CN108951384A - The laying apparatus and its laying method of TGXG - Google Patents

The laying apparatus and its laying method of TGXG Download PDF

Info

Publication number
CN108951384A
CN108951384A CN201811025390.2A CN201811025390A CN108951384A CN 108951384 A CN108951384 A CN 108951384A CN 201811025390 A CN201811025390 A CN 201811025390A CN 108951384 A CN108951384 A CN 108951384A
Authority
CN
China
Prior art keywords
tgxg
support beam
otic placode
shaft
dump truck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811025390.2A
Other languages
Chinese (zh)
Inventor
程寅雪
王朝瑞
蒋培春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
International Construction Project Co Ltd Of Beijing Jian Gong
Original Assignee
International Construction Project Co Ltd Of Beijing Jian Gong
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by International Construction Project Co Ltd Of Beijing Jian Gong filed Critical International Construction Project Co Ltd Of Beijing Jian Gong
Priority to CN201811025390.2A priority Critical patent/CN108951384A/en
Publication of CN108951384A publication Critical patent/CN108951384A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C21/00Apparatus or processes for surface soil stabilisation for road building or like purposes, e.g. mixing local aggregate with binder

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention relates to TGXG technical fields, disclose the laying apparatus and its laying method of a kind of TGXG.The present invention includes dump truck, the supporting frame positioned at dump truck front end, and hangs the TGXG reel being located at below supporting frame, and TGXG reel is fixed by shaft and supporting frame;Supporting frame includes support beam, connects a pair of of attachment beam of support beam and dump truck, and a pair of of the connection otic placode being arranged in support beam;Support beam is arranged perpendicular to the direction of travel of dump truck, and a pair of of connection otic placode is symmetricly set on support beam both ends, is located at below support beam, and vertical edge edge in connection otic placode side offers the mounting groove that shaft is set for card diagonally downward;Shaft is equipped in TGXG reel, TGXG reel and shaft are rotatablely connected, and shaft both ends are fastened in the mounting groove of connection otic placode.Operation of the present invention mechanization degree is high, time saving and energy saving, is laid with high-efficient.

