CN108921443A - A kind of power grid early warning scheduling system, method, apparatus and server - Google Patents

A kind of power grid early warning scheduling system, method, apparatus and server Download PDF

Info

Publication number
CN108921443A
CN108921443A CN201810762392.3A CN201810762392A CN108921443A CN 108921443 A CN108921443 A CN 108921443A CN 201810762392 A CN201810762392 A CN 201810762392A CN 108921443 A CN108921443 A CN 108921443A
Authority
CN
China
Prior art keywords
emergency
information
fuzzy
electricity exception
parameter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810762392.3A
Other languages
Chinese (zh)
Inventor
陈冬霞
邓景柱
吴钟飞
李祺威
刘沛林
郑惠芳
段孟雍
郝乾啸
林泽宏
鲁承波
汪杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd, Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Guangdong Power Grid Co Ltd
Priority to CN201810762392.3A priority Critical patent/CN108921443A/en
Publication of CN108921443A publication Critical patent/CN108921443A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

The present invention provides a kind of power grid early warning to dispatch system, method, apparatus and server, the system comprises:Information collecting device, warning center save ground tune unified platform and control centre;Information collecting device is enabled to be set to acquisition electricity exception information in plant stand to be monitored first;Secondly, warning center is enabled to generate emergency demand rating information according to electricity exception information and default fuzzy evaluation model;Then the unified platform demand rating information that will meet an urgent need is adjusted by preset interface and preset protocol to be sent to control centre by saving ground;Finally, control centre generates emergency preplan according to emergency demand rating information, and emergency materials are dispatched by the emergency preplan, it solves electricity exception information and collects hardly possible, the technical issues of method that the classification of emergency demand and the formulation of emergency preplan lack science coaches, reach and quickly and accurately collected electricity exception information and control centre can be sent information to by the channel of stability and high efficiency, so that cammander carries out the technical effect of global planning.

