CN108930265B - 一种既有无砟轨道路基基底再生隐伏岩溶的注浆修复方法 - Google Patents
一种既有无砟轨道路基基底再生隐伏岩溶的注浆修复方法 Download PDFInfo
- Publication number
- CN108930265B CN108930265B CN201810739893.XA CN201810739893A CN108930265B CN 108930265 B CN108930265 B CN 108930265B CN 201810739893 A CN201810739893 A CN 201810739893A CN 108930265 B CN108930265 B CN 108930265B
- Authority
- CN
- China
- Prior art keywords
- karst
- grouting
- regenerated
- ballastless track
- hidden
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/10—Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2/00—General structure of permanent way
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Civil Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Agronomy & Crop Science (AREA)
- Architecture (AREA)
- Soil Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Machines For Laying And Maintaining Railways (AREA)
- Railway Tracks (AREA)
Abstract
Description
技术领域
本发明涉及岩土工程技术领域,特别涉及一种既有无砟轨道路基基底再生隐伏岩溶的注浆修复方法。
背景技术
随着高速铁路快速发展,无砟轨道路基得到广泛应用。在岩溶地区,已建成的无砟轨道路基基底可溶岩在侵水溶蚀作用下极易形成新的岩溶发育区,即再生隐伏岩溶。再生隐伏岩溶具有塌陷风险,影响上覆无砟轨道路基正常使用。对此,可采用注浆加固修复再生隐伏岩溶地基,然而,在注浆过程中,若注浆压力控制不当,既有无砟轨道路基基底再生隐伏岩溶的浆液压力可能形成过大的上拱压力,引发再生隐伏岩溶覆盖层及其顶部路基产生上拱变形,引发轨道不平顺性加剧,威胁高速列车安全运营。由此可见,目前存在的技术不足是如何控制既有无砟轨道路基再生隐伏岩溶的注浆压力,迫切需要提出合理的注浆修复方法。
发明内容
本发明所要解决的技术问题是提供一种既有无砟轨道路基基底再生隐伏岩溶的注浆修复方法,以科学合理地开展再生隐伏岩溶注浆修复,有效避免无砟轨道路基产生上拱变形。
本发明解决上述技术所采用的技术方案如下:
本发明一种既有无砟轨道路基基底再生隐伏岩溶的注浆修复方法,包括以下步骤:
①通过高密度电法或探地雷达或地震反射法或电磁波CT,确定如下参数:
既有无砟轨道路基基底至再生隐伏岩溶中心的竖向距离h,单位m;
再生隐伏岩溶的分布面积Ak,单位m2;
通过以下公式确定再生隐伏岩溶(1)的等效半径rk:
③通过以下公式确定再生隐伏岩溶注浆修复的注浆压力σz:
④在既有无砟轨道路基坡脚钻斜孔至再生隐伏岩溶,并按不大于步骤③确定的注浆压力σz进行注浆修复。
本发明的有益效果是,针对目前存在的技术不足,在考虑既有无砟轨道路基基底再生隐伏岩溶的覆盖层抗剪强度、覆盖层自重及上覆路基荷载等因素的基础上,提出一种既有无砟轨道路基基底再生隐伏岩溶的注浆修复方法,能够解决既有无砟轨道路基基底再生隐伏岩溶的注浆修复问题,可有效避免无砟轨道路基发生上拱变形;该方法实施便捷,流程清晰,能够适应实际工程需要。
附图说明
图1是既有无砟轨道路基基底再生隐伏岩溶的横断面示意图。
图中示出构件和对应的标记:既有无砟轨道路基S,再生隐伏岩溶1,斜孔2,路基基底至再生隐伏岩溶中心的竖向距离h。
具体实施方式
下面通过具体的实施例并结合附图进一步说明本发明。
参照图1,本发明的一种既有无砟轨道路基基底再生隐伏岩溶的注浆修复方法,包括以下步骤:
①通过高密度电法或探地雷达或地震反射法或电磁波CT,确定如下参数:
既有无砟轨道路基S基底至再生隐伏岩溶1中心的竖向距离h,单位m;
再生隐伏岩溶1的分布面积Ak,单位m2;
通过以下公式确定再生隐伏岩溶1的等效半径rk:
③通过以下公式确定再生隐伏岩溶1注浆修复的注浆压力σz:
④在既有无砟轨道路基S坡脚钻斜孔2至再生隐伏岩溶1,并按不大于步骤③确定的注浆压力σz进行注浆修复。
实施例:
参照图1,某一无砟轨道高速铁路路基修建于岩溶地区,路基填高2.0m,既有无砟轨道路基S基底可溶岩在侵水溶蚀作用下形成了再生隐伏岩溶1,需要采用注浆修复再生隐伏岩溶1地基。