Description

The laying apparatus and its laying method of TGXG
Technical field
The present invention relates to TGXG technical fields, laying apparatus and its laying side more particularly to a kind of TGXG Method.
Background technique
In the work progress on asphalt concrete road road surface, the bituminous concrete interlayer of different-grain diameter often is provided with soil Work grid, to enhance interlayer frictional engagement power;After the completion of lower layer's bituminous concrete is laid with, sticking layer oil is sprayed, is then laid with soil Work grid.
Traditional method is the road face one end manually lifted TGXG in rolls to that need to be laid with, and TGXG reel is put down, Then it is rolled to direction to be spread, completes TGXG and be laid with, reciprocating operation is laid with until completing whole road faces.Such method is time-consuming Arduously, worker carries coiled TGXG repeatedly, inefficiency;In addition, worker is in the pitch road for being sprayed with sticking layer oil It walks about on face, sole is easily clung by sticking layer oil, and action is extremely inconvenient, and can pollute sticking layer oil surface layer, causes one to construction quality Fixed influence.
Summary of the invention
The present invention provides a kind of operation mechanization degree height, time saving and energy saving, is laid with the laying dress of high-efficient TGXG It sets and its laying method.
The technical issues of solution is: the paving mode of traditional TGXG needs consuming a large amount of artificial, and laying difficulty is big, It is time-consuming and laborious, it is laid with low efficiency;Worker walks about on the asphalt pavement for be sprayed with sticking layer oil, not only handicapped, but also can be dirty Sticking layer oil surface layer is contaminated, is affected to construction quality.
In order to solve the above technical problems, the present invention adopts the following technical scheme:
The laying apparatus of TGXG of the present invention, including dump truck, the supporting frame positioned at dump truck front end, and hang and be located at branch TGXG reel below support body, TGXG reel are fixed by shaft and supporting frame;
Supporting frame includes support beam, connects a pair of of attachment beam of support beam and dump truck, and be arranged in support beam On a pair of of connection otic placode;Support beam is arranged perpendicular to the direction of travel of dump truck, attachment beam one end and support beam side wall Fixed, the other end and the sole of dump truck front end are detachably fixed;A pair of of connection otic placode is symmetricly set on support beam both ends, Below support beam, vertical edge edge in connection otic placode side offers the mounting groove that shaft is set for card diagonally downward;
Shaft is equipped in TGXG reel, TGXG reel and shaft are rotatablely connected, and shaft both ends are fastened on engaging lug In the mounting groove of plate.
The laying apparatus of TGXG of the present invention, further, the attachment beam are located at the middle part of support beam, along support Crossbeam length direction is intervally arranged, and is arranged perpendicular to support beam;The sole of attachment beam and dump truck overlaps up and down, and passes through Connection bolt is fixed.
The laying apparatus of TGXG of the present invention, further, the connection otic placode are rectangular steel plates, are vertically arranged, and are pushed up Portion edge is welded and fixed with support beam bottom surface;The opening of mounting groove is located in the middle part of connection otic placode, installation trench bottom and cell wall circle Arc transition connection, the diameter of bottom circular arc and the outer diameter of shaft are adapted.
The laying apparatus of TGXG of the present invention, further, the angle of the mounting groove and vertical direction are 20-30 °, The distance between the vertical edge edge of connection otic placode where the edge and mounting groove of bottom circular arc is not less than 20mm, mounting groove bottom sides The distance between edge and the bottom edge of connection otic placode are not less than the 1/9 of connection otic placode height.
The laying apparatus of TGXG of the present invention is further provided with tiltedly between the connection otic placode and support beam To ribbed stiffener.
The laying apparatus of TGXG of the present invention is further provided between the attachment beam and tip lorry chassis frame Hound, hound one end are welded and fixed with attachment beam front end, and other end end is provided with connection board, and connection board passes through spiral shell The bottom surface of bolt and sole is detachably fixed.
The laying apparatus of TGXG of the present invention, further, the support beam is by the end positioned at support beam both ends It saves and the standard knot positioned at middle part splices composition, one end of end segment is provided with connection otic placode, and the other end is provided with towards end side To cammed surface diagonally downward, the both ends of standard knot are respectively arranged with the cammed surface matched with end segment cammed surface, standard knot two The cammed surface inclined direction at end is consistent, and the cammed surface of standard knot end is bonded with the cammed surface of adjacent standard knot or end segment and sets It sets;It is connected between adjacent modular section and end segment or by connecting plate between adjacent modular section.
