CN108917100A - A kind of precision air conditioner Centralized Monitoring management system - Google Patents
A kind of precision air conditioner Centralized Monitoring management system Download PDFInfo
- Publication number
- CN108917100A CN108917100A CN201810392563.8A CN201810392563A CN108917100A CN 108917100 A CN108917100 A CN 108917100A CN 201810392563 A CN201810392563 A CN 201810392563A CN 108917100 A CN108917100 A CN 108917100A
- Authority
- CN
- China
- Prior art keywords
- air conditioner
- precision air
- monitoring
- centralized monitoring
- cooling tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/50—Control or safety arrangements characterised by user interfaces or communication
- F24F11/56—Remote control
- F24F11/58—Remote control using Internet communication
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/50—Control or safety arrangements characterised by user interfaces or communication
- F24F11/52—Indication arrangements, e.g. displays
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/50—Control or safety arrangements characterised by user interfaces or communication
- F24F11/52—Indication arrangements, e.g. displays
- F24F11/526—Indication arrangements, e.g. displays giving audible indications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/89—Arrangement or mounting of control or safety devices
Abstract
The invention discloses a kind of precision air conditioner Centralized Monitoring management systems, including end hosts equipment and supervisor's net cooling water system, the end hosts equipment includes that several precision air conditioners, centralized monitoring system and management platform, the precision air conditioner are connected to management platform by centralized monitoring system;Supervisor's net cooling water system is connected in parallel in each precision air conditioner;Pass through centralized monitoring system, the precision air conditioner of each floor is brought into unified management platform, the running temperature of every precision air conditioner, humidity, voltage, electric current, pressure, the parameters such as pressure difference, management platform can be collected in real time automatically, the precision air conditioner Centralized Monitoring management system improves modern management efficiency with Information Technology Methods, pass through strategy setting, real time monitoring, alarm and data collection and analysis in time, realize safety in production, the intelligent service mode of administration of energy conservation, this intelligence O&M mode, it is safe and orderly by being commanded to overall scheduling, information system is round-the-clock reliable and stable, play the role of escorting.
Description
Technical field
The present invention relates to one kind for large-scale precision air-conditioning and cooling pipe network Centralized Monitoring intelligent management system, especially relates to
And precision air conditioner host is arrived, cooling tower quantity is more, network management main line is long, equipment and line distribution region are wide, service object's equipment weight
The features such as property wanted.Involve HVAC system, distribution system, ventilating system, water treatment system, BA system, the intelligence building system, intelligence
Energy management system, cloud data system etc..
Background technique
Would generally be arranged in computer room it is main take the various equipment such as device, work station, interchanger, core router, these equipment
Power consumption, calorific value are all very big, and according to statistics, in fiducial temperature, temperature increases 10% every year, the reliability of computer
With regard to decline 25%.In recent years, with the development of science and technology railway and subway are all made of intelligent dispatch, pacify in each Dispatching Building
It fills in tens information machine rooms, is then to need up to a hundred precision air conditioners, precision air conditioner is can sufficiently to meet building environment condition
It is required that computer room Special precision air conditioner, it not only can control computer room temperature, can also control humidity simultaneously, therefore also referred to as
Constant-temperature constant-humidity air-conditioner;The working environment of constant temperature and humidity is provided for each computer room.And in recent years, precision air conditioner cooling water fault is right
System-wide scheduling production commander produces influence, high-quality reliable building environment how is provided, and effectively control operation cost, to fortune
Dimension department proposes acid test and challenge.
Therefore, it is necessary to develop a kind of precision air conditioner Centralized Monitoring management system, the management of precision air conditioner Centralized Monitoring is improved
System and cooling recirculation system operational management efficiency, timely discovering device failure and hidden trouble of equipment.Effectively solve computer room safety, drop
Low operation energy consumption plays the effect of energy-saving and emission-reduction.
Summary of the invention
The invention proposes a kind of precision air conditioner Centralized Monitoring management system, computer room safety can effectively solve, and reduce fortune
Capable energy consumption plays the effect of energy-saving and emission-reduction.
In order to solve the above-mentioned technical problem, the technical proposal of the invention is realized in this way:The precision air conditioner Centralized Monitoring
Management system includes end hosts equipment and supervisor's net cooling water system, and the end hosts equipment includes several accurate empty
It adjusts, centralized monitoring system and management platform, the precision air conditioner are connected to management platform by centralized monitoring system;The supervisor
Net cooling water system is connected in parallel in each precision air conditioner.
In the precision air conditioner for being distributed in each floor in building in the past, all monitoring and maintenance work all rely on O&M
The timing inspection of personnel by centralized monitoring system, is brought the precision air conditioner of each floor into now by adopting the above technical scheme
Unified management platform, the parameters such as running temperature, humidity, voltage, electric current, pressure, pressure difference of every precision air conditioner, can be automatic
Collect management platform in real time, once go wrong, management platform can automatic alarm, staff shows up dimension in time after being informed of a case
It repairs, after the operation of precision air conditioner centralized monitoring system, is automation inspection in 24 hours by high-intensitive manual inspection work change, protects
Demonstrate,prove the server of all computer rooms of Dispatch and Command Center, can be safe and reliable in the environment of constant temperature and humidity, while also by pair
The data acquisition of all end precision air conditioners, statistics and analysis realize and concentrate prison to the temperature and humidity of all computer room end-equipments
Depending on real-time monitoring adjusts computer room cold energy demand in time, and development of latent energy-saving potential, system can also discovering device operation in time and configuration
Conflict, the tail end air conditioner machine that such as same computer room has are dehumidifying, and some is but humidifying, and energy in-fighting is avoided, if precise machine room air conditioner
It is not implemented and is precisely controlled, environment temperature is uncontrolled to be reduced once, will consume energy 5%, often avoids 1 air-conditioning " in-fighting " operation, can more
The energy consumption for avoiding 20 kilowatt hours, under the premise of ensuring computer room safety, this set end hosts Centralized Monitoring platform is able to achieve 10%
It is energy-saving.The principle of end precision air conditioner refrigeration is that the temperature in each computer room is transported to outdoor from interior, carries out heat
Exchange realizes constant indoor temperature constant humidity, introduces the cooling water pipe network system through the building Zheng Dong thus.
The present invention further improvement lies in that, the end hosts equipment further includes warning device and server, the alarm
Device and the server are connected with the management platform.Setting in this way manages platform meeting once going wrong
Automatic alarm, staff shows up maintenance in time after being informed of a case, will be high-intensitive artificial after the operation of precision air conditioner centralized monitoring system
Inspection work is changed into automation inspection in 24 hours, guarantees the server of all computer rooms of Dispatch and Command Center, can be in constant temperature and humidity
In the environment of safe and reliable operation.
The present invention further improvement lies in that, supervisor's net cooling water system includes cooling water pipe network, cooling tower and circulation
Pump, the cooling tower are mounted on the roof of Dispatching Building, and cooling water pipe network is connected in each precision air conditioner;It is described accurate empty
The heat by being generated by operation is adjusted to be transferred to the cooling tower through cooling water pipe network as carrier using the cooling water recycled;It is described cold
But tower is connected by circulating pump with the host of the precision air conditioner.Cooling water pipe network is connected in each precision air conditioner, fortune
The heat that row generates is transferred to the cooling tower of Dispatching Building roof, through in 20 cooling towers using the cooling water recycled as carrier
Wind and weather, efficient thermal effect change rear cooling water, then by circulation pumped back precision air conditioner host, circulation temperature lowering, is realized in cycles
Up to a hundred end precision air conditioners work normally (32 degree of water inlet is discharged 28 degree, temperature difference 3-5 degree).
The present invention further improvement lies in that, supervisor's net cooling water system further includes spray pump and blower fan of cooling tower, institute
The top that blower fan of cooling tower is mounted on the cooling tower is stated, the spray pump is mounted on the side of the bottom of the cooling tower.
The present invention further improvement lies in that, the end hosts equipment further includes monitoring system, the monitoring system and institute
Management platform is stated to be connected;The monitoring system includes cooling tower monitoring module, small pump monitoring module, power distribution cabinet monitoring mould
Block, air conditioning monitoring module and general view monitoring module;The cooling tower monitoring module is for monitoring cooling water recirculation system in real time
Each device parameter;The small pump monitoring module is in the operating status, running frequency and water tank of real-time display small pump
Water level, and break down alarm in time;The power distribution cabinet monitoring module is used for water circulating pump, spray pump, cooling
The electric current metering separate of the equipment such as tower blower, electric heater is shown, guarantees stable power-supplying;The air conditioning monitoring module is used to be real
Existing building air-conditioning system centralized displaying and monitoring on unified screen;The operation of overview module whole system for rendering
The parameter of energy consumption, cooling capacity and system effectiveness, while counting the purpose that energy consumption realizes scientific operation management and energy-saving and emission-reduction.Monitoring system
System is exactly to acquire the major parameters such as temperature, water level and the pressure of each monitoring point and former setting according to the real-time load of each computer room
Parameter compares, and amounts to nearly 50 motors to supervisor's net circulating pump, blower fan of cooling tower, spray pump and implement accurate control, control
Method is exactly to implement frequency conversion management to motor, is responsible for the management of net total flow, wherein 20 cooling tower linkages or respective independent operating
Concentration team control, utmostly realize energy conservation, the cooling water in cooling tower sink, due to there is evaporation and elegant, cooling water meeting
Naturally it reduces, water supply tank is fetched water from the municipal network of rivers, gives each cooling tower sink certainly from cooling water replenishment case by the small pump in negative one building
Dynamic moisturizing, cooling water pipe network monitor system are made of following 7 big functional modules:
1- cooling tower -- each equipment of real time monitoring cooling water recirculation system and sink temperature, water level, general pipeline are supplied back
The parameters such as coolant-temperature gage, pressure, flow, cooling blower operation;
2-2- small pump -- the operating status of real-time display small pump, the water level in running frequency and water tank break down
It alarms in time;
3-3- power distribution cabinet shows the electric current metering separate of the equipment such as water circulating pump, spray pump, tower blower, electric heater,
Guarantee stable power-supplying;
4-4- central air-conditioning -- to realize building air-conditioning system centralized displaying and monitoring, 4 central hollows on unified screen
The operating status of tune also brings this system monitoring into;
5-5- general view -- operation energy consumption, the cooling capacity, system effectiveness parameter of whole system is presented, while counting energy consumption, it is real
The purpose of existing science operation management and energy-saving and emission-reduction.
The present invention further improvement lies in that, be equipped in the sink of the cooling tower electric heater unit, liquid level sensor and
Temperature Humidity Sensor;The liquid level sensor and Temperature Humidity Sensor are also connected with the management platform.Monitoring system is default
The water level parameters of good cooling tower sink and water supply tank, and liquid level, temperature are monitored in real time, it is ensured that equivalent water level maintains controllable position
It sets, for anti-water stopping trough freezed in winter, has added electric heater unit in the sink.
The present invention further improvement lies in that, the monitoring system further includes system equipment fault alarm module and APP mobile
Terminal;The system equipment fault alarm module is divided into device failure alert and parameter geofence, notifies operation maintenance in time
Personnel, the safety of safeguards system, stable operation.The mating mobile terminal APP of this system, no matter when and where, it is all available
Mobile phone checks the real-time status of field device.
The present invention further improvement lies in that, the type of alarm of the system equipment fault alarm module be sound or interface or
Information is sent.
The present invention further improvement lies in that, information send mode be GSM network send GSM message mode.
Compared with prior art, of the invention to have the advantages that:The precision air conditioner Centralized Monitoring management system with
Information Technology Methods improve modern management efficiency, by strategy setting, real time monitoring, in time alert and data collection and analysis,
Realize safety in production, the intelligent service mode of administration of energy conservation, this intelligence O&M mode, by what is commanded to overall scheduling
Safe and orderly, information system is round-the-clock reliable and stable, plays the role of escorting.
Detailed description of the invention
Fig. 1 is the structure chart of precision air conditioner Centralized Monitoring management system of the invention.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention figure, technical solution in the embodiment of the present invention carries out clear
Chu, complete description.
Embodiment 1:As shown in Figure 1, the precision air conditioner Centralized Monitoring management system includes end hosts equipment and supervisor's net
Cooling water system, the end hosts equipment include several precision air conditioners, centralized monitoring system and management platform, the precision
Air-conditioning is connected to management platform by centralized monitoring system;Supervisor's net cooling water system is connected in parallel on each accurate sky
In tune;The principle of end precision air conditioner refrigeration is that the temperature in each computer room is transported to outdoor from interior, carries out heat exchange,
It realizes constant indoor temperature constant humidity, introduces the cooling water pipe network system through the building Zheng Dong thus;The end hosts equipment is also wrapped
Warning device and server are included, the warning device and the server are connected with the management platform.In this way
Setting, once go wrong, management platform can automatic alarm, staff shows up maintenance in time after being informed of a case, precision air conditioner concentration
After supervisory control system running, it is automation inspection in 24 hours by high-intensitive manual inspection work change, guarantees Dispatch and Command Center
The server of all computer rooms, can be safe and reliable in the environment of constant temperature and humidity;Supervisor's net cooling water system includes cold
But pipe network, cooling tower and circulating pump, the cooling tower are mounted on the roof of Dispatching Building, and cooling water pipe network is connected to each
In precision air conditioner;The precision air conditioner is passed as carrier through cooling water pipe network by the heat generated by operation using the cooling water recycled
It is defeated to arrive the cooling tower;The cooling tower is connected by circulating pump with the host of the precision air conditioner.Using above-mentioned technical side
Case brings the precision air conditioner of each floor into unified management platform, the operation of every precision air conditioner by centralized monitoring system
The parameters such as temperature, humidity, voltage, electric current, pressure, pressure difference can collect management platform in real time automatically, once it goes wrong,
Manage platform can automatic alarm, staff shows up maintenance in time after being informed of a case, will be high after precision air conditioner centralized monitoring system is run
The manual inspection work change of intensity is automation inspection in 24 hours, guarantees the server of all computer rooms of Dispatch and Command Center, energy
It is safe and reliable in the environment of constant temperature and humidity, at the same also by data acquisition to all end precision air conditioners, statistics and
Analysis realizes the temperature and humidity centralized watch to all computer room end-equipments, and real-time monitoring adjusts computer room cold energy demand in time,
Development of latent energy-saving potential, system can also discovering device be run in time and configuration conflict, the tail end air conditioner machine that such as same computer room has are removing
Wet, some is but humidifying, and avoids energy in-fighting, is precisely controlled if precise machine room air conditioner is not implemented, reduction that environment temperature is uncontrolled
Once, it will consume energy 5% more, and often avoid 1 air-conditioning " in-fighting " operation, can avoid the energy consumption of 20 kilowatt hours, ensuring computer room safety
Under the premise of, this set end hosts Centralized Monitoring platform be able to achieve 10% it is energy-saving.Cooling water pipe network is connected to each
In precision air conditioner, the heat of generation is run using the cooling water recycled as carrier, the cooling tower of Dispatching Building roof is transferred to, through 20
Wind and weather, efficient thermal effect in platform cooling tower change rear cooling water, then by circulation pumped back precision air conditioner host, follow in cycles
Ring cooling realizes that up to a hundred end precision air conditioners work normally (32 degree of water inlet is discharged 28 degree, temperature difference 3-5 degree);Supervisor's net
Cooling water system further includes spray pump and blower fan of cooling tower, and the blower fan of cooling tower is mounted on the top of the cooling tower, described
Spray pump is mounted on the side of the bottom of the cooling tower, and the end hosts equipment further includes monitoring system, the monitoring system
System is connected with the management platform;The monitoring system includes cooling tower monitoring module, small pump monitoring module, power distribution cabinet prison
Control module, air conditioning monitoring module and general view monitoring module;The cooling tower monitoring module is for monitoring cooling water circulation in real time
Each device parameter of system;The small pump monitoring module is used for operating status, running frequency and the water of real-time display small pump
Water level in case, and alarm in time breaking down;The power distribution cabinet monitoring module be used for water circulating pump, spray pump,
The electric current metering separate of the equipment such as blower fan of cooling tower, electric heater is shown, guarantees stable power-supplying;The air conditioning monitoring module is used for
To realize building air-conditioning system centralized displaying and monitoring on unified screen;Overview module whole system for rendering
The parameter of operation energy consumption, cooling capacity and system effectiveness, while counting the purpose that energy consumption realizes scientific operation management and energy-saving and emission-reduction.Prison
Control system is exactly to acquire the major parameters such as temperature, water level and the pressure of each monitoring point and original according to the real-time load of each computer room
Setup parameter compares, and amounts to nearly 50 motors to supervisor's net circulating pump, blower fan of cooling tower, spray pump and implement accurate control;Control
The method of system is exactly to implement frequency conversion management to motor, is responsible for the management of net total flow, wherein 20 cooling tower linkages or respectively independent
The concentration team control of operation, utmostly realization is energy saving, the cooling water in cooling tower sink, due to there is evaporation and elegant, cooling
Water meeting nature is reduced, and water supply tank is fetched water from the municipal network of rivers, gives each cooling tower water from cooling water replenishment case by the small pump in negative one building
Slot automatic water supplement, cooling water pipe network monitor system are made of following 7 big functional modules, 1- cooling tower -- and real time monitoring cooling water follows
The ginseng such as each equipment of loop system and sink temperature, water level, general pipeline supply and return water temperature, pressure, flow, cooling blower operation
It counts, 2- small pump -- the operating status of real-time display small pump, the water level in running frequency and water tank, breaks down and carry out in time
Alarm;3- power distribution cabinet shows the electric current metering separate of the equipment such as water circulating pump, spray pump, tower blower, electric heater, guarantees
Stable power-supplying;4- central air-conditioning -- to realize building air-conditioning system centralized displaying and monitoring, 4 central air-conditioning on unified screen
Operating status also bring into this system monitoring;5- general view -- operation energy consumption, the cooling capacity, system effectiveness ginseng of whole system is presented
Number, while energy consumption is counted, realize the purpose of scientific operation management and energy-saving and emission-reduction.
Embodiment 2:The difference from embodiment 1 is that being equipped with electric heater unit in the sink of the cooling tower, liquid level passes
Sensor and Temperature Humidity Sensor;The liquid level sensor and Temperature Humidity Sensor are also connected with the management platform.Specifically:
The precision air conditioner Centralized Monitoring management system includes end hosts equipment and supervisor's net cooling water system, the end hosts equipment
It is connected to including several precision air conditioners, centralized monitoring system and management platform, the precision air conditioner by centralized monitoring system
Manage platform;Supervisor's net cooling water system is connected in parallel in each precision air conditioner;The original of end precision air conditioner refrigeration
Reason is that the temperature in each computer room is transported to outdoor from interior, carries out heat exchange, realize constant indoor temperature constant humidity, introduce thus
Cooling water pipe network system through the building Zheng Dong;The end hosts equipment further includes warning device and server, the report
Alarm device and the server are connected with the management platform.Setting in this way manages platform once going wrong
Can automatic alarm, staff shows up maintenance in time after being informed of a case, after the operation of precision air conditioner centralized monitoring system, by the people of high intensity
Work inspection work is changed into automation inspection in 24 hours, guarantees the server of all computer rooms of Dispatch and Command Center, can be in constant temperature perseverance
It is safe and reliable under wet environment;Supervisor's net cooling water system includes cooling water pipe network, cooling tower and circulating pump, described
Cooling tower is mounted on the roof of Dispatching Building, and cooling water pipe network is connected in each precision air conditioner;The precision air conditioner passes through
The cooling tower is transferred to through cooling water pipe network as carrier using the cooling water recycled by the heat that operation generates;The cooling tower is logical
Circulating pump is crossed to be connected with the host of the precision air conditioner.By adopting the above technical scheme, by centralized monitoring system, each floor
Precision air conditioner bring unified management platform, running temperature, humidity, voltage, electric current, pressure, the pressure of every precision air conditioner into
The parameters such as difference can collect management platform in real time automatically, once it goes wrong, management platform meeting automatic alarm, work after being informed of a case
Make personnel to show up in time maintenance, is 24 by high-intensitive manual inspection work change after the operation of precision air conditioner centralized monitoring system
Hour automation inspection, guarantees the server of all computer rooms of Dispatch and Command Center, can be safe and reliable in the environment of constant temperature and humidity
Operation, while server realizes also by the data acquisition to all end precision air conditioners, statistics and analysis to all computer rooms
The temperature and humidity centralized watch of end-equipment, real-time monitoring adjust computer room cold energy demand in time, and development of latent energy-saving potential, system can also
Timely discovering device operation and configuration conflict, the tail end air conditioner machine that such as same computer room has are dehumidifying, and some is but humidifying, and avoids energy
Source in-fighting is precisely controlled if precise machine room air conditioner is not implemented, and environment temperature is uncontrolled to be reduced once, will consume energy 5% more, is often avoided
1 air-conditioning " in-fighting " operation, can avoid the energy consumption of 20 kilowatt hours, under the premise of ensuring computer room safety, this set end hosts collection
Middle monitor supervision platform be able to achieve 10% it is energy-saving.Cooling water pipe network is connected in each precision air conditioner, runs the heat of generation
Amount is transferred to the cooling tower of Dispatching Building roof, through wind and weather, the height in 20 cooling towers using the cooling water recycled as carrier
Effect thermal effect changes rear cooling water, then by circulation pumped back precision air conditioner host, circulation temperature lowering, realizes up to a hundred end essences in cycles
Close air-conditioning works normally (32 degree of water inlet is discharged 28 degree, temperature difference 3-5 degree);Supervisor's net cooling water system further includes spray pump
And blower fan of cooling tower, the blower fan of cooling tower are mounted on the top of the cooling tower, the spray pump is mounted on the cooling tower
Bottom side, the end hosts equipment further includes monitoring system, and the monitoring system is connected with the management platform;
The monitoring system includes cooling tower monitoring module, small pump monitoring module, power distribution cabinet monitoring module, air conditioning monitoring module and total
Look at figure monitoring module;The cooling tower monitoring module is used to monitor in real time each device parameter of cooling water recirculation system;The benefit
Water pump monitoring module is breaking down for the water level in the operating status, running frequency and water tank of real-time display small pump
It alarms in time;The power distribution cabinet monitoring module is for setting water circulating pump, spray pump, blower fan of cooling tower, electric heater etc.
Standby electric current metering separate is shown, guarantees stable power-supplying;The air conditioning monitoring module is used to realize that building air-conditioning system is being united
Centralized displaying and monitoring on one screen;The overview module for rendering imitate by the operation energy consumption of whole system, cooling capacity and system
The parameter of rate, while counting the purpose that energy consumption realizes scientific operation management and energy-saving and emission-reduction;Monitoring system presets cooling tower water
The water level parameters of slot and water supply tank, and liquid level, temperature are monitored in real time, it is ensured that equivalent water level maintains controllable position, to prevent
Sink freezed in winter, has added electric heater unit in the sink;The monitoring system further includes system equipment fault alarm module
With APP mobile terminal;The system equipment fault alarm module is divided into device failure alert and parameter geofence, notifies in time
Operation and maintenance personnel, the safety of safeguards system, stable operation.The mating mobile terminal APP of this system, no matter when and where,
The real-time status of field device is all checked using mobile phone;The type of alarm of the system equipment fault alarm module be sound or
Interface or information are sent;The mode that information is sent is the mode that GSM network sends GSM message.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to restrict the invention, all in essence of the invention
Within mind and principle, any modification, equivalent substitution, improvement and etc. done be should all be included in the protection scope of the present invention.
Claims (9)
1. a kind of precision air conditioner Centralized Monitoring management system, which is characterized in that the precision air conditioner Centralized Monitoring management system includes
End hosts equipment and supervisor's net cooling water system, the end hosts equipment includes several precision air conditioners, Centralized Monitoring system
System and management platform, the precision air conditioner are connected to management platform by centralized monitoring system;Supervisor's net cooling water system
It is connected in parallel in each precision air conditioner.
2. precision air conditioner Centralized Monitoring management system according to claim 1, which is characterized in that the end hosts equipment
It further include warning device and server, the warning device and the server are connected with the management platform.
3. precision air conditioner Centralized Monitoring management system according to claim 1, which is characterized in that supervisor's net cooling water
System includes cooling water pipe network, cooling tower and circulating pump, and the cooling tower is mounted on the roof of Dispatching Building, the cooling water pipe
Net is connected in each precision air conditioner;The precision air conditioner is by the heat by operation generation using the cooling water recycled as carrier
The cooling tower is transferred to through cooling water pipe network;The cooling tower is connected by circulating pump with the host of the precision air conditioner.
4. precision air conditioner Centralized Monitoring management system according to claim 3, which is characterized in that supervisor's net cooling water
System further includes spray pump and blower fan of cooling tower, and the blower fan of cooling tower is mounted on the top of the cooling tower, the spray pump
It is mounted on the side of the bottom of the cooling tower.
5. precision air conditioner Centralized Monitoring management system according to claim 4, which is characterized in that the end hosts equipment
It further include monitoring system, the monitoring system is connected with the management platform;The monitoring system includes cooling tower monitoring mould
Block, small pump monitoring module, power distribution cabinet monitoring module, air conditioning monitoring module and general view monitoring module;The cooling tower monitoring
Module is used to monitor in real time each device parameter of cooling water recirculation system;The small pump monitoring module is used for real-time display moisturizing
Water level in the operating status of pump, running frequency and water tank, and alarm in time breaking down;The power distribution cabinet monitors mould
Block guarantees to stablize for showing the electric current metering separate of the equipment such as water circulating pump, spray pump, blower fan of cooling tower, electric heater
Power supply;The air conditioning monitoring module is used to realize building air-conditioning system centralized displaying and monitoring on unified screen;It is described total
It lookes at the parameter of the module operation energy consumption of whole system, cooling capacity and system effectiveness for rendering, while counting energy consumption and realizing science
The purpose of operation management and energy-saving and emission-reduction.
6. precision air conditioner Centralized Monitoring management system according to claim 5, which is characterized in that the monitoring system is also wrapped
Include system equipment fault alarm module and APP mobile terminal;The system equipment fault alarm module is divided into device failure alert
With parameter geofence, operation and maintenance personnel, the safety of safeguards system, stable operation are notified in time.
7. precision air conditioner Centralized Monitoring management system according to claim 6, which is characterized in that the sink of the cooling tower
Electric heater unit, liquid level sensor and Temperature Humidity Sensor are inside installed;The liquid level sensor and Temperature Humidity Sensor also with
The management platform is connected.
8. precision air conditioner Centralized Monitoring management system according to claim 6, which is characterized in that the system equipment failure
The type of alarm of alarm module is that sound or interface or information are sent.
9. precision air conditioner Centralized Monitoring management system according to claim 8, which is characterized in that information send mode be
The mode of GSM network transmission GSM message.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810392563.8A CN108917100A (en) | 2018-04-27 | 2018-04-27 | A kind of precision air conditioner Centralized Monitoring management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810392563.8A CN108917100A (en) | 2018-04-27 | 2018-04-27 | A kind of precision air conditioner Centralized Monitoring management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108917100A true CN108917100A (en) | 2018-11-30 |
Family
ID=64403203
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810392563.8A Pending CN108917100A (en) | 2018-04-27 | 2018-04-27 | A kind of precision air conditioner Centralized Monitoring management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108917100A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112781131A (en) * | 2021-01-05 | 2021-05-11 | 中国建筑一局(集团)有限公司 | Method for analyzing operation energy efficiency of refrigerating machine room and achieving high efficiency and energy conservation after optimization |
CN113438844A (en) * | 2021-06-25 | 2021-09-24 | 深圳谷探科技有限公司 | Centralized monitoring system for back plate air conditioner |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103512386A (en) * | 2013-07-03 | 2014-01-15 | 烟台荏原空调设备有限公司 | Crossfolw open type cooling tower |
CN104101050A (en) * | 2013-11-30 | 2014-10-15 | 深圳市作夏科技有限公司 | Energy-saving management system for central air conditioner |
CN105444356A (en) * | 2015-12-08 | 2016-03-30 | 刘俊声 | Intelligent energy efficiency optimizing control system for central air conditioning system and control method of intelligent energy efficiency optimizing control system |
-
2018
- 2018-04-27 CN CN201810392563.8A patent/CN108917100A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103512386A (en) * | 2013-07-03 | 2014-01-15 | 烟台荏原空调设备有限公司 | Crossfolw open type cooling tower |
CN104101050A (en) * | 2013-11-30 | 2014-10-15 | 深圳市作夏科技有限公司 | Energy-saving management system for central air conditioner |
CN105444356A (en) * | 2015-12-08 | 2016-03-30 | 刘俊声 | Intelligent energy efficiency optimizing control system for central air conditioning system and control method of intelligent energy efficiency optimizing control system |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112781131A (en) * | 2021-01-05 | 2021-05-11 | 中国建筑一局(集团)有限公司 | Method for analyzing operation energy efficiency of refrigerating machine room and achieving high efficiency and energy conservation after optimization |
CN113438844A (en) * | 2021-06-25 | 2021-09-24 | 深圳谷探科技有限公司 | Centralized monitoring system for back plate air conditioner |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104260763B (en) | A kind of railway station comprehensive monitoring system and method for designing | |
CN104993399B (en) | A kind of box type switch station | |
CN104407575B (en) | A kind of railway power dispatch automated system | |
CN105091224B (en) | Large public building IAQ adjusting method and system | |
CN102608966B (en) | Cabinet micro-environment monitoring system | |
KR101940384B1 (en) | Monitoring system for air conditioning systems based on distributed power generation and air conditioning system using same | |
CN108895637A (en) | A kind of cooling water recirculation system with real-time monitoring and control | |
CN105072875B (en) | A kind of cabinet type computer room | |
CN106504501A (en) | The monitoring of long-distance intelligent comprehensive energy consumption and metering system | |
CN112213953A (en) | Intelligent building equipment control method, platform, equipment and computer storage medium | |
CN110267490A (en) | A kind of micromodule data center | |
CN108917100A (en) | A kind of precision air conditioner Centralized Monitoring management system | |
CN205079368U (en) | Cold and hot source system of water source VRF air conditioner | |
CN106123235A (en) | A kind of central air-conditioning energy management control system | |
CN202993476U (en) | Energy-saving fine control system for building | |
CN115047816A (en) | Building electrical energy-saving monitoring method | |
CN206131228U (en) | Weaving workshop temperature and humidity control system | |
CN204836932U (en) | Cabinet type computer lab | |
CN104993398B (en) | A kind of applicable switchyard in high temperature area | |
CN113743647A (en) | Data center energy consumption control system | |
CN209787687U (en) | Modularization integral type device cabinet | |
CN109952004A (en) | A kind of container-type data center of large capacity | |
CN207162863U (en) | Multiuser to remotely O&M monitoring management type central air-conditioning cooling/heating system | |
CN205405152U (en) | Intelligent building equipment control system | |
CN107329447A (en) | A kind of heat exchange station intelligent measurement and control system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181130 |
|
RJ01 | Rejection of invention patent application after publication |