CN108951836B - Online concrete pool wall opening structure and method - Google Patents
Online concrete pool wall opening structure and method Download PDFInfo
- Publication number
- CN108951836B CN108951836B CN201810824524.0A CN201810824524A CN108951836B CN 108951836 B CN108951836 B CN 108951836B CN 201810824524 A CN201810824524 A CN 201810824524A CN 108951836 B CN108951836 B CN 108951836B
- Authority
- CN
- China
- Prior art keywords
- bar planting
- steel
- flange
- short pipe
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F11/00—Cesspools
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28D—WORKING STONE OR STONE-LIKE MATERIALS
- B28D1/00—Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor
- B28D1/14—Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by boring or drilling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28D—WORKING STONE OR STONE-LIKE MATERIALS
- B28D7/00—Accessories specially adapted for use with machines or devices of the preceding groups
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Working Measures On Existing Buildindgs (AREA)
- Building Environments (AREA)
Abstract
The invention discloses an online hole-opening structure and method for a concrete pool wall, and the structure comprises a plurality of bar-planting bolts, a steel short pipe, a flange, a valve, a hole-opening machine and the concrete pool wall, wherein the plurality of bar-planting bolts are arranged, the concrete pool wall is provided with a plurality of bar-planting holes, the plurality of bar-planting holes are distributed in a circular shape, the plurality of bar-planting bolts are respectively fixed in the plurality of bar-planting holes, the concrete pool wall surrounded by the bar-planting bolts is provided with a mounting hole, the steel short pipe is fixed in the mounting hole, the outer wall of the steel short pipe is welded with a steel bar in the concrete pool wall, the exposed end of the bar-planting bolts is connected with the flange, one end of the steel short pipe, which is close to the flange, is welded with the flange, the other end of the flange is connected with the valve. The invention has the advantages of high sealing performance, reliable sealing, good corrosion resistance, small concrete pool wall chiseling surface, small wall surface damage and controllable construction surface.
Description
Technical Field
The invention belongs to the technical field of on-line hole opening of a pool wall, and particularly relates to an on-line hole opening structure and method for a concrete pool wall.
Background
At present, many oil refineries and sewage treatment plants are built by themselves and operated for nearly many years, process upgrading is not carried out, partial facilities and equipment are aged, sewage discharge reaching standards cannot be stable, and technical transformation of sewage treatment process is urgently needed. If the transformation is carried out, the biochemical sewage in the sewage pool or the biochemical pool needs to be drained or transferred firstly in the construction, and then the construction is carried out, and the sewage treatment function of the sewage pool or the biochemical pool is invalid due to the fact that the biochemical sewage with about 8000m inside the sewage pool or the biochemical pool is drained or transferred, and the sewage discharge can not reach the standard, so that the normal production of the device is influenced. Therefore, in order to adjust the design scheme without influencing the normal production of the production device, the online hole opening under pressure is carried out by adopting a method which does not need cleaning a pool and does not influence the production. Utilize machinery among the prior art to excavate the wall body for 1000mm degree of depth be 100 mm's hole with the wall body, destroy the wall body great, have the wall body fracture in the work progress, the construction risk is great. Meanwhile, the mechanical excavation flatness of the wall body is difficult to guarantee, the sealing controllability between the steel plate and the wall body is not high, the in-hole corrosion prevention cannot be implemented, the connection strength of the wall body embedded bolts cannot be guaranteed, and the flanges are easy to connect and lose efficacy.
Disclosure of Invention
The invention aims to overcome the defects of the prior art, provides an online hole opening structure and method for a concrete pool wall, and overcomes the defects of the prior art that 1: the flatness is difficult to ensure, and the sealing property controllability is not high; 2: the damage to the pool wall is large, the wall body cracks in the construction process, and the construction risk is large; 3: corrosion prevention in the hole cannot be performed.
In order to solve the technical problem, the technical scheme of the invention is as follows: the utility model provides an online trompil structure of concrete pool wall, includes bar planting bolt, steel nozzle stub, flange, valve, tapping machine and concrete pool wall, and wherein the bar planting bolt is a plurality of, a plurality of bar planting holes have been seted up to the concrete pool wall, and wherein a plurality of bar planting holes are circular distribution, a plurality of bar planting bolts are fixed in respectively in a plurality of bar planting holes, and wherein the mounting hole has been seted up by the concrete pool wall that the bar planting bolt centers on, the steel nozzle stub is fixed in the mounting hole to steel bar welding in the outer wall of steel nozzle stub and the concrete pool wall, exposed one end and flange joint of bar planting bolt, wherein the steel nozzle stub is close to the one end and the flange welding of flange, flange other end connection valve, wherein the tapping machine is connected to the other end of valve.
Preferably, a gap between the outer wall of the steel short pipe and the mounting hole is filled with a high-performance sealant, wherein the inner wall of the steel short pipe is coated with a preservative to form an anticorrosive layer.
Preferably, the high-performance sealant is JL-747 450-temperature-resistant high-temperature-resistant insulating sealant, Dow Corning 991 high-performance silicone sealant, SD927 plane high-performance sealant or high-performance silicone sealing glue KN-300B, and the preservative is a Technit anticorrosive and antirust treatment agent or a metal preservative SE-1602.
Preferably, the gap between the bar planting hole and the bar planting bolt is filled with bar planting glue, wherein the inner diameter of the bar planting hole is 30mm, and the depth is 200 mm.
Preferably, the bar-planting adhesive is an A-grade adhesive.
Preferably, the diameter of the bar planting bolt is 27mm, the length of the bar planting bolt is 300mm, and the number of the bar planting bolts is 24-30.
Preferably, the inner diameter of the mounting hole is 500mm, the depth of the mounting hole is 200mm, the outer diameter of the steel short pipe is 500mm, and the length of the steel short pipe is 200 mm.
Preferably, the method for opening the hole on the concrete pool wall in line comprises the following steps:
the method comprises the following steps: grinding the concrete pool wall to enable the concrete pool wall to be parallel to the flange sealing surface, and prefabricating a flange and a steel short pipe;
step two: cutting bar planting holes in the wall of the concrete pool, and anchoring bar planting bolts;
step three: cutting a mounting hole in the concrete pool wall surrounded by the bar planting hole, fixing the steel short pipe in the mounting hole, welding the outer wall of the steel short pipe with a steel bar in the concrete pool wall, filling a high-performance sealant in a gap between the outer wall of the steel short pipe and the mounting hole, and coating a preservative on the inner wall of the steel short pipe to form an anticorrosive coating;
step four: fixedly connecting a flange with a bar-planting bolt, and welding the flange with a short steel pipe, wherein a preservative is coated at the joint of the flange and the concrete pool wall;
step five: and connecting a valve to the other end face of the flange, connecting a tapping machine to the other end face of the valve, then performing online tapping operation, and taking out the residual concrete in the mounting hole by using the tapping machine to complete the online tapping operation of the concrete pool wall.
Compared with the prior art, the invention has the advantages that:
(1) according to the invention, the concrete pool wall is provided with a plurality of bar planting holes, the bar planting bolts are fixed in the plurality of bar planting holes, then the concrete pool wall surrounded by the bar planting bolts is provided with mounting holes, then the steel short pipe is fixed in the mounting holes, the outer wall of the steel short pipe is welded with the steel bars in the concrete pool wall, the exposed end of the bar planting bolts is connected with the flange, and the end of the steel short pipe close to the flange is welded with the flange, so that the sealing performance is high, and the sealing is reliable;
(2) the diameter of the mounting hole is 500mm, the depth is 200mm, the concrete pool wall cutting surface is small, the wall surface damage is small, and the construction surface is controllable;
(3) the inner wall of the steel short pipe is coated with the preservative to form an anticorrosive coating, and the joint of the flange and the concrete tank wall is coated with the preservative, so that the corrosion can be effectively prevented.
Drawings
FIG. 1 is a schematic structural diagram of the present invention.
Description of reference numerals:
1-bar planting bolt, 2-steel short pipe, 3-flange, 4-valve, 5-tapping machine, 6-bar planting hole, 7-mounting hole, 8-concrete pool wall, 9-steel bar in the concrete pool wall, and 10-anticorrosive coating.
Detailed Description
The following description of the embodiments of the present invention refers to the accompanying drawings and examples:
it should be noted that the structures, proportions, sizes, and other dimensions shown in the drawings and described in the specification are only for the purpose of understanding and reading the present disclosure, and are not intended to limit the scope of the present disclosure, which is defined by the following claims, and any modifications of the structures, changes in the proportions and adjustments of the sizes, without affecting the efficacy and attainment of the same, are intended to fall within the scope of the present disclosure.
In addition, the terms "upper", "lower", "left", "right", "middle" and "one" used in the present specification are for clarity of description, and are not intended to limit the scope of the present invention, and the relative relationship between the terms and the terms is not to be construed as a scope of the present invention.
Example 1
As shown in figure 1, the invention discloses an on-line hole-opening structure of a concrete pool wall, which comprises a bar-planting bolt 1, a steel short pipe 2, a flange 3, a valve 4, a hole-opening machine 5 and a concrete pool wall 8, wherein the number of the bar planting bolts 1 is multiple, the concrete pool wall 8 is provided with a plurality of bar planting holes 6, the plurality of bar planting holes 6 are distributed in a circular shape, the plurality of bar planting bolts 1 are respectively fixed in the plurality of bar planting holes 6, wherein a concrete pool wall 8 surrounded by the bar planting bolt 1 is provided with a mounting hole 7, the steel short pipe 2 is fixed in the mounting hole 7, the outer wall of the steel short pipe 2 is welded with a steel bar 9 in the concrete pool wall, one exposed end of the embedded bar bolt 1 is connected with the flange 3, one end of the steel short pipe 2 close to the flange 3 is welded with the flange 3, the other end of the flange 3 is connected with a valve 4, and the other end of the valve 4 is connected with a tapping machine 5.
Example 2
As shown in figure 1, the invention discloses an on-line hole-opening structure of a concrete pool wall, which comprises a bar-planting bolt 1, a steel short pipe 2, a flange 3, a valve 4, a hole-opening machine 5 and a concrete pool wall 8, wherein the number of the bar planting bolts 1 is multiple, the concrete pool wall 8 is provided with a plurality of bar planting holes 6, the plurality of bar planting holes 6 are distributed in a circular shape, the plurality of bar planting bolts 1 are respectively fixed in the plurality of bar planting holes 6, wherein a concrete pool wall 8 surrounded by the bar planting bolt 1 is provided with a mounting hole 7, the steel short pipe 2 is fixed in the mounting hole 7, the outer wall of the steel short pipe 2 is welded with a steel bar 9 in the concrete pool wall, one exposed end of the embedded bar bolt 1 is connected with the flange 3, one end of the steel short pipe 2 close to the flange 3 is welded with the flange 3, the other end of the flange 3 is connected with a valve 4, and the other end of the valve 4 is connected with a tapping machine 5.
As shown in fig. 1, preferably, a gap between the outer wall of the steel short pipe 2 and the installation hole 7 is filled with a high-performance sealant, wherein the inner wall of the steel short pipe 2 is coated with a corrosion inhibitor to form an anticorrosive coating 10.
Example 3
As shown in figure 1, the invention discloses an on-line hole-opening structure of a concrete pool wall, which comprises a bar-planting bolt 1, a steel short pipe 2, a flange 3, a valve 4, a hole-opening machine 5 and a concrete pool wall 8, wherein the number of the bar planting bolts 1 is multiple, the concrete pool wall 8 is provided with a plurality of bar planting holes 6, the plurality of bar planting holes 6 are distributed in a circular shape, the plurality of bar planting bolts 1 are respectively fixed in the plurality of bar planting holes 6, wherein a concrete pool wall 8 surrounded by the bar planting bolt 1 is provided with a mounting hole 7, the steel short pipe 2 is fixed in the mounting hole 7, the outer wall of the steel short pipe 2 is welded with a steel bar 9 in the concrete pool wall, one exposed end of the embedded bar bolt 1 is connected with the flange 3, one end of the steel short pipe 2 close to the flange 3 is welded with the flange 3, the other end of the flange 3 is connected with a valve 4, and the other end of the valve 4 is connected with a tapping machine 5.
As shown in fig. 1, preferably, a gap between the outer wall of the steel short pipe 2 and the installation hole 7 is filled with a high-performance sealant, wherein the inner wall of the steel short pipe 2 is coated with a corrosion inhibitor to form an anticorrosive coating 10.
Preferably, the high-performance sealant is JL-747 450-temperature-resistant high-temperature-resistant insulating sealant, Dow Corning 991 high-performance silicone sealant, SD927 plane high-performance sealant or high-performance silicone sealing glue KN-300B, and the preservative is a Technit anticorrosive and antirust treatment agent or a metal preservative SE-1602.
Example 4
As shown in figure 1, the invention discloses an on-line hole-opening structure of a concrete pool wall, which comprises a bar-planting bolt 1, a steel short pipe 2, a flange 3, a valve 4, a hole-opening machine 5 and a concrete pool wall 8, wherein the number of the bar planting bolts 1 is multiple, the concrete pool wall 8 is provided with a plurality of bar planting holes 6, the plurality of bar planting holes 6 are distributed in a circular shape, the plurality of bar planting bolts 1 are respectively fixed in the plurality of bar planting holes 6, wherein a concrete pool wall 8 surrounded by the bar planting bolt 1 is provided with a mounting hole 7, the steel short pipe 2 is fixed in the mounting hole 7, the outer wall of the steel short pipe 2 is welded with a steel bar 9 in the concrete pool wall, one exposed end of the embedded bar bolt 1 is connected with the flange 3, one end of the steel short pipe 2 close to the flange 3 is welded with the flange 3, the other end of the flange 3 is connected with a valve 4, and the other end of the valve 4 is connected with a tapping machine 5.
As shown in fig. 1, preferably, a gap between the outer wall of the steel short pipe 2 and the installation hole 7 is filled with a high-performance sealant, wherein the inner wall of the steel short pipe 2 is coated with a corrosion inhibitor to form an anticorrosive coating 10.
Preferably, the high-performance sealant is JL-747 450-temperature-resistant high-temperature-resistant insulating sealant, Dow Corning 991 high-performance silicone sealant, SD927 plane high-performance sealant or high-performance silicone sealing glue KN-300B, and the preservative is a Technit anticorrosive and antirust treatment agent or a metal preservative SE-1602.
Preferably, the gap between the bar planting hole 6 and the bar planting bolt 1 is filled with bar planting glue, wherein the inner diameter of the bar planting hole 6 is 30mm, and the depth is 200 mm.
Example 5
As shown in figure 1, the invention discloses an on-line hole-opening structure of a concrete pool wall, which comprises a bar-planting bolt 1, a steel short pipe 2, a flange 3, a valve 4, a hole-opening machine 5 and a concrete pool wall 8, wherein the number of the bar planting bolts 1 is multiple, the concrete pool wall 8 is provided with a plurality of bar planting holes 6, the plurality of bar planting holes 6 are distributed in a circular shape, the plurality of bar planting bolts 1 are respectively fixed in the plurality of bar planting holes 6, wherein a concrete pool wall 8 surrounded by the bar planting bolt 1 is provided with a mounting hole 7, the steel short pipe 2 is fixed in the mounting hole 7, the outer wall of the steel short pipe 2 is welded with a steel bar 9 in the concrete pool wall, one exposed end of the embedded bar bolt 1 is connected with the flange 3, one end of the steel short pipe 2 close to the flange 3 is welded with the flange 3, the other end of the flange 3 is connected with a valve 4, and the other end of the valve 4 is connected with a tapping machine 5.
As shown in fig. 1, preferably, a gap between the outer wall of the steel short pipe 2 and the installation hole 7 is filled with a high-performance sealant, wherein the inner wall of the steel short pipe 2 is coated with a corrosion inhibitor to form an anticorrosive coating 10.
Preferably, the high-performance sealant is JL-747 450-temperature-resistant high-temperature-resistant insulating sealant, Dow Corning 991 high-performance silicone sealant, SD927 plane high-performance sealant or high-performance silicone sealing glue KN-300B, and the preservative is a Technit anticorrosive and antirust treatment agent or a metal preservative SE-1602.
Preferably, the gap between the bar planting hole 6 and the bar planting bolt 1 is filled with bar planting glue, wherein the inner diameter of the bar planting hole 6 is 30mm, and the depth is 200 mm.
Preferably, the bar-planting adhesive is an A-grade adhesive.
Example 6
As shown in figure 1, the invention discloses an on-line hole-opening structure of a concrete pool wall, which comprises a bar-planting bolt 1, a steel short pipe 2, a flange 3, a valve 4, a hole-opening machine 5 and a concrete pool wall 8, wherein the number of the bar planting bolts 1 is multiple, the concrete pool wall 8 is provided with a plurality of bar planting holes 6, the plurality of bar planting holes 6 are distributed in a circular shape, the plurality of bar planting bolts 1 are respectively fixed in the plurality of bar planting holes 6, wherein a concrete pool wall 8 surrounded by the bar planting bolt 1 is provided with a mounting hole 7, the steel short pipe 2 is fixed in the mounting hole 7, the outer wall of the steel short pipe 2 is welded with a steel bar 9 in the concrete pool wall, one exposed end of the embedded bar bolt 1 is connected with the flange 3, one end of the steel short pipe 2 close to the flange 3 is welded with the flange 3, the other end of the flange 3 is connected with a valve 4, and the other end of the valve 4 is connected with a tapping machine 5.
As shown in fig. 1, preferably, a gap between the outer wall of the steel short pipe 2 and the installation hole 7 is filled with a high-performance sealant, wherein the inner wall of the steel short pipe 2 is coated with a corrosion inhibitor to form an anticorrosive coating 10.
Preferably, the high-performance sealant is JL-747 450-temperature-resistant high-temperature-resistant insulating sealant, Dow Corning 991 high-performance silicone sealant, SD927 plane high-performance sealant or high-performance silicone sealing glue KN-300B, and the preservative is a Technit anticorrosive and antirust treatment agent or a metal preservative SE-1602.
Preferably, the gap between the bar planting hole 6 and the bar planting bolt 1 is filled with bar planting glue, wherein the inner diameter of the bar planting hole 6 is 30mm, and the depth is 200 mm.
Preferably, the bar-planting adhesive is an A-grade adhesive.
Preferably, the diameter of the bar planting bolt 1 is 27mm, the length is 300mm, and the number is 24-30.
Example 7
As shown in figure 1, the invention discloses an on-line hole-opening structure of a concrete pool wall, which comprises a bar-planting bolt 1, a steel short pipe 2, a flange 3, a valve 4, a hole-opening machine 5 and a concrete pool wall 8, wherein the number of the bar planting bolts 1 is multiple, the concrete pool wall 8 is provided with a plurality of bar planting holes 6, the plurality of bar planting holes 6 are distributed in a circular shape, the plurality of bar planting bolts 1 are respectively fixed in the plurality of bar planting holes 6, wherein a concrete pool wall 8 surrounded by the bar planting bolt 1 is provided with a mounting hole 7, the steel short pipe 2 is fixed in the mounting hole 7, the outer wall of the steel short pipe 2 is welded with a steel bar 9 in the concrete pool wall, one exposed end of the embedded bar bolt 1 is connected with the flange 3, one end of the steel short pipe 2 close to the flange 3 is welded with the flange 3, the other end of the flange 3 is connected with a valve 4, and the other end of the valve 4 is connected with a tapping machine 5.
As shown in fig. 1, preferably, a gap between the outer wall of the steel short pipe 2 and the installation hole 7 is filled with a high-performance sealant, wherein the inner wall of the steel short pipe 2 is coated with a corrosion inhibitor to form an anticorrosive coating 10.
Preferably, the high-performance sealant is JL-747 450-temperature-resistant high-temperature-resistant insulating sealant, Dow Corning 991 high-performance silicone sealant, SD927 plane high-performance sealant or high-performance silicone sealing glue KN-300B, and the preservative is a Technit anticorrosive and antirust treatment agent or a metal preservative SE-1602.
Preferably, the gap between the bar planting hole 6 and the bar planting bolt 1 is filled with bar planting glue, wherein the inner diameter of the bar planting hole 6 is 30mm, and the depth is 200 mm.
Preferably, the bar-planting adhesive is an A-grade adhesive.
Preferably, the diameter of the bar planting bolt 1 is 27mm, the length is 300mm, and the number is 24-30.
Preferably, the inner diameter of the mounting hole is 500mm, the depth of the mounting hole is 200mm, the outer diameter of the steel short pipe is 500mm, and the length of the steel short pipe is 200 mm.
Example 8
As shown in figure 1, the invention discloses an on-line hole-opening structure of a concrete pool wall, which comprises a bar-planting bolt 1, a steel short pipe 2, a flange 3, a valve 4, a hole-opening machine 5 and a concrete pool wall 8, wherein the number of the bar planting bolts 1 is multiple, the concrete pool wall 8 is provided with a plurality of bar planting holes 6, the plurality of bar planting holes 6 are distributed in a circular shape, the plurality of bar planting bolts 1 are respectively fixed in the plurality of bar planting holes 6, wherein a concrete pool wall 8 surrounded by the bar planting bolt 1 is provided with a mounting hole 7, the steel short pipe 2 is fixed in the mounting hole 7, the outer wall of the steel short pipe 2 is welded with a steel bar 9 in the concrete pool wall, one exposed end of the embedded bar bolt 1 is connected with the flange 3, one end of the steel short pipe 2 close to the flange 3 is welded with the flange 3, the other end of the flange 3 is connected with a valve 4, and the other end of the valve 4 is connected with a tapping machine 5.
As shown in fig. 1, preferably, a gap between the outer wall of the steel short pipe 2 and the installation hole 7 is filled with a high-performance sealant, wherein the inner wall of the steel short pipe 2 is coated with a corrosion inhibitor to form an anticorrosive coating 10.
Preferably, the high-performance sealant is JL-747 450-temperature-resistant high-temperature-resistant insulating sealant, Dow Corning 991 high-performance silicone sealant, SD927 plane high-performance sealant or high-performance silicone sealing glue KN-300B, and the preservative is a Technit anticorrosive and antirust treatment agent or a metal preservative SE-1602.
Preferably, the gap between the bar planting hole 6 and the bar planting bolt 1 is filled with bar planting glue, wherein the inner diameter of the bar planting hole 6 is 30mm, and the depth is 200 mm.
Preferably, the bar-planting adhesive is an A-grade adhesive.
Preferably, the diameter of the bar planting bolt 1 is 27mm, the length is 300mm, and the number is 24-30.
Preferably, the inner diameter of the mounting hole is 500mm, the depth of the mounting hole is 200mm, the outer diameter of the steel short pipe is 500mm, and the length of the steel short pipe is 200 mm.
As shown in fig. 1, an on-line hole opening method for a concrete pool wall as described in any one of the above, comprises the following steps:
the method comprises the following steps: grinding the concrete pool wall 8 to enable the concrete pool wall 8 to be parallel to the sealing surface of the flange 3, and prefabricating the flange 3 and the steel short pipe 2;
step two: cutting a bar planting hole 6 in the concrete pool wall 8, and anchoring the bar planting bolt 1;
step three: cutting a mounting hole 7 in a concrete pool wall 8 surrounded by the bar planting hole 6, fixing the steel short pipe 2 in the mounting hole 7, welding the outer wall of the steel short pipe 2 with a steel bar 9 in the concrete pool wall, filling a high-performance sealant in a gap between the outer wall of the steel short pipe 2 and the mounting hole 7, and coating a preservative on the inner wall of the steel short pipe 2 to form an anticorrosive coating;
step four: fixedly connecting a flange 3 with a bar-planting bolt 1, and welding the flange 2 with a steel short pipe 2, wherein a preservative is coated at the joint of the flange 3 and a concrete pool wall 8;
step five: and connecting a valve 4 to the other end face of the flange 3, connecting a tapping machine 5 to the other end face of the valve 4, then performing online tapping operation, and taking out the residual concrete in the mounting hole 7 by using the tapping machine 5 to complete the online tapping operation of the concrete pool wall.
The bar-planting adhesive disclosed by the invention is constructed by adopting a domestic grade A adhesive according to the strict standard of concrete structure reinforcement technical specification CECS 25: 90, the bar-planting bolt 1 is strictly prohibited to be triggered and interfered within 3 days after being implanted, the maintenance and the curing are enhanced, the flange 3 and the valve 4 are installed and subjected to a hydraulic test 5 days after the bar-planting bolt 1 is implanted and cured, and the hole opening operation is performed after the detection is qualified.
According to the invention, the mounting hole 7 with the diameter of 510mm and the depth of 200mm is drilled at the position of the drilled hole, the steel short pipe 2 with the outer diameter of 500mm and the length of 200mm is mounted in the mounting hole 7, the outer wall of the steel short pipe 2 is welded with the steel bar 9 in the concrete pool wall, a high-performance sealant is filled in a gap between the outer wall of the steel short pipe 2 and the concrete pool wall 8, after solidification, the outer flange 3 and the inner steel short pipe 2 are welded, so that the connection strength and the sealing property can be ensured, and meanwhile, the inner layer corrosion prevention is carried out on the inner wall of the steel short pipe 2.
According to the invention, the concrete pool wall is provided with a plurality of bar planting holes, the bar planting bolts are fixed in the plurality of bar planting holes, then the concrete pool wall surrounded by the bar planting bolts is provided with the mounting holes, then the steel short pipe is fixed in the mounting holes, the outer wall of the steel short pipe is welded with the steel bars in the concrete pool wall, the exposed end of the bar planting bolts is connected with the flange, and the end of the steel short pipe close to the flange is welded with the flange, so that the sealing performance is high, and the sealing is reliable.
The diameter of the mounting hole is 500mm, the depth is 200mm, the concrete pool wall cutting surface is small, the wall surface damage is small, and the construction surface is controllable; the inner wall of the steel short pipe is coated with the preservative to form an anticorrosive coating, and the joint of the flange and the concrete tank wall is coated with the preservative, so that the corrosion can be effectively prevented.
Although the preferred embodiments of the present invention have been described in detail with reference to the accompanying drawings, the present invention is not limited to the above embodiments, and various changes can be made within the knowledge of those skilled in the art without departing from the spirit of the present invention.
Many other changes and modifications can be made without departing from the spirit and scope of the invention. It is to be understood that the invention is not to be limited to the specific embodiments, but only by the scope of the appended claims.
Claims (1)
1. The utility model provides an online trompil structure of concrete pool wall which characterized in that: the steel bar planting bolt structure comprises a plurality of steel bar planting bolts, a steel short pipe, a flange, a valve, a hole opening machine and a concrete pool wall, wherein the plurality of steel bar planting bolts are arranged, the concrete pool wall is provided with a plurality of steel bar planting holes, the plurality of steel bar planting holes are distributed in a circular shape, the plurality of steel bar planting bolts are respectively fixed in the plurality of steel bar planting holes, the concrete pool wall surrounded by the steel bar planting bolts is provided with a mounting hole, the steel short pipe is fixed in the mounting hole, the outer wall of the steel short pipe is welded with steel bars in the concrete pool wall, one exposed end of the steel bar planting bolts is connected with the flange, one end, close to the flange, of the steel short pipe is welded with the flange, the other end of the flange is connected with the valve, and; a gap between the outer wall of the steel short pipe and the mounting hole is filled with a high-performance sealant, wherein the inner wall of the steel short pipe is coated with a preservative to form an anticorrosive layer; the gap between the bar planting hole and the bar planting bolt is filled with bar planting glue, wherein the inner diameter of the bar planting hole is 30mm, and the depth is 200 mm; the diameter of the bar planting bolt is 27mm, the length of the bar planting bolt is 300mm, and the number of the bar planting bolts is 24-30; the inner diameter of the mounting hole is 500mm, the depth of the mounting hole is 200mm, the outer diameter of the steel short pipe is 500mm, and the length of the steel short pipe is 200 mm;
the method for opening the concrete pool wall in the online opening structure comprises the following steps:
the method comprises the following steps: grinding the concrete pool wall to enable the concrete pool wall to be parallel to the flange sealing surface, and prefabricating a flange and a steel short pipe;
step two: cutting bar planting holes in the wall of the concrete pool, and anchoring bar planting bolts;
step three: cutting a mounting hole in the concrete pool wall surrounded by the bar planting hole, fixing the steel short pipe in the mounting hole, welding the outer wall of the steel short pipe with a steel bar in the concrete pool wall, filling a high-performance sealant in a gap between the outer wall of the steel short pipe and the mounting hole, and coating a preservative on the inner wall of the steel short pipe to form an anticorrosive coating;
step four: fixedly connecting a flange with a bar-planting bolt, and welding the flange with a short steel pipe, wherein a preservative is coated at the joint of the flange and the concrete pool wall;
step five: and connecting a valve to the other end face of the flange, connecting a tapping machine to the other end face of the valve, then performing online tapping operation, and taking out the residual concrete in the mounting hole by using the tapping machine to complete the online tapping operation of the concrete pool wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810824524.0A CN108951836B (en) | 2018-07-25 | 2018-07-25 | Online concrete pool wall opening structure and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810824524.0A CN108951836B (en) | 2018-07-25 | 2018-07-25 | Online concrete pool wall opening structure and method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108951836A CN108951836A (en) | 2018-12-07 |
CN108951836B true CN108951836B (en) | 2021-05-14 |
Family
ID=64464760
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810824524.0A Active CN108951836B (en) | 2018-07-25 | 2018-07-25 | Online concrete pool wall opening structure and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108951836B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112343164B (en) * | 2020-10-22 | 2022-02-08 | 中建一局集团安装工程有限公司 | Construction process for communicating pipeline with water tank body |
CN114799253B (en) * | 2022-03-11 | 2024-03-12 | 中石化石油工程技术服务有限公司 | Hole punching tool under pressure |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1413789A (en) * | 2002-11-12 | 2003-04-30 | 江苏法尔胜技术开发中心 | Method and device for open pore on steel plastic compound tube with pressure |
FR2888308A1 (en) * | 2005-07-05 | 2007-01-12 | Avk Rewag B V | Making joints to permanent pipes under pressure, e.g. steel pipes containing a circulating medium, involves using a coupling joint with an integrated drill which drills through the pipe wall while the joint is in place |
CN201261950Y (en) * | 2008-09-09 | 2009-06-24 | 贵阳铝镁设计研究院 | Open pore structure on steel reinforced concrete pond wall |
CN104763846A (en) * | 2015-04-08 | 2015-07-08 | 河南省煤气(集团)有限责任公司义马气化厂 | Online hole forming device and method for large reinforced concrete wall |
CN105019540A (en) * | 2014-04-23 | 2015-11-04 | 宝山钢铁股份有限公司 | Method for quickly perforating hole and installing water inlet pipe in water pool |
CN106704702A (en) * | 2016-12-14 | 2017-05-24 | 江西自立环保科技有限公司 | Simple embedded pipe adding method |
-
2018
- 2018-07-25 CN CN201810824524.0A patent/CN108951836B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1413789A (en) * | 2002-11-12 | 2003-04-30 | 江苏法尔胜技术开发中心 | Method and device for open pore on steel plastic compound tube with pressure |
FR2888308A1 (en) * | 2005-07-05 | 2007-01-12 | Avk Rewag B V | Making joints to permanent pipes under pressure, e.g. steel pipes containing a circulating medium, involves using a coupling joint with an integrated drill which drills through the pipe wall while the joint is in place |
CN201261950Y (en) * | 2008-09-09 | 2009-06-24 | 贵阳铝镁设计研究院 | Open pore structure on steel reinforced concrete pond wall |
CN105019540A (en) * | 2014-04-23 | 2015-11-04 | 宝山钢铁股份有限公司 | Method for quickly perforating hole and installing water inlet pipe in water pool |
CN104763846A (en) * | 2015-04-08 | 2015-07-08 | 河南省煤气(集团)有限责任公司义马气化厂 | Online hole forming device and method for large reinforced concrete wall |
CN106704702A (en) * | 2016-12-14 | 2017-05-24 | 江西自立环保科技有限公司 | Simple embedded pipe adding method |
Also Published As
Publication number | Publication date |
---|---|
CN108951836A (en) | 2018-12-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108951836B (en) | Online concrete pool wall opening structure and method | |
CN106639313A (en) | Rubber water stopping plug and construction method for plugging and stopping water of opposite-pull bolt hole of underground outer wall template | |
CN206666644U (en) | Oil-water well sacrificial anode corrosion-preventing device | |
CN104295109B (en) | Do not register one's residence balcony rapid reinforcement structure and construction method thereof in old community | |
CN108104367B (en) | Double-connecting beam and construction method thereof | |
CN109056734A (en) | Diaphram wall defect grouting mending construction method | |
CN207702026U (en) | A kind of automatic slag removal water pipeline applied to hydraulic engineering | |
CN111962407A (en) | Method for treating incomplete grouting of hogging moment prestress hole channel of continuous beam | |
CN110777860A (en) | Method for grouting and plugging back of side wall leakage water of subway station | |
CN202689039U (en) | Grouting tube structure of immersed tube tunnel tube section | |
CN110863670A (en) | Method for repairing corrosion of tower foot of transmission steel tower | |
CN206874975U (en) | A kind of water string | |
WO2022052438A1 (en) | End plugging device for pre-stressed pipeline press-grouting | |
CN201093142Y (en) | Erosion pipe cold weld reinforcing tube sleeve | |
CN204874758U (en) | Degrease equipment of almag pipeline | |
CN207673965U (en) | Circulating water pipeline plugging device through walls | |
CN207608935U (en) | A kind of basement bottom board water seepage treatment device | |
CN204098519U (en) | Do not register one's residence balcony rapid reinforcement structure in old community | |
CN207453121U (en) | A kind of hydraulic structure flow-passing surface pre-embedded anchoring bolts | |
CN204898709U (en) | Architecture of pump | |
CN202830998U (en) | Integrated equipment foundation and terrace connection alkali-resisting structure | |
CN214062961U (en) | Compound complicated section shaped steel shield constructs restoration structure | |
CN216076768U (en) | Tool type civil air defense door lifting hook | |
CN220748285U (en) | Tunnel reinforced structure of prestressing force grooving embedding steel | |
CN104060636A (en) | Depressurization and anti-floating method and device thereof for foundation construction in high water level region building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Yang Kaiyan Inventor after: Yan Wenting Inventor after: He Jianbin Inventor after: Wang Chao Inventor after: Sun Dong Inventor after: Liu Hongbo Inventor after: Zhang Fei Inventor before: He Jianbin Inventor before: Wang Chao Inventor before: Sun Dong |
|
GR01 | Patent grant | ||
GR01 | Patent grant |