The laying apparatus of TGXG of the present invention, further, the connecting plate include the point that end segment cammed surface is arranged in The second connecting plate holding first connecting plate in outside and being arranged on the outside of the tip of standard knot cammed surface, first connecting plate one End is set up and is welded and fixed with end segment outer wall, and the other end and adjacent standard knot are detachably connected fixation;Second connecting plate One end is set up and is welded and fixed with standard knot outer wall, and the other end and adjacent standard knot or end segment are detachably connected fixation.
The laying apparatus of TGXG of the present invention, further, the end of the shaft are more than TGXG reel ends At least 500mm.
The laying method of the laying apparatus of TGXG of the present invention, comprising the following steps:
Step 1: the TGXG reel being laid with will be needed to be set on shaft, and shaft is fixed in connection otic placode;
Step 2: the starting point of TGXG is fixed with base;
Step 3: operation dump truck retroversion travels backward, travel route drawout of the TGXG along dump truck;
Step 4: after single width TGXG is laid with, severing TGXG.
The laying apparatus and its laying method of TGXG of the present invention compared with prior art, have the following beneficial effects:
Laying apparatus structure of the present invention is simple, and manufacture difficulty is small, and the dump truck to be left unused using construction site is transformed use, Supporting frame is detachably fixed with dump truck, convenience flexible in application, can sufficiently be adapted to the condition of construction for coordinating scene, be expanded the spare time The use function and range for setting dump truck, improve the utilization rate of mechanical equipment, reduce construction cost, improve the machine of construction Toolization is horizontal;Supporting frame is to be detachably fixed with TGXG reel, reusable, and scene is used in turn rate height, at This is low.
Support beam of the present invention is that standard knot and end segment sequentially splice composition, can according to need the TGXG of laying Width adjusts the quantity of standard knot, is laid with adapting to the TGXG of a variety of width specifications, applied widely, equally also fits Laying work for rolls such as geotextiles;It, can by connecting plate between standard knot and end segment or between adjacent modular section Dismantling connection, fixed form is simple to operation, and regulative mode is flexible, and connectivity robustness is strong, and device is reliable and stable.
TGXG reel is erected on supporting frame by laying method of the present invention, provides power using dump truck, so that The movement of TGXG reel is more convenient, effectively reduces the transport operation of worker, time saving and energy saving, and work effect is greatly improved Rate;The end of fixed TGXG is travelled using the retrogressing of dump truck, the laying of TGXG can be completed, not only increase The speed of laying, and substantially increase the quality and accuracy of laying.
The laying apparatus and its laying method of TGXG of the invention are described further with reference to the accompanying drawing.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the laying apparatus of TGXG of the present invention;
Fig. 2 is the top view of the laying apparatus of TGXG of the present invention;
Fig. 3 is the detailed structure schematic diagram of the position A main view direction in Fig. 2;
Fig. 4 is the structural schematic diagram of connection otic placode;
Fig. 5 is the main view of support beam;
Fig. 6 is the structural schematic diagram of end segment;
Fig. 7 is the structural schematic diagram of standard knot.
Appended drawing reference:
1- dump truck;2- support beam;21- end segment;22- standard knot;The first connecting plate of 23-;The second connecting plate of 24-;25- fastening Bolt;3- attachment beam;31- connection bolt;4- connection otic placode;5- TGXG reel;6- shaft;7- inclined stiffener;8- is oblique Strut;9- mounting groove.
Specific embodiment
As shown in Figures 1 to 7, the laying apparatus of TGXG of the present invention includes dump truck 1, positioned at 1 front end of dump truck Supporting frame, and the TGXG reel 5 being located at below supporting frame is hung, TGXG reel 5 passes through shaft 6 and support frame Body is fixed.
As shown in Figure 1 to Figure 3, supporting frame includes support beam 2, and connection support beam 2 is connect with a pair of dump truck 1 Beam 3, and a pair of of the connection otic placode 4 being arranged in support beam 2;Support beam 2 is the fashioned iron of elongated setting, perpendicular to tipping bucket The direction of travel of vehicle 1 is arranged;Attachment beam 3 is located at the middle part of support beam 2, is intervally arranged along 2 length direction of support beam, vertically It is arranged in support beam 2, one end is fixed with 2 sidewall weld of support beam, and the other end and the sole of 1 front end of dump truck are detachable Fixed, the spacing between two neighboring attachment beam 3 is not less than the 1/4 of 2 length of support beam;The chassis of attachment beam 3 and dump truck 1 Frame overlaps up and down, and fixed by connection bolt 31, and the lap of splice of attachment beam 3 and sole is not less than 3 length of attachment beam 3/5,31 quantity of connection bolt on every attachment beam 3 is no less than 2, and the spacing of adjacent connection bolt 31 is not more than attachment beam 3 The 1/5 of length, the connection bolt 31 close to 3 end of attachment beam are 30-50mm at a distance from 3 end of attachment beam;A pair of of engaging lug Plate 4 is symmetricly set on 2 both ends of support beam, is located at 2 lower section of support beam, and connection otic placode 4 is the rectangle steel that thickness is not less than 8mm Plate is vertically arranged, and top sides edge is welded and fixed with 2 bottom surface of support beam;As shown in figure 4,4 side vertical edge edge of connection otic placode is inclined The mounting groove 9 that shaft 6 is set for card is offered obliquely, and mounting groove 9 and the angle of vertical direction are 20-30 °, mounting groove 9 Opening is located at the middle part of connection otic placode 4, and 9 bottom of mounting groove connect with cell wall arc transition, the diameter of bottom circular arc with outside shaft 6 Diameter is adapted, and the distance between edge and the vertical edge edge of 9 place connection otic placode 4 of mounting groove of bottom circular arc are not less than 20mm, The distance between bottom edge of 9 bottom edge of mounting groove and connection otic placode 4 is not less than the 1/9 of 4 height of connection otic placode.
As shown in figure 3, being provided with inclined stiffener 7 between connection otic placode 4 and support beam 2, inclined stiffener 7 is inclination The reinforcing bar or steel plate of setting, the angle between connection otic placode 4 are not less than 45 °.
Hound 8 is provided between 1 sole of attachment beam 3 and dump truck, 8 one end of hound and 3 front end of attachment beam are welded Fixed, other end end is provided with connection board, and connection board is detachably fixed by the bottom surface of bolt and sole.
As shown in Figures 5 to 7, support beam 2 can also be by being located at the end segment 21 at 2 both ends of support beam and positioned at middle part The splicing composition of standard knot 22, one end of end segment 21 are provided with connection otic placode 4, and the other end is provided with towards end direction diagonally downward Cammed surface, the angle of cammed surface and horizontal direction is 30-60 °;It is provided with the first connecting plate 23 on the outside of the tip of cammed surface, the One connecting plate 23 is the rectangular steel plates that thickness is not less than 8mm, and one end is set up and is welded and fixed with 21 outer wall of end segment, the other end and phase Adjacent standard knot 22 is detachably connected fixation by fastening bolt 25;First connecting plate 23 and the lap of splice of end segment 21 are not less than 50mm, the length that the first connecting plate 23 stretches out end segment 21 are not less than 100mm;The both ends of standard knot 22 are respectively arranged with and end segment 21 The cammed surface inclined direction of the cammed surface that cammed surface matches, 22 both ends of standard knot is consistent, and cammed surface and adjacent standard knot 22 or the cammed surface of end segment 21 be bonded setting, the second connecting plate 24 is provided on the outside of the tip of 22 cammed surface of standard knot, second connects Fishplate bar 24 is the rectangular steel plates that thickness is not less than 8mm, and one end sets up and be welded and fixed with 22 outer wall of standard knot, the other end with it is adjacent Standard knot 22 or end segment 21 fixation is detachably connected by fastening bolt 25;Second connecting plate 24 and 22 lap of splice of standard knot Not less than 50mm, the length that the second connecting plate 24 stretches out standard knot 22 is not less than 100mm.
Shaft 6 is equipped in TGXG reel 5, TGXG reel 5 and shaft 6 are rotatablely connected, and 6 both ends card of shaft is set In the mounting groove 9 of connection otic placode 4, the end of shaft 6 is more than 5 end of TGXG reel at least 500mm, and shaft 6 is nominal Diameter is not less than the elongated reinforcing bar of 28mm.
The laying method of the laying apparatus of TGXG of the present invention, comprising the following steps:
Step 1: the TGXG reel 5 being laid with will be needed to be set on shaft 6, and shaft 6 is fixed in connection otic placode 4;
Step 2: the starting point of TGXG is fixed with base;
Step 3: the operation retroversion of dump truck 1 travels backward, travel route drawout of the TGXG along dump truck 1;
Step 4: after single width TGXG is laid with, severing TGXG.
Then dump truck 1 is operated, the starting point of next paving location is moved to, repeats the above steps, carry out next width The laying of TGXG.
Embodiment described above only describe the preferred embodiments of the invention, not to model of the invention It encloses and is defined, without departing from the spirit of the design of the present invention, those of ordinary skill in the art are to technical side of the invention The various changes and improvements that case is made should all be fallen into the protection scope that claims of the present invention determines.

Claims (10)

1. the laying apparatus of TGXG, it is characterised in that: including dump truck (1), be located at the support frame of dump truck (1) front end Body, and the TGXG reel (5) being located at below supporting frame is hung, TGXG reel (5) passes through shaft (6) and support frame Body is fixed;
Supporting frame includes support beam (2), connects a pair of of attachment beam (3) of support beam (2) and dump truck (1), Yi Jishe Set a pair of of connection otic placode (4) on support beam (2);Support beam (2) is arranged perpendicular to the direction of travel of dump truck (1), Attachment beam (3) one end is fixed with support beam (2) side wall, and the other end and the sole of dump truck (1) front end are detachably fixed;One Support beam (2) both ends are symmetricly set on to connection otic placode (4), are located at below support beam (2), connection otic placode (4) side is perpendicular Straight flange edge is offered diagonally downward for blocking the mounting groove (9) for setting shaft (6);
It is equipped with shaft (6) in TGXG reel (5), TGXG reel (5) and shaft (6) are rotatablely connected, shaft (6) two End is fastened in the mounting groove (9) of connection otic placode (4).
2. the laying apparatus of TGXG according to claim 1, it is characterised in that: the attachment beam (3) is located at support The middle part of crossbeam (2), along support beam (2), length direction is intervally arranged, and is arranged perpendicular to support beam (2);Attachment beam (3) with The sole of dump truck (1) overlaps up and down, and fixed by connection bolt (31).
3. the laying apparatus of TGXG according to claim 1, it is characterised in that: the connection otic placode (4) is rectangle Steel plate is vertically arranged, and top sides edge is welded and fixed with support beam (2) bottom surface;The opening of mounting groove (9) is located at connection otic placode (4) middle part, mounting groove (9) bottom are connect with cell wall arc transition, and the diameter of bottom circular arc and the outer diameter of shaft (6) are adapted.
4. the laying apparatus of TGXG according to claim 3, it is characterised in that: the mounting groove (9) and vertical side To angle be 20-30 °, the vertical edge of connection otic placode (4) where the edge of bottom circular arc and mounting groove (9) along the distance between Not less than 20mm, the distance between bottom edge of mounting groove (9) bottom edge and connection otic placode (4) is not less than connection otic placode (4) the 1/9 of height.
5. the laying apparatus of TGXG according to claim 1, it is characterised in that: the connection otic placode (4) and support Inclined stiffener (7) are provided between crossbeam (2).
6. the laying apparatus of TGXG according to claim 1, it is characterised in that: the attachment beam (3) and dump truck (1) it is provided between sole hound (8), hound (8) one end is welded and fixed with attachment beam (3) front end, other end end It is provided with connection board, connection board is detachably fixed by the bottom surface of bolt and sole.
7. the laying apparatus of TGXG according to claim 1, it is characterised in that: the support beam (2) is by being located at The end segment (21) at support beam (2) both ends and positioned at middle part standard knot (22) splice composition, one end of end segment (21) is provided with Connection otic placode (4), the other end are provided with the cammed surface towards end direction diagonally downward;The both ends of standard knot (22) are respectively set There is the cammed surface matched with end segment (21) cammed surface, the cammed surface inclined direction at standard knot (22) both ends is consistent, and standard knot (22) cammed surface of end is bonded setting with the cammed surface of adjacent standard knot (22) or end segment (21);Adjacent modular section (22) with It is connected between end segment (21) or by connecting plate between adjacent modular section (22).
8. the laying apparatus of TGXG according to claim 7, it is characterised in that: the connecting plate includes that setting is being held Save the of the first connecting plate (23) and setting on the outside of the tip of (21) cammed surface on the outside of the tip of standard knot (22) cammed surface Two connecting plates (24), described first connecting plate (23) one end are set up and are welded and fixed with end segment (21) outer wall, the other end with it is adjacent Standard knot (22) be detachably connected fixation;Described second connecting plate (24) one end and standard knot (22) outer wall are set up and are welded solid Fixed, the other end and adjacent standard knot (22) or end segment (21) are detachably connected fixation.
9. the laying apparatus of TGXG according to claim 1, it is characterised in that: the end of the shaft (6) is more than TGXG reel (5) end at least 500mm.
10. the laying method of the laying apparatus of TGXG described in any one of claim 1-9, it is characterised in that: including Following steps:
Step 1: the TGXG reel (5) being laid with will be needed to be set on shaft (6), and shaft (6) are fixed in engaging lug On plate (4);
Step 2: the starting point of TGXG is fixed with base;
It is travelled backward Step 3: operation dump truck (1) is fallen back, travel route drawout of the TGXG along dump truck (1);
Step 4: after single width TGXG is laid with, severing TGXG.
CN201811025390.2A 2018-09-04 2018-09-04 The laying apparatus and its laying method of TGXG Withdrawn CN108951384A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811025390.2A CN108951384A (en) 2018-09-04 2018-09-04 The laying apparatus and its laying method of TGXG

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811025390.2A CN108951384A (en) 2018-09-04 2018-09-04 The laying apparatus and its laying method of TGXG

Publications (1)

Publication Number Publication Date
CN108951384A true CN108951384A (en) 2018-12-07

Family

ID=64475685

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811025390.2A Withdrawn CN108951384A (en) 2018-09-04 2018-09-04 The laying apparatus and its laying method of TGXG

Country Status (1)

Country Link
CN (1) CN108951384A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110387796A (en) * 2019-07-29 2019-10-29 新疆邦特尔信息科技有限公司 A kind of laying frame and installation apparatus being used cooperatively with loading machine
CN113565100A (en) * 2021-07-01 2021-10-29 陈优伟 Method for laying and installing geogrids on soil slope

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2711113Y (en) * 2004-04-02 2005-07-20 元贝实业股份有限公司 Carpet film protection spreading device
CN202945524U (en) * 2012-11-26 2013-05-22 新疆交通建设(集团)有限责任公司 Geotextile paving device
CN203905328U (en) * 2014-06-05 2014-10-29 郑德龙 Adjustable spreading and laying device of waterproof roll
CN204715180U (en) * 2015-06-05 2015-10-21 哈尔滨职业技术学院 Road construction special-purpose vehicle
CN206281805U (en) * 2016-12-26 2017-06-27 杭州金屋防水材料有限公司 A kind of asphalt water-proof coiled material heat-resistance test suspension arrangement
CN209066229U (en) * 2018-09-04 2019-07-05 北京建工国际建设工程有限责任公司 The laying apparatus of TGXG

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2711113Y (en) * 2004-04-02 2005-07-20 元贝实业股份有限公司 Carpet film protection spreading device
CN202945524U (en) * 2012-11-26 2013-05-22 新疆交通建设(集团)有限责任公司 Geotextile paving device
CN203905328U (en) * 2014-06-05 2014-10-29 郑德龙 Adjustable spreading and laying device of waterproof roll
CN204715180U (en) * 2015-06-05 2015-10-21 哈尔滨职业技术学院 Road construction special-purpose vehicle
CN206281805U (en) * 2016-12-26 2017-06-27 杭州金屋防水材料有限公司 A kind of asphalt water-proof coiled material heat-resistance test suspension arrangement
CN209066229U (en) * 2018-09-04 2019-07-05 北京建工国际建设工程有限责任公司 The laying apparatus of TGXG

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110387796A (en) * 2019-07-29 2019-10-29 新疆邦特尔信息科技有限公司 A kind of laying frame and installation apparatus being used cooperatively with loading machine
CN110387796B (en) * 2019-07-29 2023-10-17 新疆邦特尔信息科技有限公司 Paving frame and paving equipment matched with loader for use
CN113565100A (en) * 2021-07-01 2021-10-29 陈优伟 Method for laying and installing geogrids on soil slope

Similar Documents

Publication Publication Date Title
WO2021189746A1 (en) Rapid construction structure and method for secondary lining of multiple variable-cross-section bored tunnels
CN105952474A (en) Rapid construction method for primary support of confined concrete of large-section tunnel
CN108951384A (en) The laying apparatus and its laying method of TGXG
CN110683317A (en) Aggregate conveying device, operation system and construction method thereof
CN209066229U (en) The laying apparatus of TGXG
CN102979040B (en) Assembly method of bridge-building machine at exit of tunnel connected with bridge
CN210216163U (en) Self-supporting cantilever formwork support system
CN111622027A (en) Construction method and construction equipment for cast-in-situ ballastless track integral ballast bed in tunnel
CN213898162U (en) Movable chute for concrete pouring of hidden culvert
CN214737834U (en) Simple fastener type steel pipe operation platform
CN210439081U (en) Magnetic suspension type platform
CN106050265A (en) Full-automatic hydraulic self-propelled caterpillar trestle
CN202509530U (en) Post-cast strip water stopping steel plate combined structure of foundation bottom plate
CN205936646U (en) A trolley -bus formworking jumbo for tunnel side wall concrete construction
CN210972853U (en) Aggregate conveying device and operation system
CN212003048U (en) Slope anchoring drilling construction support
CN210888046U (en) Grid combined formwork system
CN207597215U (en) Interlocking segment brick paving machine making positioning auxiliary device
CN207986477U (en) A kind of side slope protection construction material transport system
CN207392211U (en) Assembled foundation pit pre-loaded support struts system
CN219972882U (en) Human road surface tiling equipment for municipal works
CN218030228U (en) Portable tunnel waterproof board overlap joint construction platform
CN209891687U (en) Movable operating platform for installing advertising lamp boxes in rail traffic station rail traveling area
CN105178152B (en) A kind of side mould automatic coupling system
CN216894438U (en) Support for assisting shield launching

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20181207

WW01 Invention patent application withdrawn after publication