CN102254241A - On-line estimating method for power demand balanced capability based on full network topology - Google Patents
On-line estimating method for power demand balanced capability based on full network topology Download PDFInfo
- Publication number
- CN102254241A CN102254241A CN2011101505565A CN201110150556A CN102254241A CN 102254241 A CN102254241 A CN 102254241A CN 2011101505565 A CN2011101505565 A CN 2011101505565A CN 201110150556 A CN201110150556 A CN 201110150556A CN 102254241 A CN102254241 A CN 102254241A
- Authority
- CN
- China
- Prior art keywords
- frequency
- load
- data
- scheme
- network
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 21
- 230000005611 electricity Effects 0.000 claims abstract description 17
- 238000004364 calculation method Methods 0.000 claims abstract description 9
- 238000012544 monitoring process Methods 0.000 claims abstract description 6
- 238000011156 evaluation Methods 0.000 claims description 15
- 230000008676 import Effects 0.000 claims description 8
- 238000004088 simulation Methods 0.000 claims description 8
- 230000009471 action Effects 0.000 claims description 7
- 238000007726 management method Methods 0.000 claims description 6
- 230000006641 stabilisation Effects 0.000 claims description 6
- 238000011105 stabilization Methods 0.000 claims description 6
- 238000012545 processing Methods 0.000 claims description 4
- 238000011084 recovery Methods 0.000 claims description 4
- 238000013016 damping Methods 0.000 claims description 3
- 238000013523 data management Methods 0.000 claims description 3
- 238000009472 formulation Methods 0.000 claims description 3
- 239000000203 mixture Substances 0.000 claims description 3
- 238000011217 control strategy Methods 0.000 abstract description 4
- 238000004458 analytical method Methods 0.000 abstract description 3
- 230000008569 process Effects 0.000 description 5
- 238000013461 design Methods 0.000 description 2
- 208000019901 Anxiety disease Diseases 0.000 description 1
- 230000036506 anxiety Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 238000004422 calculation algorithm Methods 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000013178 mathematical model Methods 0.000 description 1
- 230000036316 preload Effects 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Images
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011101505565A CN102254241A (en) | 2011-06-07 | 2011-06-07 | On-line estimating method for power demand balanced capability based on full network topology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011101505565A CN102254241A (en) | 2011-06-07 | 2011-06-07 | On-line estimating method for power demand balanced capability based on full network topology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102254241A true CN102254241A (en) | 2011-11-23 |
Family
ID=44981488
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011101505565A Pending CN102254241A (en) | 2011-06-07 | 2011-06-07 | On-line estimating method for power demand balanced capability based on full network topology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102254241A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103279814A (en) * | 2012-01-20 | 2013-09-04 | 株式会社理光 | Apparatus and system for managing multiple electronic devices |
CN104794580A (en) * | 2015-04-28 | 2015-07-22 | 电力规划设计总院 | Unit-by-unit month-by-month electric power and energy balance calculation method |
CN103761587B (en) * | 2014-02-13 | 2016-08-17 | 国家电网公司 | A kind of electric power demand side MRP method based on intelligent power technology |
CN109728993A (en) * | 2019-01-28 | 2019-05-07 | 赵瑞红 | Remote lan encryption authentication device and application method based on VXLAN |
CN112564032A (en) * | 2020-11-27 | 2021-03-26 | 国网四川省电力公司德阳供电公司 | Adjusting method for setting line of low-frequency load shedding protection device of city power grid |
CN112600236A (en) * | 2020-12-09 | 2021-04-02 | 国电南瑞科技股份有限公司 | Frequency centralized correction control method and system based on multi-source flexible power fast adjustment |
-
2011
- 2011-06-07 CN CN2011101505565A patent/CN102254241A/en active Pending
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103279814A (en) * | 2012-01-20 | 2013-09-04 | 株式会社理光 | Apparatus and system for managing multiple electronic devices |
CN103761587B (en) * | 2014-02-13 | 2016-08-17 | 国家电网公司 | A kind of electric power demand side MRP method based on intelligent power technology |