Description

A kind of power grid early warning scheduling system, method, apparatus and server
Technical field
The present invention relates to emergency scheduling technical field, more particularly, to a kind of power grid early warning scheduling system, method, apparatus and Server.
Background technique
Currently, such as the severe operation against rules of great construction accident, public emergency event, property, earthquake, flood, pole Easily cause massive blackout accident even electric network from collapsing, large-scale power outage and seriously affects social stability and people's life wealth Produce safety.When electricity exception occurs, the data that the formulation of emergency preplan is often depending on the emergency exception information being collected into are It is no accurate, comprehensive and timely;But during electricity exception, actual conditions one second of power failure may occur earth-shaking Change, the collection work of electricity exception information is difficult to execute in time, and the classification of emergency demand and the formulation of emergency preplan are often main By the experience and subjective judgement of contingency management personnel and emergency expert, there is certain randomness and blindness in scheduling, The stage division for lacking science coaches.
Summary of the invention
In view of this, the purpose of the present invention is to provide a kind of power grid early warning scheduling system, method, apparatus and server, To alleviate, there is certain randomness and blindness in current emergency scheduling, lack the skill that the stage division of science coaches Art problem.
In a first aspect, the embodiment of the invention provides a kind of power grid early warning to dispatch system, including:It is information collecting device, pre- Alert center saves ground tune unified platform and control centre;
The information collecting device is set in plant stand to be monitored, for acquiring the electricity exception information of plant stand to be monitored;
The warning center is used to generate emergency demand point according to the electricity exception information and default fuzzy evaluation model Grade information;
Adjust to the province unified platform for sending out the emergency demand rating information by preset interface and preset protocol Give the control centre;
The control centre is used to be generated and the emergency demand rating information pair according to the emergency demand rating information The emergency preplan answered, and emergency materials are dispatched by the emergency preplan.
With reference to first aspect, the embodiment of the invention provides the first possible embodiments of first aspect, wherein institute Stating power grid early warning scheduling system further includes:Communication device;
The communication device is used to the electricity exception information being sent to the warning center.
Second aspect, the embodiment of the present invention also provide a kind of power grid early warning dispatching method, are applied to warning center, including:
Receive the electricity exception information of information collecting device acquisition;
Emergency demand rating information is generated according to the electricity exception information and default fuzzy evaluation model;
By saving unified platform is adjusted to be sent to control centre the emergency demand rating information.
In conjunction with second aspect, the embodiment of the invention provides the first possible embodiments of second aspect, wherein institute It states and emergency demand rating information is generated according to the electricity exception information and default fuzzy evaluation model, including:
The input parameter, the input ginseng are determined by the corresponding relationship for presetting the electricity exception information and input parameter Number is the input of fuzzy evaluation model;
In the fuzzy evaluation model, the input parameter is subjected to blurring, controlling fuzzy parameter is calculated;
It is fuzzy that emergency demand levels are carried out by the corresponding relationship for presetting the controlling fuzzy parameter and emergency demand levels influence Reasoning from logic obtains fuzzy reasoning parameter;
In the fuzzy evaluation model, emergency demand point is calculated in fuzzy reasoning parameter progress de-fuzzy Grade information.
In conjunction with second aspect, the embodiment of the invention provides second of possible embodiments of second aspect, wherein institute It states in the fuzzy evaluation model, the input parameter is subjected to blurring, controlling fuzzy parameter is calculated, including:
The first subordinating degree function is determined by the default corresponding relationship of the input parameter and the first subordinating degree function;
The calculating for receiving user's input inputs operation, and the input parameter fuzzy is obtained controlling fuzzy parameter.
In conjunction with second aspect, the embodiment of the invention provides the third possible embodiments of second aspect, wherein In the fuzzy evaluation model, emergency demand rating information is calculated in fuzzy reasoning parameter progress de-fuzzy, is wrapped It includes:
The second subordinating degree function is determined by the default corresponding relationship of the fuzzy reasoning parameter and output subordinating degree function;
The calculating for receiving user's input exports operation, and the fuzzy reasoning parameter de-fuzzy is generated the classification of emergency demand Information.
The third aspect, the embodiment of the present invention also provide a kind of power grid early warning dispatching method, are applied to control centre, including:
Receive the emergency demand rating information that warning center is sent;
By the corresponding relationship of default emergency preplan and the emergency demand rating information, institute is generated in the control centre State the corresponding emergency preplan of emergency demand rating information;
Emergency materials are dispatched by the emergency preplan.
In conjunction with the third aspect, the embodiment of the invention provides the first possible embodiments of the third aspect, wherein institute It states and dispatches emergency materials by the emergency preplan, including:
The power plant and substation's information for the generation electricity exception situation that warning center is sent is received, the power plant and substation's information includes plant stand geography Position;
According to the plant stand geographical location, it is different that the corresponding emergency materials of the emergency preplan are dispatched to the generation electric power The plant stand of reason condition.
Second aspect, the embodiment of the present invention also provide a kind of power grid early warning dispatching device, are applied to warning center, including:
First receiving module, for receiving the electricity exception information of information collecting device acquisition;
First generation module, for generating emergency demand point according to the electricity exception information and default fuzzy evaluation model Grade information;
First sending module, for by saving unified platform being adjusted to be sent to scheduling the emergency demand rating information Center.
A kind of server, including memory, processor, be stored in the memory to run on the processor Computer program, the processor realize above-mentioned second aspect and the third aspect either side institute when executing the computer program The step of method stated.
The embodiment of the present invention brings following beneficial effect:The embodiment of the present invention is by providing a kind of power grid early warning scheduling system System, method, apparatus and server, the system comprises:Information collecting device, warning center save ground tune unified platform and tune Degree center;The information collecting device is set in plant stand to be monitored first, for acquiring the electricity exception of plant stand to be monitored Information;Secondly, the warning center is enabled to generate emergency demand point according to the electricity exception information and default fuzzy evaluation model Grade information;Then, adjust unified platform by the emergency demand rating information by preset interface and default association by the province View is sent to the control centre;Finally, the control centre generates and the emergency according to the emergency demand rating information The corresponding emergency preplan of demand rating information, and emergency materials are dispatched by the emergency preplan.
The embodiment of the present invention realizes the automatic collection to electricity exception information by setting information acquisition device, by setting It adjusts integral intelligent platform the electricity exception information can be sent to control centre in real time with setting province, realizes accurate quick Collection electricity exception information and control centre can be sent information to by the channel of stability and high efficiency, so as to cammander progress Global planning.
Other features and advantages of the present invention will illustrate in the following description, also, partly become from specification It obtains it is clear that understand through the implementation of the invention.The objectives and other advantages of the invention are in specification, claims And specifically noted structure is achieved and obtained in attached drawing.
To enable the above objects, features and advantages of the present invention to be clearer and more comprehensible, preferred embodiment is cited below particularly, and cooperate Appended attached drawing, is described in detail below.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art Embodiment or attached drawing needed to be used in the description of the prior art be briefly described, it should be apparent that, it is described below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is that system composition schematic diagram is dispatched in a kind of power grid early warning provided in an embodiment of the present invention;
Fig. 2 is a kind of power grid early warning dispatching method flow chart applied to warning center provided in an embodiment of the present invention;
Fig. 3 is the method flow schematic diagram that step S2 includes;
Fig. 4 is a kind of power grid early warning dispatching method flow chart applied to control centre provided in an embodiment of the present invention.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with attached drawing to the present invention Technical solution be clearly and completely described, it is clear that described embodiments are some of the embodiments of the present invention, rather than Whole embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise Under every other embodiment obtained, shall fall within the protection scope of the present invention.
Currently, such as the severe operation against rules of great construction accident, public emergency event, property, earthquake, flood, pole Easily cause massive blackout accident even electric network from collapsing, large-scale power outage and seriously affects social stability and people's life wealth Produce safety.When electricity exception occurs, the data that the formulation of emergency preplan is often depending on the emergency exception information being collected into are It is no accurate, comprehensive and timely;But during electricity exception, actual conditions one second of power failure may occur earth-shaking Change, the collection work of electricity exception information is difficult to execute in time, and the classification of emergency demand and the formulation of emergency preplan are often main By the experience and subjective judgement of contingency management personnel and emergency expert, there is certain randomness and blindness in scheduling, The stage division for lacking science coaches, and is based on this, and it is fast that exception information is dispatched during a kind of emergency provided in an embodiment of the present invention Speed reports and submits method, apparatus and system, and the automatic collection to electricity exception information can be realized by setting information acquisition device, It adjusts integral intelligent platform the electricity exception information can be sent to control centre in real time with saving by setting, realizes standard It really quickly collects electricity exception information and control centre can be sent information to by the channel of stability and high efficiency, to command Person carries out global planning.
It is to be dispatched to a kind of power grid early warning disclosed in the embodiment of the present invention first convenient for understanding the present embodiment System describes in detail, as shown in Figure 1, power grid early warning scheduling system includes:Information collecting device 1, saves warning center 2 Ground tune unified platform 3 and control centre 4;
The information collecting device 1 is set in plant stand to be monitored, for acquiring the electricity exception information of plant stand to be monitored;
In embodiments of the present invention, the information collecting device 1 can refer to intelligent electric power monitor table, with intelligence interface Low-voltage circuit breaker and the intellectual monitorings instrument such as direct current cabinet;The plant stand can refer to that power plant and substation, power plant are used to send out Electricity, the substation are the hinges of the voltage for converting, and the conversion of the height of voltage may be implemented.Substantially, by power plant The electricity issued require by line transmission to substation through substation conversion voltage after again by line transmission to purpose Ground.It can be seen that the plant stand occupies extremely important position in the power system, once electric power occurs for power plant or substation Abnormal failure often causes disintegrating for power grid, and then the power failure phenomenon of occurrence of large-area, seriously affects people's lives and wealth Produce safety.Therefore in embodiments of the present invention, for the power information situation of each plant stand of real-time monitoring, can distinguish in each plant stand The electricity exception information that setting information acquisition device 1 is used to acquire plant stand can be sent out through the embodiment of the present invention in electricity exception Raw initial stage can monitor exception information in time, facilitate staff that can find electricity exception situation in time, arrange early Except failure, realizes to a certain extent and power abnormal failure was just excluded and is solved in the budding stage, avoid large-area power-cuts The generation of event.
The warning center 2 is used to generate emergency demand point according to the electricity exception information and default fuzzy evaluation model Grade information;
In embodiments of the present invention, the warning center 2 may include server, and the electricity exception information can refer to electricity Pressure, the deviation of frequency are more than permissible range, and certain equipment are overloaded, overcurrent, and list does not occur neutral point for solidly grounded system It is mutually grounded, the abnormal conditions information such as oscillation occur for system;In embodiments of the present invention, the fuzzy evaluation model can refer to including The preset evaluation model that Indistinct Input operation, fuzzy logic inference and fuzzy output calculate.The emergency demand classification Information can refer to the different brackets divided according to the influence that different electricity exception situations may cause, illustratively, can incite somebody to action Electricity exception situation divides I grade (superfine demand) by urgency level, by II grade (urgent need) III grade (compared with being badly in need of asking) IV grade (one As demand).Corresponding evaluation of estimate can be set for different grades, it is big that I grade of corresponding evaluation of estimate, which illustratively can be set, Be less than or equal to 10 in being equal to 8, II grade of corresponding evaluation of estimate is to be less than or equal to 7 more than or equal to 5, III grade of corresponding evaluation of estimate be greater than It is less than or equal to 4 equal to 2, IV grade of corresponding evaluation of estimate is to be less than or equal to 1 more than or equal to 0.
Adjust to the province unified platform 3 for sending out the emergency demand rating information by preset interface and preset protocol Give the control centre 4;
In embodiments of the present invention, adjust to the province unified platform 3 that can refer to adjusts end and ground to adjust the intelligence at end including saving Service platform saves and end is adjusted the key hardwares such as server, computer and display equipment to can be set and including such as platform The software systems of software, operating system, database and application software etc.;Ground tune end then may include some monitoring service modules, End is adjusted to pass through detailed monitoring information to save.
In embodiments of the present invention, with can the referring to province integrated webServices interface of the preset interface, it is described pre- If agreement can refer to webServices agreement;In embodiments of the present invention, province's tune end and described adjust end that can pass through province The integrated webServices interface in ground carries out the transmission of electricity exception information data using webServices agreement, described Electricity exception information data can be encoded using utf-8 coded format, can also will be after coding for the safety of transmission Message using base64 encrypt, save adjust end and ground adjust end according to include in encrypted message unique identifier carry out data Interaction.
The control centre 4 is used to be generated and the emergency demand rating information pair according to the emergency demand rating information The emergency preplan answered, and emergency materials are dispatched by the emergency preplan.
In embodiments of the present invention, the emergency preplan, which can refer to, is directed to electric power according to what emergency demand rating information generated The emergency measure and scheme that abnormal conditions are made.
The embodiment of the present invention realizes the automatic collection to electricity exception information by setting information acquisition device 1, passes through Setting saves ground and integral intelligent platform is adjusted the electricity exception information can be sent to control centre 4 in real time, and it is accurate to realize It quickly collects electricity exception information and control centre 4 can be sent information to by the channel of stability and high efficiency, to command Person carries out global planning.
In another embodiment of the present invention, the power grid early warning scheduling system further includes:Communication device;
The communication device is used to the electricity exception information being sent to the warning center 2.
In embodiments of the present invention, the communication device can refer between information collecting device 1 and warning center 2 into The PORT COM or device of row communication interaction.
In another embodiment of the present invention, as shown in Fig. 2, also providing a kind of power grid early warning dispatching method, it is applied to pre- Alert center 2, includes the next steps:
Step S1, for receiving the electricity exception information of the acquisition of information collecting device 1;
Step S2, for generating emergency demand classification letter according to the electricity exception information and default fuzzy evaluation model Breath;
Step S3, for by saving unified platform 3 being adjusted to be sent to control centre the emergency demand rating information 4。
In embodiments of the present invention, the warning center 2 can be with real-time reception electricity exception information, and can be according to reception To electricity exception information calculate emergency demand rating information, finally will emergency demand rating information by save ground adjust integration Platform 3 is timely transmitted to control centre 4.
In another embodiment of the present invention, as shown in figure 3, step S2 can also include the following steps:
Step S21, for determining that the input is joined by the corresponding relationship for presetting the electricity exception information and input parameter Number, the input parameter are the input of fuzzy evaluation model;
In embodiments of the present invention, the input parameter and the electricity exception information are corresponding, and the input parameter is by institute The decision of electricity exception information is stated, different electricity exception information corresponds to different input parameters.It illustratively, can be by the electricity Power exception information corresponds to different input parameters in terms of importance, timeliness and notch degree three.It is fixed by natural language The different electricity exception situation of justice corresponds to different importance, timeliness and notch degree, may be implemented through the embodiment of the present invention Real data, that is, electricity exception information is converted into mathematical data, in order to what how can be constructed in advance by the mathematical data Analysis and operation are carried out in fuzzy evaluation model.
Step S22, in the fuzzy evaluation model, the input parameter be blurred be calculated it is fuzzy Change parameter;
In embodiments of the present invention, blurring calculating process can have been pre-defined in the fuzzy evaluation model.
The blurring, which calculates, can refer to the numerical value that input parameter is transformed into default domain in the proper ratio, utilize mouth Language variable come describe measurement physical quantity process, the colloquial style variable be referred to as fuzzy subset conjunction, the default domain can Think a kind of bounded theory of real numbers domain with mathematical form predetermined.
Step S23, for meeting an urgent need by the corresponding relationship for presetting the controlling fuzzy parameter and emergency demand levels influence Demand levels fuzzy logic inference obtains fuzzy reasoning parameter;
In embodiments of the present invention, the fuzzy logic inference can refer to pre-establishes according in the fuzzy evaluation model Knowledge base, carry out inference with fuzzy logic and fuzzy deduction method and obtain fuzzy control signal;In embodiments of the present invention, institute Stating knowledge base may include database and rule base two parts, and the correlation that the database can provide processing fuzzy data is fixed Justice, the rule base, which can refer to, has gathered some Linguistic control laws and description control target and strategy, the rule base description The combined influence of the corresponding anxious demand levels of the input variable of various combination, illustratively, the rule base can be by different groups The combined influence of the corresponding anxious demand levels of the input variable of conjunction is described by natural language, mostly uses " the IF- of fuzzy statement THEN " rule." IF-THEN " rule can be divided into two parts:The part IF is the premise that can be compared with input parameter; The part THEN is then the result obtained under the premise of this.
Step S24, in the fuzzy evaluation model, fuzzy reasoning parameter progress de-fuzzy to be calculated To emergency demand rating information.
In embodiments of the present invention, the de-fuzzy calculating can refer to the fuzzy reasoning that will be obtained through fuzzy logic inference Parameter Switch is the calculating process of specific emergency demand rating information data;The emergency demand rating information can be used as mould Paste the output of evaluation model.
In another embodiment of the present invention, step S22 can also include:
The first subordinating degree function is determined by the default corresponding relationship of the input parameter and the first subordinating degree function;
The calculating for receiving user's input inputs operation, and the input parameter fuzzy is obtained controlling fuzzy parameter.
In embodiments of the present invention, can refer to will be described according to membership predetermined for first subordinating degree function Parameter sets are inputted into the function of fuzzy set.It illustratively, can be using trapezoidal function as subordinating degree function.
In another embodiment of the present invention, step S24 can also include:
The second subordinating degree function is determined by the default corresponding relationship of the fuzzy reasoning parameter and output subordinating degree function;
The calculating for receiving user's input exports operation, and the fuzzy reasoning parameter de-fuzzy is generated the classification of emergency demand Information.
In embodiments of the present invention, can refer to will be described according to membership predetermined for second subordinating degree function Fuzzy reasoning Parameter Switch at fuzzy set function.
In another embodiment of the present invention, as shown in figure 4, also providing a kind of power grid early warning dispatching method, it is applied to adjust Degree center 4, may comprise steps of:
Step S101, for receiving the emergency demand rating information of the transmission of warning center 2;
Step S102, for the corresponding relationship by default emergency preplan and the emergency demand rating information, in the tune The corresponding emergency preplan of the emergency demand rating information is generated in degree center 4;
Step S103, for dispatching emergency materials by the emergency preplan.
Power grid early warning dispatching method provided in an embodiment of the present invention dispatches system with power grid early warning provided by the above embodiment Technical characteristic having the same reaches identical technical effect so also can solve identical technical problem, to briefly describe, Part of the embodiment of the present invention does not refer to place, can refer to corresponding contents in aforementioned power grid early warning scheduling system embodiment.
In another embodiment of the present invention, step S103 may include:
The power plant and substation's information for the generation electricity exception situation that warning center 2 is sent is received, the power plant and substation's information includes plant stand Manage position;
According to the plant stand geographical location, it is different that the corresponding emergency materials of the emergency preplan are dispatched to the generation electric power The plant stand of reason condition.
In embodiments of the present invention, the plant stand geographical location information can refer to the actual geographic position letter of the plant stand Breath.Through the embodiment of the present invention, it may be implemented fast and accurately to be dispatched emergency materials according to the geographical location information It goes, solves the problems, such as electricity exception in time.
In another embodiment of the present invention, a kind of power grid early warning dispatching device is also provided, is applied to warning center 2, packet It includes:
First receiving module, for receiving the electricity exception information of the acquisition of information collecting device 1;
First generation module, for generating emergency demand point according to the electricity exception information and default fuzzy evaluation model Grade information;
First sending module, for by saving unified platform 3 being adjusted to be sent to tune the emergency demand rating information Degree center 4.
Power grid early warning dispatching device provided in an embodiment of the present invention is applied to warning center 2 with provided by the above embodiment Power grid early warning dispatching method technical characteristic having the same reach identical skill so also can solve identical technical problem Art effect.
In another embodiment of the present invention, a kind of server, including memory, processor, the memory are also provided In be stored with the computer program that can be run on the processor, the processor is realized when executing the computer program The step of stating either the method for the intrinsic control centre 4 of methods and applications applied to warning center 2 method.
It is apparent to those skilled in the art that for convenience and simplicity of description, the system of foregoing description It with the specific work process of device, can refer to corresponding processes in the foregoing method embodiment, details are not described herein.
In addition, in the description of the embodiment of the present invention unless specifically defined or limited otherwise, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition Concrete meaning in invention.
It, can be with if the function is realized in the form of SFU software functional unit and when sold or used as an independent product It is stored in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially in other words The part of the part that contributes to existing technology or the technical solution can be embodied in the form of software products, the meter Calculation machine software product is stored in a storage medium, including some instructions are used so that a computer equipment (can be a People's computer, server or network equipment etc.) it performs all or part of the steps of the method described in the various embodiments of the present invention. And storage medium above-mentioned includes:USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), arbitrary access are deposited The various media that can store program code such as reservoir (RAM, Random Access Memory), magnetic or disk.
In the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" be based on the orientation or positional relationship shown in the drawings, merely to Convenient for description the present invention and simplify description, rather than the device or element of indication or suggestion meaning must have a particular orientation, It is constructed and operated in a specific orientation, therefore is not considered as limiting the invention.In addition, term " first ", " second ", " third " is used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
Finally it should be noted that:Embodiment described above, only a specific embodiment of the invention, to illustrate the present invention Technical solution, rather than its limitations, scope of protection of the present invention is not limited thereto, although with reference to the foregoing embodiments to this hair It is bright to be described in detail, those skilled in the art should understand that:Anyone skilled in the art In the technical scope disclosed by the present invention, it can still modify to technical solution documented by previous embodiment or can be light It is readily conceivable that variation or equivalent replacement of some of the technical features;And these modifications, variation or replacement, do not make The essence of corresponding technical solution is detached from the spirit and scope of technical solution of the embodiment of the present invention, should all cover in protection of the invention Within the scope of.Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (10)

