CN108920307A - Server Restart test method, device, equipment and computer readable storage medium - Google Patents

Server Restart test method, device, equipment and computer readable storage medium Download PDF

Info

Publication number
CN108920307A
CN108920307A CN201810751780.1A CN201810751780A CN108920307A CN 108920307 A CN108920307 A CN 108920307A CN 201810751780 A CN201810751780 A CN 201810751780A CN 108920307 A CN108920307 A CN 108920307A
Authority
CN
China
Prior art keywords
server
test
restart
power supply
supply status
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810751780.1A
Other languages
Chinese (zh)
Inventor
李乐乐
刘波
齐冀
曾菊香
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Yunhai Information Technology Co Ltd
Original Assignee
Zhengzhou Yunhai Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Yunhai Information Technology Co Ltd filed Critical Zhengzhou Yunhai Information Technology Co Ltd
Priority to CN201810751780.1A priority Critical patent/CN108920307A/en
Publication of CN108920307A publication Critical patent/CN108920307A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/14Error detection or correction of the data by redundancy in operation
    • G06F11/1402Saving, restoring, recovering or retrying
    • G06F11/1415Saving, restoring, recovering or retrying at system level
    • G06F11/1441Resetting or repowering
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/30Monitoring
    • G06F11/3055Monitoring arrangements for monitoring the status of the computing system or of the computing system component, e.g. monitoring if the computing system is on, off, available, not available

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computing Systems (AREA)
  • Power Sources (AREA)

Abstract

The invention discloses a kind of Server Restart test methods, in the method, when carrying out restarting test to server, Server Restart can be tested by method that server management system and this software and hardware of hardware GPIO status inquiry combine, rather than check the switch state of current server merely;In addition, not only the multistage is divided to be tested when this programme tests Server Restart state, carry out comprehensive judgement herein in connection with the test log of server, so that the verifying to server test process can be realized, problem place can be easily determined after error;In this way, the various hidden danger in server design in computer starting link can effectively be found, the working efficiency of tester can be effectively improved, human cost is saved, improve the accuracy and reliability of work.The invention also discloses a kind of Server Restart test device, equipment and computer readable storage mediums, are equally able to achieve above-mentioned technical effect.

Description

Server Restart test method, device, equipment and computer readable storage medium
Technical field
The present invention relates to server the field of test technology, more specifically to a kind of Server Restart test method, dress It sets, equipment and computer readable storage medium.
Background technique
It is well known that server is the core of whole network system and computing platform, many important data are all stored in On server.It is also higher and higher to the stability requirement of server with the development of the business such as big data and cloud computing, it weighs repeatedly Whether the important indicator for also becoming server stability can be worked normally after opening server.Currently, after to Server Restart Test verifying also only reside within and judge on current server power supply status, such as judge that power supply status is unlatching or pass It closes;But this verification mode is far from being enough.On the one hand, which, which only demonstrates result, does not have verification process, another party Face, after verifying by this way, if error, problem place could be understood by also needing largely to analyze.
Therefore, how to server carry out it is efficient restart verifying, be those skilled in the art's problem to be solved.
Summary of the invention
The purpose of the present invention is to provide a kind of Server Restart test method, device, equipment and computer-readable storages Medium efficient carries out server to restart test to realize.
To achieve the above object, the embodiment of the invention provides following technical solutions:
A kind of Server Restart test method, including:
Obtain the current power state of server;
Reboot operation is executed to the server using the current power state;
After the server executes reboot operation, judge whether the power supply status of the server is open state;If It is no, then determine the server test crash;If so, by GPIO pin verify the server power supply status whether be High level;
If low level, then the server test crash is determined;If high level, then judge whether deposit in BMC log In the test log of this test;
If it exists, then determine that the server is successfully tested;If it does not exist, then determine the server test crash.
Wherein, described that reboot operation is executed to server using the current power state, including:
If the current power state is power-up state, reboot operation directly is executed to the server;
If the current power state is off-position, control after the server powers on, then the server is held Row reboot operation.
Wherein, before the utilization current power state executes reboot operation to server, further include:
Remove the BMC log of the server.
Wherein, whether the power supply status by GPIO pin authentication server is high level, including:
Execute Gpiotool order by the GPIO pin of the server, verify the server power supply status whether For high level.
Wherein, before the current power state for obtaining server, further include:
Obtain preset loop test number;
After then determining the server test crash every time or determining that the server is successfully tested, current survey is judged Whether examination number is equal to the loop test number;
If being not equal to, continue to execute it is described obtain server current power state the step of;If being equal to, stopping pair The server restarts test, and generates test report according to each test result.
A kind of Server Restart test device, including:
Power supply status obtains module, for obtaining the current power state of server;
Operation executing module, for executing reboot operation to the server using the current power state;
First judgment module, for judging the power supply status of the server after the server executes reboot operation It whether is open state;If it is not, then determining the server test crash;
When authentication module for the power supply status in the server is open state, verified by GPIO pin described in Whether the power supply status of server is high level;If low level, then the server test crash is determined;
Second judgment module, when the power supply status for verifying the server by GPIO pin is high level, judgement With the presence or absence of the test log of this test in BMC log;If it exists, then determine that the server is successfully tested;If it does not exist, Then determine the server test crash.
Wherein, this programme further includes:
Module is removed, for restarting behaviour to server execution using the current power state in the operation executing module Before work, the BMC log of the server is removed.
Wherein, this programme further includes:
Loop test number obtains module, for obtaining preset loop test number;
Third judgment module, for determine the server test crash every time or determine server test at After function, judge whether current testing time is equal to the loop test number;If being not equal to, triggers the power supply status and obtain Modulus block;If being equal to, stopping restarts test to the server;
Test report generation module, for generating test report according to each test result.
A kind of Server Restart test equipment, including:
Memory, for storing computer program;
Processor is realized when for executing the computer program such as the step of above-mentioned Server Restart test method.
A kind of computer readable storage medium is stored with computer program on the computer readable storage medium, described It realizes when computer program is executed by processor such as the step of above-mentioned Server Restart test method.
By above scheme it is found that a kind of Server Restart test method provided in an embodiment of the present invention, including:Obtain clothes The current power state of business device;Reboot operation is executed to the server using the current power state;In the server After executing reboot operation, judge whether the power supply status of the server is open state;If it is not, then determining that the server is surveyed Examination failure;If so, verifying whether the power supply status of the server is high level by GPIO pin;If low level, then Determine the server test crash;If high level, then judge in BMC log with the presence or absence of the test log of this test; If it exists, then determine that the server is successfully tested;If it does not exist, then determine the server test crash.
As it can be seen that this programme when carrying out restarting test to server, can pass through server management system and hardware GPIO Method that this software and hardware of status inquiry combines tests Server Restart, rather than checks current server merely Switch state;In addition, not only the multistage is divided to be tested when this programme tests Server Restart state, also tie The test log of hop server carrys out comprehensive judgement, thus can realize the verifying to server test process, it can be convenient after error Determine problem place;In this way, the various hidden danger in server design in computer starting link can effectively be found, it can To effectively improve the working efficiency of tester, human cost is saved, the accuracy and reliability of work is improved.
The invention also discloses a kind of Server Restart test device, equipment and computer readable storage medium, same energy Realize above-mentioned technical effect.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is a kind of Server Restart test method flow diagram disclosed by the embodiments of the present invention;
Fig. 2 is another Server Restart test method flow diagram disclosed by the embodiments of the present invention;
Fig. 3 is a kind of Server Restart schematic structural diagram of testing device disclosed by the embodiments of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
The embodiment of the invention discloses a kind of Server Restart test method, device, equipment and computer-readable storage mediums Matter efficient carries out server to restart test to realize.
Referring to Fig. 1, a kind of Server Restart test method provided in an embodiment of the present invention, including:
S101, the current power state for obtaining server;
Specifically, being obtained currently when this programme obtains the current power state of server particular by IPMI order Server power supply state, such as:
Ipmitool–I lanplus–H 100.3.7.209–U admin–P admin power status
S102, reboot operation is executed to the server using the current power state;
Wherein, before the utilization current power state executes reboot operation to server, further include:Described in removing The BMC log of server.
Specifically, in the present embodiment, after the current power state for obtaining server, just needing to restart server Operation;But before the restart, it needs to remove BMC log, i.e.,:Current BMC SEL elist is removed by IPMI order Log:
Ipmitool–I lanplus–H 100.3.7.209–U admin–P admin sel clear
It should be noted that the test process in this test process can be recorded in BMC SEL elist log, such as The power supply status obtained in S101, the power supply status of S103, the verification process etc. of S105 can be clear by the log Server is understood in the test result of each test phase, will pass through the test process recorded in log, in error post analysis Where understanding problem, so as to effectively find the various hidden danger in test process.
Wherein, described that reboot operation is executed to server using the current power state, including:
If the current power state is power-up state, reboot operation directly is executed to the server;
If the current power state is off-position, control after the server powers on, then the server is held Row reboot operation.
Specifically, being carried out again by transmission ipmi order to server when this programme executes reboot operation to server Reboot operation, it should be noted that the current power state obtained in S101 can be power-up state on and off-position off, If current power state is on, reboot operation is directly executed;If current power state is off, need to first carry out After power on order powers on, then power cycle reset command is executed, such as:
Ipmitool–I lanplus–H 100.3.7.209–U admin–P admin power on(if required)
Ipmitool–I lanplus–H 100.3.7.209–U admin–P admin power cycle
S103, the server execute reboot operation after, judge whether the power supply status of the server is opening state State;If it is not, then executing S104;If so, executing S105;
Specifically, whether the power supply status for needing authentication server current after this programme executes reboot operation to server Correctly, it waits 30 seconds, if Chassis Power is on, the i.e. power supply status of server are open state, then it is assumed that current Power supply status is correct, then is successfully tested, and continues to execute S105, otherwise epicycle test crash, such as:
Ipmitool–I lanplus–H 100.3.7.209–U admin–P admin power status
S104, determine the server test crash;
Whether S105, the power supply status that the server is verified by GPIO pin are high level;If low level, then hold Row S104;If high level, then S106 is executed;
Wherein, whether the power supply status by GPIO pin authentication server is high level, including:
Execute Gpiotool order by the GPIO pin of the server, verify the server power supply status whether For high level.
Specifically, in the present embodiment, authentication server power supply status is after open state, it is also necessary to pass through server (the Platform Reset detection of gpio pin number 210:Be switched on the power on signal after) gpiotool order is executed to verify Whether corresponding power supply status is high level High;If it is High, illustrates to be successfully tested, continue to execute S107;If it is Low then illustrates test crash, such as:
Gpiotool–getdata 210
S106, judge in BMC log with the presence or absence of the test log of this test;If it does not exist, then S104 is executed;If depositing Then executing S107;
S107, determine that the server is successfully tested.
Specifically, in the present embodiment, obtaining test log by IPMI order, which is:SEL elist days Will information, the log include System ACPI PowerState | Legancy OFF state (system ACPI power supply status-conjunction Method off-state) and System ACPI PowerState | (system ACPI power supply status-is legal to lead Legancy ON state Logical state), and then judge whether server contains corresponding log;If comprising being successfully tested;Otherwise test crash, example Such as:
Ipmitool–I lanplus–H 100.3.7.209–U admin–P admin sel clear
Note:100.3.7.209 is server ip in the above order line, and admin is username and password, should basis in Actual conditions are adjusted.
It is understood that include the log information of above-mentioned each step in the test log, if step execute to S106, illustrate S106 before the step of all execute completion, under normal circumstances should include each step in the test log Execution journal, at this moment if checked in the test log, there is no journal files corresponding with each step, illustrate holding It there is a problem in row, at this moment discriminating test fails.
As can be seen that when this programme tests Server Restart, be tested by multiple stages, such as: Power supply status in S103 is verified, and the log verifying in level state verifying, S106 in S105 is only verified in each stage After success, the verifying in next stage is just continued to execute;That is, the multistage test method that this programme proposes, it can be with Easily discovery server can effectively improve the work effect of tester in the various hidden danger of computer starting link Rate.
Based on the above embodiment, before the current power state for obtaining server, further include:
Obtain preset loop test number;
After then determining the server test crash every time or determining that the server is successfully tested, current survey is judged Whether examination number is equal to the loop test number;
If being not equal to, continue to execute it is described obtain server current power state the step of;If being equal to, stopping pair The server restarts test, and generates test report according to each test result.
Referring to fig. 2, overall schematic is tested for a Server Restart provided in this embodiment, specifically includes following step Suddenly:
S201, the current power state for obtaining server;
S202, reboot operation is executed to the server using the current power state;
S203, the server execute reboot operation after, judge whether the power supply status of the server is opening state State;If it is not, then executing S204;If so, executing S205;
S204, determine the server test crash, and execute S208;
Whether S205, the power supply status that the server is verified by GPIO pin are high level;If low level, then hold Row S204;If high level, then S206 is executed;
S206, judge in BMC log with the presence or absence of the test log of this test;If it does not exist, then S204 is executed;If depositing Then executing S207;
S207, determine that the server is successfully tested, and execute S208;
S208, preset loop test number is obtained;
S209, judge whether current testing time is equal to the loop test number;
If being not equal to, S201 is continued to execute;If being equal to, S210 is executed;
The test of restarting of S210, stopping to the server, and test report is generated according to each test result.
Specifically, the S101-S107 in above-described embodiment is a test process, it is past when testing server Reliable test result can be just obtained toward needing to carry out repeatedly test, therefore in the present embodiment, sets loop test number, it should Loop test number is to recycle the number for executing S201-S207 test method, after test method of every execution, requires to carry out Record, each determining server be successfully tested or determining server test crash after, require to detect current test time Whether number, which has reached preset loop test number, continues to execute S201-S207 if do not reached, if reached , then test terminates.It, can be according to each test result for executing test method, to determine that server is being held after test Row restart in test process there may be the problem of;The test result of test is executed every time, including is successfully tested or is lost every time It is specifically information etc. in which step failure when the test result that loses, test crash, by summarizing to each test result Test report is generated, can obtain carrying out server the test result after testing repeatedly.
To sum up, in the present solution, judging to service using server management system and hardware GPIO status inquiry Think highly of to open and whether come into force, is executed with multiple circulation to verify the test result of repeated switching.It can be effectively with this method Improve the working efficiency of tester, save human cost, improve the accuracy and reliability of work, also, this programme with The server architecture of Intel platform explains, but this method is not limited to the server of Intel platform, in the service of other platforms There is general application value in device and computer platform.
Server Restart test device provided in an embodiment of the present invention is introduced below, service described below is thought highly of Opening test device can be cross-referenced with above-described Server Restart test method.
Referring to Fig. 3, a kind of Server Restart test device provided in an embodiment of the present invention, including:
Power supply status obtains module 100, for obtaining the current power state of server;
Operation executing module 200, for executing reboot operation to the server using the current power state;
First judgment module 300, for judging the power supply shape of the server after the server executes reboot operation Whether state is open state;If it is not, then determining the server test crash;
Authentication module 400, for the power supply status in the server be open state when, institute is verified by GPIO pin Whether the power supply status for stating server is high level;If low level, then the server test crash is determined;
Second judgment module 500 is sentenced when the power supply status for verifying the server by GPIO pin is high level With the presence or absence of the test log of this test in disconnected BMC log;If it exists, then determine that the server is successfully tested;If not depositing Then determining the server test crash.
Wherein, the operation executing module, including:
First execution unit, for directly being executed to the server when the current power state is power-up state Reboot operation;
Second execution unit controls after the server powers on for being off-position in the current power state, then Reboot operation is executed to the server.
Wherein, this programme further includes:
Module is removed, for restarting behaviour to server execution using the current power state in the operation executing module Before work, the BMC log of the server is removed.
Wherein, the authentication module executes Gpiotool order, verifying clothes specifically for the GPIO pin by server Whether the power supply status of business device is high level.
Wherein, this programme further includes:
Loop test number obtains module, for obtaining preset loop test number;
Third judgment module, for determine the server test crash every time or determine server test at After function, judge whether current testing time is equal to the loop test number;If being not equal to, triggers the power supply status and obtain Modulus block;If being equal to, stopping restarts test to the server;
Test report generation module, for generating test report according to each test result.
The embodiment of the present invention also provides a kind of Server Restart test equipment, including:
Memory, for storing computer program;Processor realizes above-mentioned service when for executing the computer program Think highly of the step of opening test method.
The embodiment of the present invention also provides a kind of computer readable storage medium, stores on the computer readable storage medium There is the step of computer program, the computer program realizes above-mentioned Server Restart test method when being executed by processor.
Wherein, which may include:USB flash disk, mobile hard disk, read-only memory (Read-Only Memory, ROM), random access memory (Random Access Memory, RAM), magnetic or disk etc. are various can store program The medium of code.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other The difference of embodiment, the same or similar parts in each embodiment may refer to each other.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.

Claims (10)

1. a kind of Server Restart test method, which is characterized in that including:
Obtain the current power state of server;
Reboot operation is executed to the server using the current power state;
After the server executes reboot operation, judge whether the power supply status of the server is open state;If it is not, then Determine the server test crash;If so, verifying whether the power supply status of the server is high electricity by GPIO pin It is flat;
If low level, then the server test crash is determined;If high level, then judge in BMC log with the presence or absence of this The test log of secondary test;
If it exists, then determine that the server is successfully tested;If it does not exist, then determine the server test crash.
2. Server Restart test method according to claim 1, which is characterized in that described to utilize the current power shape State executes reboot operation to server, including:
If the current power state is power-up state, reboot operation directly is executed to the server;
If the current power state is off-position, control after the server powers on, then weight is executed to the server Open operation.
3. Server Restart test method according to claim 2, which is characterized in that described to utilize the current power shape Before state executes reboot operation to server, further include:
Remove the BMC log of the server.
4. Server Restart test method according to claim 3, which is characterized in that described verified by GPIO pin takes Whether the power supply status of business device is high level, including:
Gpiotool order is executed by the GPIO pin of the server, whether the power supply status for verifying the server is high Level.
5. Server Restart test method as claimed in any of claims 1 to 4, which is characterized in that the acquisition Before the current power state of server, further include:
Obtain preset loop test number;
After then determining the server test crash every time or determining that the server is successfully tested, current test time is judged Whether number is equal to the loop test number;
If being not equal to, continue to execute it is described obtain server current power state the step of;If being equal to, stop to described Server restarts test, and generates test report according to each test result.
6. a kind of Server Restart test device, which is characterized in that including:
Power supply status obtains module, for obtaining the current power state of server;
Operation executing module, for executing reboot operation to the server using the current power state;
First judgment module, for the server execute reboot operation after, judge the server power supply status whether For open state;If it is not, then determining the server test crash;
Authentication module, for the power supply status in the server be open state when, the service is verified by GPIO pin Whether the power supply status of device is high level;If low level, then the server test crash is determined;
Second judgment module judges BMC days when the power supply status for verifying the server by GPIO pin is high level With the presence or absence of the test log of this test in will;If it exists, then determine that the server is successfully tested;If it does not exist, then sentence The fixed server test crash.
7. Server Restart test device according to claim 6, which is characterized in that further include:
Remove module, for the operation executing module using the current power state to server execute reboot operation it Before, remove the BMC log of the server.
8. Server Restart test device according to claim 6 or 7, which is characterized in that further include:
Loop test number obtains module, for obtaining preset loop test number;
Third judgment module, for determining the server test crash every time or determining that the server is successfully tested Afterwards, judge whether current testing time is equal to the loop test number;If being not equal to, triggers the power supply status and obtain Module;If being equal to, stopping restarts test to the server;
Test report generation module, for generating test report according to each test result.
9. a kind of Server Restart test equipment, which is characterized in that including:
Memory, for storing computer program;
Processor realizes that Server Restart is tested as described in any one of claim 1 to 5 when for executing the computer program The step of method.
10. a kind of computer readable storage medium, which is characterized in that be stored with computer on the computer readable storage medium Program realizes the Server Restart test side as described in any one of claim 1 to 5 when the computer program is executed by processor The step of method.
CN201810751780.1A 2018-07-10 2018-07-10 Server Restart test method, device, equipment and computer readable storage medium Pending CN108920307A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810751780.1A CN108920307A (en) 2018-07-10 2018-07-10 Server Restart test method, device, equipment and computer readable storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810751780.1A CN108920307A (en) 2018-07-10 2018-07-10 Server Restart test method, device, equipment and computer readable storage medium

Publications (1)

Publication Number Publication Date
CN108920307A true CN108920307A (en) 2018-11-30

Family

ID=64410380

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810751780.1A Pending CN108920307A (en) 2018-07-10 2018-07-10 Server Restart test method, device, equipment and computer readable storage medium

Country Status (1)

Country Link
CN (1) CN108920307A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109698772A (en) * 2018-12-14 2019-04-30 郑州云海信息技术有限公司 A kind of method and system for verifying network interface card PXE functional stabilization
CN110413531A (en) * 2019-08-02 2019-11-05 深圳忆联信息系统有限公司 Realize IOMT automatic test approach, device, computer equipment and storage medium
CN110525065A (en) * 2019-08-31 2019-12-03 森大(深圳)技术有限公司 Printer stability test method, storage medium, equipment and printer
CN111188782A (en) * 2019-12-31 2020-05-22 苏州浪潮智能科技有限公司 Fan redundancy test method and device and computer readable storage medium
CN112379255A (en) * 2020-11-12 2021-02-19 浪潮商用机器有限公司 Alternating current power supply switch test method, device and equipment and alternating current power supply switch
CN114153692A (en) * 2021-11-26 2022-03-08 浪潮(山东)计算机科技有限公司 Ampere processor monitoring method and server

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101436154A (en) * 2007-11-14 2009-05-20 鸿富锦精密工业(深圳)有限公司 Startup and closedown test system and method of computer mainboard
US20100185880A1 (en) * 2009-01-16 2010-07-22 Hong Fu Jin Precision Industry (Shenzhen) Co., Ltd. Test apparatus
CN102289398A (en) * 2010-06-17 2011-12-21 英业达股份有限公司 Restart testing method
US8538720B2 (en) * 2010-08-16 2013-09-17 Hon Hai Precision Industry Co., Ltd. Cold boot test system and method for electronic devices
CN103970630A (en) * 2014-05-23 2014-08-06 浪潮电子信息产业股份有限公司 Method for testing overall stability of server
CN104239211A (en) * 2014-09-26 2014-12-24 广东欧珀移动通信有限公司 Method and device for enabling mobile terminal to rapidly enter test mode
US8954805B2 (en) * 2011-04-19 2015-02-10 Compal Electronics, Inc. Computer booting method and computer system
CN105224436A (en) * 2015-10-29 2016-01-06 曙光信息产业股份有限公司 A kind of operation condition of server method for supervising and device
CN105302726A (en) * 2015-11-13 2016-02-03 浪潮电子信息产业股份有限公司 Test method and device
CN105866604A (en) * 2016-06-22 2016-08-17 重庆长安汽车股份有限公司 Automatic on/off testing system and method
CN106201799A (en) * 2016-07-14 2016-12-07 浪潮电子信息产业股份有限公司 A kind of service based on ipmi carries out, to server, the method for testing that DC is restarted
CN107612775A (en) * 2017-09-19 2018-01-19 郑州云海信息技术有限公司 A kind of node two level connects the DC method of testings and system of server

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101436154A (en) * 2007-11-14 2009-05-20 鸿富锦精密工业(深圳)有限公司 Startup and closedown test system and method of computer mainboard
US20100185880A1 (en) * 2009-01-16 2010-07-22 Hong Fu Jin Precision Industry (Shenzhen) Co., Ltd. Test apparatus
CN102289398A (en) * 2010-06-17 2011-12-21 英业达股份有限公司 Restart testing method
US8538720B2 (en) * 2010-08-16 2013-09-17 Hon Hai Precision Industry Co., Ltd. Cold boot test system and method for electronic devices
US8954805B2 (en) * 2011-04-19 2015-02-10 Compal Electronics, Inc. Computer booting method and computer system
CN103970630A (en) * 2014-05-23 2014-08-06 浪潮电子信息产业股份有限公司 Method for testing overall stability of server
CN104239211A (en) * 2014-09-26 2014-12-24 广东欧珀移动通信有限公司 Method and device for enabling mobile terminal to rapidly enter test mode
CN105224436A (en) * 2015-10-29 2016-01-06 曙光信息产业股份有限公司 A kind of operation condition of server method for supervising and device
CN105302726A (en) * 2015-11-13 2016-02-03 浪潮电子信息产业股份有限公司 Test method and device
CN105866604A (en) * 2016-06-22 2016-08-17 重庆长安汽车股份有限公司 Automatic on/off testing system and method
CN106201799A (en) * 2016-07-14 2016-12-07 浪潮电子信息产业股份有限公司 A kind of service based on ipmi carries out, to server, the method for testing that DC is restarted
CN107612775A (en) * 2017-09-19 2018-01-19 郑州云海信息技术有限公司 A kind of node two level connects the DC method of testings and system of server

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
孙凌云: "《基于Daily Build的软件自动化测试系统的研究与实现》", 《中国优秀硕士学位论文全文数据库(电子期刊)信息科技辑》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109698772A (en) * 2018-12-14 2019-04-30 郑州云海信息技术有限公司 A kind of method and system for verifying network interface card PXE functional stabilization
CN110413531A (en) * 2019-08-02 2019-11-05 深圳忆联信息系统有限公司 Realize IOMT automatic test approach, device, computer equipment and storage medium
CN110525065A (en) * 2019-08-31 2019-12-03 森大(深圳)技术有限公司 Printer stability test method, storage medium, equipment and printer
CN110525065B (en) * 2019-08-31 2021-04-27 森大(深圳)技术有限公司 Printer stability testing method, storage medium, equipment and printer
CN111188782A (en) * 2019-12-31 2020-05-22 苏州浪潮智能科技有限公司 Fan redundancy test method and device and computer readable storage medium
CN112379255A (en) * 2020-11-12 2021-02-19 浪潮商用机器有限公司 Alternating current power supply switch test method, device and equipment and alternating current power supply switch
CN114153692A (en) * 2021-11-26 2022-03-08 浪潮(山东)计算机科技有限公司 Ampere processor monitoring method and server

Similar Documents

Publication Publication Date Title
CN108920307A (en) Server Restart test method, device, equipment and computer readable storage medium
US20240086269A1 (en) Method, Apparatus and System for Locating Fault of Server, and Computer-readable Storage Medium
CN100568254C (en) A kind of credible platform module and active measure thereof
CN106789306B (en) Method and system for detecting, collecting and recovering software fault of communication equipment
US20070234123A1 (en) Method for detecting switching failure
CN109510742B (en) Server network card remote test method, device, terminal and storage medium
CN108694320B (en) Method and system for measuring sensitive application dynamic under multiple security environments
CN104572031A (en) Method and device for generating test case
CN110716872B (en) Vulnerability mining system and method for electric energy metering automation equipment
CN110348218A (en) A kind of loophole test method and device based on vehicle-mounted terminal system
CN110557299A (en) network transmission function batch test method, system, terminal and storage medium
CN105553783A (en) Automated testing method for switching of configuration two-computer resources
CN108768793B (en) Storage dual-active link fault testing method and device
CN105512562B (en) Vulnerability mining method and device and electronic equipment
CN107679423A (en) Partition integrity inspection method and device
CN201203868Y (en) Credible platform module
CN111274135B (en) Openstack calculation node high availability test method
CN116775376A (en) Method, system, device and storage medium for processing NVMe disk link failure
CN105912431A (en) Reboot testing method of server, server, control device and system
CN109783288A (en) It is a kind of to automate the method and system for restarting reset test server stability
CN112463504B (en) Double-control storage product testing method, system, terminal and storage medium
CN108804269A (en) A kind of system and method controlling test RAID board stability based on domain
CN107907762B (en) Test method and system for detecting influence of BBU on stability of whole cabinet
CN114327968A (en) Method and device for realizing early warning of server hardware fault telephone with universal interface
CN111240990A (en) ISMCLI command line testing method, system, terminal and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181130