CN104794580A (en) * | 2015-04-28 | 2015-07-22 | 电力规划设计总院 | Unit-by-unit month-by-month electric power and energy balance calculation method |
CN104794580B (en) * | 2015-04-28 | 2018-02-06 | 电力规划设计总院 | It is a kind of by unit balance of electric power and ener computational methods month by month |
CN109728993A (en) * | 2019-01-28 | 2019-05-07 | 赵瑞红 | Remote lan encryption authentication device and application method based on VXLAN |
CN112564032A (en) * | 2020-11-27 | 2021-03-26 | 国网四川省电力公司德阳供电公司 | Adjusting method for setting line of low-frequency load shedding protection device of city power grid |
CN112564032B (en) * | 2020-11-27 | 2023-03-28 | 国网四川省电力公司德阳供电公司 | Adjusting method for setting line of low-frequency load shedding protection device of city power grid |
CN112600236A (en) * | 2020-12-09 | 2021-04-02 | 国电南瑞科技股份有限公司 | Frequency centralized correction control method and system based on multi-source flexible power fast adjustment |
CN112600236B (en) * | 2020-12-09 | 2023-02-28 | 国电南瑞科技股份有限公司 | Frequency centralized correction control method and system based on multi-source flexible power fast adjustment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Hartmann et al. | Effects of decreasing synchronous inertia on power system dynamics—Overview of recent experiences and marketisation of services | |
Li et al. | Energy management and operational control methods for grid battery energy storage systems | |
CN105046395B (en) | Method for compiling day-by-day rolling plan of power system containing multiple types of new energy | |
CA2809011C (en) | Adaptive energy management system | |
Tian et al. | A hierarchical energy management system based on hierarchical optimization for microgrid community economic operation | |
Hoogsteen | A cyber-physical systems perspective on decentralized energy management | |
CN103904695B (en) | A kind ofly close on island many microgrids dynamic dispatching method based on MCS-PSO | |
Lin et al. | Situation awareness of active distribution network: Roadmap, technologies, and bottlenecks | |
CN102254241A (en) | On-line estimating method for power demand balanced capability based on full network topology | |
CN103001225A (en) | MAS-based (multi-agent system) multi-microgrid energy management system simulation method | |
CN103825279A (en) | Micro-grid system voltage stability control method based on robust control | |
WO2015028840A1 (en) | Composable method for explicit power flow control in electrical grids | |
CN103699941A (en) | Method for making annual dispatching operation plan for power system | |
CN106099951A (en) | Load cutting method and device for microgrid type combined generating system | |
CN105515044B (en) | DTS-based black start aid decision making system | |
Eskandari et al. | Battery energy storage systems (BESSs) and the economy-dynamics of microgrids: Review, analysis, and classification for standardization of BESSs applications | |
CN102832614A (en) | Robust optimizing method for power generation plan under uncertain environment | |
CN111313475A (en) | Power system scheduling method considering prediction error uncertain variable through power balance constraint | |
Yuan et al. | Enhanced frequency-constrained unit commitment considering variable-droop frequency control from converter-based generator | |
KR20210100699A (en) | hybrid power plant | |
CN115224746A (en) | Multi-scene cluster coordination control method, device and system for offshore wind power | |
Cheng et al. | A review on virtual power plants interactive resource characteristics and scheduling optimization | |
Thornburg et al. | Simulating energy management strategies for microgrids with smart meter demand management | |
Bruno et al. | Managing networked hybrid-energy systems: A predictive dispatch approach | |
Kalsi et al. | Distributed smart grid asset control strategies for providing ancillary services |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: STATE GRID CORPORATION OF CHINA Effective date: 20121206 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20121206 Address after: 300010 Tianjin city Hebei District Wujing Road No. 39 Applicant after: Tianjin Electric Power Corp. Applicant after: State Grid Corporation of China Address before: 300010 Tianjin city Hebei District Wujing Road No. 39 Applicant before: Tianjin Electric Power Corp. |
|
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20111123 |