1. system is dispatched in a kind of power grid early warning, which is characterized in that including:Information collecting device, warning center save ground tune integration Platform and control centre;
The information collecting device is set in plant stand to be monitored, for acquiring the electricity exception information of plant stand to be monitored;
The warning center is used to generate emergency demand classification letter according to the electricity exception information and default fuzzy evaluation model Breath;
Adjust to the province unified platform for the emergency demand rating information to be sent to by preset interface and preset protocol The control centre;
The control centre is used to be generated according to the emergency demand rating information corresponding with the emergency demand rating information Emergency preplan, and emergency materials are dispatched by the emergency preplan.
2. system is dispatched in power grid early warning according to claim 1, which is characterized in that further include:Communication device;
The communication device is used to the electricity exception information being sent to the warning center.
3. a kind of power grid early warning dispatching method, which is characterized in that it is applied to warning center, including:
Receive the electricity exception information of information collecting device acquisition;
Emergency demand rating information is generated according to the electricity exception information and default fuzzy evaluation model;
By saving unified platform is adjusted to be sent to control centre the emergency demand rating information.
4. power grid early warning dispatching method according to claim 3, which is characterized in that described according to the electricity exception information Emergency demand rating information is generated with default fuzzy evaluation model, including:
Determine that the input parameter, the input parameter are by the corresponding relationship for presetting the electricity exception information and input parameter The input of fuzzy evaluation model;
In the fuzzy evaluation model, the input parameter is subjected to blurring, controlling fuzzy parameter is calculated;
Emergency demand levels fuzzy logic is carried out by the corresponding relationship for presetting the controlling fuzzy parameter and emergency demand levels influence Reasoning obtains fuzzy reasoning parameter;
In the fuzzy evaluation model, emergency demand classification letter is calculated in fuzzy reasoning parameter progress de-fuzzy Breath.
5. power grid early warning dispatching method according to claim 4, which is characterized in that described in the fuzzy evaluation model In, the input parameter is subjected to blurring, controlling fuzzy parameter is calculated, including:
The first subordinating degree function is determined by the default corresponding relationship of the input parameter and the first subordinating degree function;
The calculating for receiving user's input inputs operation, and the input parameter fuzzy is obtained controlling fuzzy parameter.
6. power grid early warning dispatching method according to claim 4, which is characterized in that, will in the fuzzy evaluation model The fuzzy reasoning parameter carries out de-fuzzy and emergency demand rating information is calculated, including:
The second subordinating degree function is determined by the default corresponding relationship of the fuzzy reasoning parameter and output subordinating degree function;
The calculating for receiving user's input exports operation, and the fuzzy reasoning parameter de-fuzzy is generated emergency demand classification letter Breath.
7. a kind of power grid early warning dispatching method, which is characterized in that it is applied to control centre, including:
Receive the emergency demand rating information that warning center is sent;
By the corresponding relationship of default emergency preplan and the emergency demand rating information, answered described in generation in the control centre Urgent need seeks the corresponding emergency preplan of rating information;
Emergency materials are dispatched by the emergency preplan.
8. power grid early warning dispatching method according to claim 7, which is characterized in that described to be answered by emergency preplan scheduling Anxious goods and materials, including:
The power plant and substation's information for the generation electricity exception situation that warning center is sent is received, the power plant and substation's information includes plant stand geography position It sets;
According to the plant stand geographical location, the corresponding emergency materials of the emergency preplan are dispatched to the generation electricity exception feelings The plant stand of condition.
9. a kind of power grid early warning dispatching device, which is characterized in that it is applied to warning center, including:
First receiving module, for receiving the electricity exception information of information collecting device acquisition;
First generation module, for generating emergency demand classification letter according to the electricity exception information and default fuzzy evaluation model Breath;
First sending module, for by saving unified platform being adjusted to be sent in scheduling the emergency demand rating information The heart.
10. a kind of server, including memory, processor, be stored in the memory to run on the processor Computer program, which is characterized in that the processor realizes that the claims 3 to 8 are any when executing the computer program The step of method described in item.
CN201810762392.3A 2018-07-11 2018-07-11 A kind of power grid early warning scheduling system, method, apparatus and server Pending CN108921443A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810762392.3A CN108921443A (en) 2018-07-11 2018-07-11 A kind of power grid early warning scheduling system, method, apparatus and server