为避免岩溶注浆造成既有无砟轨道路基S产生上拱变形,采用本发明方法确定既有无砟轨道路基S基底的再生隐伏岩溶1的注浆修复方法,具体步骤如下:
1.通过高密度电法或探地雷达或地震反射法或电磁波CT,确定既有无砟轨道路基S基底至再生隐伏岩溶1中心的竖向距离h为4.5m;确定既有无砟轨道路基S基底再生隐伏岩溶1的分布面积Ak为6.4m2,并通过以下公式确定既有无砟轨道路基S基底再生隐伏岩溶1的等效半径rk:
3.既有无砟轨道路基S基底应力σj取50.7kPa,安全系数K取1.4,确定再生隐伏岩溶1注浆修复的注浆压力σz:
(4)在既有无砟轨道路基S坡脚钻斜孔2至再生隐伏岩溶1,并按注浆压力不大于340.5kPa进行注浆修复。
本发明的优点在于提供的一种科学合理、实施简便的既有无砟轨道路基基底再生隐伏岩溶的注浆修复方法,可有效避免无砟轨道路基发生上拱变形,能满足实际工程的需要,具有广阔的推广应用前景。
以上所述只是采用图解说明本发明一种既有无砟轨道路基基底再生隐伏岩溶的注浆修复方法的一些原理,并非是要将本发明局限在所示和所述的具体方法和适用范围内,故凡是所有可能被利用的相应修改以及等同物,均属于本发明所申请的专利范围。
Claims (1)
1.一种既有无砟轨道路基基底再生隐伏岩溶的注浆修复方法,包括以下步骤:
①通过高密度电法或探地雷达或地震反射法或电磁波CT,确定如下参数:
既有无砟轨道路基(S)基底至再生隐伏岩溶(1)中心的竖向距离h,单位m;
再生隐伏岩溶(1)的分布面积Ak,单位m2;
通过以下公式确定再生隐伏岩溶(1)的等效半径rk:
③通过以下公式确定再生隐伏岩溶(1)注浆修复的注浆压力σz:
④在既有无砟轨道路基(S)坡脚钻斜孔(2)至再生隐伏岩溶(1),并按不大于步骤③确定的注浆压力σz进行注浆修复。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810739893.XA CN108930265B (zh) | 2018-07-06 | 2018-07-06 | 一种既有无砟轨道路基基底再生隐伏岩溶的注浆修复方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810739893.XA CN108930265B (zh) | 2018-07-06 | 2018-07-06 | 一种既有无砟轨道路基基底再生隐伏岩溶的注浆修复方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108930265A CN108930265A (zh) | 2018-12-04 |
CN108930265B true CN108930265B (zh) | 2020-05-08 |
Family
ID=64447427
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810739893.XA Active CN108930265B (zh) | 2018-07-06 | 2018-07-06 | 一种既有无砟轨道路基基底再生隐伏岩溶的注浆修复方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108930265B (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102503310A (zh) * | 2011-11-07 | 2012-06-20 | 西南交通大学 | 一种高速铁路无砟轨道结构修补用超早强注浆材料 |
CN102505582A (zh) * | 2011-11-07 | 2012-06-20 | 西南交通大学 | 一种高速铁路板式无砟轨道填充层修补方法 |
CN104452484A (zh) * | 2014-11-10 | 2015-03-25 | 中国铁道科学研究院铁道建筑研究所 | 无砟轨道基础沉降的修复方法 |
CN105274907A (zh) * | 2015-09-28 | 2016-01-27 | 中铁十八局集团第三工程有限公司 | 有砟轨道路基改造为无砟轨道的整体道床施工工艺 |
CN105625124A (zh) * | 2015-12-31 | 2016-06-01 | 中国铁路总公司 | 高速铁路无砟轨道路基沉降修复质量检控方法 |
-
2018
- 2018-07-06 CN CN201810739893.XA patent/CN108930265B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102503310A (zh) * | 2011-11-07 | 2012-06-20 | 西南交通大学 | 一种高速铁路无砟轨道结构修补用超早强注浆材料 |
CN102505582A (zh) * | 2011-11-07 | 2012-06-20 | 西南交通大学 | 一种高速铁路板式无砟轨道填充层修补方法 |
