for from order acquisition mould
All order deadlines are obtained in block, and priority is carried out to all orders according to the deadline of order and divides management, institute
There is order to be divided into two classes: rush order and common order;And the corresponding raw material types information of the rush order is sent to
Buying task distribution module, the buying task distribution module are involved in the aggregate demand and correspondence of the raw material of rush order
The highest supplier of delivery speed-priority grade be sent to purchasing agent.
The BOM table includes all finished product classifications and finished product class raw material types, quantity and processing loss required now
Measure information.
The invention has the benefit that it is former to solve artificial calculating to system of the invention instead of artificial buying raw material
The problem of error is easy when material;Whole computer control, prevents purchasing agent from colluding with supplier, damages company's interest.
Detailed description of the invention
Fig. 1 is a kind of schematic diagram of food processing materials procurement system.
Specific embodiment
For a better understanding of the present invention, technical solution of the present invention is done further below with reference to embodiment and attached drawing
Illustrate (as shown in Figure 1).
Embodiment one
A kind of food processing materials procurement system, it includes order acquisition module, order judgment module, BOM table is counter pushes away
Module, raw material aggregation module, buying task distribution module and supplier's priority judge module.
All orders are sent to order and judge mould by the order acquisition module for collecting and managing all orders
Block.
The order judgment module is divided into two classes: raw material according to the type of order for classifying to all orders
Demand order and product demand order, the Raw Material Demand order are sent to raw material aggregation module, and the product demand is ordered
Single-shot gives that BOM table is counter to push away module.
The anti-module that pushes away of the BOM table includes finished product Raw Material Demand BOM table, for compare it is counter push away in product demand order at
The raw material actual demand amount of product, and raw material actual demand amount is sent to raw material aggregation module;The BOM table includes institute
Raw material types, quantity and the processing loss amount information for having finished product classification and finished product class required now.The raw material are practical to be needed
The amount of asking=raw material quantity+raw material processing loss amount.Wherein BOM table information is artificial filling early period.
The raw material aggregation module obtains every for Raw Material Demand order and raw material actual demand amount to be aggregated into
Kind of raw material aggregate demand (such as: A Raw Material Demand order is equal to A raw material plus all A raw material actual demand amounts
Aggregate demand), and the aggregate demand of every kind of raw material is sent to buying task distribution module.
Supplier's priority judges module for dividing to the priority of supplier, and division result is sent
Give buying task distribution module;The condition that the priority divides includes material quality, the prices of raw materials and supplier's delivery
(priority divides the priority including material quality, the prices of raw materials and supplier's delivery speed and divides speed, also wraps
Comprehensive priority division is included, as B supplier material quality priority is 8, prices of raw materials priority is 9, supplier's delivery
Speed-priority grade is 8, then 25) comprehensive priority of B supplier is.
The buying task distribution module is used to for the priority of the aggregate demand of raw material and corresponding supplier being sent to
Purchasing agent (finally completes buying task according to priority by purchasing agent).Such as, B is supplied in four suppliers B, C, D, E of A raw material
The comprehensive priority highest of quotient is answered, then purchasing agent purchases A raw material to B supplier.
Embodiment two
System in embodiment one further includes raw materials inventory management module, and the raw materials inventory management module is for managing
The inventory information (such as quantity in stock of A raw material is a) of all raw material is managed, and every kind of raw material are designed with inventory's early warning value (A
100) inventory's early warning value of raw material is;The raw materials inventory management module is also used to for quantity in stock being lower than the former material of early warning value
Inventory's residual quantity (the inventory residual quantity h=100-a of such as A raw material) of material is sent to buying task distribution module, and by buying task
Inventory's residual quantity of the raw material is sent to (i.e. the raw material) corresponding purchasing agent by distribution module, is then completed by the purchasing agent
Buying task.
Embodiment three
System in embodiment one or two further includes order priority management module, and the order priority management module is used
In (completing order taking responsibility in such as three days, in 15 days complete order from obtaining all order deadlines in order acquisition module
Task dispatching), and priority is carried out to all orders according to the deadline of order and divides management, all orders are divided into two classes: tight
Anxious order and common order;And by the corresponding raw material types information of the rush order (in such as rush order include finished product X,
Y, finished product X need raw material l, k and j, and finished product Y needs raw material l, k, m and n, i.e. the rush order chinese raw materials type includes
L, k, j, m and it n) is sent to buying task distribution module,
The buying task distribution module be involved in the raw material (l, k, j, m and n) of rush order aggregate demand and
The corresponding highest supplier of delivery speed-priority grade (i.e. the corresponding supplier of raw material l, k, j, m and n) is sent to corresponding
Purchasing agent.
Described above is only Application Example of the invention, cannot limit the right model of the present invention with this certainly
It encloses, therefore according to equivalence changes made by scope of the present invention patent, still belongs to protection scope of the present invention.