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810762392.3A CN108921443A (en) 2018-07-11 2018-07-11 A kind of power grid early warning scheduling system, method, apparatus and server

Publications (1)

Publication Number Publication Date
CN108921443A true CN108921443A (en) 2018-11-30

Family

ID=64412034

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810762392.3A Pending CN108921443A (en) 2018-07-11 2018-07-11 A kind of power grid early warning scheduling system, method, apparatus and server

Country Status (1)

Country Link
CN (1) CN108921443A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110991799A (en) * 2019-10-30 2020-04-10 广西电网有限责任公司电力科学研究院 Comprehensive early warning method for power distribution network production
CN111833561A (en) * 2019-11-20 2020-10-27 杭州四方博瑞科技股份有限公司 Method and system for judging abnormal conditions of perimeter of enclosing wall
CN112348327A (en) * 2020-10-26 2021-02-09 易显智能科技有限责任公司 Supervision system of evaluation management system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102074956A (en) * 2011-02-11 2011-05-25 华北电网有限公司 Power grid risk management method and system
CN104346701A (en) * 2014-11-11 2015-02-11 国家电网公司 Condition-based maintenance and evaluation decision making system for grid information communication equipment
CN105303285A (en) * 2014-09-04 2016-02-03 国网山东省电力公司应急管理中心 Intelligent allocation method for power emergency disposal materials

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102074956A (en) * 2011-02-11 2011-05-25 华北电网有限公司 Power grid risk management method and system
CN105303285A (en) * 2014-09-04 2016-02-03 国网山东省电力公司应急管理中心 Intelligent allocation method for power emergency disposal materials
CN104346701A (en) * 2014-11-11 2015-02-11 国家电网公司 Condition-based maintenance and evaluation decision making system for grid information communication equipment

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张向东 等: "基于模糊综合评判的智能变电站告警系统研究", 《电网与清洁能源》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110991799A (en) * 2019-10-30 2020-04-10 广西电网有限责任公司电力科学研究院 Comprehensive early warning method for power distribution network production
CN111833561A (en) * 2019-11-20 2020-10-27 杭州四方博瑞科技股份有限公司 Method and system for judging abnormal conditions of perimeter of enclosing wall
CN111833561B (en) * 2019-11-20 2021-11-09 杭州四方博瑞科技股份有限公司 Method and system for judging abnormal conditions of perimeter of enclosing wall
CN112348327A (en) * 2020-10-26 2021-02-09 易显智能科技有限责任公司 Supervision system of evaluation management system

Similar Documents

Publication Publication Date Title
CN110134094B (en) Industrial enterprise energy consumption monitoring and management system
CN106655522B (en) A kind of main station system suitable for electric grid secondary equipment operation management
CN103633739B (en) Microgrid energy management system and method
CN102737287B (en) Regional power grid on-line power supply risk assessment system
CN108921443A (en) A kind of power grid early warning scheduling system, method, apparatus and server
Lin et al. Situation awareness of active distribution network: Roadmap, technologies, and bottlenecks
CN105678467A (en) Regulation and control integrated data analysis and aid decision making system and method under ultrahigh-voltage alternating current and direct current networking
CN107798395A (en) A kind of power grid accident signal automatic diagnosis method and system
CN108206747A (en) Method for generating alarm and system
CN109636113A (en) Power grid risk analysis method based on deploying node
CN105184490B (en) Forming Electrical Dispatching Command Tickets process risk assists Pre-control System
CN105372534A (en) Multi-sensor multi-parameter information intelligent integration system
CN106655158A (en) Smart grid based distribution network self-healing control system and method
CN106771852A (en) A kind of online monitoring data unification collection of net source and analysis and processing method
CN109767063A (en) A kind of stability control device operation information system and its online power grid risk assessment method
CN113746138A (en) Energy storage intelligent energy management system applied to wind storage power station
CN102254241A (en) On-line estimating method for power demand balanced capability based on full network topology
CN105811588A (en) Electric power grid safety running monitoring and communication system
CN109787242A (en) A kind of power grid low-frequency voltage off-load method and system
CN104979903B (en) A kind of centralized control center patrols dimension analysis method and device
CN203151231U (en) Monitoring and analysis system for power grid running state of electrical power system
CN107390592A (en) A kind of business electrical monitoring information and mobile phone interaction communication system
CN113837423A (en) Power grid operation situation prediction method based on energy internet electric power big data
CN108288122B (en) Assessment method and device of multi-region interconnection system
Tong Smart grid information management system relying on MAS technology and complex scientific management thinking

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181130