CN108916881A - The garbage burning factory and reconstruction method of reconstruction - Google Patents

The garbage burning factory and reconstruction method of reconstruction Download PDF

Info

Publication number
CN108916881A
CN108916881A CN201810738011.8A CN201810738011A CN108916881A CN 108916881 A CN108916881 A CN 108916881A CN 201810738011 A CN201810738011 A CN 201810738011A CN 108916881 A CN108916881 A CN 108916881A
Authority
CN
China
Prior art keywords
garbage
reservoir
newly
biochemical bin
conveyor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810738011.8A
Other languages
Chinese (zh)
Other versions
CN108916881B (en
Inventor
李佳臻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Huiju Environmental Technology Co.,Ltd.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810738011.8A priority Critical patent/CN108916881B/en
Publication of CN108916881A publication Critical patent/CN108916881A/en
Application granted granted Critical
Publication of CN108916881B publication Critical patent/CN108916881B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G5/00Incineration of waste; Incinerator constructions; Details, accessories or control therefor
    • F23G5/02Incineration of waste; Incinerator constructions; Details, accessories or control therefor with pretreatment
    • F23G5/033Incineration of waste; Incinerator constructions; Details, accessories or control therefor with pretreatment comminuting or crushing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B03SEPARATION OF SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS; MAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
    • B03CMAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
    • B03C1/00Magnetic separation
    • B03C1/02Magnetic separation acting directly on the substance being separated
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G5/00Incineration of waste; Incinerator constructions; Details, accessories or control therefor
    • F23G5/44Details; Accessories

Abstract

The present invention relates to a kind of garbage burning factory of reconstruction and reconstruction methods, belong to technical field of waste treatment.Using existing refuse-unloading platform, in the newly-built newly-increased rubbish reservoir in the opposite side that conventional garbage platform is equipped with rubbish reservoir side, conventional garbage reservoir is subjected to subregion and adds blast apparatus using as biochemical bin;The newly-increased rubbish reservoir top in opposite side equipped with rubbish reservoir side is hung equipped with new line increment and garbage grab bucket, newly-increased rubbish reservoir opens up refuse-unloading mouth close to refuse-unloading platform side, adds screening installation mounting platform in the opposite side that newly-increased rubbish reservoir is equipped with refuse-unloading platform side;Newly-increased rubbish reservoir is equipped with batcher, and biochemical bin adds cross conveyor and material distributing machine;Garbage sorting equipment is equipped between batcher and cross conveyor, garbage sorting equipment is set on screening installation mounting platform.The present invention is of great significance to improving the operation of existing incineration plant, pollutant discharge in compliance with the standard, improving rubbish utilization efficiency of heat energy.

Description

The garbage burning factory and reconstruction method of reconstruction
Technical field
The present invention relates to a kind of garbage burning factory of reconstruction and reconstruction methods, belong to technical field of waste treatment.
Background technique
Conventional garbage power generation by waste combustion factory generally burns primary composting, composting complicated component, wherein containing masonry, The noncombustible matters such as ceramics, glass, metal are up to containing rubbishes from cooking, moisture content such as a large amount of gourd, fruit and vegetable gurrys, leftovers 50%-70%, Lower heat value only have about 900-1000kcal/kg, cause difficulty to the normal operation of garbage burning boiler, burning Burning process need to add that the fossil fuels such as coal, oil are combustion-supporting, and fire box temperature is difficult to stably reach >=850 DEG C of national standard, leads to play The generation of noxious material bioxin, causes environmental pollution.
By the end of the year 2017, China has built up and has built garbage incinerating power plant about 438, is substantially composting Burning process, undergo technological transformation to it upgrading, pre-processes to primary composting, and it is 2000- that calorific value, which is made, The derivatived fuel of 3000kcal/kg can improve the running quality of burning boiler, improve ignition temperature and environmental emission standard. But to the transformation of existing incineration plant by place, cannot stop production, the limitation such as cost of investment.
Summary of the invention
The present invention proposes the garbage burning factory and reconstruction method of a kind of reconstruction.Operation, pollution to existing incineration plant is improved Object qualified discharge improves rubbish utilization efficiency of heat energy, is of great significance.
The present invention, which is that the following technical solution is employed, to be realized:
A kind of garbage burning factory of reconstruction, including conventional garbage reservoir and refuse-unloading platform, conventional garbage reservoir are equipped with Incinerator feed hopper, conventional garbage reservoir top is hung equipped with row and garbage grab bucket, is equipped with rubbish reservoir side in refuse-unloading platform Opposite side add newly-increased rubbish reservoir, conventional garbage reservoir is subjected to subregion and adds blast apparatus to increase newly as biochemical bin Rubbish reservoir top is hung equipped with new line increment and garbage grab bucket, increases garbage storing bottom of pond portion newly and is equipped with newly-increased cesspool, in refuse-unloading Platform adds newly-increased rubbish close to newly-increased rubbish reservoir side and unloads mouth, is equipped with refuse-unloading platform side in newly-increased rubbish reservoir Screening installation mounting platform is added in opposite side;Newly-increased rubbish reservoir is equipped with batcher, and biochemical bin adds cross conveyor and material distributing machine, For cross conveyor across different biochemical bin subregions, cross conveyor includes moving conveyor, and material distributing machine is located at moving conveyor Two ends and be mutually perpendicular to place with moving conveyor;Garbage sorting equipment is equipped between batcher and cross conveyor, Garbage sorting equipment is set on screening installation mounting platform, is equipped between batcher, garbage sorting equipment and cross conveyor defeated Send equipment.
The reconstruction of conventional garbage incineration plant faces that place is limited, cannot stop production and higher cost Three Difficult Issues.Especially field The limited problem in ground, strongly limits the reconstruction to garbage burning factory.Existing major part garbage burning factory is only in refuse-unloading There is idle space in front of platform, therefore can only be real based on the utilization to this segment space to the reconstruction of conventional garbage incineration plant It is existing.The present invention will be used as biochemical bin after conventional garbage reservoir subregion, and build newly-increased rubbish in the other side of refuse-unloading platform Reservoir and screening installation mounting platform are difficult to the mode expected with a kind of other field technical staff, make full use of existing Idle space completes the reconstruction to conventional garbage incineration plant.In addition, having little influence on the normal of conventional garbage incineration plant when reconstruction Operation, without stopping production;The facility of conventional garbage incineration plant is made full use of, reconstruction cost is saved.
The subregion of the conventional garbage reservoir is virtual partition.
The subregion of the conventional garbage reservoir is the entity subregion separated by partition wall, and the partition wall is half wall.
The partition wall quantity is the face 2-12, and number of partitions corresponding with partition wall quantity is 3-13.
Typically, the biochemical treatment time is 4-15 days, and each subregion accommodates 1-3 days crude wastes.It is accordingly used in Between the number of partitions of biochemical treatment is preferably 2-12.
The garbage sorting equipment is followed successively by from batcher to cross conveyor direction:Bag-breaking machine, screening plant, crusher And magnetic separator, conveying equipment is equipped between garbage sorting equipment.
Bag-breaking machine can break polybag;Screening plant can sub-elect the noncombustible matters such as masonry, ceramics, and big part is flammable Object and rubbish from cooking sorting are classified;Big part combustible can be broken for little particle by crusher;Magnetic separator can sub-elect magnetisable material. This set screening installation is in the present invention, to be able to satisfy the highest optimizating unit of the biological dewatered processing of biochemical bin.
The biochemical bin feed inlet of the biochemical bin is set to the end of biochemical bin length direction, and the cross conveyor includes water The fixed conveyor that plain cloth is set and the moving conveyor with fixed conveyor parallel arrangement, fixed conveyor are higher than mobile conveying Machine, one end of fixed conveyor are set to below biochemical bin feed inlet, and the other end of fixed conveyor is set to moving conveyor Top, the moving conveyor are set to the overhead rail along biochemical bin length direction arrangement, and the length of moving conveyor is Biochemical bin length 1/2 or slightly longer than biochemical bin length 1/2, the length of fixed conveyor be biochemical bin length 1/2 or slightly It is longer than the 1/2 of biochemical bin length.
When biochemical bin feed inlet is set to the end of biochemical bin length direction, cross conveyor includes that horizontally disposed fixation is defeated Machine and the moving conveyor with fixed conveyor parallel arrangement are sent, fixed conveyor is used to accept the rubbish of biochemical bin feed inlet simultaneously Send the rubbish of undertaking to moving conveyor.Therefore, the length of fixed conveyor is preferably the 1/2 or slightly longer of biochemical bin length In the 1/2 of biochemical bin length.Moving conveyor can be moved left and right along overhead track, in conjunction with the rotation of moving conveyor belt, with Realize the uniform distribution on biochemical bin length direction.In order to realize the uniform distribution between each subregion, moving conveyor Length be preferably biochemical bin length 1/2 or slightly longer than biochemical bin length 1/2.Equally, for fixed conveyor, preferably Length for fixed conveyor be biochemical bin length 1/2 or slightly longer than biochemical bin length 1/2.
The material distributing machine includes horizontally disposed fixed material distributing machine and the moving cloth machine with fixed material distributing machine parallel arrangement, The fixed material distributing machine is higher than the moving cloth machine, and one end of fixed material distributing machine is set to the lower section of moving conveyor end, The other end of fixed material distributing machine is set to above moving cloth machine, and the moving cloth machine is set to along biochemical bin width direction cloth The overhead rail set, the length of moving cloth machine be biochemical bin width 1/2 or slightly longer than biochemical bin width 1/2, it is fixed The length of material distributing machine be biochemical bin width 1/2 or slightly longer than biochemical bin width 1/2.
The garbage burning factory of reconstruction in the process of running, needs to grab the good rubbish of desiccation in biochemical bin subregion using grab bucket Enter to incinerator feed hopper.Thus, in order to avoid the obstacle grabbed bucket in the process of running, preferably by cross conveyor along biochemical The side wall in storehouse is arranged, once cross conveyor is arranged along side wall, material distributing machine is preferably using fixed material distributing machine and moving cloth machine Cooperate the scheme of cloth, fixed material distributing machine is used to accept the rubbish of biochemical bin feed inlet and sends the rubbish of undertaking to mobile cloth Material machine, moving cloth machine can be moved along overhead track, in conjunction with the rotation of moving cloth machine belt, to realize in biochemical bin width side Upward uniform distribution.
The biochemical bin side is equipped with biological purification plant, and biological purification plant is communicated with biochemical bin by induced duct, drawn Air-introduced machine is set on air hose.
The odorous gas and vapor that biochemical process generates are sent into biological purification plant purified treatment by induced duct, air-introduced machine Qualified discharge afterwards.Biological purification plant is by shell, set on the air inlet of housing bottom, the biofilter material and shell that are set in the housing The air outlet and air-exhausting duct on top are constituted.
A method of reconstruction garbage burning factory includes the following steps:Conventional garbage reservoir is subjected to subregion and adds drum Wind devices are to add cross conveyor and material distributing machine in biochemical bin, cross conveyor is across different biochemical bins as biochemical bin Subregion, material distributing machine are located at two ends of moving conveyor and are mutually perpendicular to place with moving conveyor;In refuse-unloading platform Opposite side equipped with rubbish reservoir side is added hangs and the newly-increased rubbish reservoir of garbage grab bucket and batcher with new line increment, in newly-increased rubbish Rubbish reservoir is additionally arranged at the bottom of newly-increased cesspool;Newly-increased rubbish is added close to newly-increased rubbish reservoir side in refuse-unloading platform to unload Mouthful;Screening installation mounting platform is added in the opposite side that newly-increased rubbish reservoir is equipped with refuse-unloading platform side;In batcher and transverse direction Garbage sorting equipment is added between conveyer, garbage sorting equipment is set on screening installation mounting platform, batcher, refuse classification Conveying equipment is equipped between equipment and cross conveyor.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of conventional garbage incineration plant.
Fig. 2 is the structural schematic diagram for the garbage burning factory that the present invention reconstructs.
Fig. 3 is one of the schematic layout pattern of garbage burning factory that the present invention reconstructs.
Fig. 4 is the two of the schematic layout pattern for the garbage burning factory that the present invention reconstructs.
Fig. 5 is one of lateral material distributing machine structural schematic diagram of the invention.
In figure:1, refuse-unloading platform;2, conventional garbage reservoir;3, row is hung and garbage grab bucket;4, incinerator feed hopper;5, Incinerator;6, rubbish is unloaded mouth;7, rubbish reservoir is increased newly;8, rubbish is increased newly to unload mouth;9, new line increment is hung and garbage grab bucket;10, Garbage sorting equipment;11, screening installation mounting platform;12, batcher;13, conveying equipment;14, bag-breaking machine;15, screening plant; 16, magnetic separator;17, crusher;18, cross conveyor;19, material distributing machine;20, partition wall;21, biochemical bin;22, induced duct;23, draw Blower;24, biological purification plant;25, air supply tube;26, blast apparatus;27, biochemical bin feed inlet;28, fixed conveyor;29, Moving conveyor;30, fixed material distributing machine;31, moving cloth machine;32, existing cesspool;33, cesspool is increased newly.
Specific embodiment
In order to which the object of the invention, technical solution is more clearly understood, with reference to the accompanying drawing, the present invention is made further detailed It describes in detail bright.
As shown in Figure 1, existing garbage burning factory includes conventional garbage reservoir 2 and refuse-unloading platform 1, conventional garbage storage Pond is equipped with incinerator feed hopper 4, hangs at the top of conventional garbage reservoir equipped with row and garbage grab bucket 3, conventional garbage reservoir bottom are equipped with Existing cesspool 32.Rubbish is discharged into conventional garbage reservoir from rubbish mouth 6 of unloading in refuse-unloading platform by cram packer, and row is hung And the rubbish in garbage grab bucket crawl conventional garbage reservoir is put into incinerator feed hopper and is burned.
Embodiment one:
As shown in Figures 2 and 3, conventional garbage reservoir is added 4 face partition walls by the garbage burning factory of reconstruction of the present invention 20 are divided into 5 subregions, and add blast apparatus 26 so that as biochemical bin 21, the partition wall is half wall;It is set in refuse-unloading platform There is the opposite side of rubbish reservoir side to add newly-increased rubbish reservoir, the length for increasing rubbish reservoir 7 newly is identical as biochemical bin length, increases rubbish newly Rubbish reservoir top is hung equipped with new line increment and garbage grab bucket 9, increases garbage storing bottom of pond portion newly and is equipped with newly-increased cesspool 33, in refuse-unloading Platform adds newly-increased rubbish close to newly-increased rubbish reservoir side and unloads mouth 8, in newly-increased rubbish reservoir equipped with refuse-unloading platform side Opposite side add screening installation mounting platform 11.
Newly-increased rubbish reservoir is equipped with batcher 12, and the biochemical bin feed inlet 27 of biochemical bin is set to the end of biochemical bin length direction Portion, biochemical bin add cross conveyor 18 and material distributing machine 19, and cross conveyor is across different biochemical bin subregions, cross conveyor Moving conveyor 29 including horizontally disposed fixed conveyor 28 and with fixed conveyor parallel arrangement, fixed conveyor is higher than Moving conveyor, one end of fixed conveyor are set to below biochemical bin feed inlet, and the other end of fixed conveyor is set to shifting Above dynamic conveyer, moving conveyor is set to the overhead rail along biochemical bin length direction arrangement, the length of moving conveyor Degree is the 1/2 of biochemical bin length, and the length of fixed conveyor is the 1/2 of biochemical bin length, as shown in Figure 5.Material distributing machine, which is located at, moves It moves two ends of conveyer and is mutually perpendicular to place with moving conveyor.Material distributing machine includes horizontally disposed fixed material distributing machine 30 With the moving cloth machine with fixed material distributing machine parallel arrangement, the fixed material distributing machine is higher than the moving cloth machine, fixed cloth One end of machine is set to the lower section of moving conveyor end, and the other end of fixed material distributing machine is set to above moving cloth machine, institute It states moving cloth machine and is set to the overhead rail along biochemical bin width direction arrangement, the length of moving cloth machine 31 is biochemical bin The 1/2 of width, the length of fixed material distributing machine are the 1/2 of biochemical bin width.
Garbage sorting equipment 10 is equipped between batcher and cross conveyor, the garbage sorting equipment is from batcher to cross It is followed successively by conveyor direction:Bag-breaking machine 14, screening plant 15, crusher 17 and magnetic separator 16 are set between garbage sorting equipment There is conveying equipment 13;Garbage sorting equipment is set on screening installation mounting platform, batcher, garbage sorting equipment and lateral transfer Conveying equipment is equipped between machine.
Embodiment two:
As shown in figure 4, the garbage burning factory of reconstruction of the present invention, the difference with embodiment one is, conventional garbage The subregion of reservoir is virtual partition.Biochemical bin side be equipped with biological purification plant 24, biological purification plant by induced duct 22 with Biochemical bin communicates, and air-introduced machine 23 is arranged on induced duct.
Embodiment three:
It is a kind of reconstruct garbage burning factory method include the following steps:Conventional garbage reservoir is subjected to subregion and adds air blast Equipment is to add cross conveyor and material distributing machine in biochemical bin, cross conveyor is across different biochemical bin point as biochemical bin Area, material distributing machine are located at two ends of moving conveyor and are mutually perpendicular to place with moving conveyor;It is set in refuse-unloading platform There is the opposite side of rubbish reservoir side to add to hang with new line increment and the newly-increased rubbish reservoir of garbage grab bucket and batcher, in newly-increased rubbish Reservoir is additionally arranged at the bottom of newly-increased cesspool;Newly-increased rubbish is added close to newly-increased rubbish reservoir side in refuse-unloading platform to unload mouth; Screening installation mounting platform is added in the opposite side that newly-increased rubbish reservoir is equipped with refuse-unloading platform side;In batcher and lateral transfer Garbage sorting equipment is added between machine, garbage sorting equipment is set on screening installation mounting platform, batcher, garbage sorting equipment Conveying equipment is equipped between cross conveyor.
Example IV:
It is of the invention use process is as follows shown:Cram packer enters refuse-unloading platform, is unloaded by newly-increased rubbish Rubbish is discharged into newly-increased rubbish reservoir by mouth, and new line increment is hung and garbage grab bucket grabs rubbish into batcher, and batcher is uniformly by rubbish Bag-breaking machine is fed by conveying equipment, rubbish feeds screening plant by conveying equipment after broken bag, and sub-electing masonry, ceramics etc. can not Combustion things matter, and big part combustible and rubbish from cooking sorting are classified;Big part combustible feeds crusher by conveying equipment and is broken for Small particle is readily burned, and broken rear substance is sent into magnetic separator by conveying equipment;Rubbish from cooking is sent directly into magnetic separation by conveying equipment Machine.After magnetic separator sub-elects metallics, nonmetallic substance is sent into cross conveyor, cross conveyor by conveying equipment Cloth is realized with material distributing machine collective effect, rubbish is respectively fed to different subregions in order, and each subregion accommodates 1-3 days primary Rubbish.
Crude waste ferments in biochemical bin generates biological high temperature, and flashes vapor makes garbage drying, improves refuse thermal value.It is raw Change storehouse sequence batch job, the biochemical treatment time is 6-12 days.Rubbish in the subregion of completion biochemical treatment is hung by row and garbage grab bucket It grabs into incinerator feed hopper, is sent into incinerator 5 and burns, vacant subregion undertaking out is new to be sent by cross conveyor and material distributing machine The rubbish come.The odorous gas and vapor that biochemical process generates can be sent into biological purification plant purification by induced duct, air-introduced machine Qualified discharge after processing.
Refuse biochemical process is:By air blower, by air supply tube 25, air is sent into biochemical bin, is aerobic in rubbish Oxygen needed for biological bacteria provides, under microbial action, rubbish generates the biological high temperature of 55-75 DEG C of degree, steams moisture in rubbish Hair, achievees the purpose that biological dewatered.

Claims (9)

1. a kind of garbage burning factory of reconstruction, including conventional garbage reservoir (2) and refuse-unloading platform (1), conventional garbage reservoir (2) incinerator feed hopper (4) are equipped with, conventional garbage reservoir (2) top is hung equipped with row and garbage grab bucket (3), which is characterized in that Newly-increased rubbish reservoir (7) is added in the opposite side that refuse-unloading platform (1) is equipped with rubbish reservoir side, and conventional garbage reservoir (2) are carried out Subregion simultaneously adds blast apparatus (26) so that as biochemical bin (21), newly-increased rubbish reservoir (7) top is hung equipped with new line increment and rubbish It grabs bucket (9), increases rubbish reservoir (7) bottom newly and be equipped with newly-increased cesspool (33), in refuse-unloading platform (1) close to newly-increased garbage storing Pond (7) side adds newly-increased rubbish and unloads mouth (8), increases in the opposite side that newly-increased rubbish reservoir (7) are equipped with refuse-unloading platform (1) side If screening installation mounting platform (11);Newly-increased rubbish reservoir (7) are equipped with batcher (12), and biochemical bin (21) adds cross conveyor (18) and material distributing machine (19), cross conveyor (18) include shifting across different biochemical bin (21) subregions, cross conveyor (18) Dynamic conveyer (29), material distributing machine (19) are located at two ends of moving conveyor (29) and are mutually perpendicular to moving conveyor (29) It places;Garbage sorting equipment (10) are equipped between batcher (12) and cross conveyor (18), garbage sorting equipment (10) is set to It is equipped on screening installation mounting platform (11), between batcher (12), garbage sorting equipment (10) and cross conveyor (18) defeated Send equipment (13).
2. the garbage burning factory of reconstruction according to claim 1, which is characterized in that point of the conventional garbage reservoir (2) Area is virtual partition.
3. the garbage burning factory of reconstruction according to claim 1, which is characterized in that point of the conventional garbage reservoir (2) Area is the entity subregion separated by partition wall (20), and the partition wall (20) is half wall.
4. the garbage burning factory of reconstruction according to claim 3, which is characterized in that partition wall (20) quantity is 2-12 Face, number of partitions corresponding with partition wall (20) quantity are 3-13.
5. the garbage burning factory of reconstruction according to claim 1, which is characterized in that the garbage sorting equipment (10) is from giving Material machine (12) is followed successively by cross conveyor (18) direction:Bag-breaking machine (14), screening plant (15), crusher (17) and magnetic separator (16), conveying equipment (13) are equipped between garbage sorting equipment (10).
6. the garbage burning factory of reconstruction according to claim 1, which is characterized in that the biochemical bin of the biochemical bin (21) into Material mouth (27) is set to the end of biochemical bin (21) length direction, and the cross conveyor (18) includes horizontally disposed fixed conveying Machine (28) and the moving conveyor (29) being arranged in parallel with fixed conveyor (28), fixed conveyor (28) are higher than moving conveyor (29), one end of fixed conveyor (28) is set to below biochemical bin feed inlet (27), and the other end of fixed conveyor (28) is set It is placed in above moving conveyor (29), the moving conveyor (29) is set to along the aerial of biochemical bin (21) length direction arrangement On track, the length of moving conveyor (29) be biochemical bin (21) length 1/2 or slightly longer than biochemical bin (21) length 1/2, The length of fixed conveyor (28) be biochemical bin (21) length 1/2 or slightly longer than biochemical bin (21) length 1/2.
7. the garbage burning factory of reconstruction according to claim 1, which is characterized in that the material distributing machine (19) includes horizontal cloth The fixation material distributing machine (30) set and the moving cloth machine (31) with fixed material distributing machine (30) parallel arrangement, the fixed material distributing machine (30) it is higher than the moving cloth machine (31), the one end of fixed material distributing machine (30) is set under moving conveyor (29) end Side, the other end of fixed material distributing machine (30) are set to above moving cloth machine (31), and the moving cloth machine (31) is set to edge The overhead rail of biochemical bin (21) width direction arrangement, the length of moving cloth machine (31) are the 1/2 of biochemical bin (21) width Or slightly longer than biochemical bin (21) width 1/2, the length of fixed material distributing machine (30) is the 1/2 of biochemical bin (21) width or is slightly longer than The 1/2 of biochemical bin (21) width.
8. the garbage burning factory of reconstruction according to claim 1, which is characterized in that biochemical bin (21) side is equipped with life Object purification device (24), biological purification plant (24) are communicated by induced duct (22) with biochemical bin (21), and induced duct is set on (22) Set air-introduced machine (23).
9. a kind of method for reconstructing garbage burning factory, which is characterized in that include the following steps:Conventional garbage reservoir (2) are carried out Subregion simultaneously adds blast apparatus (26) to add cross conveyor (18) and material distributing machine in biochemical bin (21) as biochemical bin (21) (19), cross conveyor (18) is located at the two of moving conveyor (29) across different biochemical bin (21) subregions, material distributing machine (19) It a end and is mutually perpendicular to place with moving conveyor (29);Increase in the opposite side that refuse-unloading platform (1) is equipped with rubbish reservoir side If being hung and the newly-increased rubbish reservoir (7) of garbage grab bucket (9) and batcher (12) with new line increment, at newly-increased rubbish reservoir (7) bottom Portion adds newly-increased cesspool (33);Newly-increased rubbish is added close to newly-increased rubbish reservoir (7) side in refuse-unloading platform (1) to unload Mouth (8);Screening installation mounting platform (11) are added in the opposite side that newly-increased rubbish reservoir (7) are equipped with refuse-unloading platform (1) side;? It is added between batcher (12) and cross conveyor (18) garbage sorting equipment (10), garbage sorting equipment (10) is set to sorting and sets On standby mounting platform (11), conveying equipment is equipped between batcher (12), garbage sorting equipment (10) and cross conveyor (18) (13)。
CN201810738011.8A 2018-07-06 2018-07-06 The garbage burning factory and reconstruction method of reconstruction Active CN108916881B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810738011.8A CN108916881B (en) 2018-07-06 2018-07-06 The garbage burning factory and reconstruction method of reconstruction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810738011.8A CN108916881B (en) 2018-07-06 2018-07-06 The garbage burning factory and reconstruction method of reconstruction

Publications (2)

Publication Number Publication Date
CN108916881A true CN108916881A (en) 2018-11-30
CN108916881B CN108916881B (en) 2019-11-19

Family

ID=64425002

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810738011.8A Active CN108916881B (en) 2018-07-06 2018-07-06 The garbage burning factory and reconstruction method of reconstruction

Country Status (1)

Country Link
CN (1) CN108916881B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111878829A (en) * 2020-07-28 2020-11-03 浦湘生物能源股份有限公司 Coal and garbage coupling fuel comprehensive treatment system and method based on fluidized bed

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100942212B1 (en) * 2009-07-24 2010-02-11 주식회사 한국휴먼기술 Garbage treating system
CN103481359A (en) * 2013-10-15 2014-01-01 浙江天晟建材集团有限公司 Concrete distributing and conveying system
CN104791802A (en) * 2015-04-14 2015-07-22 李轼 Integrated set device for garbage derived fuel preparing and incinerating power generation
CN106196076A (en) * 2016-08-12 2016-12-07 光大环保(中国)有限公司 A kind of garbage combustion device
CN206398728U (en) * 2016-12-30 2017-08-11 安徽海螺川崎工程有限公司 A kind of rubbish storage pool structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100942212B1 (en) * 2009-07-24 2010-02-11 주식회사 한국휴먼기술 Garbage treating system
CN103481359A (en) * 2013-10-15 2014-01-01 浙江天晟建材集团有限公司 Concrete distributing and conveying system
CN104791802A (en) * 2015-04-14 2015-07-22 李轼 Integrated set device for garbage derived fuel preparing and incinerating power generation
CN106196076A (en) * 2016-08-12 2016-12-07 光大环保(中国)有限公司 A kind of garbage combustion device
CN206398728U (en) * 2016-12-30 2017-08-11 安徽海螺川崎工程有限公司 A kind of rubbish storage pool structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111878829A (en) * 2020-07-28 2020-11-03 浦湘生物能源股份有限公司 Coal and garbage coupling fuel comprehensive treatment system and method based on fluidized bed

Also Published As

Publication number Publication date
CN108916881B (en) 2019-11-19

Similar Documents

Publication Publication Date Title
CN106090935B (en) A kind of waste incineration processing system
CN102889597B (en) Process and system for domestic garbage incineration waste heat drying pretreatment
CN107008735A (en) A kind of Combustion Properties of Municipal Solid Waste gasification process
CN109761653A (en) A kind of house refuse and kitchen garbage biofermentation fertilizer manufacture
CN102563659B (en) Refuse incineration power generation process and refuse incineration power generation equipment
CN111389878A (en) Domestic waste solid zero release processing system
CN110631347A (en) Drying production system and method for active carbon molding material
KR101232058B1 (en) Organic waste recycling system using twice drying method
KR101272123B1 (en) Organic waste recycling system
CN102676264B (en) Refuse-derived fuel based on combustible components of domestic refuse and preparation method thereof
CN108916881B (en) The garbage burning factory and reconstruction method of reconstruction
RU2455567C1 (en) Production system for municipal solid waste disposal
CN110756565A (en) Resourceful treatment system for efficiently utilizing various solid waste gasification coupling novel building materials
CN207298968U (en) Environment protection garbage incineration stove
CN212069896U (en) Domestic waste solid zero release processing system
CN210711236U (en) Sludge graded drying gasification coupling coal-fired power generation system
CN111019676A (en) Household garbage treatment system and method
KR20180038204A (en) Apparatus for reducing moisture of waste
CN206316118U (en) The system for handling house refuse
CN208652573U (en) Garbage incinerating power plant
CN206519427U (en) The system for handling house refuse
CN213840926U (en) Domestic waste gasification incineration treatment system
CN209006383U (en) Trash processing unit and its destructor plant
CN214556181U (en) Cement kiln is domestic waste processing system in coordination
CN211011384U (en) Clean high-temperature co-combustion furnace for treating household garbage

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230825

Address after: 2nd Floor, Building 8, No. 116 Jiwang Road, Lixia District, Jinan City, Shandong Province, 250000

Patentee after: Shandong Beile Construction Engineering Design Co.,Ltd.

Address before: Room 102, Unit 3, Building 3, Jinxi Luyuan, No. 177 Jinshui Road, Licang District, Qingdao City, Shandong Province, 266199

Patentee before: Li Jiazhen

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240117

Address after: 2-1005, Xiyuan Building, northeast corner of Shun'an Road and Yantai Road intersection, Jinan High Speed Railway West Station area, Huaiyin District, Jinan City, Shandong Province, 250000

Patentee after: Shandong Huiju Environmental Technology Co.,Ltd.

Address before: 2nd Floor, Building 8, No. 116 Jiwang Road, Lixia District, Jinan City, Shandong Province, 250000

Patentee before: Shandong Beile Construction Engineering Design Co.,Ltd.