Claims (4)
1. a kind of food processing materials procurement system, it is characterised in that: it include order acquisition module, order judgment module,
Anti- module, raw material aggregation module, buying task distribution module and the supplier's priority of pushing away of BOM table judges module;
All orders are sent to order judgment module for collecting and managing all orders by the order acquisition module;
The order judgment module is divided into two classes: Raw Material Demand according to the type of order for classifying to all orders
Order and product demand order, the Raw Material Demand order are sent to raw material aggregation module, the product demand order hair
Give that BOM table is counter to push away module;
The anti-module that pushes away of the BOM table includes finished product Raw Material Demand BOM table, counter pushes away finished product in product demand order for comparing
Raw material actual demand amount, and raw material actual demand amount is sent to raw material aggregation module;
The raw material aggregation module obtains every kind of original for Raw Material Demand order and raw material actual demand amount to be aggregated into
The aggregate demand of material, and the aggregate demand of every kind of raw material is sent to buying task distribution module;
Supplier's priority judges module for dividing to the priority of supplier, and division result is sent to and is adopted
Purchase task allocating module;The condition that the priority divides includes material quality, the prices of raw materials and supplier's delivery speed;
The buying task distribution module is used to the priority of the aggregate demand of raw material and corresponding supplier being sent to buying
Member.
2. a kind of food processing materials procurement system according to claim 1, it is characterised in that: the system further includes original
Material stock management module, the raw materials inventory management module are used to manage the inventory information of all raw material, and every kind
Raw material are designed with inventory's early warning value;The raw materials inventory management module is also used to for quantity in stock being lower than the raw material of early warning value
Inventory's residual quantity be sent to buying task distribution module, and inventory's residual quantity of the raw material is sent by buying task distribution module
To corresponding purchasing agent.
3. a kind of food processing materials procurement system according to claim 2, it is characterised in that: the system further includes ordering
Single priority management module, when the order priority management module is completed for obtaining all orders from order acquisition module
Between, and priority is carried out to all orders according to the deadline of order and divides management, all orders are divided into two classes: rush order
With common order;And the corresponding raw material types information of the rush order is sent to buying task distribution module, it is described to adopt
Purchase task allocating module be involved in rush order raw material aggregate demand and corresponding delivery speed-priority grade it is highest
Supplier is sent to purchasing agent.
4. a kind of food processing materials procurement system according to claim 1, it is characterised in that: the BOM table includes
All finished product classifications and finished product class now needed for raw material types, quantity and processing loss amount information.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810785670.7A CN108961011A (en) | 2018-07-17 | 2018-07-17 | A kind of food processing materials procurement system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810785670.7A CN108961011A (en) | 2018-07-17 | 2018-07-17 | A kind of food processing materials procurement system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108961011A true CN108961011A (en) | 2018-12-07 |
Family
ID=64481422
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810785670.7A Pending CN108961011A (en) | 2018-07-17 | 2018-07-17 | A kind of food processing materials procurement system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108961011A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109767296A (en) * | 2018-12-31 | 2019-05-17 | 北京云杉世界信息技术有限公司 | The method that fresh cargo generates buying order |
CN110222900A (en) * | 2019-06-12 | 2019-09-10 | 行小膳科技(杭州)有限公司 | A kind of quinoa polygamy side meal replacement powder raw materials inventory procurement management system |
CN110264122A (en) * | 2019-05-09 | 2019-09-20 | 中山易裁剪网络科技有限公司 | A kind of clothes correlative configures procurement management system in real time |
CN110675102A (en) * | 2019-08-15 | 2020-01-10 | 浙江国自机器人技术有限公司 | Order binding method and device, computer equipment and storage medium |
CN110796413A (en) * | 2019-10-29 | 2020-02-14 | 珠海格力电器股份有限公司 | Cargo distribution method and device, storage medium and electronic equipment |
CN112258078A (en) * | 2020-11-03 | 2021-01-22 | 六盘水师范学院 | Food processing raw material purchasing system |
CN114926092A (en) * | 2022-06-17 | 2022-08-19 | 株洲南软计算机有限公司 | Production management system and method based on MES intelligent manufacturing |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105389653A (en) * | 2015-10-30 | 2016-03-09 | 广东石油化工学院 | Adaptive material requirement plan (MRP) calculation method |
CN105868954A (en) * | 2016-06-15 | 2016-08-17 | 环山集团有限公司 | Raw material informatization management device |
CN106295989A (en) * | 2016-08-08 | 2017-01-04 | 统安易(北京)科技有限公司 | Food materials management system |
CN107590590A (en) * | 2017-08-25 | 2018-01-16 | 宁波凯信服饰股份有限公司 | Dress ornament production management system |
CN107977821A (en) * | 2018-01-08 | 2018-05-01 | 东莞嘉泰钟表有限公司 | A kind of purchase order generation and management method |
-
2018
- 2018-07-17 CN CN201810785670.7A patent/CN108961011A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105389653A (en) * | 2015-10-30 | 2016-03-09 | 广东石油化工学院 | Adaptive material requirement plan (MRP) calculation method |
CN105868954A (en) * | 2016-06-15 | 2016-08-17 | 环山集团有限公司 | Raw material informatization management device |
CN106295989A (en) * | 2016-08-08 | 2017-01-04 | 统安易(北京)科技有限公司 | Food materials management system |
CN107590590A (en) * | 2017-08-25 | 2018-01-16 | 宁波凯信服饰股份有限公司 | Dress ornament production management system |
CN107977821A (en) * | 2018-01-08 | 2018-05-01 | 东莞嘉泰钟表有限公司 | A kind of purchase order generation and management method |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109767296A (en) * | 2018-12-31 | 2019-05-17 | 北京云杉世界信息技术有限公司 | The method that fresh cargo generates buying order |
CN110264122A (en) * | 2019-05-09 | 2019-09-20 | 中山易裁剪网络科技有限公司 | A kind of clothes correlative configures procurement management system in real time |
CN110222900A (en) * | 2019-06-12 | 2019-09-10 | 行小膳科技(杭州)有限公司 | A kind of quinoa polygamy side meal replacement powder raw materials inventory procurement management system |
CN110222900B (en) * | 2019-06-12 | 2021-08-31 | 中食安泓(广东)健康产业有限公司 | Chenopodium quinoa willd multi-formula meal replacement powder raw material stock purchase management system |
CN110675102A (en) * | 2019-08-15 | 2020-01-10 | 浙江国自机器人技术有限公司 | Order binding method and device, computer equipment and storage medium |
CN110796413A (en) * | 2019-10-29 | 2020-02-14 | 珠海格力电器股份有限公司 | Cargo distribution method and device, storage medium and electronic equipment |
CN112258078A (en) * | 2020-11-03 | 2021-01-22 | 六盘水师范学院 | Food processing raw material purchasing system |
CN114926092A (en) * | 2022-06-17 | 2022-08-19 | 株洲南软计算机有限公司 | Production management system and method based on MES intelligent manufacturing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108961011A (en) | A kind of food processing materials procurement system | |
Xu | Managing production and procurement through option contracts in supply chains with random yield | |
CN109523108A (en) | A kind of enterprise's manufacturing management and buying unified platform | |
Zaeri et al. | Application of multi criteria decision making technique to evaluation suppliers in supply chain management | |
Mas' udin et al. | Electronic data interchange and demand forecasting implications on supply chain management collaboration: a customer service perspective | |
Zhang et al. | Modelling and integration of customer flexibility in the order commitment process for high mix low volume production | |
Vijayashree et al. | A single-vendor and a single-buyer integrated inventory model with ordering cost reduction dependent on lead time | |
CN107622420A (en) | A kind of supplier recommends method and device | |
US20130144745A1 (en) | Method and apparatus for managing a supply chain | |
CN112766849A (en) | Method and system for managing digital tags of full life cycles of associated storage materials | |
CN110782199A (en) | Intelligent material distribution system | |
Behin et al. | Optimization of supply chain planning with considering defective rates of products in each echelon | |
Permatasari et al. | Inventory Policy Determination for Raw Materials in ILY Pharmaceutical using Periodic Review (R, s, S) and Periodic Review (R, S) Method to Minimize Total Inventory Cost | |
WO2015050585A1 (en) | Methods and systems for product management | |
Mohammadi et al. | A mixed integer programming model formulation for solving the lot-sizing problem | |
Hulvej et al. | Production planning and production levelling | |
El Masbahi et al. | Enterprise Resource Planning (ERP) and integration of purchase, inventory and sale processes: proposition of a common minimal model | |
Davis | The distribution revolution | |
Guirong et al. | Study on Auto Enterprise Inventory Management | |
TWI506570B (en) | Classification product resource planning system and method thereof | |
CN107515940A (en) | A kind of big data application for alleviating hotel article supply chain Bullwhip Effect | |
RU121623U1 (en) | AUTOMATED SYSTEM FOR IMPLEMENTING AN INTEGRATED PROCUREMENT PROGRAM USING ELECTRONIC TRADING PROCEDURES | |
RU119490U1 (en) | SYSTEM FOR IMPLEMENTATION OF AN INTEGRATED PROCUREMENT PROGRAM | |
Udayakumar et al. | Setup cost reduction in an integrated production inventory system for defective items with service level constraint and delay in payments | |
US7941334B2 (en) | Supplier planning information warehouse |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181207 |