CN104452484A (zh) * | 2014-11-10 | 2015-03-25 | 中国铁道科学研究院铁道建筑研究所 | 无砟轨道基础沉降的修复方法 |
CN105274907A (zh) * | 2015-09-28 | 2016-01-27 | 中铁十八局集团第三工程有限公司 | 有砟轨道路基改造为无砟轨道的整体道床施工工艺 |
CN105625124A (zh) * | 2015-12-31 | 2016-06-01 | 中国铁路总公司 | 高速铁路无砟轨道路基沉降修复质量检控方法 |
Also Published As
Publication number | Publication date |
---|---|
CN108930265A (zh) | 2018-12-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Liu et al. | Characterization of ballast particle movement at mud spot | |
CN105040775A (zh) | 深层承压自流井封堵系统与方法 | |
CN104632244B (zh) | 确定地面沉降对地铁隧道沉降影响及保护隧道结构的方法 | |
CN104947721B (zh) | 一种地铁车辆段试车线复合隔振屏障 | |
CN114841532A (zh) | 一种盾构开挖过程中地表沉降的安全性评价方法和系统 | |
CN105332392B (zh) | 一种露天矿山坑底防渗结构及防渗处理的方法 | |
CN110245426B (zh) | 一种用于管廊结构顶管施工的有限元精细化模拟方法 | |
Mu et al. | Failure mechanism of grouted floor with confined aquifer based on mining-induced data | |
CN108930265B (zh) | 一种既有无砟轨道路基基底再生隐伏岩溶的注浆修复方法 | |
CN113027529B (zh) | 一种基于数值反演的采场冲击危险性评估方法 | |
CN112901268B (zh) | 一种煤层底板水害防治方法 | |
CN115217487A (zh) | 一种下穿铁路路基地层的土压平衡圆形顶管施工工法 | |
CN109024129A (zh) | 高填方路基挤密施工方法 | |
Jiajia et al. | Causes of tunnel diseases in a karst stratum and remediation measures: a case study | |
CN109056731B (zh) | 一种紧邻既有无砟轨道路基的岩溶注浆加固方法 | |
Liu et al. | Analysis on treatment effect of mine tunnel construction spring in karst area | |
CN113898411A (zh) | 一种煤层底板高承压灰岩水原位保护技术体系 | |
CN208981352U (zh) | 一种具有防治和预警岩溶塌陷的墙网组合结构 | |
Kielbassa et al. | Karst investigation and treatment measures for the high‐speed track on the Swabian Jura/Karsterkundungs‐und Sanierungsmaßnahmen für den Hochgeschwindigkeitsfahrweg auf der Schwäbischen Alb | |
CN205205879U (zh) | 一种露天矿山坑底防渗结构 | |
Moritz et al. | Application of the observational method in geotechnical safety management | |
North et al. | Copenhagen M4 line-safeguarding for future OSD | |
Rafi et al. | Jacking of rocks fractures during pre-grouting in Scandinavian tunneling projects–a study of the effects from chosen grouting pressure | |
Dong et al. | Prevention and Control of Mine Water Hazards from Underlying Aquifers | |
Li et al. | Influence of Base Rock Deterioration on Tunnel Bottom Structure Damage under Train Excitation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |