CN108930279B - 深基坑降水管井开挖后封闭方法 - Google Patents
深基坑降水管井开挖后封闭方法 Download PDFInfo
- Publication number
- CN108930279B CN108930279B CN201710389768.6A CN201710389768A CN108930279B CN 108930279 B CN108930279 B CN 108930279B CN 201710389768 A CN201710389768 A CN 201710389768A CN 108930279 B CN108930279 B CN 108930279B
- Authority
- CN
- China
- Prior art keywords
- well
- pipe
- sealing
- vacuum
- dewatering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
- E02D19/10—Restraining of underground water by lowering level of ground water
Abstract
本发明涉及深基坑施工,尤其涉及深基坑降水管井。深基坑降水管井开挖后封闭方法,它包括封闭井帽与过滤段密封压盖,该密封压盖由塑料或玻璃钢定型制作,封闭井帽按降水管井的直径制作,过滤段密封压盖按降水管井的直径与井孔过滤段的直径制作;对于土方未开挖的状态,此时将井帽扣在降水管井上,井帽分别有穿线管、排水管与真空管,穿线管连接降水管内水泵电源,排水管连接降水管井内水泵排水管与井外排水管,真空管连接井外真空泵,井帽与降水管井之间采用塑料膜缠绕密封,在真空作用下缠绕的薄膜会自动吸附在降水井外壁与井帽外壁上起到密封作用。本发明能保证降水管井的真空度,安拆方便,节约成本。
Description
技术领域
本发明涉及深基坑施工,尤其涉及深基坑降水管井。
背景技术
深基坑在开挖前需采用降水措施,为提高降水措施的效能会在降水管井内施加真空,但较深基坑开挖后由于真空管井井孔的过滤段会被挖穿,导致真空降水管井内部与外部贯通,无法形成真空,影响降水真空管井的使用效能。
发明内容
本发明旨在克服现有技术的缺陷,提供一种深基坑降水管井开挖后封闭方法。本发明能保证降水管井的真空度,安拆方便,节约成本。
为了解决上述技术问题,本发明是这样实现的:
深基坑降水管井开挖后封闭方法,它包括封闭井帽与过滤段密封压盖,该密封压盖由塑料或玻璃钢定型制作,封闭井帽按降水管井的直径制作,过滤段密封压盖按降水管井的直径与井孔过滤段的直径制作;对于土方未开挖的状态,此时将井帽扣在降水管井上,井帽分别有穿线管、排水管与真空管,穿线管连接降水管内水泵电源,排水管连接降水管井内水泵排水管与井外排水管,真空管连接井外真空泵,井帽与降水管井之间采用塑料膜缠绕密封,在真空作用下缠绕的薄膜会自动吸附在降水井外壁与井帽外壁上起到密封作用。
所述的深基坑降水管井开挖后封闭方法,其特征在于,对于基坑开挖后,将过滤段上部的粘土密封层挖穿,这时降水井内部与通过透水的滤料与外部大气贯通,降水井内无法形成真空,将井帽按土方未开挖状态扣在降水管井上,基坑底部过滤段挖掉一层套上过滤段密封压盖后用粘土密封,过滤段密封压盖上部用塑料薄膜缠绕与降水管井密封,保证井内密封形成真空。
本发明工艺原理简单,便于操作。井帽与过滤段密封压盖可周转使用。缠绕塑料密封膜利用真空吸附密封安拆方便,节约成本。可保证深基坑多层开挖时降水管井的真空功效。
附图说明
图1是本发明实施例1的示意图;
图2是本发明的实施例2示意图。
具体实施方式
如图1和图2所示:深基坑真空降水管井开挖后封闭方法,该方法设置封闭井帽1与过滤段2密封压盖8,封闭井帽1与过滤段密封压盖由塑料或玻璃钢定型制作,井帽按降水管井的直径制作,过滤段密封压盖按降水管井6的直径与井孔过滤段的直径制作;
实施例1,图1的情况下为土方未开挖的状态,此时将井帽扣在降水管井6上,井帽分别有穿线管4、排水管5与真空管3,穿线管连接降水管内水泵电源,排水管连接降水管井内水泵排水管与井外排水管,真空管连接井外真空泵,井帽与降水管井之间采用塑料膜7缠绕密封,在真空作用下缠绕的薄膜会自动吸附在降水井外壁与井帽外壁上起到密封作用。
实施例2,图2为基坑开挖后将过滤段上部的粘土密封层挖穿,这时降水井内部与通过透水的滤料与外部大气贯通,降水井内无法形成真空,此时将井帽按工况1扣在降水管井上,基坑底部过滤段挖掉一层套上过滤段密封压盖后用粘土密封,过滤段密封压盖上部用塑料薄膜缠绕与降水管井密封,真空降水管井在工况2的情况下可保证井内密封形成真空,充分发挥真空降水管井的效能,工况2可在多层开挖的情况下反复使用,使深基坑降水管井在多层开挖的情况下保证真空降水功效。
Claims (1)
1.深基坑降水管井开挖后封闭方法,其特征在于,它包括封闭井帽与过滤段密封压盖,该密封压盖由塑料或玻璃钢定型制作,封闭井帽按降水管井的直径制作,过滤段密封压盖按降水管井的直径与井孔过滤段的直径制作;对于土方未开挖的状态,此时将井帽扣在降水管井上,井帽分别有穿线管、排水管与真空管,穿线管连接降水管内水泵电源,排水管连接降水管井内水泵排水管与井外排水管,真空管连接井外真空泵,井帽与降水管井之间采用塑料膜缠绕密封,在真空作用下缠绕的薄膜会自动吸附在降水井外壁与井帽外壁上起到密封作用,对于基坑开挖后,将过滤段上部的粘土密封层挖穿,这时降水井内部通过透水的滤料与外部大气贯通,降水井内无法形成真空,将井帽按土方未开挖状态扣在降水管井上,基坑底部过滤段挖掉一层套上过滤段密封压盖后用粘土密封,过滤段密封压盖上部用塑料薄膜缠绕与降水管井密封,保证井内密封形成真空。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710389768.6A CN108930279B (zh) | 2017-05-27 | 2017-05-27 | 深基坑降水管井开挖后封闭方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710389768.6A CN108930279B (zh) | 2017-05-27 | 2017-05-27 | 深基坑降水管井开挖后封闭方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108930279A CN108930279A (zh) | 2018-12-04 |
CN108930279B true CN108930279B (zh) | 2021-01-15 |
Family
ID=64450649
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710389768.6A Active CN108930279B (zh) | 2017-05-27 | 2017-05-27 | 深基坑降水管井开挖后封闭方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108930279B (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4260334A (en) * | 1976-02-11 | 1981-04-07 | Kelley Contract Dewatering Company | Ground dewatering system |
JPS61211415A (ja) * | 1985-03-18 | 1986-09-19 | Takenaka Komuten Co Ltd | 還元井戸工法 |
CN101787702A (zh) * | 2010-02-08 | 2010-07-28 | 上海广联建设发展有限公司 | 强力真空疏干降水方法 |
CN201610552U (zh) * | 2010-02-08 | 2010-10-20 | 上海广联建设发展有限公司 | 强力真空疏干降水管井 |
CN204343282U (zh) * | 2014-11-12 | 2015-05-20 | 叶吉 | 软弱地基分离注浆预压法用快速分离降水装置 |
CN105780792A (zh) * | 2016-04-12 | 2016-07-20 | 中南勘察设计院(湖北)有限责任公司 | 一种基坑高水头减压降水井封井方法及封井结构 |
-
2017
- 2017-05-27 CN CN201710389768.6A patent/CN108930279B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4260334A (en) * | 1976-02-11 | 1981-04-07 | Kelley Contract Dewatering Company | Ground dewatering system |
JPS61211415A (ja) * | 1985-03-18 | 1986-09-19 | Takenaka Komuten Co Ltd | 還元井戸工法 |
CN101787702A (zh) * | 2010-02-08 | 2010-07-28 | 上海广联建设发展有限公司 | 强力真空疏干降水方法 |
CN201610552U (zh) * | 2010-02-08 | 2010-10-20 | 上海广联建设发展有限公司 | 强力真空疏干降水管井 |
CN204343282U (zh) * | 2014-11-12 | 2015-05-20 | 叶吉 | 软弱地基分离注浆预压法用快速分离降水装置 |
CN105780792A (zh) * | 2016-04-12 | 2016-07-20 | 中南勘察设计院(湖北)有限责任公司 | 一种基坑高水头减压降水井封井方法及封井结构 |
Also Published As
Publication number | Publication date |
---|---|
CN108930279A (zh) | 2018-12-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201610552U (zh) | 强力真空疏干降水管井 | |
CN102330424B (zh) | 一种吹填软土的复式真空管井真空预压加固方法 | |
CN101787702A (zh) | 强力真空疏干降水方法 | |
CN112031812B (zh) | 排水定位注浆管片及其施工方法 | |
CN107386307B (zh) | 基坑内结构抗浮系统及其施工方法 | |
CN110439015B (zh) | 一种具有清孔功能的降水井结构 | |
CN109723071B (zh) | 地下室底板后浇带内置双层钢桶降排水系统的施工方法 | |
CN107956221A (zh) | 降水井管道保护装置及施工方法 | |
CN108930279B (zh) | 深基坑降水管井开挖后封闭方法 | |
CN108824463B (zh) | 一种用于建筑工程施工的井点降水装置 | |
CN214563115U (zh) | 非开挖修复软管的灌胶生产线 | |
CN201762716U (zh) | 一种新型的轻型密布井点降水系统 | |
CN109750684B (zh) | 一种多用降水井结构及其制作方法 | |
CN104343123A (zh) | 应用于涌水砂土层中注浆管封固的双层式膜袋装置及方法 | |
CN207452926U (zh) | 一种提高轻型井点降水效率的工具 | |
CN103774619A (zh) | 一种对混凝土体内大流量漏水孔快速处理装置 | |
CN202247918U (zh) | 降水井管 | |
CN203795442U (zh) | 地下深井封堵盖板系统 | |
CN109629586B (zh) | 一种带有滤水结构的回灌井 | |
CN203213129U (zh) | 可控逆止式排水器 | |
CN105064382A (zh) | 高效率真空降水井点 | |
CN205348149U (zh) | 一种水利工程施工用的井点降水 | |
CN112301995A (zh) | 一种兼作降水注浆通道的预制复合加固体结构及施工方法 | |
CN105604076A (zh) | 一种适用于隧洞开挖的真空泵降水装置 | |
CN204849794U (zh) | 高效率真空降水井点 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |