CN108951639A CN201810962546.3A CN201810962546A CN108951639A CN 108951639 A CN108951639 A CN 108951639A CN 201810962546 A CN201810962546 A CN 201810962546A CN 108951639 A CN108951639 A CN 108951639A
Authority
CN
China
Prior art keywords
bored concrete
concrete pile
geological environment
pile
ampelitic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810962546.3A
Other languages
Chinese (zh)
Inventor
易超
梁森
郭永伟
向良馗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau First Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau First Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau First Construction Engineering Co Ltd
Priority to CN201810962546.3A priority Critical patent/CN108951639A/en
Publication of CN108951639A publication Critical patent/CN108951639A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts

Abstract

The present invention provides bored concrete pile post-grouting method under a kind of ampelitic limestone geological environment, it is characterized in that, advance drilling detection is carried out to stake position geological environment before filling pile construction, advance drilling can accurately judge the solution cavity position of this when detecting, when fabrication of reinforcing cage installs Grouting Pipe, endless tube Grouting Pipe is mounted on corresponding solution cavity middle position and stake bottom, slip casting is carried out to bored concrete pile after pile 3 days.To solve to use the problems such as excessive, construction is complex, higher cost for bored concrete pile pile body integrity, the influence of pile body frictional force, bearing capacity of pile tip, and Grouting Pipe under ampelitic limestone geological environment.Belong to foundation of civil work technical field of construction.

Description

Bored concrete pile post-grouting method under a kind of ampelitic limestone geological environment
Technical field
The present invention relates to a kind of bored concrete pile post-grouting methods, belong to foundation of civil work technical field of construction.
Background technique
Bored concrete pile grouting behind shaft or drift lining is one kind of bored concrete pile grouting behind shaft or drift lining under ampelitic limestone geological environment.Bored concrete pile grouting behind shaft or drift lining is to fill Slip casting is carried out to bored concrete pile after infusing pile driving construction, Grouting Pipe is added in filling pile cage of reinforcement production, starts to infuse after pile 3 days Slurry, the sequence of slip casting is upper side pipe → lower side pipe → end pipe.Its advantage is that an end, Pile side soil body (including sediment and mud can be made Skin) it is reinforced, to improve single pile bearing capacity of single pile, reduce sedimentation.
Currently, the Grouting Pipe that bored concrete pile grouting behind shaft or drift lining uses is straight tube, under ampelitic limestone geological environment, after filling pile construction Slip casting need to be carried out for pile body solution cavity position, when slip casting, each solution cavity position need at least install 3 Grouting Pipes, if pile body exists Multiple solution cavities then need to install a large amount of Grouting Pipes, i.e. influence pile body structure, and it is complicated to construct, and higher cost is unfavorable to apply on site Work.
Summary of the invention
It is an object of the invention to: bored concrete pile post-grouting method under a kind of ampelitic limestone geological environment is provided, to solve carbon Bored concrete pile pile body integrity, the influence of pile body frictional force, bearing capacity of pile tip, and Grouting Pipe are used under matter limestone geology environment Excessively, the problems such as construction is complex, higher cost.
To solve the above problems, bored concrete pile post-grouting method under such a ampelitic limestone geological environment of proposed adoption, is filling Advance drilling detection is carried out to stake position geological environment before infusing pile driving construction, advance drilling can accurately judge the solution cavity position of this when detecting It sets, when fabrication of reinforcing cage installs Grouting Pipe, endless tube Grouting Pipe is mounted on corresponding solution cavity middle position and stake bottom, pile 3 days Slip casting is carried out to bored concrete pile afterwards.
In preceding method, each solution cavity and stake bottom are correspondingly arranged on an endless tube Grouting Pipe respectively;
In preceding method, the endless tube Grouting Pipe includes spiral helicine slip casting section and vertically arranged draws slurry section, spiral helicine note Slurry section is installed on the middle position or stake bottom of solution cavity, and the lower end for drawing slurry section is connected with the upper end of slip casting section;
In preceding method, slip casting section is an integral structure with slurry section is drawn.
Compared with prior art, the present invention takes full advantage of advance drilling detection, has understood this 's before filling pile construction Geological environment can accurately judge the position of solution cavity, and when installing Grouting Pipe, Grouting Pipe is accurately mounted on solution cavity region Centre, effective solution influence of the ampelitic limestone geological environment for bored concrete pile;In addition, the present invention is using endless tube as slip casting Pipe, as Grouting Pipe, reduces the installation of Grouting Pipe, is easy to make, and easy for installation, cost is relatively low relative to using straight tube.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is the structural schematic diagram of endless tube Grouting Pipe.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, the present invention is made into one below in conjunction with attached drawing The detailed description of step.
Embodiment:
Referring to Figures 1 and 2, the present embodiment provides bored concrete pile post-grouting method under a kind of ampelitic limestone geological environment, this method exists Bored concrete pile 4 carries out advance drilling detection to stake position geological environment before constructing, and advance drilling can accurately judge that this 's is molten when detecting Endless tube Grouting Pipe 3 is mounted on middle position and the stake of corresponding solution cavity 1 in 2 fabrication and installation Grouting Pipe of steel reinforcement cage by 1 position of hole Bottom 5, each solution cavity 1 and stake bottom 5 are correspondingly arranged on an endless tube Grouting Pipe 3 respectively, and endless tube Grouting Pipe 3 includes spiral helicine note Section 32 is starched in slurry section 31 and vertically arranged drawing, and spiral helicine slip casting section 31 is installed on the middle position or stake bottom 5 of solution cavity 1, draws slurry The lower end of section 32 is connected with the upper end of slip casting section 31, and preferably slip casting section 31 is an integral structure with slurry section 32 is drawn, and pile 3 days Slip casting is carried out to bored concrete pile 4 afterwards, 6 refer to stake top in Fig. 1.
The above embodiments are only used to illustrate and not limit the technical solutions of the present invention, although referring to above-described embodiment to this hair It is bright to be described in detail, it will be apparent to an ordinarily skilled person in the art that: still the present invention can be modified or be waited With replacement, without departing from the spirit or scope of the invention, or any substitutions, should all cover in power of the invention In sharp claimed range.

Claims (4)

1. bored concrete pile post-grouting method under a kind of ampelitic limestone geological environment, it is characterised in that: to stake before bored concrete pile (4) construction Position geological environment carries out advance drilling detection, and advance drilling can accurately judge 1 position of solution cavity of this when detecting, in steel reinforcement cage (2) when fabrication and installation Grouting Pipe, endless tube Grouting Pipe (3) is mounted on corresponding solution cavity (1) middle position and stake bottom (5), pile 3 days Slip casting is carried out to bored concrete pile (4) afterwards.
2. bored concrete pile post-grouting method under a kind of ampelitic limestone geological environment according to claim 1, it is characterised in that: each Solution cavity (1) and stake bottom (5) are correspondingly arranged on an endless tube Grouting Pipe (3) respectively.
3. bored concrete pile post-grouting method under a kind of ampelitic limestone geological environment according to claim 2, it is characterised in that: described Endless tube Grouting Pipe (3) includes that section (32) are starched in spiral helicine slip casting section (31) and vertically arranged drawing, spiral helicine slip casting section (31) It is installed on the middle position or stake bottom (5) of solution cavity (1), the lower end for drawing slurry section 32 is connected with the upper end of slip casting section (31).
4. bored concrete pile post-grouting method under a kind of ampelitic limestone geological environment according to claim 3, it is characterised in that: slip casting Section (31) and draw starch section (32) be an integral structure.
CN201810962546.3A 2018-08-22 2018-08-22 Bored concrete pile post-grouting method under a kind of ampelitic limestone geological environment Pending CN108951639A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810962546.3A CN108951639A (en) 2018-08-22 2018-08-22 Bored concrete pile post-grouting method under a kind of ampelitic limestone geological environment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810962546.3A CN108951639A (en) 2018-08-22 2018-08-22 Bored concrete pile post-grouting method under a kind of ampelitic limestone geological environment

Publications (1)

Publication Number Publication Date
CN108951639A true CN108951639A (en) 2018-12-07

Family

ID=64473677

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810962546.3A Pending CN108951639A (en) 2018-08-22 2018-08-22 Bored concrete pile post-grouting method under a kind of ampelitic limestone geological environment

Country Status (1)

Country Link
CN (1) CN108951639A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07158062A (en) * 1992-09-10 1995-06-20 Kume Sekkei:Kk Concrete pile and joint construction method for the pile and foundation slab
CN201722685U (en) * 2010-02-05 2011-01-26 中国建筑第四工程局有限公司 No-adhesive prestress and pile side rear grouting punching pile structure
CN203411979U (en) * 2013-08-20 2014-01-29 河北建设勘察研究院有限公司 Post-grouting device for pile side of cast-in-situ bored pile
CN106088086A (en) * 2016-08-08 2016-11-09 中国电建集团贵阳勘测设计研究院有限公司 The pile body post-mud-jacking bored pile of karst area deep foundation pit fender post supporting
CN206308699U (en) * 2016-11-24 2017-07-07 北京市地质工程公司 Dregs area slope protection pile fixed section grouting and reinforcing device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07158062A (en) * 1992-09-10 1995-06-20 Kume Sekkei:Kk Concrete pile and joint construction method for the pile and foundation slab
CN201722685U (en) * 2010-02-05 2011-01-26 中国建筑第四工程局有限公司 No-adhesive prestress and pile side rear grouting punching pile structure
CN203411979U (en) * 2013-08-20 2014-01-29 河北建设勘察研究院有限公司 Post-grouting device for pile side of cast-in-situ bored pile
CN106088086A (en) * 2016-08-08 2016-11-09 中国电建集团贵阳勘测设计研究院有限公司 The pile body post-mud-jacking bored pile of karst area deep foundation pit fender post supporting
CN206308699U (en) * 2016-11-24 2017-07-07 北京市地质工程公司 Dregs area slope protection pile fixed section grouting and reinforcing device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
许晓英;: "冲(钻)孔灌注桩后注浆技术在岩溶地区的应用" *

Similar Documents

Publication Publication Date Title
CN101122131B (en) Foundation pit supporting pile using pipe casting pile embedding in rock
CN103334770B (en) One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method
CN103114599B (en) Deep basal pit sealing dewatering device and construction method thereof
CN104532821A (en) Extra-large karst cave bottom treatment construction method
CN210562157U (en) Post-grouting composite pile
CN105696550B (en) A kind of three axes agitating pile construction method of additional reinforcement continuous wall trench underground
CN208167713U (en) A kind of film bag grouting and reinforcing type filling pile structure
CN107386274A (en) Wear the compound isolation pile and its reinforced construction method of bridge pier in tunnel side
CN110359540A (en) A kind of shallow earthing Large Diameter Pipeline high water level wears the artificial jacking construction engineering method of existing road
CN105332710A (en) Construction method suitable for up-down overlapped tunnel with small clear space and long distance under weak geological condition
CN101906780A (en) Method for protecting and reinforcing anchor rope of steel pipe pile
CN110295597A (en) Close to buildings Soft Clay pattern foundation pit supporting structure steel sheet pile is pulled out and grouting strengthening method
CN201762702U (en) Drilling bitten pile
CN107965325A (en) Just branch bow member replaces construction method to a kind of small interval shallow tunnel
CN104453915B (en) Big cross section vertical shaft pre-pouring grout reinforces Rapid Excavation method
CN103343534A (en) Closed precipitation method for foundation pit construction
CN110055973A (en) Construction space foundation pit enclosure structure and water-stopping method under by high metal bridge in limited time
CN102434718B (en) Method for reinforcing originating end of push bench
CN205444192U (en) Bridge stake is towards pile driving construction system
CN209621322U (en) A kind of guide table structure missed the stop suitable for rock tunnel(ling) machine
CN108951639A (en) Bored concrete pile post-grouting method under a kind of ampelitic limestone geological environment
CN208717914U (en) The cyclic annular Grouting Pipe of bored concrete pile grouting behind shaft or drift lining under a kind of geological environment for ampelitic limestone
CN105840209A (en) Construction method for controlling deformation of anchor piles at barrel segment of tunnel
CN105804072A (en) Slip casting pipe device, Y-shaped abnormal-shape pile with device in prefabricated manner and slip casting method of device
CN206581314U (en) Screw head muscle body posttension pile foundation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181207